Search NASA⌕ Search

SEARCH · Search NASA

Results for “procurement”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 325 records · Page 18

Energy Use Intensity and its Influence on the Integrated Daylighting Design of a Large Net Zero Energy Building: Preprint

Net-zero energy buildings generate as much energy as they consume and are significant in the sustainable future of building design and construction. The role of daylighting (and its simulation) in the design process becomes critical. In this paper we present the process the National Renewable Energy Laboratory embarked on in the procurement, design, and construction of its newest building, theResearch Support Facility (RSF) - particularly the roles of daylighting, electric lighting, and simulation. With a rapid construction schedule, the procurement, design, and construction had to be tightly integrated; with low energy use. We outline the process and measures required to manage a building design that could expect to operate at an efficiency previously unheard of for a building ofthis type, size, and density. Rigorous simulation of the daylighting and the electric lighting control response was a given, but the oft-ignored disconnect between lighting simulation and whole-building energy use simulation had to be addressed. The RSF project will be thoroughly evaluated for its performance for one year; preliminary data from the postoccupancy monitoring efforts will also bepresented with an eye toward the current efficacy of building energy and lighting simulation.

32 ENERGY CONSERVATION, CONSUMPTION, AND UTILIZATI↗

Progress in design and integration of the ITER Electron Cyclotron H&CD system

The Electron Cyclotron system for ITER is an in-kind procurement shared between five parties and the total installed power will be 24 MW, corresponding to a nominal injected power of 20 MW to the plasma, with a possible upgrade up to 48 MW (corresponding to 40 MW injected). Some critical issues have been raised and changes are proposed to simplify these procurements and to facilitate the integration into ITER. The progress in the design and the integration of the EC system into the whole project is presented in this paper, as well as some issues still under studies and some recommendations made by external expert committees.

43 PARTICLE ACCELERATORS↗

Operational Benefits of Meeting California's Energy Storage Targets

In October 2013, the California Public Utilities Commission (CPUC) finalized procurement targets and other requirements to its jurisdictional utilities for a minimum of 1,325 MW of 'viable and cost-effective' energy storage systems by 2020. The goal of this study is to explore several aspects of grid operations in California and the Western Interconnection resulting from meeting the CPUC storage targets. We perform this analysis using a set of databases and grid simulation tools developed and implemented by the CPUC, the California Independent System Operator (CAISO), and the California Energy Commission (CEC) for the CPUC's Long-term Procurement Plan (LTPP). The 2014 version of this database contains information about generators, storage, transmission, and electrical demand, for California in the year 2024 for both 33 percent and 40 percent renewable energy portfolios. We examine the value of various services provided by energy storage in these scenarios. Sensitivities were performed relating to the services energy storage can provide, the capacity and duration of storage devices, export limitations, and negative price floor variations. Results show that a storage portfolio, as outlined by the CPUC, can reduce curtailment and system-wide production costs for 33 percent and 40 percent renewable scenarios.

29 ENERGY PLANNING, POLICY, AND ECONOMY↗

Lessons Learned from the 200 West Pump and Treatment Facility Construction Project at the US DOE Hanford Site - A Leadership for Energy and Environmental Design (LEED) Gold-Certified Facility - 13113

CH2M Hill Plateau Remediation Company (CHPRC) designed, constructed, commissioned, and began operation of the largest groundwater pump and treatment facility in the U.S. Department of Energy's (DOE) nationwide complex. This one-of-a-kind groundwater pump and treatment facility, located at the Hanford Nuclear Reservation Site (Hanford Site) in Washington State, was built to an accelerated schedule with American Recovery and Reinvestment Act (ARRA) funds. There were many contractual, technical, configuration management, quality, safety, and Leadership in Energy and Environmental Design (LEED) challenges associated with the design, procurement, construction, and commissioning of this $95 million, 52,000 ft groundwater pump and treatment facility to meet DOE's mission objective of treating contaminated groundwater at the Hanford Site with a new facility by June 28, 2012. The project team's successful integration of the project's core values and green energy technology throughout design, procurement, construction, and start-up of this complex, first-of-its-kind Bio Process facility resulted in successful achievement of DOE's mission objective, as well as attainment of LEED GOLD certification (Figure 1), which makes this Bio Process facility the first non-administrative building in the DOE Office of Environmental Management complex to earn such an award. (authors)

54 ENVIRONMENTAL SCIENCES↗

Major Modification Determination Process Utilized for Proposed Idaho National Laboratory Projects

