Search NASA⌕ Search

SEARCH · Search NASA

Results for “COST ESTIMATE”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 325 records · Page 18

Air-cushion tankers for Alaskan North Slope oil

A concept is described for transporting oil from the Arctic to southern markets in 10,000-ton, chemically fueled air-cushion vehicles (ACV's) configured as tankers. Based on preliminary cost estimates the conceptual ACV tanker system as tailored to the transportation of Alaskan North Slope oil could deliver the oil for about the same price per barrel as the proposed trans-Alaska pipeline with only one-third of the capital investment. The report includes the description of the conceptual system and its operation; preliminary cost estimates; an appraisal of ACV tanker development; and a comparison of system costs, versatility, vulnerability, and ecological effect with those of the trans-Alaska pipeline.

Anderson, J. L.↗

The importance of operations, risk, and cost assessment to space transfer systems design

This paper examines several methodologies which contribute to comprehensive subsystem cost estimation. The example of a space-based lunar space transfer vehicle (STV) design is used to illustrate how including both primary and secondary factors into cost affects the decision of whether to use aerobraking or propulsion for earth orbit capture upon lunar return. The expected dominant cost factor in this decision is earth-to-orbit launch cost driven by STV mass. However, to quantify other significant cost factors, this cost comparison included a risk analysis to identify development and testing costs, a Taguchi design of experiments to determine a minimum mass aerobrake design, and a detailed operations analysis. As a result, the predicted cost advantage of aerobraking, while still positive, was subsequently reduced by about 30 percent compared to the simpler mass-based cost estimates.

Ball, J. M.↗

Cost of energy evaluation

The estimated cost per kilowatt hour, the wind resources in the utilities service area, and the reliability of the units are considered in computing the cost of energy of the wind turbine generator system.

Hasbrouck, T. M.↗

Quantitative software models for the estimation of cost, size, and defects

The presentation will provide a brief overview of the SQI measurement program as well as describe each of these models and how they are currently being used in supporting JPL project, task and software managers to estimate and plan future software systems and subsystems.

software metrics process improvement↗

Modification of the ECAS reference steam power generating plant to comply with the EPA 1979 new source performance standards

Detailed capital cost estimates for the ECAS and modified reference plants in mid-1978 dollars for both 250 and 175 F (394 and 353 K) stack gas reheat temperatures based on the cost estimates developed for the ECAS study are presented. The scope of the work included technical assessment of sulfur dioxide scrubber system design, on site calcination versus purchased lime, reheat of stack gas, effect of sulfur dioxide scrubber on particulate emission, and control of nitrogen oxides.

Fogelson, S. A.↗

Air Force Reusable Booster System: A Quick-look, Design Focused Modeling and Cost Analysis Study

This paper presents a method and an initial analysis of the costs of a reusable booster system (RBS) as envisioned by the US Department of Defense (DoD) and numerous initiatives that form the concept of Operationally Responsive Space (ORS). This paper leverages the knowledge gained from decades of experience with the semi-reusable NASA Space Shuttle to understand how the costs of a military next generation semi-reusable space transport might behave in the real world - and how it might be made as affordable as desired. The NASA Space Shuttle had a semi-expendable booster, that being the reusable Solid Rocket MotorslBoosters (SRMlSRB) and the expendable cryogenic External Tank (ET), with a reusable cargo and crew capable orbiter. This paper will explore DoD concepts that invert this architectural arrangement, using a reusable booster plane that flies back to base soon after launch, with the in-space elements of the launch system being the expendable portions. Cost estimating in the earliest stages of any potential, large scale program has limited usefulness. As a result, the emphasis here is on developing an approach, a structure, and the basic concepts that could continue to be matured as the program gains knowledge. Where cost estimates are provided, these results by necessity carry many caveats and assumptions, and this analysis becomes more about ways in which drivers of costs for diverse scenarios can be better understood. The paper is informed throughout with a design-for-cost philosophy whereby the design and technology features of the proposed RBS (who and what, the "architecture") are taken as linked at the hip to a desire to perform a certain mission (where and when), and together these inform the cost, responsiveness, performance and sustainability (how) of the system. Concepts for developing, acquiring, producing or operating the system will be shown for their inextricable relationship to the "architecture" of the system, and how these too relate to costs. Design and technology features bear special relevance to early program research and development directions. Given the uncertainties involved in both their actual performance promise and their relation to costs of operational systems, this later relationship is also given special attention.

Zapata, Edgar↗

Cost analysis of carbon dioxide concentrators

Methodology and cost estimating relationships, for flight-type and prototype CO2 concentrators, have been developed and presented. A validity check was made by comparing the molecular sieves system considered here and that developed for Skylab. The system evaluated here is twice the size of the Skylab system and is also more complex as it desorbs CO2 thermally and stores it in an accumulator. The cost estimates developed were found to be approximately 50 to 70% higher than the actual cost of the Skylab unit.

