Search NASA⌕ Search

SEARCH · Search NASA

Results for “grid interconnection”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 325 records · Page 18

Small Reactors in Microgrids: Technical Studies Guidance

This report provides initial guidance for the technical studies that are needed for the integration of small reactors (SR)—i.e., small modular reactors (SMR) and microreactors—in microgrids. Power-system engineering issues related to the configuration of these microgrids and their interconnection and interaction with the grid are identified. This guidance applies microgrid concepts to the deployment of SRs for a range of use cases (scenarios). Further, it identifies issues and necessary studies related to laboratory testing and validation of various configurations of SR in microgrids.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Electrolytic Renewable Fuel Production Optimal Operation Investigation - H2@Scale: Cooperative Research and Development Final Report, CRADA Number CRD-19-00818

This work explored the optimal design and operation of electrolytic hydrogen production from renewable power. While there are many financial incentives for renewable hydrogen, this work investigated the effects of Low Carbon Fuel Standards (LCFS) on the hydrogen breakeven cost. To this end, this project developed optimized operational strategies for electrolytic hydrogen facilities in the California. Four specific model projects were used as the basis for the analysis. Three model projects will be located in California and one in Texas or the Midwest to be determined during the project. All projects include interconnection to the natural gas grid as a method of transport for the product fuel and the hydrogen cases will also consider alternative modes of transport. The operational optimization will maximize project return through fuel production and grid services based on future scenarios for the value of each. The effort will rely on modeling tools developed by NREL and the UCI for grid modeling as well as the integrated resource planning tool (IRP), RESOLVE, which is the official IRP tool used by the California Public Utility Commission (CPUC). The development of this project can help to inform future hydrogen deployment, policy and regulation makers, research and development decisions, and private and public investment.

08 HYDROGEN↗

Generator Interconnection Costs to the Transmission System in non-ISO Balancing Authorities [Slides]

Electric transmission system operators—including Independent System Operators (ISOs), Regional Transmission Organizations (RTOs), and utilities—require proposed power plants to undergo a series of interconnection studies before connecting to the grid. These studies assess what transmission upgrades or new infrastructure may be necessary and assign the associated costs to the project. Lawrence Berkeley National Laboratory has compiled, aggregated, and cleaned interconnection cost data, originally for ISOs/RTOs, and now for five non-ISO Balancing Authorities: PacifiCorp, Bonneville Power Authority, Duke Energy Progress, Duke Energy Carolinas and Duke Energy Florida. Insufficient transparency in interconnection cost data may contribute to rapidly expanding interconnection queues, with active queue capacities tripling between 2020 and 2024 in the studied BAs. Most projects withdraw after receiving high interconnection cost estimates. Interconnection costs have increased since the early 2000s, with average costs for "complete" projects reaching $194/kW between 2018 and 2024. Active queue projects and withdrawn projects incur substantially higher costs, primarily due to rising network upgrade costs. Recent interconnection costs in non-ISO balancing authorities are higher than in ISO regions, potentially due to a greater willingness to pay among developers. Utility-scale solar, wind, and storage projects have interconnection costs that exceed those for natural gas. However, when focusing on projects that do not withdraw from the queue, the interconnection costs for these technologies are more similar to natural gas projects. Other key findings include: (1) Larger generation projects benefit from lower proportional interconnection costs, (2) capacity transmission service (NRIS) often requires additional network investments, and (3) projects with high network upgrade costs are often clustered geographically. The dataset includes results from 2,104 interconnection studies conducted between 2000 and 2024, covering projects that are operational, withdrawn, or still progressing through the study process. The Excel file contains (a) the complete project-level interconnection cost dataset, and (b) seven additional tabs summarizing cost metrics across dimensions such as time, market structure, cost category (point of interconnection vs. broader network upgrades), fuel type, service type (ERIS vs. NRIS), generator size, and geography.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Coolidge solar powered irrigation pumping project

A 150 kW solar thermal electric power plant which includes over 2100 square meters of parabolic trough type collectors and an organic Rankine cycle turbine engine was constructed on an irrigated farm. The plant is interconnected with the electrical utility grid. Operation is providing an evaluation of equipment performance and operating and maintenance requirements as well as the desirability of an on farm location.