Over the past three years, several new projects with the potential for major modifications to existing facilities have been considered for implementation at the Idaho National Laboratory (INL). These projects were designated to take place in existing nuclear facilities with existing documented safety analyses. 10 CFR 830.206 requires the contractor for a major modification to a Hazard Category 1, 2, or 3 nuclear facility to obtain Department of Energy (DOE) approval for the nuclear facility design criteria to be used for preparation of a preliminary documented safety analysis (PDSA), as well as creation and approval of the PDSA, before the contractor can procure materials or components or begin construction on the project. Given the significant effort and expense of preparation and approval of a PDSA, a major modification determination for new projects is warranted to determine if the rigorous requirements of a major modification are actually required. Furthermore, performing a major modification determination helps to ensure that important safety aspects of a project are appropriately considered prior to modification construction or equipment procurement. The projects considered for major modification status at the INL included: treatment and packaging of unirradiated, sodium-bonded highly enriched uranium (HEU) fuel and miscellaneous casting scrap in the Materials and Fuels Complex (MFC) Fuel Manufacturing Facility (FMF); post irradiation examination of Advance Fuel Cycle Initiative (AFCI) fuel in the MFC Analytical Laboratory (AL); the Advanced Test Reactor (ATR) gas test loop (GTL); and the hydraulic shuttle irradiation system (HSIS) at ATR. The major modification determinations for three of the proposed projects resulted in a negative major modification. On the other hand, the major modification determination for the GTL project concluded that the project would require a major modification. This paper discusses the process, methods, and considerations used by the INL for the four major modification determinations. Three of the four major modification determinations discussed herein were completed using the guidance specified in the draft of DOE STD-1189, “Integration of Safety into the Design Process.” DOE-STD-1189 was released as a draft document in March 2007 and provides guidance for integrating safety considerations into the early design activities for constructing new facilities or making modifications to existing nuclear facilities. The fourth major modification determination was prepared prior to the existence of DOE STD-1189 and was evaluated solely by the definition of a major modification given in 10 CFR 830.206. For all four projects, consideration was given to: • Facility hazard categorization change and material inventory • Facility footprint change with the potential to adversely affect credited safety function • New or changed processes resulting in a change to the safety basis • The use of new technology or equipment not approved for use in the facility • The need for new or revised safety basis controls • Hazards not previously evaluated in the safety basis.

10 CFR 830↗

Including operational aspects in the planning of power systems with large amounts of variable generation: A review of modeling approaches

In the past, power system planning was based on meeting the load duration curve at minimum cost. The increasing share of variable generation (VG) makes operational constraints more important in the planning problem, and there is more and more interest in considering aspects such as sufficient ramping capability, sufficient reserve procurement, power system stability, storage behavior, and the integration of other energy sectors often through demand response assets. In VG integration studies, several methods have been applied to combine the planning and operational timescales. We present a four-level categorization for the modeling methods, in order of increasing complexity: (1a) investment model only, (1b) operational model only, (2) unidirectionally soft-linked investment and operational models, (3a) bidirectionally soft-linked investment and operational models, (3b) operational model with an investment update algorithm, and (4) co-optimization of investments and operation. The review shows that using a low temporal resolution or only few representative days will not suffice in order to determine the optimal generation portfolio. In addition, considering operational effects proves to be important in order to get a more optimal generation portfolio and more realistic estimations of system costs. However, operational details appear to be less significant than the temporal representation. Furthermore, the benefits and impacts of more advanced modeling techniques on the resulting generation capacity mix significantly depend on the system properties. Thus, the choice of the model should depend on the purpose of the study as well as on system characteristics.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Expert and operator perspectives on barriers to energy efficiency in data centers

Abstract It was last estimated in 2016 that data centers (DCs) comprise approximately 2% of total US electricity consumption. However, this estimate is currently being updated to account for the massive increase in computing needs due to streaming, cryptocurrency, and artificial intelligence (AI). To prevent energy consumption that tracks with increasing computing needs, it is imperative we identify energy efficiency strategies and investments beyond the low-hanging fruit solutions. In a two-phased research approach, we ask: What non-technical barriers still impede energy efficiency (EE) practices and investments in the data center sector, and what can be done to overcome these barriers? In particular, we are focused on social and organizational barriers to EE. In Phase I, we performed a literature review and found that technical solutions are abundant in the literature, but fail to address the top-down cultural shifts that need to take place in order to adapt new energy efficiency strategies. In Phase II, reported here, we interviewed 16 data center operators/experts to ground-truth our literature findings. Our interview protocols focus on three aspects of DC decision-making: procurement practices, metrics and monitoring, and perceived barriers to energy efficiency. We find that vendors are the key drivers of procurement decisions, advanced efficiency metrics are facility-specific, and there is convergence in the design of advanced facilities due to the heat density of parallelized infrastructure. Our ultimate goals for our research are to design DC decarbonization policies that target organizational structure, empower individual staff, and foster a supportive external market.

