RELAP5-3D Validation Using the Primary Coolant Apparatus Test (PCAT) Facility
Presentation for discussing the use for PCAT for validating RELAP5-3D
SEARCH · Search NASA
Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.
Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.
Presentation for discussing the use for PCAT for validating RELAP5-3D
Presentation on MARVEL thermal-hydraulics and safety basis, for dissemination to general audience.
This report documents the results of preliminary nuclear criticality and radiation shielding assessments during transfer and dry storage of irradiated Microreactor Applications Research Validation and Evaluation (MARVEL) reactor fuel at Idaho National Laboratory (INL). The assessments focus on transfer casks and storage canisters that are currently in use at INL, which may be compatible with the irradiated MARVEL reactor fuel. The criticality assessments were performed using the radiation transport code MCNP6 with 37 MARVEL reactor fuel elements in various configurations and scenarios. All transfer and storage configurations under dry conditions were below the assumed criticality safety limit of 0.93. Some storage and transfer configurations under wet conditions exceeded the criticality safety limit. This suggests that the appropriate administrative and engineering controls, in addition to reducing the number of MARVEL reactor fuel elements per transfer cask or storage canister, can be expected to ensure criticality safety under all scenarios. The radiation shielding assessments were performed by generating conservative neutron and photon source terms using the ORIGEN module in the SCALE suite of codes. These source spectra were used to estimate the dose equivalent rates using the radiation transport code MCNP6, both on contact and 1 m away from the fuel and transfer casks. The maximum estimated dose equivalent rate of 37 unshielded MARVEL reactor fuel elements on contact is approximately 42000 R/hr. The maximum estimated dose equivalent rates on contact to the ATR transfer cask, HFEF-5 transfer cask, and high load charger were approximately 233 mR/hr, 171 mR/hr, and 201 mR/hr, respectively. This suggests that with the appropriate administrative and engineering controls, all three transfer casks analyzed can be expected to provide sufficient radiation shielding to workers during transfer of irradiated MARVEL reactor fuel. These calculations are performed to support the planning and strategy for the MARVEL project and will demonstrate the technical viability of the different configurations discussed and help identify where engineered or administrative controls may be necessary. A complete criticality safety analysis and radiation shielding analysis, including validation and contingency and accident analysis must be completed by licensed and authorized personnel before any transfer or storage of MARVEL reactor nuclear fuel.
Decarbonizing to meet aggressive climate change mitigation targets requires energy transition within all sectors. In the industrial sector, global emissions will need to decrease by 65–90% by 2050 to avert warming greater than 1.5°C (Pörtner et al., 2022). Recent U.S. laws, including the Inflation Reduction Act (IRA), Bipartisan Infrastructure Law (BIL), Defense Production Act, Creating Helpful Incentives to Produce Semiconductors (or CHIPS), state programs, and other recent laws, have clean energy requirements and provide financial incentives to accelerate the use of clean energy technologies in the industrial sector. These new laws include supporting mechanisms with direct financial support for nuclear power (e.g., advanced reactor development and hydrogen production). However, advanced nuclear could also gain these financial benefits by coupling with low-carbon industrial projects. For example, microreactors could supply low-carbon energy to producers of critical metals that (1) are eligible to receive investment and production tax credits and favorable loans, and (2) the low-carbon product could gain preference in emerging markets for green products.
Overview of the PM-HIP work performed on stainless steel 316H as part of the microreactor program. High temperature mechanical testing was performed, with concerns identified with the creep-fatigue performance. Variations in feedstock and processing parameters did not conclusively identify the primary factor in the reduced creep-fatigue performance.
