Solid-State Lighting: Early Lessons Learned on the Way to the Market Report Summary

Summary of lessons learned from 2014 analysis of the early stages of solid-state lighting market introduction in the U.S., which also summarizes early actions taken to avoid potential problems anticipated based on lessons learned from the market introduction of compact fluorescent lamps.

ssl, lighting, LED, energy, performance, testing, ↗

Establishing Building-Level Energy Goals in Procurement Documents: Lessons Learned from Pilot Utility and Portfolio Projects: Preprint

Encouraging commercial building owners to set measurable energy goals before design begins can drive design and contractor teams to develop innovative energy efficiency solutions within conventional building budgets. A federal building owner piloted this technique and created a large-scale zero energy office building on a budget comparable to local market construction rates. The successes and lessons learned from this performance-based procurement project formed the basis of an expanded program using utilities as the outreach channel to replicate the approach. The utilities delivered incentive-based offerings to focus building owners on the whole building rather than on individual building components and systems. In addition, a ripple effect was evident, with individual building owners as well as owners of multiple-building portfolios adopting the techniques, sometimes with variations, but always maintaining the same core principles. The original performance-based procurement process and its successful implementation in a federal building project informed all these efforts. Those successes and lessons learned demonstrate that the approach can be adapted to utility programs with some variation and is a powerful tool for engaging building owners as they make critical design decisions that impact energy performance over the life of the building.

32 ENERGY CONSERVATION, CONSUMPTION, AND UTILIZATI↗

Establishing Building-Level Energy Goals in Procurement Documents: Lessons Learned from Pilot Utility and Portfolio Projects

Encouraging commercial building owners to set measurable energy goals before design begins can drive design and contractor teams to develop innovative energy efficiency solutions within conventional building budgets. A federal building owner piloted this technique and created a large-scale zero energy office building on a budget comparable to local market construction rates. The successes and lessons learned from this performance-based procurement project formed the basis of an expanded program using utilities as the outreach channel to replicate the approach. The utilities delivered incentive-based offerings to focus building owners on the whole building rather than on individual building components and systems. In addition, a ripple effect was evident, with individual building owners as well as owners of multiple-building portfolios adopting the techniques, sometimes with variations, but always maintaining the same core principles. The original performance-based procurement process and its successful implementation in a federal building project informed all these efforts. Those successes and lessons learned demonstrate that the approach can be adapted to utility programs with some variation and is a powerful tool for engaging building owners as they make critical design decisions that impact energy performance over the life of the building.

32 ENERGY CONSERVATION, CONSUMPTION, AND UTILIZATI↗

From Theory to Practice: Lessons Learned from an Advanced M&V Commercial Pilot

Advanced measurement & verification (M&V), or M&V 2.0, is an energy data analysis method using advanced metering infrastructure (AMI) data in combination with analytics to quantify energy efficiency project savings. Advanced M&V is viewed as an enabler for underutilized behavioral, retrocommissioning, and holistic multi-measure efficiency efforts, as quantifying savings for these programs with existing methods has typically been very challenging. Despite its promise, there are still several unanswered questions about the use of advanced M&V such as: How accurately can these tools quantify energy savings? How can advanced M&V satisfy regulatory requirements for rigorous savings estimates? Where and how does advanced M&V intersect with traditional impact evaluation and the principles of ‘embedded’ evaluation, measurement & verification (EM&V)? Pilots are being pursued in various regions and program contexts to address these research questions. However, results from these pilots are rarely made public, meaning that lessons may not be widely shared and the scope of analyses varies widely. The paper presents encouraging results from a recent advanced M&V pilot and discusses key process-related aspects such as managing AMI data and refining analysis methodologies. An approach to reviewing and classifying projects based on savings characteristics and magnitude is demonstrated, as a potential risk management tool. The authors also demonstrate how advanced M&V can identify underperforming projects and non-routine events in a timely manner. The paper also outlines lessons learned from this and other recent pilot activity and barriers to be overcome in moving toward the goal of widespread adoption of holistic meter-based programs.

