Search NASA⌕ Search

SEARCH · Search NASA

Results for “challenges”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 325 records · Page 18

Autonomy Software: V&V Challenges and Characteristics

The successful operation of unmanned air vehicles requires software with a high degree of autonomy. Only if high level functions can be carried out without human control and intervention, complex missions in a changing and potentially unknown environment can be carried out successfully. Autonomy software is highly mission and safety critical: failures, caused by flaws in the software cannot only jeopardize the mission, but could also endanger human life (e.g., a crash of an UAV in a densely populated area). Due to its large size, high complexity, and use of specialized algorithms (planner, constraint-solver, etc.), autonomy software poses specific challenges for its verification, validation, and certification. -- - we have carried out a survey among researchers aid scientists at NASA to study these issues. In this paper, we will present major results of this study, discussing the broad spectrum. of notions and characteristics of autonomy software and its challenges for design and development. A main focus of this survey was to evaluate verification and validation (V&V) issues and challenges, compared to the development of "traditional" safety-critical software. We will discuss important issues in V&V of autonomous software and advanced V&V tools which can help to mitigate software risks. Results of this survey will help to identify and understand safety concerns in autonomy software and will lead to improved strategies for mitigation of these risks.

Schumann, Johann↗

Leadership Challenges in ISS Operations: Lessons Learned from Junior and Senior Mission Control Personnel

The International Space Station (ISS) is operated by a multi-national, multi-organizational team that is dispersed across multiple locations, time zones, and work schedules. At NASA, both junior and senior mission control personnel have had to find ways to address the leadership challenges inherent in such work, but neither have had systematic training in how to do so. The goals of this study were to examine the major leadership challenges faced by ISS mission control personnel and to highlight the approaches that they have found most effective to surmount them. We pay particular attention to the approaches successfully employed by the senior personnel and to the training needs identified by the junior personnel. We also evaluate the extent to which responses are consistent across the junior and senior samples. Further, we compare the issues identified by our interview survey to those identified by a standardized questionnaire survey of mission control personnel and a contrasting group of space station crewmembers. We studied a sample of 14 senior ISS flight controllers and a contrasting sample of 12 more junior ISS controllers. Data were collected using a semi-structured qualitative interview and content analyzed using an iterative process with multiple coders and consensus meetings to resolve discrepancies. To further explore the meaning of the interview findings, we also conducted new analyses of data from a previous questionnaire study of 13 American astronauts, 17 Russian cosmonauts, and 150 U.S. and 36 Russian mission control personnel supporting the ISS or Mir space stations. The interview data showed that the survey respondents had substantial consensus on several leadership challenges and on key strategies for dealing with them, and they offered a wide range of specific tactics for implementing these strategies. Interview data from the junior respondents will be presented for the first time at the meeting. The questionnaire data showed that the US mission control sample reported a level of support from their management that compared favorably to national norms. American mission control personnel and Russian crewmembers reported higher supervisor support than American crewmembers and Russian mission control personnel. We will present the specific issues underlying these findings and compare and contrast the results from the two datasets. Although specific to space station personnel, our results are consistent with recent management, cultural, and aerospace research. We aim to use our results to improve training for current and future mission control personnel.

