Search NASA⌕ Search

SEARCH · Search NASA

Results for “Propulsion Hardware”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 325 records · Page 18

Results of solar electric thrust vector control system design, development and tests

Efforts to develop and test a thrust vector control system TVCS for a solar-energy-powered ion engine array are described. The results of solar electric propulsion system technology (SEPST) III real-time tests of present versions of TVCS hardware in combination with computer-simulated attitude dynamics of a solar electric multi-mission spacecraft (SEMMS) Phase A-type spacecraft configuration are summarized. Work on an improved solar electric TVCS, based on the use of a state estimator, is described. SEPST III tests of TVCS hardware have generally proved successful and dynamic response of the system is close to predictions. It appears that, if TVCS electronic hardware can be effectively replaced by control computer software, a significant advantage in control capability and flexibility can be gained in future developmental testing, with practical implications for flight systems as well. Finally, it is concluded from computer simulations that TVCS stabilization using rate estimation promises a substantial performance improvement over the present design.

Fleischer, G. E.↗

Apollo 16 mission report. Supplement 2: Service Propulsion system final flight evaluation

The Apollo 16 Mission was the sixteenth in a series of flights using Apollo flight hardware and included the fifth lunar landing of the Apollo Program. The Apollo 16 Mission utilized CSM 113 which was equipped with SPS Engine S/N 66 (Injector S/N 137). The engine configuration and expected performance characteristics are presented. Since previous flight results of the SPS have consistently shown the existence of a negative mixture ratio shift, SPS Engine S/N 66 was reorificed to increase the mixture ratio for this mission. The propellant unbalance for the two major engine firings is compared with the predicted unbalance. Although the unbalance at the end of the TEI burn is significantly different than the predicted unbalance, the propellant mixture ratio was well within limits. The SPS performed six burns during the mission, with a total burn duration of 575.3 seconds. The ignition time, burn duration and velocity gain for each of the six SPS burns are reported.

Smith, R. J.↗

The 8-CM ion thruster characterization

The performance capabilities of the 8 cm diameter mercury ion thruster were increased by modifying the thruster operating parameters and component hardware. The initial performance levels, representative of the Hughes/NASA Lewis Research Center Ion Auxiliary Propulsion Subsystem (IAPS) thruster, were raised from the baseline values of thrust, T = 5 mN, and specific impulse, I sub sp = 2,900s, to thrust, T = 25 mN and specific impulse, I sub sp = 4,300 s. Performance characteristics including estmates of the erosion rates of various component surfaces are presented.

Wessel, F. J.↗

Pyrotechnic system failures: Causes and prevention

Although pyrotechnics have successfully accomplished many critical mechanical spacecraft functions, such as ignition, severance, jettisoning and valving (excluding propulsion), failures continue to occur. Provided is a listing of 84 failures of pyrotechnic hardware with completed design over a 23-year period, compiled informally by experts from every NASA Center, as well as the Air Force Space Division and the Naval Surface Warfare Center. Analyses are presented as to when and where these failures occurred, their technical source or cause, followed by the reasons why and how these kinds of failures persist. The major contributor is a fundamental lack of understanding of the functional mechanisms of pyrotechnic devices and systems, followed by not recognizing pyrotechnics as an engineering technology, insufficient manpower with hands-on experience, too few test facilities, and inadequate guidelines and specifications for design, development, qualification and acceptance. Recommendations are made on both a managerial and technical basis to prevent failures, increase reliability, improve existing and future designs, and develop the technology to meet future requirements.

Bement, Laurence J.↗

Expendable vs reusable propulsion systems cost sensitivity

One of the key trade studies that must be considered when studying any new space transportation hardware is whether to go reusable or expendable. An analysis is presented here for such a trade relative to a proposed Liquid Rocket Booster which is being studied at MSFC. The assumptions or inputs to the trade were developed and integrated into a model that compares the Life-Cycle Costs of both a reusable LRB and an expendable LRB. Sensitivities were run by varying the input variables to see their effect on total cost. In addition a Monte-Carlo simulation was run to determine the amount of cost risk that may be involved in a decision to reuse or expend.