Crowe, Eliot↗

Federal Automotive Statistical Tool: Asset-Level Data - Lessons Learned and Looking Forward

This presentation provides an overview of collecting federal motor vehicle fleet data at the individual vehicle level for the first time during the fall of 2017, lessons learned related how that data was validated, and changes being made based on those lessons. This presentation is one of three comprising a panel discussion with representatives from other Federal agencies. FAST is a Web-based information system managed by the US Department of Energy, the US General Services Administration, and the Energy Information Administration. FAST is used to collect information about the fleet of motor vehicles used and managed by the Federal government.

99 GENERAL AND MISCELLANEOUS↗

Target Control and Protection Systems Lessons from SNS Operations

The Spallation Neutron Source (SNS) at Oak Ridge National Laboratory has been in operations since 2006 and proposes a project to build a Second Target Station (STS) to effectively double potential scientific output. The SNS target controls operate in a harsh environment which includes high radiation, exposure to gaseous radionuclides, and activated liquid mercury and mercury vapor. These conditions necessitate protective interlocks and credited controls for protection functions to ensure proper response to off-normal conditions. In order to inform the design of target controls for the STS, we have examined lessons learned during SNS operations regarding the design and implementation of the control and protection systems for the first target station (FTS). This paper will examine various aspects of the performance of the target control and protection systems including reliability, maintainability and sustainability given the challenging environment created by 1.4 MW operations. Specific topics include distributed control of various target subsystems, response to loss of power, selection of nuclear grade instrumentation, and applying these lessons to the design for the STS project.

Humphreys, Dana↗

Challenges and Lessons Learned from fabrication, testing and analysis of eight MQXFA Low Beta Quadrupole magnets for HL-LHC

By the end of October 2022, the US HL-LHC Accelerator Upgrade Project (AUP) had completed fabrication of ten MQXFA magnets and tested eight of them. The MQXFA magnets are the low beta quadrupole magnets to be used in the Q1 and Q3 Inner Triplet elements of the High Luminosity LHC. This AUP effort is shared by BNL, Fermilab, and LBNL, with strand verification tests at NHMFL. An important step of the AUP QA plan is the testing of MQXFA magnets in a vertical cryostat at BNL. The acceptance criteria that could be tested at BNL were all met by the first four production magnets (MQXFA03-MQXFA06). Subsequently, two magnets (MQXFA07 and MQXFA08) did not meet some criteria and were disassembled. Lessons learned during the disassembly of MQXFA07 caused a revision to the assembly specifications that were used for MQXFA10 and subsequent magnets. In this paper, we present a summary of: 1) the fabrication and test data of all the MQXFA magnets; 2) the analysis of MQXFA07/A08 test results with characterization of the limiting mechanism; 3) the outcome of the investigation, including the lessons learned during MQXFA07 disassembly; and 4) the finite element analysis correlating observations with test performance.

43 PARTICLE ACCELERATORS↗

Lessons Learned From Ventilation and Glovebox Flooding Via Overfilling of the Wet Vacuum System in a Plutonium Facility

In the summer of 2021, operations personnel requested maintenance personnel to fill a wet vacuum (Wetvac) seal water tank in a plutonium facility at Los Alamos National Laboratory (LANL). After the filling was finished, the fill valve of the Wetvac seal water tank was left open and a ‘dead-man’ valve on an isolation line failed to close properly. After a series of other failures, the water exited the glovebox and contaminated three rooms of the first floor of the facility and an underlying area in the basement. A retrospective analysis of this event determined that there was no risk of a criticality due to the inherent design features of the ventilation system. This paper will explain the driving factors behind how this event was able to happen, as well as some of the major lessons learned that can be universally applied to other nuclear facilities. One of the main causes of the event was the delegation of work to maintenance personnel that were not qualified for the work being asked of them. Additionally, there was a lack of coordination between criticality safety engineers and facility operations equipment owners regarding equipment and connections present on the seal water tanks for the Wetvac, specifically the presence of overflow drain lines. The respective criticality safety evaluation credited an overflow drain line being present on the seal water tanks that was later found to have not been present. Lastly, there are lessons to be learned regarding equipment configuration and designing systems with safety in mind.