Clement, James L.↗

Integrated Simulation Design Challenges to Support TPS Repair Operations

During the Orbiter Repair Maneuver (ORM) operations planned for Return to Flight (RTF), the Shuttle Remote Manipulator System (SRMS) must grapple the International Space Station (ISS), undock the Orbiter, maneuver it through a long duration trajectory, and orient it to an EVA crewman poised at the end of the Space Station Remote Manipulator System (SSRMS) to facilitate the repair of the Thermal Protection System (TPS). Once repair has been completed and confirmed, then the SRMS proceeds back through the trajectory to dock the Orbiter to the Orbiter Docking System. In order to support analysis of the complex dynamic interactions of the integrated system formed by the Orbiter, ISS, SRMS, and SSMS during the ORM, simulation tools used for previous ‘nominal’ mission support required substantial enhancements. These upgrades were necessary to provide analysts with the capabilities needed to study integrated system performance. Prevalent throughout this ORM operation is a dynamically varying topology. In other words, the ORM starts with the SRMS grappled to the mated Shuttle/ISS stack (closed loop topology), moves to an open loop chain topology consisting of the Shuttle, SRMS, and ISS, and then, at the repair configuration, extends the chain topology to one consisting of the Shuttle, SMS, ISS, and SSRMS/EVA crewman. The resulting long dynamic chain of vehicles and manipulators may exhibit significant motion between the Shuttle worksite and the EVA crewman due to the system flexibility throughout the topology (particularly within the SRMS/SSRMS joints and links). Since the attachment points of both manipulators span the flexible structure of the ISS, simulation analysis may also need to take that into consideration. Moreover, due to the lengthy time duration associated with the maneuver and repair, orbital effects become a factor and require the ISS vehicle control system to maintain active attitude control. Several facets of the ORM operation make the associated analytical efforts different from previous mission support, including: (1) the magnitude of the SRMS handled payload (Le., Orbiter class), (2) the orbital effects induced on the integrated system consisting of the large Shuttle and ISS masses connected by a light flexible SRMS, (3) long duration environmental consequences due to the lengthy operational times associated with the maneuver and repair of the TPS, (4) active attitude control (as opposed to free drift) interacting with the SRMS and SSRMS manipulators (also due to the length of the maneuver and repair), (5) relative dynamics between the EVA crewman and thc worksite influenced by the extended flexible topology. In order to meet these analysis challenges, an ORM simulation architecture was developed leveraging upon numerous pre-existing simulation elements to analyze the various subsystems individually. For example, core manipulator subsystem simulations for both the SRMS and SSRMS were originally combined to provide the dual-arm dynamics topology simulation (in the absence of orbital dynamics and vehicle control). This capability was later merged with the simulation used to analyze SRMS loading with a heavy payload in the orbital environment with an active payload control system (in this case, the ISS Attitude Control System (ACS)), configured for the ORM. The resulting worksite dynamics simulation, based off of the modified ORM simulation, provided the extended topological chain of vehicles and manipulators, while taking into account the orbital effects of both the Shuttle and ISS (as well as its ACS). Verification and validation (V&V) of these integrated simulations became a challenge in itself. A systematic approach needed to be developed such that integration simulation results could be tested against previous constituent simulations upon which these simulations were built. General V&V categories included: (1) core orbital state propagation, (2), stand-alone SRMS, (3) stand-alone SSRMS, (4) stand-alone ISS ACS, (5) integrated Shuttle, SRMS, ISS (with active ACS) in the orbital environment, and (5) dual-arm SRMS/SSRMS dynamics topology. Integrated simulation V&V run suites were created and correlated to verification runs from subsystem simulations, in order to establish the validity of the results. This paper discusses the simulation design challenges encountered while developing simulation capabilities to mirror the ORM operations. The paper also describes the incremental build approach that was utilized, starting with the subsystem simulation elements and integration into increasing more complex simulations until the resulting ORM worksite dynamics simulation had been assembled. Furthermore, the paper presents an overall integrated simulation V&V methodology based upon a subsystem level testing, integrated comparisons, and phased checkout.

Thermal Protection System↗

Mars Science Laboratory Overview and MSL EDL Challenges

An overview of Mars Science Laboratory (MSL) Entry, Descent and Landing (EDL) challenges is presented. The topics include: 1) MSL Project Overview; 2) Mars Science Laboratory Top Level Schedule (Single Launch); 3) EDL Challenges; 4) MSL Surface System; 5) Mars Rover Wheel Family Tree; 6) Gusev Comparisons; 7) Mars Surface Accessibility; 8) Atlas V 401 Launch Performance; 9) Parachute Deployment Altitude Variation with Time of Year and Latitude; 10) Dust Storms and Winds; 11) Nominal MSL EDL Timeline; and 12) Specific EDL Challenges.

Umland, Jeffrey W.↗

Life Support Requirements and Challenges for NASA's Constellation Program

NASA's Constellation Program, which includes the mission objectives of establishing a permanently-manned lunar Outpost, and the exploration of Mars, poses new and unique challenges for human life support systems that will require solutions beyond the Shuttle and International Space Station state of the art systems. In particular, the requirement to support crews for 210 days duration at the lunar outpost with limited resource resupply capability wilt require closed-loop regenerative life support systems with minimal expendables. Planetary environmental conditions such as lunar dust and extreme temperatures, as well as the capability to support frequent and extended-duration EVA's will be particularly challenging. This presentation will summarize the key program and mission life support requirements for the Constellation Program and the unique challenges they present for technology and architecture development.