Hamaker, Joseph W.↗

Mars Smart Lander Simulations for Entry, Descent, and Landing

Two primary simulations have been developed and are being updated for the Mars Smart Lander Entry, Descent, and Landing (EDL). The high fidelity engineering end-to-end EDL simulation that is based on NASA Langley's Program to Optimize Simulated Trajectories (POST) and the end-to-end real-time, hardware-in-the-loop simulation testbed, which is based on NASA JPL's (Jet Propulsion Laboratory) Dynamics Simulator for Entry, Descent and Surface landing (DSENDS). This paper presents the status of these Mars Smart Lander EDL end-to-end simulations at this time. Various models, capabilities, as well as validation and verification for these simulations are discussed.

Striepe, S. A.↗

Structural Seal Development

NASA currently has aggressive goals for the development of the next generations of Reusable Launch Vehicles (RLV). Many of the goals center around significantly reducing the time and cost of deployment (including payload) for these spacecraft, as well as substantially increasing the safety of the crew and hardware. A core component in the design of these next generation spacecraft is the propulsion system. Many concepts are currently being evaluated including Rocket Based Combined Cycle (RBCC) and Turbine Based Combined Cycle (TBCC) engine technologies, shown.

DeMange, Jeff↗

Sustainable Human Presence on the Moon using In Situ Resources

New capabilities, technologies and infrastructure must be developed to enable a sustained human presence on the moon and beyond. The key to having this permanent presence is the utilization of in situ resources. To this end, NASA is investigating how in situ resources can be utilized to improve mission success by reducing up-mass, improving safety, reducing risk, and bringing down costs for the overall mission. To ensure that this capability is available when needed, technology development is required now. NASA/Marshall Space Flight Center (MSFC) is supporting this endeavor, along with other NASA centers, by exploring how lunar regolith can be mined for uses such as construction, life support, propulsion, power, and fabrication. Efforts at MSFC include development of lunar regolith simulant for hardware testing and development, extraction of oxygen and other materials from the lunar regolith, production of parts and tools on the moon from local materials or from provisioned feedstocks, and capabilities to show that produced parts are "ready for use". This paper discusses the lunar regolith, how the regolith is being replicated in the development of simulants and possible uses of the regolith.

McLemore, Carol A.↗

Analyses of Injection-Coupled Combustion Instability from J-2X Gas Generator Development

During development of the gas generator for the liquid oxygen/liquid hydrogen propellant J-2X rocket engine, combustion instabilities were observed near the frequency of the first longitudinal acoustic mode of the hot gas combustion chamber duct. These instabilities were similar to intermediate-frequency or buzz-type instabilities as described in historical programs, except for several aspects: 1) the frequencies were low, in the realm of chug; 2) at times the instability oscillation amplitudes were quite large, with peak-to-peak amplitudes exceeding 50% of the mean chamber pressure along with the appearance of harmonics; 3) the chamber excitation was related to but not exactly at the first longitudinal combustion chamber acoustic mode; and 4) the injector provided mass flow rate oscillations induced by capacitance and inertance effects in the injector rather than by organ pipe resonances of the coaxial oxidizer posts. This type of combustion instability is referred to as "injection coupling" because one critical driving source of the instability is mass flow rate oscillations from the injector. However, the type of injection coupling observed here is different than observed in previous instances of buzz instability with coaxial injectors, because of the lower frequencies and lack of influence from the oxidizer post organ pipe resonances. Test data and preliminary analyses of the initial combustion instabilities were presented in several papers at the 5th Liquid Propulsion Subcommittee meeting. Since that time, additional hot-fire tests with several new hardware configurations have been conducted, and additional analyses have been completed. The analytical models described in previous papers have been updated to include the influences of new geometrical configurations, including a different oxidizer injector manifold configuration and a branch pipe in the hot gas duct that supplies gaseous helium during the start transient to pre-spin the turbine. In addition, the analysis methodology has been revisited to evaluate the potential influence of a combustion response as well as an injection response.