Efforts are currently underway to deploy microreactor modeling and simulation tools to better support vendors and regulatory authorities in submitting and reviewing licensing applications. In particular, the Nuclear Regulatory Commission is expected to rely on the Comprehensive Reactor Analysis Bundle (BlueCRAB) multiphysics toolset in performing design- and beyond-design-basis accident analyses. In addition, the Nuclear Regulatory Commission has been using the MELCOR code to estimate mechanistic source terms during accidents. As MELCOR relies on isotopic inventory and reactor temperature/power evolution profiles during accident conditions—all of which can theoretically be obtained from BlueCRAB—the ultimate goal of this activity is to establish a common BlueCRAB-MELCOR framework. However, prior to the present research, BlueCRAB had never been used to calculate such quantities of interest at the full-core level. While there are many Monte Carlo (MC) codes capable of computing such quantities of interest, they are unable to readily account for multiphysics feedback. BlueCRAB allows for the coupling of different physics codes together to perform multiphysics-informed calculations. Therefore, the purpose of this fiscal year 2023 work is to investigate the feasibility and challenges of performing such calculations within BlueCRAB so as to generate the data that MELCOR relies on. To demonstrate the methodology, the proposed workflow was applied to a prototypical heat pipe-cooled microreactor model. To predict isotopic concentrations (taking into account the ac- cumulation of fission products during operation), the necessary microscopic cross sections were generated via OpenMC and tabulated with respect to temperature and burnup. Next, a recently developed capability in Griffin (the reactor physics application in BlueCRAB) was used to convert the OpenMC output format into the ISOXML format used by Griffin. A multiphysics microscopic depletion calculation that involved performing a coupled full-core, heterogeneous neutron trans- port and thermal calculation at each depletion step was conducted to deplete the core to end of life (EOL) conditions so as to provide both isotopics and the initial condition for the transient calculation. Following a brief null-transient to verify that the initial condition had been properly restarted and was indeed in thermal equilibrium, a heat pipe failure transient was simulated. Thus, the entire workflow of using BlueCRAB to generate MELCOR inputs, from cross-section generation to producing isotopic inventory and power/temperature evolution profiles during transients, is demonstrated. This report also details the identified gaps in the workflow and how they were (for the most part) addressed. Future work should focus on directly including MEL- COR into the workflow by performing a MELCOR calculation using the BlueCRAB-generated input data. In addition, the heat pipe reactor design should be improved so as to reflect more prototypical burnup characteristics at EOL.
This report supplies the technical information to enable a broader understanding of different technology choices for nuclear reactors in Brazil. The assessment characteristics of this process include reactor technology, economic costs for deployment, and regulatory analyses of small modular reactors, advanced reactors, and microreactors. The analysis documented in this report provides economic and technological information to assist Brazil, whose official indicative scenarios show an increase in operating nuclear power from 2 Gigawatt in 2022 to 8–10 Gigawatt by 2050, in policy making and long-term energy planning. To protect company proprietary information, the information in this report was limited to publicly available information and therefore can only inform preliminary reactor technology assessments. This report does not recommend or endorse any specific reactor developer or technology.
Current nuclear facility emergency planning zones (EPZs) are based on outdated distance-based criteria, predating comprehensive dose and risk-informed frameworks. Recent advancements in simulation tools have permitted the development of site-specific, dose, and risk-based consequence-driven assessment frameworks. This study investigated the computation of advanced reactor (AR) EPZs using two atmospheric dispersion models: a straight-line Gaussian plume model (GPM) and a semi-Lagrangian Particle in Cell (PIC). Two case studies were conducted: (1) benchmarking the NRC SOARCA study for the Peach Bottom Nuclear Generating Station and (2) analyzing an advanced INL Heat Pipe Design A microreactor's end-of-cycle inventory. The dose criteria for both cases were 10 mSv at mean weather conditions and 50 mSv at 95th percentile weather conditions at 96 h post-release. Results demonstrated that GPM and PIC estimated similar mean peak dose levels for large boiling water reactors in the farfield case, placing EPZ limits beyond current regulations. For ARs with source terms remaining in the nearfield, PIC modeling without specific nearfield considerations could result in excessively high doses and inaccurate EPZ designations. PIC dispersion demonstrated an order of magnitude higher estimate of nearfield inhalation dose contribution when compared to GPM results. Furthermore, both models significantly reduced EPZ sizing within the nearfield. Thus, reductions in the AR source term may eliminate the need for a separate EPZ.