Carasquillo, Robyn↗

Research Infrastructure Challenges for Graduate Programs in STEM Disciplines at Minority Institutions

It is much more challenging to perform experimental research functions at many minority institutions, because of lack of adequate research infrastructure. This is especially true if one wishes to initiate and implement masters and doctoral degree program in physics. In the present paper, an attempt is made to discuss the various hurdles encountered by the authors in the establishment of Master's and Doctoral degree programs in physics at one of the HBCUs (Historically Black Colleges and Universities). The department got no special or necessary treatment and faculty members are asked to teach as much course work as any other undergraduate department on the campus. It was very hard to convince university administration that giving less teaching load to research producing department faculty, shall culminate in abundant funding for the future years. This scenario created an extra heavy pressure on the faculty to continue the program. Some of the challenges included the resistance of some faculty and administrators to change, lack of sufficient release time for research producing faculty, and potential variation in funding or support with changes in the state education budget proration or members of the administration. In spite of the indirect cost recovery, very little infrastructure facilities was provided and the federal funding agencies did not want to interfere in the administration of the university. Various issues of recruiting and mentoring minority students, retention in the STEM disciplines as well as research infrastructure challenges at an HBCU university are presented.

Aggarwal, M. D.↗

Current Challenges for HTCMC Aero-Propulsion Components

In comparison to the best metallic materials, HTCMC aero-propulsion engine components offer the opportunity of reduced weight and higher temperature operation, with corresponding improvements in engine cooling requirements, emissions, thrust, and specific fuel consumption. Although much progress has been made in the development of advanced HTCMC constituent materials and processes, major challenges still remain for their implementation into these components. The objectives of this presentation are to briefly review (1) potential HTCMC aero-propulsion components and their generic material performance requirements, (2) recent progress at NASA and elsewhere concerning advanced constituents and processes for meeting these requirements, (3) key HTCMC component implementation challenges that are currently being encountered, and (4) on-going activities within the new NASA Fundamental Aeronautics Program that are addressing these challenges.

DiCarlo, James A.↗

Mars Reconnaissance Orbiter Mission: Systems Engineering Challenges on the Mars Reconnaissance Orbiter Mission

MRO project is a system of systems requiring system engineering team to architect, design, integrate, test, and operate these systems at each level of the project. The challenge of system engineering mission objectives into a single mission architecture that can be integrated tested, launched, and operated. Systems engineering must translate high-level requirements into integrated mission design. Systems engineering challenges were overcome utilizing a combination by creative designs built into MRO's flight and ground systems: a) Design of sophisticated spacecraft targeting and data management capabilities b) Establishment of a strong operations team organization; c) Implementation of robust operational processes; and d) Development of strategic ground tools. The MRO system has met the challenge of its driving requirements: a) MRO began its two-year primary science phase on November 7, 2006, and by July 2007, met it minimum requirement to collect 15 Tbits of data after only eight months of operations. Currently we have collected 22 Tbits. b) Based on current performance, mission data return could return 70 Tbits of data by the end of the primary science phase in 2008.

systems engineering↗

A Survey of Terrestrial Approaches to the Challenge of Lunar Dust Containment

Numerous technical challenges exist to successfully extend lunar surface exploration beyond the tantalizing first steps of Apollo. Among these is the challenge of lunar dust intrusion into the cabin environment. Addressing this challenge includes the design of barriers to intrusion as well as techniques for removing the dust from the cabin atmosphere. Opportunities exist for adapting approaches employed in dusty industrial operations and pristine manufacturing environments to cabin environmental quality maintenance applications. A survey of process technologies employed by the semiconductor, pharmaceutical, food processing, and mining industries offers insight into basic approaches that may be suitable for adaptation to lunar surface exploration applications.

Aguilera, Tatiana↗

Using Unmanned Aircraft Systems (UAS) for Remote Sensing: Airspace Access Challenges

Several areas of scientific interest have been identified that would significantly benefit from using Unmanned Aircraft Systems (UAS) for gathering remote sensing data. UAS are uniquely suited for applications that require long dwell times and/or in locations that are generally too dangerous for manned aircraft. Sea ice characterization, mapping of fault lines, hurricane monitoring, and satellite validation are some examples of applications that are benefited by the use of UAS. UAS are not without their challenges, however. Instruments must be automated and miniaturized, and be able to operate in extreme conditions (i.e. high altitude environments). However, because UAS currently lack a see-and-avoid capability, the greatest challenge is getting access to the airspace required to accomplish science missions. The ability for UAS to access airspace varies from country to country. This paper will give a brief overview of different UAS remote sensing applications, and will address general world airspace issues and challenges with a specific look at the United States.