Hulka, James R.↗

Mars Sample Return Landed with Red Dragon

A Mars Sample Return (MSR) mission is the highest priority science mission for the next decade as recommended by the recent Decadal Survey of Planetary Science. However, an affordable program to carry this out has not been defined. This paper describes a study that examined use of emerging commercial capabilities to land the sample return elements, with the goal of reducing mission cost. A team at NASA Ames examined the feasibility of the following scenario for MSR: A Falcon Heavy launcher injects a SpaceX Dragon crew capsule and trunk onto a Trans Mars Injection trajectory. The capsule is modified to carry all the hardware needed to return samples collected on Mars including a Mars Ascent Vehicle (MAV), an Earth Return Vehicle (ERV) and Sample Collection and Storage hardware. The Dragon descends to land on the surface of Mars using SuperSonic Retro Propulsion (SSRP) as described by Braun and Manning [IEEEAC paper 0076, 2005]. Samples are acquired and deliverd to the MAV by a prelanded asset, possibly the proposed 2020 rover. After samples are obtained and stored in the ERV, the MAV launches the sample-containing ERV from the surface of Mars. We examined cases where the ERV is delivered to either low Mars orbit (LMO), C3 = 0 (Mars escape), or an intermediate energy state. The ERV then provides the rest of the energy (delta V) required to perform trans-Earth injection (TEI), cruise, and insertion into a Moon-trailing Earth Orbit (MTEO). A later mission, possibly a crewed Dragon launched by a Falcon Heavy (not part of the current study) retrieves the sample container, packages the sample, and performs a controlled Earth re-entry to prevent Mars materials from accidentally contaminating Earth. The key analysis methods used in the study employed a set of parametric mass estimating relationships (MERs) and standard aerospace analysis software codes modified for the MAV class of launch vehicle to determine the range of performance parameters that produced converged spacecraft designs capable of meeting mission requirements. Subsystems modeled in this study included structures, power system, propulsion system, nose fairing, thermal insulation, actuation devices, and GN&C. Best practice application of loads and design margins for all resources were used. Both storable and cryogenic propellant systems were examined. The landed mass and lander capsule size provide boundary conditions for the MAV design and packaging. We estimated the maximum mass the Dragon capsule is capable of landing. This and the volume capability to store the MAV was deduced from publically available data from SpaceX as well as our own engineering and aerodynamic estimates. Minimum gross-liftoff mass (GLOM) for the MAV were obtained for configurations that used pump-fed storable bi-propellant rocket engines for both the MAV and the ERV stage. The GLOM required fits within our internal estimate of the mass that Dragon can land at low elevation/optimal seasons on Mars. Based on the analysis, we show that a single Mars launch sample return mission is feasible using current commercial capabilities to deliver the return spacecraft assets.

Mars Ascent Vehicle (MAV)↗

Can Cell to Cell Thermal Runaway Propagation be Prevented in a Li-ion Battery Module?

Increasing cell spacing decreased adjacent cell damage center dotElectrically connected adjacent cells drained more than physically adjacent cells center dotRadiant barrier prevents propagation when fully installed between BP cells center dotBP cells vent rapidly and expel contents at 100% SOC -Slower vent with flame/smoke at 50% -Thermal runaway event typically occurs at 160 degC center dotLG cells vent but do not expel contents -Thermal runaway event typically occurs at 200 degC center dotSKC LFP modules did not propagate; fuses on negative terminal of cell may provide a benefit in reducing cell to cell damage propagation. New requirement in NASA-Battery Safety Requirements document: JSC 20793 Rev C 5.1.5.1 Requirements - Thermal Runaway Propagation a. For battery designs greater than a 80-Wh energy employing high specific energy cells (greater than 80 watt-hours/kg, for example, lithium-ion chemistries) with catastrophic failure modes, the battery shall be evaluated to ascertain the severity of a worst-case single-cell thermal runaway event and the propensity of the design to demonstrate cell-to-cell propagation in the intended application and environment. NASA has traditionally addressed the threat of thermal runaway incidents in its battery deployments through comprehensive prevention protocols. This prevention-centered approach has included extensive screening for manufacturing defects, as well as robust battery management controls that prevent abuse-induced runaway even in the face of multiple system failures. This focused strategy has made the likelihood of occurrence of such an event highly improbable. b. The evaluation shall include all necessary analysis and test to quantify the severity (consequence) of the event in the intended application and environment as well as to identify design modifications to the battery or the system that could appreciably reduce that severity. In addition to prevention protocols, programs developing battery designs with catastrophic failure modes should take the steps necessary to assess the severity of a possible thermal runaway event. Programs should assess whether there are reasonable design changes that could appreciably affect the severity of the outcome. Evaluation should include environmental effects to surrounding hardware (i.e., temperature, pressure, shock), contamination effects due to any expelled contaminates, and venting propulsive effects when venting overboard.

