Search NASA⌕ Search

SEARCH · Search NASA

Results for “DAMS”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 325 records · Page 18

Saline pulse test monitoring with the self‐potential method to nonintrusively determine the velocity of the pore water in leaking areas of earth dams and embankments

A method is proposed to localize preferential fluid flow pathways in porous media on the basis of time‐lapse self‐potential measurements associated with salt tracer injection upstream. This method is first tested using laboratory data. A network of nonpolarizing electrodes located is connected to a highly sensitive voltmeter used to record the resulting electrical field fluctuations occurring over time at the surface of the tank. The transport of the conductive salt plume through the permeable porous materials changes the localized streaming potential coupling coefficient associated with the advective drag of the excess charge of the pore water and is also responsible for a diffusion current associated with the salinity gradient. Monitoring of the electrical potential distribution at the ground surface can be used to localize the pulse of saline water over time and to determine its velocity. This method applies in real time and can be used to track highly localized flow pathways characterized by high permeability. Our sandbox experiment demonstrates the applicability of this new method under well‐controlled conditions with a coarse‐sand channel embedded between fine‐sand banks. A finite element model allows us to reproduce the time‐lapse electrical potential distribution over the channel, but some discrepancies were observed on the banks. Finally, we performed a numerical simulation for a synthetic case study inspired by a recently published field case study. A Markov chain Monte Carlo sampler is used to determine the permeability and the porosity of the preferential fluid flow pathway of this synthetic case study.

54 ENVIRONMENTAL SCIENCES↗

Lack of long-term effect of coarse woody debris dam restoration on ecosystem functioning and water quality in Coastal Plain streams

Coarse woody debris (CWD) addition is a restoration technique that has been used to reduce effects of landscape disturbance on instream habitat. However, efficacy of this technique for improving ecosystem condition is not well established, in part because monitoring designed to evaluate long-term efficacy is rare. We assessed the effectiveness of CWD additions in disturbed Coastal Plain streams at Fort Benning Military Installation, Georgia, USA, 14 y after initial restoration. In October 2003, 4 disturbed streams received CWD additions (restored streams), and 4 streams were left as unrestored controls. Pre-restoration (2001–2003) and post-restoration (2003–2006) monitoring of nutrient uptake, stream metabolism, and water-quality variables revealed 1) minimal change in water-quality variables, 2) increased stream metabolism and nutrient-uptake rates immediately following restoration, and 3) decreased metabolism and uptake over the remainder of the 3-y post-restoration period. We returned to these streams in 2017 and 2018, measured the same variables, and found minimal long-term effects of restoration on water quality, nutrient uptake, and whole-stream metabolism indicators; however, streamwater pH decreased in all streams 14 y after restoration, and there was a weak treatment × period interaction, indicating that CWD additions may decrease pH in the long term. Further, we found few relationships between watershed disturbance and water-quality variables and ecosystem function metrics, although some relationships were apparent during certain seasons and years. Furthermore, our study is one of the few that have assessed the long-term effects of CWD additions, or any other stream-restoration technique, on ecosystem function. These long-term assessments may be necessary to determine if restorations are a good use of limited resources.

54 ENVIRONMENTAL SCIENCES↗

Accreting planets as dust dams in 'transition' disks

We investigate under what circumstances an embedded planet in a protoplanetary disk may sculpt the dust distribution such that it observationally presents as a 'transition' disk. We concern ourselves with 'transition' disks that have large holes (≳ 10 AU) and high accretion rates (∼10{sup –9}-10{sup –8} M {sub ☉} yr{sup –1}), particularly, those disks which photoevaporative models struggle to explain. Adopting the observed accretion rates in 'transition' disks, we find that the accretion luminosity from the forming planet is significant, and can dominate over the stellar luminosity at the gap edge. This planetary accretion luminosity can apply a significant radiation pressure to small (s ≲ 1 μm) dust particles provided they are suitably decoupled from the gas. Secular evolution calculations that account for the evolution of the gas and dust components in a disk with an embedded, accreting planet, show that only with the addition of the radiation pressure can we explain the full observed characteristics of a 'transition' disk (NIR dip in the spectral energy distribution (SED), millimeter cavity, and high accretion rate). At suitably high planet masses (≳ 3-4 M{sub J} ), radiation pressure from the accreting planet is able to hold back the small dust particles, producing a heavily dust-depleted inner disk that is optically thin to infrared radiation. The planet-disk system will present as a 'transition' disk with a dip in the SED only when the planet mass and planetary accretion rate are high enough. At other times, it will present as a disk with a primordial SED, but with a cavity in the millimeter, as observed in a handful of protoplanetary disks.