Argonne National Laboratory and Idaho National Laboratory, through a Department of Energy Gateway for Accelerated Innovation in Nuclear Voucher, supported key analysis needs of Radiant related to (i) air jacket thermal fluid performance, (ii) evaluation of decay heat source terms defining air jacket technical requirements, and (iii) assessment of modeling methodologies employed for core analysis. All of these activities center on numerical simulation of various aspects of Kaleidos using the Multiphysics Object-Oriented Simulation Environment (MOOSE) framework, the Cardinal multiphysics application, the OpenMC Monte Carlo code, and the Nek5000 computational fluid dynamics (CFD) code. This project builds upon an earlier Nuclear Energy Advanced Modeling and Simulation (NEAMS) Thermal-Hydraulic (T/H) Center of Excellence (CoE) project focused on initial demonstration of Cardinal multiphysics simulation of High Temperature Gas Reactors (HTGRs) and now focuses on Radiant’s Kaleidos concept.
This presentation was prepared for the Microreactor Program Stakeholders Workshop on May 12-13, 2021. It supports understanding the market and economic potential for microreactors in the U.S. and internationally by providing: a techno-economic basis for support to industrial microreactor deployment and operation; uncovering emerging market opportunities, informing R&D opportunities, and integrating the research performed by the INL [Boise State/Energy Policy Institute], and the U Alaska Anchorage, U Wisconsin-Madison, and Nuclear Alternatives Project in Puerto Rico.
The National Reactor Innovation Center (NRIC) seeks to improve the understanding of microreactor physics in industry and academia through the development of a Microreactor Applications Research Validation and Evaluation (MARVEL) reactor-based model, published on the Virtual Test Bed (VTB). To achieve this goal, the Sodium-cooled Thermal-spectrum Advanced Research Test Reactor (STARTR) model was built using publicly available MARVEL specifications where possible and approximations where applicable, and was optimized for fast runtimes for researchers to receive rapid simulation feedback. STARTR will fill a gap between stakeholder interest and available models, as the first Sodium-cooled Thermal Reactor (STR) hosted on the VTB with baseline performance sanctioned by INL. This project involved the definition of all materials used in the reactor, geometry and all reactor subcomponents, and assertion of tallies and simulation settings within OpenMC 0.13.3. This poster details a small subset of the overall reactor physics testing: the two-dimensional power peaking factors and the flux energy spectrum, as well as plots of the created geometry. Future work includes code-to-code verification between the OpenMC-based model and a separately designed MCNP 6.2-based model.
Advanced nuclear power plants (NPPs) will potentially need to operate in environments where power generation flexibility is more highly valued than the stability or baseload generation capability for conventional demand curves. Thermal energy storage (TES) systems would enable NPPs to respond nimbly to market variability and could also position advanced NPPs to participate differently in restructured markets, thus further enhancing their economic competitiveness. TES systems could also benefit the electric grid by eliminating the need for peaking plants, as well as by improving the economic performance of baseload NPPs. While TES technologies afford a unique opportunity to address many of these challenges, the applicability of these systems is also complicated by the fact that various advanced NPPs are designed differently, each with its own temperature range, size, operating fluids, and operating conditions. Hence, TES systems face significant barriers to investment, as more information on their compatibility and performance metrics is needed to quantify the advantages provided by each, as well as the challenges these technologies might face if coupled with a particular type of advanced NPP. This study explores the possibility of integrating a wide variety of TES technologies with various categories of advanced NPPs, based on their operating characteristics. To help decision makers, users and developers decide which TES technology is best suited to a particular category of advanced NPPs, this research present a Phenomena Identification and Ranking Table (PIRT) analysis of 10 TES systems that could potentially be coupled with advanced NPPs, which themselves are divided into nine categories based on their operating conditions. Then, each advanced NPP category is evaluated for compatibility with the 10 TES systems by assembling and discussing a database of information concerning 10 engineering questions, defined herein in as figures of merit (FOMs), such as: technology readiness level (TRL), temperature compatibility, energy density, size, cycle frequency, ramp time, realignment frequency, geographic needs, environmental impact, and interventions. By assembling a database of information concerning the TES technologies' compatibility with various advanced NPP systems, this study can help developers acquaint themselves with a particular TES technology before choosing to build a new integrated installation.