Jeevarajan, Judith↗

Voyager Interstellar Mission: Challenges of Flying a Very Old Spacecraft on a Very Long Mission

Two Voyager spacecraft were launched in 1977. After the successful flybys of Jupiter and Saturn by both Voyagers and Uranus and Neptune by Voyager 2, the mission has been extended for another 30 years in search of the transition region between the dominance of the solar energy and interstellar energy. The Voyager Interstellar Mission (VIM) started on January 1, 1990. It can be characterized by several factors including extremely long communication distances, aging hardware, reduced staffing levels and difficulty in obtaining Deep Space Network (DSN) resources necessitated by the increasing distance between the spacecraft and Earth. The mission was redesigned to compensate for such factors while maximizing the science return. After 25 years of VIM and several significant science discoveries, both Voyager spacecraft are still functioning well and the Voyager flight team is preparing for an even longer mission - until the year 2025 and beyond. In order to work around the challenges and to continue the mission even further, the team has been implementing numerous changes, mainly through flight software modifications and hardware reconfiguration. The major drivers for the changes are two-fold: resource constraints (such as decreasing power output and difficulty in obtaining the necessary DSN coverage) and anomalies due to the aging hardware. The majority of changes occur through flight software modifications so the state of the on-board responses is appropriate for the changing space environment and mission phase, and the flight software is compatible in allowing the maximum data gathering. The on-board flight software routines such as baseline sequence, fault protection routines, the High Gain Antenna POINTing to Earth (HPOINT) table, and long-term events table need to be maintained through flight software updates. The changes also occur through hardware reconfiguration such as selecting the backup Hybrid Buffer Interface Circuits (HYBIC) or attitude propulsion thrusters. This paper will describe the challenges of VIM and what has been done to overcome or mitigate those challenges. The primary focus will be the major flight software changes made during VIM and the changes that are in store for the near future in preparation for continuing the extended mission, from the originally projected year of 2020 out to the year 2025 and possibly beyond.

Matsumoto, Sun Kang↗

X-57 Systems Engineering Lessons Learned

The X-57 Maxwell is an electric aircraft based on a 4-passenger, twin engine Tecnam P2006T General Aviation aircraft. The X-57 project originally envisioned a straightforward integration of commercial-off-the-shelf hardware components and software into a novel configuration to demonstrate the aerodynamic and performance benefits of Distributed Electric Propulsion (DEP). The project was initially started with a high-risk venture capitalist approach under NASA’s Convergent Aeronautics Solutions (CAS) project, which led to an initial philosophy of Project Management “light” (which was then interpreted as Systems Engineering (SE) “light”). As the project matured, it was forced to transition to one with increasing SE-rigor as the project scope changed, hardware and software deficiencies were found, and the team realized the magnitude of the technical and integration challenges. In hindsight, these technical challenges came in part from an overly optimistic technology readiness assessment (TRA) at the beginning of the project, which resulted in the project assuming that little to no subsystem development would be required. The project’s approach to systems engineering evolved throughout three separate informal phases of the project as it underwent two key transitions as a result of the team wrestling with the technical challenges and resultant changing project scope. This paper discusses the assumptions, approaches, and challenges encountered from a Systems Engineering standpoint in each of the three informal phases of the X-57 project. This paper also provides recommendations on how future projects can apply Systems Engineering best practices upfront along with a realistic TRA to aid projects that find themselves with similar challenges.