79 ASTRONOMY AND ASTROPHYSICS↗

Imaging the breaking of electrostatic dams in graphene for ballistic and viscous fluids

The charge carriers in a material can, under special circumstances, behave as a viscous fluid. Here, in this work, we investigated such behavior by using scanning tunneling potentiometry to probe the nanometer-scale flow of electron fluids in graphene as they pass through channels defined by smooth and tunable in-plane p-n junction barriers. We observed that as the sample temperature and channel widths are increased, the electron fluid flow undergoes a Knudsen-to-Gurzhi transition from the ballistic to the viscous regime characterized by a channel conductance that exceeds the ballistic limit, as well as suppressed charge accumulation against the barriers. Our results are well modeled by finite element simulations of two-dimensional viscous current flow, and they illustrate how Fermi liquid flow evolves with carrier density, channel width, and temperature.

Science & Technology - Other Topics↗

Acoustic Telemetry Evaluation of Juvenile Salmonid Passage and Survival Proportions at John Day Dam, 2009

The overall purpose of the acoustic telemetry study at JDA during 2009 was to determine the best configuration and operation for JDA prior to conducting BiOp performance standard tests. The primary objective was to determine the best operation between 30% and 40% spill treatments. Route-specific and JDA to TDA forebay survival estimates, passage distribution, and timing/behavior metrics were used for comparison of 30% to a 40% spill treatments. A secondary objective was to evaluate the performance of TSWs installed in spill bays 15 and 16 and to estimate fish survival rates and passage efficiencies under 30% and 40% spill-discharge treatments each season.

54 ENVIRONMENTAL SCIENCES↗

Simulation of Sediment and Cesium Transport in the Ukedo River and the Ogi Dam Reservoir during a Rainfall Event using the TODAM Code

The accident at the Fukushima Daiichi Nuclear Power Plant in March 2011 caused widespread environmental contamination. Although decontamination activities have been performed in residential areas of the Fukushima area, decontamination of forests, rivers, and reservoirs is still controversial because of the economical, ecological, and technical difficulties. Thus, an evaluation of contaminant transport in such an environment is important for safety assessment and for implementation of possible countermeasures to reduce radiation exposure to the public.

Onishi, Yasuo↗

Three Dimensional Analysis of Pier Extension and Guide Wall Design Alternatives to Mitigate Local Scour Risk at the BNSF Railroad Bridge Downstream of the Prado Dam

The primary objectives of the computational fluid dynamics (CFD) analysis are (1) to verify that the design concept of using wedge shaped pier extensions to divert flow around piers as a scour counter measure has the intended effect on the flow, (2) to refine the design of the length and orientation of the pier extensions within the channel and (3) to optimize the guide walls that will protect a set of outer piers and the abutments on each side of the channel. The original proposed design is shown in Figure 1.3. The results of this effort are the recommended designs that are judged to be the best designs based on results from the set of test cases run combined with engineering judgment. The refined designs from the CFD analysis are expected to be tested in a limited set of physical model experiments to verify that they work well.