46 INSTRUMENTATION RELATED TO NUCLEAR SCIENCE AND ↗

U.S. Department of Energy Office of Legacy Management Legacy Uranium Mine Site Reclamation - Lessons Learned - 12384

The U.S. Department of Energy (DOE) Office of Legacy Management is responsible for administering the DOE Uranium Leasing Program (ULP) and its 31 uranium lease tracts located in the Uravan Mineral Belt of southwestern Colorado (see Figure 1). In addition to administering the ULP for the last six decades, DOE has also undertaken the significant task of reclaiming a large number of abandoned uranium (legacy) mine sites and associated features located throughout the Uravan Mineral Belt. In 1995, DOE initiated a 3-year reconnaissance program to locate and delineate (through extensive on-the-ground mapping) the legacy mine sites and associated features contained within the historically defined boundaries of its uranium lease tracts. During that same time frame, DOE recognized the lack of regulations pertaining to the reclamation of legacy mine sites and contacted the U.S. Bureau of Land Management (BLM) concerning the reclamation of legacy mine sites. In November 1995, The BLM Colorado State Office formally issued the United States Department of the Interior, Colorado Bureau of Land Management, Closure/Reclamation Guidelines, Abandoned Uranium Mine Sites as a supplement to its Solid Minerals Reclamation Handbook (H-3042-1). Over the next five-and-one-half years, DOE reclaimed the 161 legacy mine sites that had been identified on DOE withdrawn lands. By the late 1990's, the various BLM field offices in southwestern Colorado began to recognize DOE's experience and expertise in reclaiming legacy mine sites. During the ensuing 8 years, BLM funded DOE (through a series of task orders) to perform reclamation activities at 182 BLM mine sites. To date, DOE has reclaimed 372 separate and distinct legacy mine sites. During this process, DOE has learned many lessons and is willing to share those lessons with others in the reclamation industry because there are still many legacy mine sites not yet reclaimed. DOE currently administers 31 lease tracts (11,017 ha) that collectively contain over 220 legacy (abandoned) uranium mine sites. This contrasts to the millions of hectares administered by the BLM, the U.S. Forest Service, and other federal, tribal, and state agencies that contain thousands of such sites. DOE believes that the processes it has used provide a practical and cost-effective approach to abandoned uranium mine-site reclamation. Although the Federal Acquisition Regulations preclude DOE from competing with private industry, DOE is available to assist other governmental and tribal agencies in their reclamation efforts. (authors)

11 NUCLEAR FUEL CYCLE AND FUEL MATERIALS↗

Savannah River Site, Liquid Waste Program, Savannah River Remediation American Recovery and Reinvestment Act Benefits and Lessons Learned - 12559

Utilizing funding provided by the American Recovery and Reinvestment Act (ARRA), the Liquid Waste Program at Savannah River site successfully executed forty-one design, procurement, construction, and operating activities in the period from September 2009 through December 2011. Project Management of the program included noteworthy practices involving safety, integrated project teams, communication, and cost, schedule and risk management. Significant upgrades to plant capacity, progress toward waste tank closure and procurement of needed infrastructure were accomplished. Over 1.5 million hours were worked without a single lost work day case. Lessons Learned were continually identified and applied to enhance the program. Investment of Recovery Act monies into the Liquid Waste Program has ensured continued success in the disposition of radioactive wastes and the closure of high level waste tanks at SRS. The funding of a portion of the Liquid Waste Program at SRS by ARRA was a major success. Significant upgrades to plant capacity, progress toward waste tank closure and procurement of needed infrastructure was accomplished. Integrated Project Teams ensured quality products and services were provided to the Operations customers. Over 1.5 million hours were worked without a single lost work day case. Lessons Learned were continually reviewed and reapplied to enhance the program. Investment of Recovery Act monies into the Liquid Waste Program has ensured continued success in the disposition of radioactive wastes and the closure of high level waste tanks at SRS. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Implementation of Lessons Learned - 17406

