Search NASA⌕ Search

SEARCH · Search NASA

Results for “Lunar landing”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 325 records · Page 18

After LM: NASA Lunar Lander Concepts Beyond Apollo

As this document is being compiled in 2019, NASA is once again planning a return to the Moon, and new lunar lander designs are being generated. Compared to Apollo, crews are projected to be larger (at least four per mission) and stay times longer (beginning at 6.5 days). However, it is expected that the landers will look much like the designs in this document because, as stated in the introduction, lunar lander design is a response to the simple physics that governs the tasks they are asked to perform. Design is also a living thing. New crewed lander designs will continue to emerge up until the point that humans return to the Moon, and even beyond. New players from different countries and commercial providers will create new designs based on new technologies and new requirements. Until some breakthrough technology or new physics principle is created, each lander will respond to the current physics of lunar landing. There may come a time, generations from now, when future engineers are paging through a digital copy of this catalog and reflecting on the early work of lunar lander designers. “Those Apollo guys were really smart, given that they started with nothing as a reference. The Lunar Module – now THAT was a great lunar lander design.”

Altair spacecraft↗

Surveyor spacecraft automatic landing system

The Surveyor Project achieved five successful lunar landings between 1966 and 1968, following an intensive five-year development effort. One of the many significant accomplishments made by Surveyor was the development and validation of the first-ever automated soft-landing system. This paper provides a historical and control aspects of the spacecraft's terminal descent system. Driving requirements and other important design considerations are described, along with the configuration and operational sequence of the actual flight system.

Thurman, Sam W.↗

Preliminary geologic investigation of the Apollo 17 landing site

A geological investigation of the Apollo 17 lunar landing site was conducted. The Taurus-Littrow valley is interpreted as a deep graben formed by structural adjustment of lunar crustal material to the Serenitatis impact. Materials of the valley fill were sampled at many stations. Ejecta around many craters on the valley floor consist of basalt, showing that the graben was partly filled by lava flows. The geological objectives of the Apollo 17 mission are divided into orbital and lunar surface data collection. The data obtained for both types of investigation are presented in tables, photographs, and drawings.

Muehlberger, W. R.↗

Reuse International Space Station (ISS) Modules as Lunar Habitat

NASA currently projects ending the ISS mission in approximately 2016, due primarily to the expense of re-boost and re-supply. Lunar outposts are expected to be in place in the same timeframe. In support of these mission goals, a scheme to reuse ISS modules on the moon has been identified. These modules could function as pressurized volumes for human habitation in a lunar vacuum as they have done in low-earth orbit. The ISS hull is structurally capable of withstanding a lunar landing because there is no atmospheric turbulence or friction. A compelling reason to send ISS modules to the moon is their large mass; a large portion of the ISS would survive re-entry if allowed to de-orbit to Earth. ISS debris could pose a serious risk to people or structures on Earth unless a controlled re-entry is performed. If a propulsive unit is devised to be attached to the ISS and control re-entry, a propulsion system could be used to propel the modules to the moon and land them there. ISS modules on the lunar surface would not require re-boost. Radiation protection can be attained by burying the module in lunar regolith. Power and a heat removal system would be required for the lunar modules which would need little support structure other than the lunar surface. With planetary mass surrounding the module, heat flux may be controlled by conductance. The remaining requirement is the re-supply of life-support expendables. There are raw materials on the moon to supplement these vital resources. The lunar maria is known to contain approximately 40% oxygen by mass in inorganic mineral compounds. Chemical conversion of moon rocks to release gaseous oxygen is known science. Recycling and cleaning of air and water are currently planned to be accomplished with ISS Environmental Control & Life Support Systems (ECLSS). By developing a Propulsion and Landing Module (PLM) to dock to the Common Berthing Mechanism (CBM), several identical PLMs could be produced to rescue and transfer the ISS modules to the lunar surface, one by one. The propulsion does not need to be as swift as Apollo, nor would the modules need to be manned during transportation to the moon. The trajectory from low-Earth to lunar orbit would avoid or quickly pass through the Van Allen belts to minimize radiation exposure to electronics onboard. A landing technology similar to Apollo's could be utilized to land an ISS module on the moon. Since the mission will be unmanned, system redundancy could be minimized to keep the cost down. If the mission failed and a module crashed landed on the moon, the risk of debris landing on Earth would be avoided and the raw materials could be used in future lunar missions.

Miernik, Janie↗

Apollo experience report: The docking system

The decision to accomplish the lunar landing mission by use of the lunar orbit rendezvous technique required that a docking system be developed to allow: (1) spacecraft modules to be structurally joined, (2) intravehicular transfer of the crew and equipment, and (3) separation of the modules. The basic design criteria of the docking system, the evolution process, and the various docking concepts considered for the Apollo program are presented. Docking systems that were considered for the Apollo program included both impact and nonimpact systems; a probe and drogue impact system was selected. Physical and functional descriptions of the probe and drogue, the crew transfer tunnel, and docking ring latches are presented for both the early configuration and the present configuration as influenced by the development and qualification test programs. In addition, preflight checkout activity and mission performance of the system are discussed.

Langley, R. D.↗

Metals production

Existing procedures for design of electrochemical plants can be used for design of lunar processes taking into consideration the differences in environmental conditions. These differences include: 1/6 Earth gravity, high vacuum, solar electrical and heat source, space radiation heat sink, long days and nights, and different availability and economics of materials, energy, and labor. Techniques have already been developed for operation of relatively small scale hydrogen-oxygen fuel cell systems used in the U.S. lunar landing program. Design and operation of lunar aqueous electrolytic process plants appears to be within the state-of-the-art. Finding or developing compatible materials for construction and designing of fused-magma metal winning cells will present a real engineering challenge.

Beck, Theodore S.↗

Global Performance Characterization of the Three Burn Trans-Earth Injection Maneuver Sequence over the Lunar Nodal Cycle

The Orion spacecraft will be required to perform a three-burn trans-Earth injection (TEI) maneuver sequence to return to Earth from low lunar orbit. The origin of this approach lies in the Constellation Program requirements for access to any lunar landing site location combined with anytime lunar departure. This paper documents the development of optimized databases used to rapidly model the performance requirements of the TEI three-burn sequence for an extremely large number of mission cases. It also discusses performance results for lunar departures covering a complete 18.6 year lunar nodal cycle as well as general characteristics of the optimized three-burn TEI sequence.

Williams, Jacob↗