42 ENGINEERING↗

Market Assessment for Hydropower Turbine Design Tools Using Integrated Datasets of Dams, Turbines, Owners, and Fish

A Department of Energy funded project titled Biologically Based Design and Evaluation of Hydropower Turbines (BioDE) has developed modeling tools and data that are intended to inform the design and installation of more environmentally friendly hydropower turbines. A market assessment was conducted to identify prospective users of these products within the hydropower industry and regulatory community. The market assessment included the development of a dataset of hydropower turbines and their defining characteristics (both physical and biological) for the purpose of refining program outreach and marketing of BioDE tools and data. A specific objective of the analysis was to identify hydropower owners and operators whose turbines were likely candidates for refurbishing or replacement because of senescence or re-licensing. This report describes a dataset that combines turbine properties, licensing status, fish resources, and ownership information on nearly 5,500 turbines at nearly 2,200 hydropower projects throughout the United States. The data analysis categorizes turbines by design type, geographic region, owner, age, license expiration, fish species presence, and regulatory authority. The ultimate result is the identification of the federal and non-federal owners with the most turbines of various types and the most turbines that have the potential to interact with fish species of concern.

13 HYDRO ENERGY↗

Digital Twin for Hydropower System Object Modeling: Alder Dam (FY2023)

Hydropower is the world's largest source of renewable electricity, and hydropower plants are distributed all over the world. Typical major components of a hydropower plant are the governor, excitation, generator, thrust bearing, hydraulic turbine, transformer, the main lead, metering and control, tailwater depression, and dissolved oxygen. For each component, various measures are taken. The measurements are acquired by various heterogeneous systems, including standalone sensors, programmable logic controllers (PLC), Supervisory control and data acquisition (SCADA), Internet of Things (IoT), and data acquisition and integration platforms such as OSI/PI. The measured data are often archived within the plant by a data management platform, and many institutions have cloud-based archive systems, such as Hydropower Research Institution (HRI), U.S. Army Corps of Engineers (USACE), and Columbia River Data Access in Real Time (DART). Object Modeling is a general framework for designing information systems. It focuses on objects, the actions they perform, and the messages they send to one another to cause those actions to be taken. The major differences among object modeling, network modeling, data modeling, and process modeling are that in the first we focus on the actions in response to information, objects which form the system, the actions they perform, and how they pass information to one another, while in the second we concentrate on where, when and how much information is moved, while in the third we focus on what information is moved and where it is moved, while in the last we focus on how it is moved and when it is moved. Object modeling was developed basically as a method to develop object-oriented systems and to support object-oriented programming. It describes the static structure of the system. The object Modeling Technique is easy to draw and use. That is why we choose object modeling to connect physical hydropower plants to Digital Twin. It recognizes the objects and the relationship between them. It identifies the attributes and functions of each class. Dynamic Modeling: It explains how objects respond to events. Functional Modeling indicates the processes executed in an object and how data changes when it moves to objects. It has been used in many applications like telecommunication, transportation, etc.

13 HYDRO ENERGY↗

Creating a Digital Twin for a Hydropower System through 3D Object Modeling: Alder Dam FY23

Hydropower stands as the world's leading source of renewable electricity, with hydropower plants spanning the globe. A typical hydropower plant comprises essential components including the governor, excitation system, generator, thrust bearing, hydraulic turbine, transformer, main lead, metering and control devices, tailwater depression system, and dissolved oxygen monitoring. Each of these components undergoes various measures and monitoring procedures. These measurements are collected through a diverse array of systems, encompassing standalone sensors, programmable logic controllers (PLCs), Supervisory Control and Data Acquisition (SCADA) systems, Internet of Things (IoT) devices, and data acquisition and integration platforms like OSI/PI.

13 HYDRO ENERGY↗

Loss of Glen Canyon Dam Hydropower Plant Capabilities

The power grid in the western United States is undergoing a major transformation, driven by technological advancements, power markets, policy shifts, and evolving energy demands. The integration of variable renewable energy (VRE) resources, such as wind and solar, into the power grid has become a major driver of change. Between 2018 and 2023, about 19 gigawatts (GW) of new solar capacity and 14 GW of new wind capacity was built in the Western Interconnection (WI) region. These two VRE resources accounted for the majority of WI capacity additions. The Western Interconnection is expected to host 30 GW of wind, 40 GW of solar, and 14 GW of energy storage by 2030 (Western Electricity Coordinating Council n.d.).