Yakut, M. M.↗

DACC program cost and work breakdown structure-dictionary. General purpose aft cargo carrier study, volume 2

Results of detailed cost estimates and economic analysis performed on the updated 201 configuration of the dedicated Aft Cargo Carrier (DACC) are given. The objective of this economic analysis is to provide the National Aeronautics and Space Administration (NASA) with information on the economics of using the DACC on the Space Transportation System (STS). The detailed cost estimates for the DACC are presented by a work breakdown structure (WBS) to ensure that all elements of cost are considered in the economic analysis and related subsystem trades. Costs reported by WBS provide NASA with a basis for comparing competing designs and provide detailed cost information that can be used to forecast phase C/D planning for new projects or programs derived from preliminary conceptual design studies. The scope covers all STS and STS/DACC launch vehicle cost impacts for delivering an orbital transfer vehicle to a 120 NM low Earth orbit (LEO).

Source record↗

GPACC program cost work breakdown structure-dictionary. General purpose aft cargo carrier study, volume 3

The results of detailed cost estimates and economic analysis performed on the updated Model 101 configuration of the general purpose Aft Cargo Carrier (ACC) are given. The objective of this economic analysis is to provide the National Aeronautics and Space Administration (NASA) with information on the economics of using the ACC on the Space Transportation System (STS). The detailed cost estimates for the ACC are presented by a work breakdown structure (WBS) to ensure that all elements of cost are considered in the economic analysis and related subsystem trades. Costs reported by WBS provide NASA with a basis for comparing competing designs and provide detailed cost information that can be used to forecast phase C/D planning for new projects or programs derived from preliminary conceptual design studies. The scope covers all STS and STS/ACC launch vehicle cost impacts for delivering payloads to a 160 NM low Earth orbit (LEO).

Source record↗

Solar energy research and utilization

The role is described that solar energy will play in the heating and cooling of buildings, the production of renewable gaseous, liquid and solid fuels, and the production of electric power over the next 45 years. Potential impacts on the various energy markets and estimated costs of such systems are discussed along with illustrations of some of the processes to accomplish the goals. The conclusions of the NSF/NASA Solar Energy Panel (1972) are given along with the estimated costs to accomplish the 15 year recommended program and also the recent and near future budget appropriations and recommendations are included.

Cherry, W. R.↗

Coal gasification systems engineering and analysis. Appendix D: Cost and economic studies

The detailed cost estimate documentation for the designs prepared in this study are presented. The include: (1) Koppers-Totzek, (2) Texaco (3) Babcock and Wilcox, (4) BGC-Lurgi, and (5) Lurgi. The alternate product cost estimates include: (1) Koppers-Totzek and Texaco single product facilities (methane, methanol, gasoline, hydrogen), (2) Kopers-Totzek SNG and MBG, (3) Kopers-Totzek and Texaco SNG and MBG, and (4) Lurgi-methane and Lurgi-methane and methanol.

Source record↗

Advanced transportation system studies technical area 3: Alternate propulsion subsystem concepts, volume 3

The objective of this contract was to provide definition of alternate propulsion systems for both earth-to-orbit (ETO) and in-space vehicles (upper stages and space transfer vehicles). For such propulsion systems, technical data to describe performance, weight, dimensions, etc. was provided along with programmatic information such as cost, schedule, needed facilities, etc. Advanced technology and advanced development needs were determined and provided. This volume separately presents the various program cost estimates that were generated under three tasks: the F-1A Restart Task, the J-2S Restart Task, and the SSME Upper Stage Use Task. The conclusions, technical results, and the program cost estimates are described in more detail in Volume 1 - Executive Summary and in individual Final Task Reports.

Levak, Daniel↗

Integrated Off-gas System: A Preconceptual Design of an Integrated Off-Gas Treatment System