In the nuclear industry, a manufacturing-informed design approach has the potential to yield the most benefit from advanced manufacturing. By leveraging advanced materials, data science, and rapid testing and deployment, manufacturing-informed design can drive down costs and development times, ultimately improving future commercial viability. This approach is being demonstrated in the US Department of Energy Office of Nuclear Energy (DOE-NE) Transformational Challenge Reactor (TCR) program. Preconceptual design activities for TCR have been focused on analyzing and maturing four reactor core design concepts: two fast-spectrum and two thermal-spectrum systems. Furthermore, the designs were iteratively modified and analyzed, and subcomponents were manufactured in parallel over weeks instead of months or years. To meet key program initiatives (e.g., timeline and material use), several constraints—including fissile material availability, component availability, materials compatibility, and additive manufacturing capabilities—were factored into the design effort, yielding small cores less than one cubic meter in volume with near-term viability. Additionally, the TCR program has made significant progress on development of advanced moderator materials such as yttrium hydride, advancing the feasibility of gas-cooled thermal spectrum systems using less than 250 kg of high-assay low enriched uranium (HALEU) and occupying less than 1 m3. Each of the two resulting thermal designs uses a different fuel form: traditional UO2 ceramic fuel and tristructural isotropic (advanced TRISO) fuel particles embedded inside a SiC matrix. Core neutronics and thermal performance for these systems were assessed and summarized. Evaluation of the performance metrics for these two moderated designs has yielded the downselected TCR design: a TRISO-fueled and yttrium hydride moderated gas-cooled reactor.
This paper focuses on the calculation of the energy deposition in the Transformational Challenge Reactor by two major Monte Carlo codes: Serpent and MCNP. The first software computation relies on Kinetic Energy Released per unit Mass (KERMA) factors while the second one relies on Q-values. The results from these two independent computation methodologies are in very good agreement; however, Serpent runs much faster than MCNP (for the same computational model) and allows for a detailed energy deposition distribution from a 1-mm-side square mesh with a relative statistical error between 0.5% and 1%. This detailed energy deposition is suitable for multiphysics analyses aimed at design optimizations. In order to calculate the energy deposition, Serpent needs enhanced ACE files (distributed by the software developers). Unlike other Monte Carlo software that uses inputs based on Python or Java languages, the Serpent input syntax is very similar to that of MCNP; a Python script can convert a MCNP input to a Serpent input in seconds. For simulations not requiring the calculation of the energy deposition, Serpent can also read nuclear data from MCNP ACE files, which eventually improves the comparison of the results of the two codes.
This report details progress and activities of Idaho National Laboratory (INL) on the Nuclear Regulatory Commission (NRC) project “Development and Modeling Sup- port for Advanced Non-Light Water Reactors.” The tasks completed for this report are: Task2c: Explicit modeling of pebble transient temperature response. In this simulation, the 400 MWth Pebble-Bed Modular Reactor (PBMR) design, PBMR- 400, experiences a 20-second power ramp from 100% to 150% power. This is followed by a similar reduction in the power back to 100%. Several multiscale pebble coupling approaches are tested with one pebble per mesh element in the active core region. The results show good conservation behavior and the stability of the coupling.; Extended scope part 1: An assessment of the computational efficiency of the Discontinuous Finite Element Method (DFEM) heat transfer solver shows good scalability. The DFEM solver is a factor of 4 more expensive in solution time than the Finite Element Method (FEM) solver for heat transfer problems due to the increased number of degrees of freedom. Nonetheless, the DFEM approach provides the user with the flexibility to model gap heat transfer problems.; Extended scope part 2: The GapHeatTransferInterfaceMaterial was improved to give the user increased flexibility with the modeling of heat transfer through gaps with the DFEM solver. A number of gap parameters can now be coupled both through functions and variables.; Extended scope part 3: Demonstration of how the gap width between hexagonal fuel cells can be calculated during a heat-up transient and used in the GapHeatTransferInterface model. A full-domain DFEM model with gap expansion is coupled to a SubApp that models the thermal expansion of the base plate. The results show the expected physical behavior, although have not been fully bench-marked at this point in time.