Mulac, Brenda L.↗

Investment in Open Innovation Service Providers: NASA's Innovative Strategy for Solving Space Exploration Challenges

In an effort to expand routes for open communication and create additional opportunities for public involvement with NASA, Open Innovation Service Provider (OISP) methodologies have been incorporated as a tool in NASA's problem solving strategy. NASA engaged the services of two OISP providers, InnoCentive and Yet2.com, to test this novel approach and its feasibility in solving NASA s space flight challenges. The OISPs were chosen based on multiple factors including: network size and knowledge area span, established process, methodology, experience base, and cost. InnoCentive and Yet2.com each met the desired criteria; however each company s approach to Open Innovation is distinctly different. InnoCentive focuses on posting individual challenges to an established web-based network of approximately 200,000 solvers; viable solutions are sought and granted a financial award if found. Based on a specific technological need, Yet2.com acts as a talent scout providing a broad external network of experts as potential collaborators to NASA. A relationship can be established with these contacts to develop technologies and/or maintained as an established network of future collaborators. The results from the first phase of the pilot study have shown great promise for long term efficacy of utilizing the OISP methodologies. Solution proposals have been received for the challenges posted on InnoCentive and are currently under review for final disposition. In addition, Yet2.com has identified new external partners for NASA and we are in the process of understanding and acting upon these new opportunities. Compared to NASA's traditional routes for external problem solving, the OISP methodologies offered NASA a substantial savings in terms of time and resources invested. In addition, these strategies will help NASA extend beyond its current borders to build an ever expanding network of experts and global solvers.

Fogarty, Jennifer A.↗

Verification Challenges of Dynamic Testing of Space Flight Hardware

The Six Degree-of-Freedom Dynamic Test System (SDTS) is a test facility at the National Aeronautics and Space Administration (NASA) Johnson Space Center in Houston, Texas for performing dynamic verification of space structures and hardware. Some examples of past and current tests include the verification of on-orbit robotic inspection systems, space vehicle assembly procedures and docking/berthing systems. The facility is able to integrate a dynamic simulation of on-orbit spacecraft mating or demating using flight-like mechanical interface hardware. A force moment sensor is utilized for input to the simulation during the contact phase, thus simulating the contact dynamics. While the verification of flight hardware presents many unique challenges, one particular area of interest is with respect to the use of external measurement systems to ensure accurate feedback of dynamic contact. There are many commercial off-the-shelf (COTS) measurement systems available on the market, and the test facility measurement systems have evolved over time to include two separate COTS systems. The first system incorporates infra-red sensing cameras, while the second system employs a laser interferometer to determine position and orientation data. The specific technical challenges with the measurement systems in a large dynamic environment include changing thermal and humidity levels, operational area and measurement volume, dynamic tracking, and data synchronization. The facility is located in an expansive high-bay area that is occasionally exposed to outside temperature when large retractable doors at each end of the building are opened. The laser interferometer system, in particular, is vulnerable to the environmental changes in the building. The operational area of the test facility itself is sizeable, ranging from seven meters wide and five meters deep to as much as seven meters high. Both facility measurement systems have desirable measurement volumes and the accuracies vary within the respective volumes. In addition, because this is a dynamic facility with a moving test bed, direct line-of-sight may not be available at all times between the measurement sensors and the tracking targets. Finally, the feedback data from the active test bed along with the two external measurement systems must be synchronized to allow for data correlation. To ensure the desired accuracy and resolution of these systems, calibration of the systems must be performed regularly. New innovations in sensor technology itself are periodically incorporated into the facility s overall measurement scheme. In addressing the challenges of the measurement systems, the facility is able to provide essential position and orientation data to verify the dynamic performance of space flight hardware.