The U.S. has a vested interest in the advancement of nuclear energy to achieve aggressive net-zero goals, with reprocessing and recycling of used nuclear fuels (UNF) playing a vital role. It will not be possible to meet U.S. regulatory requirements without robust off-gas treatment, so it is crucial to advance treatment technologies to facilitate the design of future reprocessing facilities. For many years, teams of researchers across the U.S. Department of Energy (DOE) National Laboratory complex have been investigating off-gas treatment technologies for the capture and removal of volatile radionuclides (i.e., 85 Kr, Xe, 14 C, and 129 I) and oxides of nitrogen (NO X ) that are produced from reprocessing. These investigations have been focused on developing individual technologies for the capture of Kr, Xe, iodine, and CO 2 . Capture technologies for each constituent were tested independently from one another by utilizing nonradioactive surrogates to simulate simplified off-gas streams. The tests have been relatively small, laboratory-scale experiments of up to approximately 1 L/minute total gas flow rate. To increase the readiness of these technologies for deployment, an integrated test system with a larger-scale capacity is needed to bridge the gap between promising bench scale and fully scalable UNF reprocessing off-gas treatment. This document contains the goals, design basis, functional requirements, preconceptual design, and cost estimates for an integrated off-gas demonstration system for the capture and removal of NO x , Kr, Xe, CO 2 , and iodine at 10× higher throughput than earlier laboratory studies. The order-of-magnitude cost estimate for this system is approximately $\$$886,000. Next phases include conceptual design, detailed design, fabrication, and commissioning.

11 NUCLEAR FUEL CYCLE AND FUEL MATERIALS↗

Cost Risk Analysis Based on Perception of the Engineering Process

In most cost estimating applications at the NASA Langley Research Center (LaRC), it is desirable to present predicted cost as a range of possible costs rather than a single predicted cost. A cost risk analysis generates a range of cost for a project and assigns a probability level to each cost value in the range. Constructing a cost risk curve requires a good estimate of the expected cost of a project. It must also include a good estimate of expected variance of the cost. Many cost risk analyses are based upon an expert's knowledge of the cost of similar projects in the past. In a common scenario, a manager or engineer, asked to estimate the cost of a project in his area of expertise, will gather historical cost data from a similar completed project. The cost of the completed project is adjusted using the perceived technical and economic differences between the two projects. This allows errors from at least three sources. The historical cost data may be in error by some unknown amount. The managers' evaluation of the new project and its similarity to the old project may be in error. The factors used to adjust the cost of the old project may not correctly reflect the differences. Some risk analyses are based on untested hypotheses about the form of the statistical distribution that underlies the distribution of possible cost. The usual problem is not just to come up with an estimate of the cost of a project, but to predict the range of values into which the cost may fall and with what level of confidence the prediction is made. Risk analysis techniques that assume the shape of the underlying cost distribution and derive the risk curve from a single estimate plus and minus some amount usually fail to take into account the actual magnitude of the uncertainty in cost due to technical factors in the project itself. This paper addresses a cost risk method that is based on parametric estimates of the technical factors involved in the project being costed. The engineering process parameters are elicited from the engineer/expert on the project and are based on that expert's technical knowledge. These are converted by a parametric cost model into a cost estimate. The method discussed makes no assumptions about the distribution underlying the distribution of possible costs, and is not tied to the analysis of previous projects, except through the expert calibrations performed by the parametric cost analyst.

Dean, Edwin B.↗

Advanced transportation system studies technical area 2(TA-2): Heavy lift launch vehicle development: Executive summary - volume 1

The purpose of the TA-2 contract was to provide advanced launch vehicle concept definition and analysis to assist NASA in the identification of future launch vehicle requirements. Contracted analysis activities included vehicle sizing and performance analysis, subsystem concept definition, propulsion subsystem definition (foreign and domestic), ground operations and facilities analysis, and life cycle cost estimation. This document is part of the final report for the TA-2 contract. The final report consists of three volumes: Volume 1 is the Executive Summary, Volume 2 is Technical Results, and Volume 3 is Program Cost Estimates. The document-at-hand, Volume 1, provides a summary description of the technical activities that were performed over the entire contract duration, covering three distinct launch vehicle definition activities: heavy-lift (300,000 pounds injected mass to low Earth orbit) launch vehicles for the First Lunar Outpost (FLO), medium-lift (50,000-80,000 pounds injected mass to low Earth orbit) launch vehicles, and single-stage-to-orbit (SSTO) launch vehicles (25,000 pounds injected mass to a Space Station orbit).