Following a negative occurrence or event, putting corrective actions into place to address an organisation's systemic and administrative weaknesses is paramount to that organisation's future success. At Los Alamos National Laboratory (LANL, or the Laboratory), recent experiences emphasize this critical point. On February 14, 2014, transuranic (TRU) waste management at DOE facilities changed significantly when a drum of mixed hazardous and TRU (MTRU) waste from LANL breached after its disposal at the Waste Isolation Pilot Plant (WIPP) near Carlsbad, New Mexico. Shortly following the LANL-WIPP event, several internal and external investigations and analyses were conducted by LANL, the U.S. Department of Energy (DOE) and others, including the DOE Inspector General and an Office of Environmental Management Accident Investigation Board (AIB), to determine the cause of the LANL drum breach at WIPP. Internal investigations led LANL to self-disclose non-compliancies including treatment without a permit and improper waste characterization to the New Mexico Environment Department (NMED), leading to a Settlement Agreement in January 2016. The Settlement Agreement, together with the other investigations, led LANL to identify and implement many corrective actions related to its waste management practices. The Laboratory recognized the need to revisit implementation of some fundamental concepts, and noted the following 'Lessons Learned': - Communicating requirements more clearly, - Using technical expertise more effectively, and - Improving implementation of policies and procedures. This paper presents the actions LANL has taken to prevent recurrence and demonstrate the Laboratory's commitment to compliant waste management requirements. They have focused on promoting a better understanding of the regulatory requirements in order to address the key root causes and the resulting Lessons Learned, as follows: - Ensure that all levels of a Project Team understand the regulatory requirements related to performing the work;- Engage RCRA subject matter experts in planning (for both initial project plans and subsequent modifications to plans); - Validate that Project Teams' plans and procedures will be effective in meeting regulatory requirements; and - Verify implementation. We believe the corrective actions taken since the drum event at WIPP will fundamentally improve our way of doing business throughout the Laboratory. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Considerations and Lessons Learned from the Use of Gamma Spectroscopy Systems at FUSRAP Project Sites - 17459

This paper will discuss the application of gamma spectroscopy systems for analysis of environmental media samples for parents and daughter progeny of the Natural Uranium and Thorium Decay Series radionuclides. The concentrations and relative ratios of naturally occurring isotopes are used to confirm the presence of FUSRAP-related wastes and for understanding the associated potential dose and health risks. Focus will be given to lessons learned from the set-up and operation of onsite gamma spectroscopy laboratories used to provide stakeholders with defensible and timely results to support FUSRAP site investigations and remediation including adaptive survey design implementation, physical remediation and waste transport, and confirmatory final status survey activities. This paper focuses on the potential impacts to gamma spectroscopy measurement accuracy from the following: - Bias caused by sample matrix effects as well as use of different library reference values between performance evaluation study providers and testing laboratories; - Use of calibration sources with limited energy ranges, and; - Selection of available alternative isotopic decay reference data for the input of line energies and their intensities. These lessons learned include discussing how inter-laboratory measurement differences from blind performance evaluation samples are affected by the manufacturer's measurement method, including equilibrium assumptions; the isotope decay information source library used by the study provider and participating laboratories; and calibration source geometry/density variances from actual sample conditions. Any of these factors can significantly impact the accuracy of reported results data. Deepening the reader's understanding of the various factors that impact the accuracy, interpretation, and overall usability of gamma spectroscopy results data from laboratories will help ensure defensible decision-making and cost-effective mission implementation within FUSRAP and similar remediation programs. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

French Atomic and alternative energies commission decommissioning policy and strategies: What is at stake lessons learned and feedback experience - 15013

Since its creation in 1945, the French Atomic Energy and Alternative Energies Commission has carried out research programmes on civil use of nuclear, and its application. CEA has set up and run various types of installations from research (accelerators, pond reactors, fast reactors, laboratories) to industry (power reactor, processing facilities). There are currently more than several tens of facilities which are presently closed down pending dismantling or in the process of being dismantled by CEA, the governmental body for research and development in nuclear and renewable energies. When operating, all these installations have generated radioactive waste. When they are shutdown, either as a result of the programmes for which they were set up, or due to equipment wearing out or being obsolete, these installations must be cleaned up, dismantled and decommissioned, taking into account their nuclear nature and requirements related to safety and environment. During the decommissioning process, the implementer has to deal with safety and site remediation issues. Dealing with these installations is a long-term programme which must be carefully planned and financed in order to optimise its management. The paper will describe the CEA's decommissioning policy, strategies adopted, and draw up lessons learned and feedback experience, showing that: - Safety is guaranteed, - Dismantling is a technically controllable operation, but R and D actions are to be developed for specific problems as characterization or operation in hostile environment. Moreover all the methods and techniques improve as a result of feedback experience, - The amount of material and waste produced by the dismantling are manageable. The very low, low and intermediate level waste can be stored on existing shallow land burial centres, some new repositories have to be created for specific waste (graphite, radium,...) and for high and intermediate level long live waste, which are stored in interim storage , - The dismantling must be optimized, especially by appliance of a good strategy based on rational industrial choices. - Communication and transparency with stakeholders is essential for global process acceptance, - The lessons learned and how feedback experience could benefit for future decommissioning projects. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Salt Waste Processing Facility project lessons learned: Acquisition through construction - 15518