Systems Engineering↗

An Evaluation of Ultra-High Pressure Regulator for Robotic Lunar Landing Spacecraft

The Robotic Lunar Lander Development (RLLD) Project Office at NASA Marshall Space Flight Center (MSFC) has studied several lunar surface science mission concepts. These missions focus on spacecraft carrying multiple science instruments and power systems that will allow extended operations on the lunar surface. Initial trade studies of launch vehicle options for these mission concepts indicate that the spacecraft design will be significantly mass-constrained. To minimize mass and facilitate efficient packaging, the notional propulsion system for these landers has a baseline of an ultra-high pressure (10,000 psig) helium pressurization system that has been used on Defense missiles. The qualified regulator is capable of short duration use; however, the hardware has not been previously tested at NASA spacecraft requirements with longer duration. Hence, technical risks exist in using this missile-based propulsion component for spacecraft applications. A 10,000-psig helium pressure regulator test activity is being carried out as part of risk reduction testing for MSFC RLLD project. The goal of the test activity is to assess the feasibility of commercial off-the-shelf ultra-high pressure regulator by testing with a representative flight mission profile. Slam-start, gas blowdown, water expulsion, lock-up, and leak tests are also performed on the regulator to assess performance under various operating conditions. The preliminary test results indicated that the regulator can regulate helium to a stable outlet pressure of 740 psig within the +/- 5% tolerance band and maintain a lock-up pressure less than +5% for all tests conducted. Numerous leak tests demonstrated leakage less than 10-3 standard cubic centimeters per second (SCCS) for internal seat leakage at lock-up and less than10-5 SCCS for external leakage through the regulator ambient reference cavity. The successful tests have shown the potential for 10,000 psig helium systems in NASA spacecraft and have reduced risk associated with hardware availability and hardware ability to meet RLL mission requirements.

Burnside, Christopher↗

Space Launch System Spacecraft and Payload Elements: Progress Toward Crewed Launch and Beyond

While significant and substantial progress continues to be accomplished toward readying the Space Launch System (SLS) rocket for its first test flight, work is already also underway on preparations for the second flight - using an upgraded version of the vehicle - and beyond. Designed to support human missions into deep space, Space Launch System (SLS), is the most powerful human-rated launch vehicle the United States has ever undertaken, and is one of three programs being managed by the National Aeronautics and Space Administration's (NASA's) Exploration Systems Development division. The Orion spacecraft program is developing a new crew vehicle that will support human missions beyond low Earth orbit (LEO), and the Ground Systems Development and Operations program is transforming Kennedy Space Center into a next-generation spaceport capable of supporting not only SLS but also multiple commercial users. Together, these systems will support human exploration missions into the proving ground of cislunar space and ultimately to Mars. For its first flight, SLS will deliver a near-term heavy-lift capability for the nation with its 70-metric-ton (t) Block 1 configuration. Each element of the vehicle now has flight hardware in production in support of the initial flight of the SLS, which will propel Orion around the moon and back. Encompassing hardware qualification, structural testing to validate hardware compliance and analytical modeling, progress in on track to meet the initial targeted launch date. In Utah and Mississippi, booster and engine testing are verifying upgrades made to proven shuttle hardware. At Michoud Assembly Facility in Louisiana, the world's largest spacecraft welding tool is producing tanks for the SLS core stage. Providing the Orion crew capsule/launch vehicle interface and in-space propulsion via a cryogenic upper stage, the Spacecraft/Payload Integration and Evolution (SPIE) element serves a key role in achieving SLS goals and objectives. The SPIE element marked a major milestone in 2014 with the first flight of original SLS hardware, the Orion Stage Adapter (OSA) which was used on Exploration Flight Test-1 with a design that will be used again on the first flight of SLS. The element has overseen production of the Interim Cryogenic Propulsion Stage (ICPS), an in-space stage derived from the Delta Cryogenic Second Stage, which was manufactured at United Launch Alliance in Decatur, Alabama, prior to being shipped to Florida for flight preparations. Manufacture of the Orion Stage Adapter and the Launch Vehicle Stage Adapter (LVSA) took place at the Friction Stir Facility located at Marshall Space Flight Center in Huntsville, Alabama. Marshall is also home to the Integrated Structural Test of the ICPS, LVSA, and OSA, subjecting the stacked components to simulated stresses of launch. The SPIE Element is also overseeing integration of 13 "CubeSat" secondary payloads that will fly on the first flight of SLS, providing access to deep space regions in a way currently not available to the science community. At the same time as this preparation work is taking place toward the first launch of SLS, however, the Space Launch System Program is actively working toward its second launch. For its second flight, SLS will be upgraded to the more-capable Block 1B configuration. While the Block 1 configuration is capable of delivering more than 70 metric tons to low Earth orbit, the Block 1B vehicle will increase that capability to 105 t. For that flight, the new configuration introduces two major new elements to the vehicle - an Exploration Upper Stage (EUS) that will be used for both ascent and in-space propulsion, and a Universal Stage Adapter (USA) that serves as a "payload bay" for the rocket, allowing the launch of large exploration systems along with the Orion spacecraft. Already, flight hardware is being prepared for the Block 1B vehicle. Welding is taking place on the second rocket's core stage. Flight hardware production has begun on booster components. An RS-25 engine slated for that flight has been tested. Development work is taking place on the Exploration Upper Stage, with contracts in place for both the stage and the RL10 engines which will power it. (The EUS will use four RL10 engines, an increase from one on the ICPS.) For the crew configuration of the Block 1B vehicle, the SLS SPIE element is managing the USA and accompanying Payload Adapter, which will accommodate both large payloads co-manifested with Orion and small-satellite secondary payloads. This co-manifested payload capacity will be instrumental for missions into the Proving Ground around the moon, where NASA will test new systems and demonstrate new capabilities needed for human exploration farther into deep space.