Larson, D. L.↗

The NASTRAN user's manual (level 17.0)

NASTRAN embodies a lumped element approach, wherein the distributed physical properties of a structure are represented by a model consisting of a finite number of idealized substructures or elements that are interconnected at a finite of grid points, to which loads are applied. All input and output data pertain to the idealized structural model. The general procedures for defining structural models are described and instructions are given for each of the bulk data cards and case control cards. Additional information on the case control cards and use of parameters is included for each rigid format.

Source record↗

3D X-ray CT for BGA/CGA Workmanship Defect Detection

Commercial-off-the-shelf (COTS) advanced microelectronic technologies in high-reliability versions are now being considered for use in a number of National Aeronautics and Space Administration (NASA) electronic systems. One of the key drawbacks of advanced electronic packages with hidden solder joint interconnections, such as the column grid array (CGA), is that inspection can be challenging—whether visually or using X-rays. In general, inspection for solder joint integrity is poor, except for identifying shorts. The new, advanced X-ray systems, especially the 3D computer tomography version, may be able to provide the three-dimensional features that are extremely difficult to resolve under the 2D systems.This report presents both 2D and 3D X-ray images along with their representative optical photomicrographs for a number of advanced electronics package assemblies including 3D stack and CGA assemblies before and after thermal cycling.

Ghaffarian, Reza↗

Operational Benefits of Meeting California's Energy Storage Targets

In October 2013, the California Public Utilities Commission (CPUC) finalized procurement targets and other requirements to its jurisdictional utilities for a minimum of 1,325 MW of 'viable and cost-effective' energy storage systems by 2020. The goal of this study is to explore several aspects of grid operations in California and the Western Interconnection resulting from meeting the CPUC storage targets. We perform this analysis using a set of databases and grid simulation tools developed and implemented by the CPUC, the California Independent System Operator (CAISO), and the California Energy Commission (CEC) for the CPUC's Long-term Procurement Plan (LTPP). The 2014 version of this database contains information about generators, storage, transmission, and electrical demand, for California in the year 2024 for both 33% and 40% renewable energy portfolios. We examine the value of various services provided by energy storage in these scenarios. Sensitivities were performed relating to the services energy storage can provide, the capacity and duration of storage devices, export limitations, and negative price floor variations. Results show that a storage portfolio, as outlined by the CPUC, can reduce curtailment and system-wide production costs for 33% and 40% renewable scenarios. A storage device that can participate in energy and ancillary service markets provides the grid with the greatest benefit; the mandated storage requirement of 1,325 MW was estimated to reduce the total cost of production by about 78 million per year in the 33% scenario and 144 million per year in the 40% scenario. Much of this value is derived from the avoided start and stop costs of thermal generators and provision of ancillary services. A device on the 2024 California grid and participating in only ancillary service markets can provide the system with over 90% of the value as the energy and ancillary service device. The analysis points to the challenge of new storage providing regulation reserve, as the added storage could provide about 75% of the regulation up requirement for all of California, which would likely greatly reduce regulation prices and potential revenue. The addition of storage in California decreases renewable curtailment, particularly in the 40% RPS case. Following previous analysis, storage has a mixed impact on emissions, generally reducing emissions, but also creating additional incentives for increased emissions from out-of-state coal generations. Overall, storage shows significant system cost savings, but analysis also points to additional challenges associated with full valuation of energy storage, including capturing the operational benefits calculated here, but also recovering additional benefits associated avoided generation, transmission, and distribution capacity, and avoided losses.