13 HYDRO ENERGY↗

Temperature and Water Depth Monitoring Within Chum Salmon Spawning Habitat Below Bonneville Dam : Annual Report October 2007-September 2008

The overall goal of the project described in this report is to provide a sound scientific basis for operation of the Federal Columbia River Power System (FCRPS) in ways that will effectively protect and enhance chum salmon populations - a species listed in March 1999 as threatened under the Endangered Species Act of 1973 (ESA). The study objective during fiscal year 2008 was to provide real-time data on Ives Island area water temperature and water surface elevations from the onset of chum salmon spawning through the end of chum salmon emergence. Sampling locations included areas where riverbed temperatures were elevated, potentially influencing alevin development and emergence timing. In these locations, hydrosystem operation caused large, frequent changes in river discharge that affected salmon habitat by dewatering redds and altering egg pocket temperatures. The 2008 objective was accomplished using temperature and water-level sensors deployed inside piezometers. Sensors were integrated with a radio telemetry system such that real-time data could be downloaded remotely and posted hourly on the Internet. During our overall monitoring period (October 2007 through June 2008), mean temperature in chum spawning areas was nearly 2 C warmer within the riverbed than in the overlying river. During chum salmon spawning (mid-November 2007 through December2007), mean riverbed temperature in the Ives Island area was 14.5 C, more than 5 C higher than in the river, where mean temperature was 9.4 C. During the incubation period (January 2008 through mid-May 2008), riverbed temperature was approximately 3 C greater than in the overlying river (10.5 C and 7.2 C, respectively). Chum salmon preferentially select spawning locations where riverbed temperatures are elevated; consequently the incubation time of alevin is shortened before they emerge in the spring.

13 HYDRO ENERGY↗

Temperature and Water Depth Monitoring Within Chum Salmon Spawning Habitat Below Bonneville Dam -- Annual Report -- October 2007-September 2008

The overall goal of the project described in this report is to provide a sound scientific basis for operation of the Federal Columbia River Power System (FCRPS) in ways that will effectively protect and enhance chum salmon populations----a species listed in March 1999 as threatened under the Endangered Species Act of 1973 (ESA). The study objective during fiscal year 2008 was to provide real-time data on Ives Island area water temperature and water surface elevations from the onset of chum salmon spawning through the end of chum salmon emergence. Sampling locations included areas where riverbed temperatures were elevated, potentially influencing alevin development and emergence timing. In these locations, hydrosystem operation caused large, frequent changes in river discharge that affected salmon habitat by dewatering redds and altering egg pocket temperatures. The 2008 objective was accomplished using temperature and water-level sensors deployed inside piezo¬meters. Sensors were integrated with a radio telemetry system such that real-time data could be downloaded remotely and posted hourly on the Internet.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Development of a computer-aided procedure for the national program of inspection of dams

An effort was undertaken to determine the utility of ERTS-1 MSS data, together with automatic data processing (ADP) techniques, to detect and locate surface water, and transfer the related technology to the Texas Water Rights Commission (TWRC). A test site was selected, ERTS-1 MSS and ancillary data obtained, and existent ADP classification programs applied. During the course of this effort a linear discriminant function was developed. The results were evaluated for potential candidates for a transferable procedure. A computer-aided technique using a linear discriminant function was selected and recommended, for inclusion in an operational system, which met detection and location criteria. Specifically, evaluation of the selected computer-aided procedure for the test site resulted in the detection of 100 percent of areas of surface water 10 acres or greater in areal extent and the geographic location of areas classified as water to a positional accuracy of 1000 feet or closer. The procedure was recommended for inclusion in an operational computer-aided procedure for transfer to TWRC.

Source record↗

DAM - detection and mapping

Integrated set of manual procedures, computer programs, and graphic devices processes multispectral scanner data from orbiting Landsat into precisely registered and formatted maps of surface water and other resources at variety of scales, sheet formats, and tick intervals.

Source record↗