The Salt Waste Processing Facility (SWPF), located at the Savannah River Site (SRS) in Aiken, South Carolina, is a multi-billion dollar Liquid Radioactive Waste (LRW) processing facility that represents the keystone for the U.S. Department of Energy (DOE)-EM clean-up mission at SRS. The SWPF facilitates DOE-EM clean-up at SRS by decontaminating the salt waste, which is the dominant volumetric component in the LRW tanks, thereby allowing the cleaned salt waste to be removed from the tanks and stabilized into an approved grout-based final waste form. The small volume of removed radionuclides is sent to the Defense Waste Processing Facility (DWPF) for vitrification. Emptied LRW storage tanks are then grouted into an approved configuration for final closure. The SWPF project is currently 100% complete with design, 80% complete with construction, and 10% complete with commissioning. To date there have been numerous lessons learned with regard to project acquisition, design, procurement, construction, and quality assurance (QA) approaches (both good practices and mistakes) that are considered to be of significant value in improving the state of major project execution within the DOE-EM clean-up program as well as to the wider DOE enterprise. An overview of the current SWPF project status is provided and key lessons learned in the aforementioned areas are presented relative to improving future DOE major project execution performance. Specific areas to be addressed include strategies to optimize integration of design and nuclear safety, constructability tools for design and construction synchronization, commercial grade dedication (CGD) approaches to mitigate atrophy in the nuclear supply chain, and QA perspectives to facilitate effective and efficient project execution. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Lessons Learned from FUSRAP - 16200

The US DOE Office of Legacy Management (LM) is the long-term steward for 90 sites remediated under numerous regulatory regimes including the Formerly Utilized Sites Remedial Action Program (FUSRAP) sites. In addition, LM holds considerable historical information, gathered in the 1970's, to determine site eligibility for remediation under FUSRAP. To date, 29 FUSRAP sites are in LM's inventory of sites for long-term surveillance and maintenance (LTS and M), and 25 are with the US Army Corps of Engineers (USACE) for remediation or in the process of being transitioned to LM. It is forecasted that 13 FUSRAP sites will transfer from the USACE to LM over the next 10 years; however, the timing of the transfers is strongly dependent upon federal funding of the ongoing remedial actions. Historically, FUSRAP sites were generally cleaned up for unrestricted industrial use or remediated to the cleanup standards at that time, and their use remained unchanged. Today, these sites as well as the adjacent properties are now changing or envisioned to have changes in land use, typically from industrial to commercial or residential uses. The implication of land-use change affects DOE's LTS and M responsibility for the sites under LM stewardship as well as the planning for the additional sites scheduled to transition in time. Coinciding with land-use changes at or near FUSRAP sites is an increased community awareness of these sites. As property development increases near FUSRAP sites, the general public and interested stakeholders regularly inquire about the sufficiency of cleanups that impact their neighborhoods and communities. LM has used this experience to address a series of lessons learned to improve our program management in light of the changing conditions of our sites. We describe these lessons learned as (1) improved stakeholder relations, (2) enhanced LTS and M requirements for the sites, and (3) greater involvement in the transition process. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Daher-TLI UCSC Wash Process - Lessons Learned from Handling a Legacy Cylinder - 16506