29 ENERGY PLANNING, POLICY, AND ECONOMY↗

Operational Benefits of Meeting California's Energy Storage Targets

In October 2013, the California Public Utilities Commission (CPUC) finalized procurement targets and other requirements to its jurisdictional utilities for a minimum of 1,325 MW of 'viable and cost-effective' energy storage systems by 2020. The goal of this study is to explore several aspects of grid operations in California and the Western Interconnection resulting from meeting the CPUC storage targets. We perform this analysis using a set of databases and grid simulation tools developed and implemented by the CPUC, the California Independent System Operator (CAISO), and the California Energy Commission (CEC) for the CPUC's Long-term Procurement Plan (LTPP). The 2014 version of this database contains information about generators, storage, transmission, and electrical demand, for California in the year 2024 for both 33 percent and 40 percent renewable energy portfolios. We examine the value of various services provided by energy storage in these scenarios. Sensitivities were performed relating to the services energy storage can provide, the capacity and duration of storage devices, export limitations, and negative price floor variations. Results show that a storage portfolio, as outlined by the CPUC, can reduce curtailment and system-wide production costs for 33 percent and 40 percent renewable scenarios.

29 ENERGY PLANNING, POLICY, AND ECONOMY↗

A method to identify weak points of interconnection of renewable energy resources

The increasing penetration of renewable energy resources (RERs) is challenging power grid planning and operation in maintaining grid reliability. Potential power grid reliability and stability issues may arise when large-scale RERs are connected to a weak power grid. These issues may become more significant due to the mutual interactions among RERs that are interconnected electrically close through a power network. Weakness analysis based on grid strength assessment is useful for identifying the potential weak grid issues. However, when taking into account the impact of the interactions among RERs, the weakness analysis becomes computationally challenging. Different combinations of points of interconnections (POIs) of RERs may have different impacts on grid strength at each POI. Due to the combination nature, such weakness analysis may be time-consuming when identifying the weakest combination of POIs from a large number of potential candidates in realistic power grids. To address this concern, the impact of the power network structure on grid strength is analyzed in this paper. It is found that the impact mainly depends on the impedance ratios at POIs. The findings can be summarized as two criteria to develop a recursive method for fast identification of the weakest combination in this paper. The efficacy of the proposed method is demonstrated through case studies on the IEEE 39-bus system and a realistic power grid.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Redefining What's Possible for Renewable Energy: Grid Integration

The Energy Department's National Renewable Energy Laboratory (NREL) is spearheading engineering innovations that will help optimize the entire energy system, and the lab's analysis capabilities complement that engineering work by identifying ways to integrate renewable energy effectively and economically. This 3-minute video shows how NREL research and analysis are redefining what’s possible for renewable energy on the grid.

14 SOLAR ENERGY↗

Powered by PRECISE [Slides]

This presentation is part of the National Renewable Energy Laboratory's (NREL's) Powered By webinar series, hosted by the Grid Planning and Analysis Center. The series highlights NREL's impressive suite of grid planning and analysis tools to help attendees better understand their capabilities and applications. In this presentation, NREL power grid researchers, Killian McKenna and Darice Guittet, and the principal electrical distribution engineer at Sacramento Municipal Utility District, Sheikh Hassan, discuss NREL's PRECISE interconnection tool. PRECISE automates holistic distributed energy resource interconnection studies for distribution utilities by leveraging diverse utility datasets.

14 SOLAR ENERGY↗

Cyber-Informed Engineering (CIE) Guide for States

The Cyber-Informed Engineering (CIE) Guide for States provides state energy offices, public utility commissions, and partner organizations with a structured framework for integrating cyber-resilient engineering practices into energy planning, grantmaking, interconnection processes, and workforce development. As grid digitalization and the adoption of distributed energy resources accelerate, states face expanding cyber-physical risks that traditional cybersecurity measures alone cannot fully address. CIE offers a proactive, consequence-focused engineering methodology that emphasizes eliminating or mitigating high-impact failure modes through design, physical controls, and operational safeguards. The guide outlines the 12 core CIE principles, demonstrates their application through state-focused use cases—including grant evaluation rubrics, interconnection reviews, allow-list development, and training programs—and provides practical tools such as scoring frameworks, impact assessment methods, and implementation checklists. It also highlights pathways for state–utility collaboration and opportunities for technical assistance from national laboratories. By adopting CIE, states can enhance grid reliability, reduce lifecycle costs, strengthen supply-chain assurance, and foster a security-aware engineering culture that aligns with broader resilience and modernization goals. November 2025