McCurry, J.↗

NASA Software Engineering Benchmarking Study

To identify best practices for the improvement of software engineering on projects, NASA's Offices of Chief Engineer (OCE) and Safety and Mission Assurance (OSMA) formed a team led by Heather Rarick and Sally Godfrey to conduct this benchmarking study. The primary goals of the study are to identify best practices that: Improve the management and technical development of software intensive systems; Have a track record of successful deployment by aerospace industries, universities [including research and development (R&D) laboratories], and defense services, as well as NASA's own component Centers; and Identify candidate solutions for NASA's software issues. Beginning in the late fall of 2010, focus topics were chosen and interview questions were developed, based on the NASA top software challenges. Between February 2011 and November 2011, the Benchmark Team interviewed a total of 18 organizations, consisting of five NASA Centers, five industry organizations, four defense services organizations, and four university or university R and D laboratory organizations. A software assurance representative also participated in each of the interviews to focus on assurance and software safety best practices. Interviewees provided a wealth of information on each topic area that included: software policy, software acquisition, software assurance, testing, training, maintaining rigor in small projects, metrics, and use of the Capability Maturity Model Integration (CMMI) framework, as well as a number of special topics that came up in the discussions. NASA's software engineering practices compared favorably with the external organizations in most benchmark areas, but in every topic, there were ways in which NASA could improve its practices. Compared to defense services organizations and some of the industry organizations, one of NASA's notable weaknesses involved communication with contractors regarding its policies and requirements for acquired software. One of NASA's strengths was its software assurance practices, which seemed to rate well in comparison to the other organizational groups and also seemed to include a larger scope of activities. An unexpected benefit of the software benchmarking study was the identification of many opportunities for collaboration in areas including metrics, training, sharing of CMMI experiences and resources such as instructors and CMMI Lead Appraisers, and even sharing of assets such as documented processes. A further unexpected benefit of the study was the feedback on NASA practices that was received from some of the organizations interviewed. From that feedback, other potential areas where NASA could improve were highlighted, such as accuracy of software cost estimation and budgetary practices. The detailed report contains discussion of the practices noted in each of the topic areas, as well as a summary of observations and recommendations from each of the topic areas. The resulting 24 recommendations from the topic areas were then consolidated to eliminate duplication and culled into a set of 14 suggested actionable recommendations. This final set of actionable recommendations, listed below, are items that can be implemented to improve NASA's software engineering practices and to help address many of the items that were listed in the NASA top software engineering issues. 1. Develop and implement standard contract language for software procurements. 2. Advance accurate and trusted software cost estimates for both procured and in-house software and improve the capture of actual cost data to facilitate further improvements. 3. Establish a consistent set of objectives and expectations, specifically types of metrics at the Agency level, so key trends and models can be identified and used to continuously improve software processes and each software development effort. 4. Maintain the CMMI Maturity Level requirement for critical NASA projects and use CMMI to measure organizations developing software for NASA. 5.onsolidate, collect and, if needed, develop common processes principles and other assets across the Agency in order to provide more consistency in software development and acquisition practices and to reduce the overall cost of maintaining or increasing current NASA CMMI maturity levels. 6. Provide additional support for small projects that includes: (a) guidance for appropriate tailoring of requirements for small projects, (b) availability of suitable tools, including support tool set-up and training, and (c) training for small project personnel, assurance personnel and technical authorities on the acceptable options for tailoring requirements and performing assurance on small projects. 7. Develop software training classes for the more experienced software engineers using on-line training, videos, or small separate modules of training that can be accommodated as needed throughout a project. 8. Create guidelines to structure non-classroom training opportunities such as mentoring, peer reviews, lessons learned sessions, and on-the-job training. 9. Develop a set of predictive software defect data and a process for assessing software testing metric data against it. 10. Assess Agency-wide licenses for commonly used software tools. 11. Fill the knowledge gap in common software engineering practices for new hires and co-ops.12. Work through the Science, Technology, Engineering and Mathematics (STEM) program with universities in strengthening education in the use of common software engineering practices and standards. 13. Follow up this benchmark study with a deeper look into what both internal and external organizations perceive as the scope of software assurance, the value they expect to obtain from it, and the shortcomings they experience in the current practice. 14. Continue interactions with external software engineering environment through collaborations, knowledge sharing, and benchmarking.

Rarick, Heather L.↗

The common engine concept for ALS application - A cost reduction approach

Future launch systems require the application of propulsion systems which have been designed and developed to meet mission model needs while providing high degrees of reliability and cost effectiveness. Vehicle configurations which utilize different propellant combinations for booster and core stages can benefit from a common engine approach where a single engine design can be configured to operate on either set of propellants and thus serve as either a booster or core engine. Engine design concepts and mission application for a vehicle employing a common engine are discussed. Engine program cost estimates were made and cost savings, over the design and development of two unique engines, estimated.

Bair, E. K.↗

Engineering support for magnetohydrodynamic power plant analysis and design studies

The major factors which influence the economic engineering selection of stack inlet temperatures in combined cycle MHD powerplants are identified and the range of suitable stack inlet temperatures under typical operating conditions is indicated. Engineering data and cost estimates are provided for four separately fired high temperature air heater (HTAH) system designs for HTAH system thermal capacity levels of 100, 250, 500 and 1000 MWt. An engineering survey of coal drying and pulverizing equipment for MHD powerplant application is presented as well as capital and operating cost estimates for varying degrees of coal pulverization.

Carlson, A. W.↗