The Daher-TLI UF{sub 6} Cylinder Service Center (UCSC) began operation in 2013 and functions as a dedicated wash, re-certification, storage and disposal facility for 122 cm uranium hexafluoride (UF{sub 6}) cylinders. The primary purpose of the facility is to provide cylinder cleaning and re--certification services to the UF{sub 6} industry for cylinders that previously contained natural or depleted UF6. The facility also has the ability to recover most of the uranium in the form of uranyl peroxide (UO{sub 4}) or triuranium octoxide (U{sub 3}O{sub 8}). Small residues of UF{sub 6} (commonly referred to as a heel) from natural cylinders are removed and treated in a patented three-step purification process that recovers U{sub 3}O{sub 8} that meets the ASTM specification. The wastewater ordinarily contains a mixture of sodium salts (77% sodium sulfate, 23% sodium nitrate) along with minute traces of uranium (1 - 2 mg/L) and fluoride (10 - 20 mg/L). Over a period of 6 months, lab analyses were performed on the filtrate from a legacy cylinder in an attempt to separate uranium and fluoride from this stream. These pilot results established near quantitative recovery of uranium (< 1 mg/L) and near complete separation of fluorides (5 - 15 mg/L). This paper follows the efforts of the Daher-TLI UCSC to process the abnormal heeled UF{sub 6} cylinder. This paper also documents the lessons learned from this experience and how those lessons were used to improve the UCSC wash process. These modifications served to recover 99.87% of the input uranium as UO{sub 4} while simultaneously creating a waste stream with only trace amounts of impurities. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Spent Nuclear Fuel Management and Disposal in Finland - Status and Lessons Learned at the End of 2015 - 16507

In November 2015 the Finnish Government approved and the Parliament ratified Posiva's 2012 License Application for Construction of a mined, deep geological repository for the spent nuclear fuel (SNF) at the Olkiluoto site in the Eurajoki municipality based upon recommendations provided by the Finnish Radiation Safety Authority (STUK), international expert groups and long-standing local support. The preceding siting process began in 1983 and it included disposal-concept selection (KBS-3V), 'consent-based' site selection and large-scale in-situ tests conducted in an underground research laboratory, the ONKALO, situated ∼440 m below the mean Sea level immediately adjacent to the planned repository at the Olkiluoto site. At the end of 2015, the Finnish SNF repository is projected to open in 2024 as the first of its kind. Four related lessons learned in Finland during the past 30 years are: 1. The selection of potentially-suitable sites for geological disposal of SNF proved to be more difficult and more time consuming than initially envisioned. 2. The siting of nuclear facilities has evolved from being mainly a radionuclide containment and isolation challenge to becoming a critical moving-target, socio-political challenge governing progress with majority local acceptance being a fundamental imperative. 3. Public and political acceptance and support are strongly linked to the competency, credibility and transparency of the involved organisations and the maturity/pedigree of the proposed disposal concept. 4. Timely sharing lessons learned and conducting selective collaborations with other countries proved to be successful keys to timely and cost-effectively obtain and maintain public and political acceptance and support. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Challenges, Successes, and Lessons Learned on Two Active DOE Facility D and D Projects - 18379

'Surgical removal', although having a number of technical and safety challenges, is an effective alternative to traditional Demolition and Decommissioning (D and D) methods. When carefully planned and managed, surgical removal of equipment can be safely performed to achieve cost savings and accelerated schedule. At Fernald, a large groundwater extraction system that treats radionuclides was downsized during continued operations. Challenges included demolition of remedial components in tight spaces adjacent to active components, in-situ management and removal of slurry multimedia and resins, and complex hoisting/rigging of whole vessels from very tight areas. The approach realized a significant reduction in waste volumes and slurry transfer to reduce radionuclide exposure while allowing use of existing vessels as IP-1 shipping containers while providing an opportunity to implement out of the box design for hoisting/rigging/moving large vessels. Several lessons were learned as Los Alamos Technical Associates, Inc. (LATA) faced the project challenges and progressed through the D and D process. The slurry removal required thorough understanding of equipment selection and circulation techniques to maintain a slurry while avoiding plugging of extraction equipment. The physical condition of each individual tank was different and required development of alternate removal techniques, such as draining the vessel and removal of the hard material with an air vacuum truck, for each one. Lessons learned regarding large tank removal focused on recertification of an overhead crane, determination of pick points from a partially filled vessel, reanalyzing the lifting lugs for a partially full tank, and requirements to fill all void space in the vessels to meet off-site disposal specifications. At Oak Ridge National Laboratory (ORNL), LATA performed the surgical removal of all biomass process equipment inside ORNL's Building 2719. Among the challenges was a requirement that the removal action had to be conducted during continued operations. Live steam lines, fire protection, water process and boiler feed water systems were operational during LATA's D and D effort and were in close proximity to removal operations. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