29 - ENERGY PLANNING, POLICY AND ECONOMY↗

Cyber-Informed Engineering (CIE) Guide for States

The Cyber-Informed Engineering (CIE) Guide for States provides state energy offices, public utility commissions, and partner organizations with a structured framework for integrating cyber-resilient engineering practices into energy planning, grantmaking, interconnection processes, and workforce development. As grid digitalization and the adoption of distributed energy resources accelerate, states face expanding cyber-physical risks that traditional cybersecurity measures alone cannot fully address. CIE offers a proactive, consequence-focused engineering methodology that emphasizes eliminating or mitigating high-impact failure modes through design, physical controls, and operational safeguards. The guide outlines the 12 core CIE principles, demonstrates their application through state-focused use cases—including grant evaluation rubrics, interconnection reviews, allow-list development, and training programs—and provides practical tools such as scoring frameworks, impact assessment methods, and implementation checklists. It also highlights pathways for state–utility collaboration and opportunities for technical assistance from national laboratories. By adopting CIE, states can enhance grid reliability, reduce lifecycle costs, strengthen supply-chain assurance, and foster a security-aware engineering culture that aligns with broader resilience and modernization goals. November 2025

29 ENERGY PLANNING, POLICY, AND ECONOMY↗

IM3 GO WEST Parameter Search Dataset

GO WEST is an open-source power grid modeling framework for U.S. Western Interconnection, which allows users to tailor the model depending on their research study and science questions. It is developed to address weather and water dynamics, and associated vulnerabilities in this bulk power system. It covers 28 balancing authorities (BA) and 12 states in U.S. Western Interconnection. GO WEST allows users to select different number of nodes and come up with a simplified network by utilizing 10,000 nodal topology of U.S. Western Interconnection created by Texas A&M University. Users can try and select different number of nodes, mathematical formulations (linear programming vs. mixed-integer linear programming), transmission line limit scaling factors, and hurdle rate scaling factors. GO WEST offers a unit commitment and economic dispatch (UC/ED) module to simulate grid operations on an hourly scale. In this sense, users can calibrate and validate their model versions by comparing model outputs to historical datasets. Therefore, GO WEST can help researchers to strike a balance between model fidelity (i.e. accuracy) and computational complexity (i.e. runtime). This dataset includes model inputs and outputs from 600 model versions for each 2019, 2020, and 2021. The folder naming convention is as follows: Exp{Number of Nodes}_{Mathematical Formulation}_{Transmission Line Limit Scaling Factor in MW}_{Hurdle Rate Scaling Factor in %}_{Year}. Linear programming is designated with "simple" label whereas mixed-integer linear programming is designated with "coal" label. For example, "Exp100_simple_1000_50_2019" folder contains inputs and outputs from 2019 model version with 100 nodes, linear programming, +1000 MW transmission line limit scaling factor, and +50% hurdle rate scaling factor. GO WEST GitHub repository hosts all raw datasets, processing scripts, and model scripts. Please refer to the README file for a detailed description of the included files.