This report details progress and activities of Idaho National Laboratory (INL) on the NRC project ”Development and Modeling Support for Advanced Non-Light Water Reactors.” The tasks completed for this report are as follows: First, Task 2c: Explicit modeling of pebble transient temperature response. In this simulation, the PBMR-400 reactor experiences a 20 second power ramp from 100% to 150% power. This is followed by a similar reduction in the power back to 100%. Several multiscale pebble coupling approaches are tested with one pebble per mesh element in the active core region. The results show good conservation behavior and the stability of the coupling. Next, Extended scope part 1: An assessment of the computational efficiency of the DFEM heat transfer solver shows good scalability. The DFEM solver is a factor of 4 more expensive in solution time than the FEM solver for heat transfer problems due to the increased number of degrees of freedom. Nonetheless, the DFEM approach provides the user with the flexibility to model gap heat transfer problems. Then Extended scope part 2: the GapHeatTransferInterfaceMaterial was improved to give the user increased flexibility with the modeling of heat transfer through gaps with the DFEM solver. A number of gap parameters can now be coupled both through functions and variables. Finally, Extended scope part 3: demonstration of how the gap width between hexagonal fuel cells can be calculated during a heat up transient and used in the GapHeat- TransferInterface model. A full domain DFEM model with gap expansion is coupled to a SubApp that models the thermal expansion of the base plate. The results show the expected physical behavior, although have not been fully bench- marked at this point in time.
This report summarizes various fuel types that may be applicable to several microreactor concepts, which are defined as (1) very high temperature reactors (VHTR), (2) sodium fast reactors (SFR), (3) system for nuclear auxiliary power (SNAP) reactors, (4) gas fast reactors (GFR), and (5) molten salt reactors (MSR). The fuel systems that were assessed include: uranium mononitride (UN), uranium monocarbide (UC), uranium dioxide (UO 2 ), uranium oxycarbide (UCO) Tristructural Isotropic (TRISO), UN TRISO, mixed oxide (MOX), metallic fuels, and metal hydrides. While UCO TRISO has undergone significant testing through the advanced gas reactor (AGR) program, the very high cost necessitates consideration of other fuel types. UN and UC were identified as fuels that should receive further investigation due to their thermophysical and mechanical properties. Minimal irradiation performance data shows that these fuels are good candidate fuels for microreactors.
Various robotic tooling options have been evaluated for the NRIC DOME concept of operations (ConOps). Framatome was contracted to develop a wide-ranging list of commercial off the shelf (COTS) and custom robotic systems to be considered for performing the DOME ConOps functions. Subsequent project tasks from Framatome narrowed down the list and scored the most viable options. The abbreviated list, and associated scoring, has been reviewed and assessed to provide formal recommendations for the robotic ConOps functions of DOME. The overhead telescoping mast & Kraft arm assembly is recommended as the primary system for reactor demobilization and removal. The estimated cost is $\$700$K with a timeline to develop and deliver of about 2.5 years. The mast & Kraft arm would still require an overhead lift system for mobilization and installation. Either the refurbished polar crane or a new gantry crane delivery platform could both serve as the overhead lift and delivery system. The estimated costs for the refurbishment polar crane and new gantry crane systems are, respectively, $\$4.4$M and $\$3$M with about 2.5 years to develop and deliver. A Brokk + Kraft crawler & arm is recommended as a secondary robotic system to support the overhead mast & Kraft arm system. The Brokk + Kraft crawler & arm would cost an estimated $\$726$k and would take about 1.5 years to develop and deliver. The Boston Dynamics SPOT robot is also recommended for the in-service monitoring during experimentation operations. The estimated cost is $\$220$K with a timeline to deliver of 8-14 months. The Elios 3 aerial drone is recommended to perform large area radiation dose rate mapping and visual inspections. The estimated cost is a $\$100$K and will also need about 8-14 months to develop and deliver. A mockup rig is also recommended to be procured an employed to test & verify the robotic capabilities as well as provide needed training for operations personnel. It is estimated that a mockup rig would cost about $\$500$k and would take up to a year to develop and build.