Schorr, Andrew A.↗

Combustion Stability Analyses of Coaxial Element Injectors with Liquid Oxygen/Liquid Methane Propellants

Liquid rocket engines using oxygen and methane propellants are being considered by the National Aeronautics and Space Administration (NASA) for in-space vehicles. This propellant combination has not been previously used in a flight-qualified engine system, so limited test data and analysis results are available at this stage of early development. NASA has funded several hardware-oriented activities with oxygen and methane propellants over the past several years with the Propulsion and Cryogenic Advanced Development (PCAD) project, under the Exploration Technology Development Program. As part of this effort, the NASA Marshall Space Flight Center has conducted combustion stability analyses of several of the configurations. This paper presents test data and analyses of combustion stability from the recent PCAD-funded test programs at the NASA MSFC. These test programs used swirl coaxial element injectors with liquid oxygen and liquid methane propellants. Oxygen was injected conventionally in the center of the coaxial element, and swirl was provided by tangential entry slots. Injectors with 28-element and 40-element patterns were tested with several configurations of combustion chambers, including ablative and calorimeter spool sections, and several configurations of fuel injection design. Low frequency combustion instability (chug) occurred with both injectors, and high-frequency combustion instability occurred at the first tangential (1T) transverse mode with the 40-element injector. In most tests, a transition between high-amplitude chug with gaseous methane flow and low-amplitude chug with liquid methane flow was readily observed. Chug analyses of both conditions were conducted using techniques from Wenzel and Szuch and from the Rocket Combustor Interactive Design and Analysis (ROCCID) code. The 1T mode instability occurred in several tests and was apparent by high-frequency pressure measurements as well as dramatic increases in calorimeter-measured heat flux throughout the chamber. Analyses of the transverse mode were conducted with ROCCID and empirical methods such as Hewitt d/V. This paper describes the test hardware configurations, test data, analysis methods, and presents results of the various analyses.