Economics↗

Cooperative Transmission Expansion Planning Experiment Data and Results

GO WEST is an open-source power grid modeling framework for U.S. Western Interconnection, which allows users to tailor the model depending on their research study and science questions. It covers 28 balancing authorities (BA) and 12 states in U.S. Western Interconnection. GO WEST allows users to select different number of nodes and come up with a simplified network by utilizing 10,000 nodal topology of U.S. Western Interconnection created by Texas A&M University. Users can try and select different number of nodes, mathematical formulations (linear programming vs. mixed-integer linear programming), transmission line limit scaling factors, and hurdle rate scaling factors. GO WEST offers a unit commitment and economic dispatch (UC/ED) module to simulate grid operations on an hourly scale. In this sense, users can calibrate and validate their model versions by comparing model outputs to historical datasets. TEP is an open-source transmission capacity expansion model, built on GO WEST framework. It utilizes linear programming to optimize transmission capacity addition investment on existing lines within GO WEST framework. In this sense, TEP model only increases the thermal capacity of existing transmission lines and does not add new lines to the system, which leaves the topology preserved. TEP minimizes the total cost of the system which comprises the operational cost of satisfying electricity demand (i.e., generation cost), cost of loss of load (i.e., unserved energy), cost of power flow, and cost of new transmission capacity additions (i.e., investment cost). In order to use TEP model, users need to create scenarios with GO WEST framework. In this analysis, outputs from several models are used to create future inputs to GO WEST and TEP models, including GCAM-USA, TELL, CERF and reV. This dataset includes experiment inputs and outputs from three different transmission expansion scenarios (cooperative, intermediate, and individual) for 2019 and 2059. For 2019, a base scenario to illustrate the default (i.e., historical) power grid operations is also included. This study utilizes rcp45hotter_ssp3 scenario from a previous version of GCAM-USA simulations. Sources of the shapefiles in supplementary data are HIFLD Open and U.S. Energy Atlas. Please see the README file for a detailed description of the main and supplementary data.

Capacity Expansion Model↗

R3IT, Rapid Rural Resilient Interconnection Toolkit, Final Technical Report

Utilities nationwide are beginning to experience multiple solar interconnection requests per day. This request volume will soon overwhelm utility engineers, especially at smaller utilities which serve the majority of the landmass of the United States. In this project, we developed open-source software tool that automates the interconnection approval process and removes 80% of the time required to approve an interconnection and hence allow more solar to be quickly and safely integrated with the grid. This software is accompanied by a guidebook detailing interconnection best practices and utility lessons learned. Competing solar interconnection software is extremely expensive at ten times the cost of typical distribution engineering tools, it’s closed source which makes it hard to integrate into utility workflows, and it doesn’t address the hardest power flow modeling challenges of interconnection screening. Our solution was built built with our utility partners who are already experiencing multiple interconnection requests per day and integrates best practices from our past work with DOE and the cooperative community on solar integration. The resulting free and open-source solution has been disseminated through our media channels and conferences that engage over 1,900 utilities nationwide.

14 SOLAR ENERGY↗

Interconnection, Integration, and Interactive Impact Analysis of Microgrids and Distribution Systems

Distribution management systems (DMSs) are increasingly used by distribution system operators (DSOs) to manage the distribution grid and to monitor the status of both power imported from the transmission grid and power generated locally by a distributed energy resource (DER), to ensure that power flows and voltages along the feeders are maintained within designed limits and that appropriate measures are taken to guarantee service continuity and energy security. When microgrids are deployed and interconnected to the distribution grids, they will have an impact on the operation of the distribution grid. The challenge is to design this interconnection in such a way that it enhances the reliability and security of the distribution grid and the loads embedded in the microgrid, while providing economic benefits to all stakeholders, including the microgrid owner and operator and the distribution system operator.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Grid connection barriers to renewable energy deployment in the United States

Bulk-power grid connection is an emerging bottleneck to the entry of wind, solar, and storage but has been understudied due to a lack of data. We create and analyze two novel interconnection datasets with more than 38,000 project-level observations that provide new information documenting interconnection challenges in the United States. Active grid connection requests are more than double the total installed capacity of the US power plant fleet (2,600 vs. 1,280 GW). The time required to secure a connection has increased by 70% over the last decade, and withdrawal rates remain high at 80%, suggesting a constrained transmission system that jeopardizes energy transition targets. Wide distributions of interconnection costs indicate the inherent uncertainty of the interconnection process. Interconnection requests that identify large transmission upgrades tend to withdraw from the process. These findings suggest the need for interconnection reforms, tighter links between long-term transmission planning and project-level interconnection processes, and more interconnection outcome transparency.

29 ENERGY PLANNING, POLICY, AND ECONOMY↗