Winnitoy, Susan↗

Zero to Integration in Eight Months, the Dawn Ground Data System Engineering Challenge

The Dawn Project has presented the Ground Data System (GDS) with technical challenges driven by cost and schedule constraints commonly associated with National Aeronautics and Space Administration (NASA) Discovery Projects. The Dawn mission consists of a new and exciting Deep Space partnership among: the Jet Propulsion Laboratory (JPL), manages the project and is responsible for flight operation; Orbital Sciences Corporation (OSC), is the spacecraft builder and is responsible for flight system test and integration; and the University of California, at Los Angeles (UCLA), is responsible for science planning and operations. As a cost-capped mission, one of Dawn's implementation strategies is to leverage from both flight and ground heritage. OSC's ground data system is used for flight system test and integration as part of the flight heritage strategy. Mission operations, however, are to be conducted with JPL's ground system. The system engineering challenge of dealing with two heterogeneous ground systems emerged immediately. During the first technical interchange meeting between the JPL's GDS Team and OSC's Flight Software Team, August 2003, the need to integrate the ground system with the flight software was brought to the table. This need was driven by the project's commitment to enable instrument engineering model integration in a spacecraft simulator environment, for both demonstration and risk mitigation purposes, by April 2004. This paper will describe the system engineering approach that was undertaken by JPL's GDS Team in order to meet the technical challenge within a non-negotiable eight-month schedule. Key to the success was adherence to fundamental systems engineering practices: decomposition of the project request into manageable requirements; integration of multiple ground disciplines and experts into a focused team effort; definition of a structured yet flexible development process; definition of an in-process risk reduction plan; and aggregation of the intermediate products to an integrated final product. In addition, this paper will highlight the role of lessons learned from the integration experience. The lessons learned from an early GDS deployment have served as the foundation for the design and implementation of the Dawn Ground Data System.

Ground Data System (GDS)↗

The Mock LISA Data Challenges: History, Status, Prospects

This slide presentation reviews the importance for the Mock LISA Data Challenges (MLDC). Laser Interferometer Space Antenna (LISA) is a gravitational wave (GW) observatory that will return data such that data analysis is integral to the measurement concept. Further rationale of the MLDC are to kickstart the development of a LISA data-analysis computational infrastructure, and to encourage, track, and compare progress in LISA data-analysis development in the open community. The MLDCs is a coordinated, voluntary effort in GW community, that will periodically issue datasets with synthetic noise and GW signals from sources of undisclosed parameters; increasing difficulty. The challenge participants return parameter estimates and descriptions of search methods. Some of the challenges and the resultant entries are reviewed. The aim is to show that LISA data analysis is possible, and to develop new techniques, using multiple international teams for the development of LISA core analysis tools

data analysis↗

Web Design for Space Operations: An Overview of the Challenges and New Technologies Used in Developing and Operating Web-Based Applications in Real-Time Operational Support Onboard the International Space Station, in Astronaut Mission Planning and Mission Control Operations

The International Space Station (ISS) Operations Planning Team, Mission Control Centre and Mission Automation Support Network (MAS) have all evolved over the years to use commercial web-based technologies to create a configurable electronic infrastructure to manage the complex network of real-time planning, crew scheduling, resource and activity management as well as onboard document and procedure management required to co-ordinate ISS assembly, daily operations and mission support. While these Web technologies are classified as non-critical in nature, their use is part of an essential backbone of daily operations on the ISS and allows the crew to operate the ISS as a functioning science laboratory. The rapid evolution of the internet from 1998 (when ISS assembly began) to today, along with the nature of continuous manned operations in space, have presented a unique challenge in terms of software engineering and system development. In addition, the use of a wide array of competing internet technologies (including commercial technologies such as .NET and JAVA ) and the special requirements of having to support this network, both nationally among various control centres for International Partners (IPs), as well as onboard the station itself, have created special challenges for the MCC Web Tools Development Team, software engineers and flight controllers, who implement and maintain this system. This paper presents an overview of some of these operational challenges, and the evolving nature of the solutions and the future use of COTS based rich internet technologies in manned space flight operations. In particular this paper will focus on the use of Microsoft.s .NET API to develop Web-Based Operational tools, the use of XML based service oriented architectures (SOA) that needed to be customized to support Mission operations, the maintenance of a Microsoft IIS web server onboard the ISS, The OpsLan, functional-oriented Web Design with AJAX

Khan, Ahmed↗

Assessment of Aerodynamic Challenges of a Variable-Speed Power Turbine for Large Civil Tilt-Rotor Application