Hulka, J. R.↗

Space Launch System Spacecraft and Payload Elements: Progress Toward Crewed Launch and Beyond

While significant and substantial progress continues to be accomplished toward readying the Space Launch System (SLS) rocket for its first test flight, work is already underway on preparations for the second flight - using an upgraded version of the vehicle - and beyond. Designed to support human missions into deep space, SLS is the most powerful human-rated launch vehicle the United States has ever undertaken, and is one of three programs being managed by the National Aeronautics and Space Administration's (NASA's) Exploration Systems Development division. The Orion spacecraft program is developing a new crew vehicle that will support human missions beyond low Earth orbit (LEO), and the Ground Systems Development and Operations (GSDO) program is transforming Kennedy Space Center (KSC) into a next-generation spaceport capable of supporting not only SLS but also multiple commercial users. Together, these systems will support human exploration missions into the proving ground of cislunar space and ultimately to Mars. For its first flight, SLS will deliver a near-term heavy-lift capability for the nation with its 70-metric-ton (t) Block 1 configuration. Each element of the vehicle now has flight hardware in production in support of the initial flight of the SLS, which will propel Orion around the moon and back. Encompassing hardware qualification, structural testing to validate hardware compliance and analytical modeling, progress is on track to meet the initial targeted launch date. In Utah and Mississippi, booster and engine testing are verifying upgrades made to proven shuttle hardware. At Michoud Assembly Facility (MAF) in Louisiana, the world's largest spacecraft welding tool is producing tanks for the SLS core stage. Providing the Orion crew capsule/launch vehicle interface and in-space propulsion via a cryogenic upper stage, the Spacecraft/Payload Integration and Evolution (SPIE) element serves a key role in achieving SLS goals and objectives. The SPIE element marked a major milestone in 2014 with the first flight of original SLS hardware, the Orion Stage Adapter (OSA) which was used on Exploration Flight Test-1 with a design that will be used again on the first flight of SLS. The element has overseen production of the Interim Cryogenic Propulsion Stage (ICPS), an in-space stage derived from the Delta Cryogenic Second Stage, which was manufactured at United Launch Alliance (ULA) in Decatur, Alabama, prior to being shipped to Florida for flight preparations. Manufacture of the OSA and the Launch Vehicle Stage Adapter (LVSA) took place at the Friction Stir Facility located at Marshall Space Flight Center (MSFC) in Huntsville, Alabama. Marshall is also home to the Integrated Structural Test of the ICPS, LVSA, and OSA, subjecting the stacked components to simulated stresses of launch. The SPIE Element is also overseeing integration of 13 "CubeSat" secondary payloads that will fly on the first flight of SLS, providing access to deep space regions in a way currently not available to the science community. At the same time as this preparation work is taking place toward the first launch of SLS, however, the Space Launch System Program is actively working toward its second launch. For its second flight, SLS will be upgraded to the more-capable Block 1B configuration. While the Block 1 configuration is capable of delivering more than 70 t to LEO, the Block 1B vehicle will increase that capability to 105 t. For that flight, the new configuration introduces two major new elements to the vehicle - an Exploration Upper Stage (EUS) that will be used for both ascent and in-space propulsion, and a Universal Stage Adapter (USA) that serves as a "payload bay" for the rocket, allowing the launch of large exploration systems along with the Orion spacecraft. Already, flight hardware is being prepared for the Block 1B vehicle. Welding is taking place on the second rocket's core stage. Flight hardware production has begun on booster components. An RS-25 engine slated for that flight has been tested. Development work is taking place on the EUS, with contracts in place for both the stage and the RL10 engines which will power it. (The EUS will use four RL10 engines, an increase from one on the ICPS.) For the crew configuration of the Block 1B vehicle, the SLS SPIE element is managing the USA and accompanying Payload Adapter, which will accommodate both large payloads co-manifested with Orion and small-satellite secondary payloads. This co-manifested payload capacity will be instrumental for missions into the proving ground around the moon, where NASA will test new systems and demonstrate new capabilities needed for human exploration farther into deep space.

Schorr, Andrew A.↗

An ion thruster module for primary propulsion systems.

The development of a 30 cm thruster module having the operational characteristics, weight, and structural integrity consistent with flight hardware is described. Elements of the program discussed in this paper are selection of an ion optical system design, development of the discharge chamber and its control, and the results of extensive performance mapping tests. The thruster system operates at 2750 sec specific impulse at 69% over-all efficiency and can be throttled from 2.0 A to 0.16 A beam current with a control system requiring a single electrical input. The 1 kV ion beam is formed by a high perveance, two grid ion optical system.

King, H. J.↗