The main rotors of the NASA Large Civil Tilt-Rotor notional vehicle operate over a wide speed-range (100% at take-off to 54% at cruise). The variable-speed power turbine, when coupled to a fixed-gear-ratio transmission, offers one approach to accomplish this speed variation. The key aero-challenges of the variable-speed power turbine are related to high work factors at cruise, where the power turbine operates at 54% of take-off speed, wide incidence variations into the vane, blade, and exit-guide-vane rows associated with the power-turbine speed change, and the impact of low aft-stage Reynolds number (transitional flow) at 28 kft cruise. Meanline and 2-D Reynolds-Averaged Navier- Stokes analyses are used to characterize the variable-speed power-turbine aerodynamic challenges and to outline a conceptual design approach that accounts for multi-point operation. Identified technical challenges associated with the aerodynamics of high work factor, incidence-tolerant blading, and low Reynolds numbers pose research needs outlined in the paper

Welch, Gerand E.↗

Active Debris Removal - A Grand Engineering Challenge for the Twenty-First Century

The collision between Iridium 33 and Cosmos 2251 in 2009 underlined the potential of an ongoing collision cascade effect (the Kessler Syndrome ) in the near-Earth orbital debris environment. A 2006 NASA analysis of the instability of the debris population in the low Earth orbit (LEO, the region below 2000 km altitude) shows that the environment has reached a point where the debris population will continue to increase in the next 200 years, even without any future launches. The increase is driven by fragments generated via collisions among existing objects in LEO. In reality, the situation will be worse than this prediction because satellite launches will continue and unexpected major breakups may continue to occur. Mitigation measures commonly adopted by the international space community (such as the 25-year rule) will help, but will be insufficient to stop the population growth. To better preserve the near-Earth space environment for future generations, active debris removal (ADR) should be considered. The idea of active debris removal is not new. However, due to the monumental technical, resource, operational, legal, and political challenges associated with removing objects from orbit, it has not yet been widely considered feasible. The recent major breakup events and the environment modeling efforts have certainly reignited the interest in using active debris removal to remediate the environment. This trend is further highlighted by the National Space Policy of the United States of America, released by the White House in June 2010, where the President explicitly directs NASA and the Department of Defense to pursue research and development of technology and techniques, to mitigate and remove on-orbit debris, reduce hazards, and increase understanding of the current and future debris environment. A 2009 modeling study by the NASA Orbital Debris Program Office has shown that, in order to maintain the LEO debris population at a constant level for the next 200 years, an active debris removal of about five objects per year is needed. The targets identified for removal are those with the highest mass and collision probability products. Analyses from the study indicate that the majority of those objects are spent upper stages with masses ranging from 1 to more than 8 metric tons, residing in several altitude regions and concentrated in about 10 inclination bands. To remove five of those objects per year in a cost-effective manner truly represents a grand challenge in engineering and technology development. An end-to-end debris removal operation includes, in general terms, launches orbit rendezvous, precision tracking, stabilization (of the tumbling motion), capture, and deorbit of the targets. An ADR system deigned to remove a single object is not very cost-effective. Therefore, the repeatability of the removal system is almost a requirement. Some of the technologies involved in the ADR process do exist, but the difficulty is to make them more cost effective. Other technologies, such as ways to stabilize a massive tumbling upper stage and the capture mechanisms, are new and will require major innovative research and development efforts. This paper summarizes an updated assessment of the environment, including what needs to be done to control the population growth, and outlines the major engineering and technology challenges to carry out active debris removal to preserve the environment.

Liou, Jer-Chyi↗

Comparison of Traditional and Innovative Techniques to Solve Technical Challenges

Although NASA has an adequate food system for current missions, research is required to accommodate new requirements for future NASA exploration missions. The Inadequate Food System risk reflects the need to develop requirements and technologies that will enable NASA to provide the crew with a safe, nutritious and acceptable food system while effectively balancing appropriate resources such as mass, volume, and crew time in exploratory missions. As we go deeper into space or spend more time on the International Space Station (ISS), there will be requirements for packaged food to be stored for 3 5 years. New food packaging technologies are needed that have adequate oxygen and water barrier properties to maintain the foods' quality over this extended shelf life. NASA has been unsuccessful in identify packaging materials that meet the necessary requirements when using several traditional routes including literature reviews, workshops, and internal shelf life studies on foods packaged in various packaging materials. Small Business Innovative Research grants were used for accelerating food packaging materials research with limited success. In order to accelerate the process, a theoretical challenge was submitted to InnoCentive resulting in a partial award. A similar food packaging challenge was submitted to Yet2.com and several potential commercial packaging material suppliers were identified that, at least partially, met the requirements. Comparisons and results of these challenges will be discussed.

Perchonok, Michele↗