32 ENERGY CONSERVATION, CONSUMPTION, AND UTILIZATI↗

Group purchasing organization design: a clustering approach

Supply chain management is monitoring of activities involved in supply chain, for integrating and coordinating between suppliers, manufacturing, inventory and transportation both within and among members. The ultimate aim of supply chains is to reduce costs and increase market coverage. Procuring and purchasing requested items in a timely manner are the two most important issues for supply chain stockholders. Group purchasing is one of the purchasing strategies in supply chains. It offers great potential by ordering large volumes to decrease expenses which can increase services to customers. A clustering optimization approach is employed to model group purchasing for a set of pharmacies in the field of healthcare. The proposed model determines a cooperation strategy based on factors such as distance between pharmacies and procurement expenditure in this network. Moreover, the proposed multi-objective group purchasing model is optimized using both goal programming and non-dominated sorting genetic algorithm. To illustrate the application of the proposed model, designing a purchasing group organization for Chalus city pharmacies is investigated. Purchasing groups are established in the way that sum of pharmacies ordering quantity has been located in the second or the third level of discount rate. Thus, the results show that GPOs can take the advantage of this cooperation.

97 MATHEMATICS AND COMPUTING↗

Biodiesel production from engineered sugarcane lipids under uncertain feedstock compositions: Process design and techno-economic analysis

In this study, different process schemes were designed and evaluated for biodiesel production from engineered cane lipids with uncertain fatty acid compositions. Four different process schemes were compared under (i) thermal glycerolysis and (ii) enzymatic glycerolysis approaches. These schemes were based on the biodiesel yield and economic indicators such as the net present value (NPV) and the minimum selling price (MSP) of biodiesel. A scheme with polar lipid separation under thermal glycerolysis resulted in the maximum NPV ($\$96.5$ million) and minimum MSP ($\$1107$ /ton biodiesel), respectively. Through local sensitivity analysis, it was concluded that the cane lipid percentage is the most significant factor influencing process economics. A conjoint analysis of the lipid procurement price and cane lipid percent suggested that 15% cane lipids with a low lipid procurement price ($\$0.536$ /kg) results in a positive NPV. When the cane lipid price is higher (> $\$0.80$ /kg), a 20% lipid content should be considered to achieve a positive NPV. At 20% cane lipids, the worst-case and best-case scenarios were evaluated by analyzing the interplay of the three most important parameters, Here, the best-case scenario revealed that the minimum NPV under any process scheme could yield more than $\$100$ million (or MSP: $\$0.80$ /L), and the worst-case analysis showed that losses incurred by the plant could be as high as 80 million (MSP: $\$1.36$ /L). A Monte Carlo simulation indicated that there is a 70% chance of the plant being profitable (NPV > 0).

09 BIOMASS FUELS↗

Multi-service battery energy storage system optimization and control

Battery energy storage systems (BESS) have become fundamental part of modern power systems due to their capability to provide multiple grid services. As the renewable penetration increases, BESS procurement is also expected to increase where it is envisioned to play a systematic and strategical role in power systems planning and operation. Hence, in this paper we present a multiple grid service procurement and operation for BESS - ranging from energy arbitrage, reserve/regulation services, power factor correction, and demand management. The proposed framework considers an optimal multi-temporal dimension, designed to be operable for both planning and real-time operation. Moreover, non-linearity inherent to BESS services and uncertainty associated to market forecasts variables are addressed using techniques such as polyhedral norms and robust optimization approaches. Here, the developed model is tested using a utility-scaled BESS and the obtained results show the effectiveness of the systematic BESS multi-service planning and operation approach.

25 ENERGY STORAGE↗

Hybrid Power Purchase Agreements for Flexible 24/7 Energy Delivery – A Comprehensive Review of Current Practices and Research Pathways

Power Purchase Agreements (PPAs) are becoming increasingly preferred among large energy consumers, such as data centers, to secure cost-effective energy and meet accelerating demand growth. Traditionally, variable renewable energy (VRE)-based PPAs operate on a pay-as-produced basis, balancing supply and demand for a relatively longer duration (e.g., annually). However, the focus is shifting toward matching supply and demand on an hourly basis to fully meet energy needs. This shift requires the integration of flexible energy resources, such as hydropower, thermal generation, and energy storage, to complement VRE sources like wind and solar, forming the foundation for 24/7 PPA. This work contributes by: (i) reviewing emerging market trends and current practices in PPA procurement, supported by data on PPA prices and technology portfolios; (ii) synthesizing the existing literature on modeling approaches for contract pricing, quantities, hybrid resource procurement, and risk management in 24/7 PPA design, while identifying key research gaps; and (iii) proposing an integrated 24/7 PPA design framework along with two contracting mechanisms from the perspectives of both PPA providers and consumers. The proposed framework highlights critical modeling challenges, risk-allocation issues, and future research opportunities for 24/7 PPA design.

24/7↗

Optimization of harvest and logistics for multiple lignocellulosic biomass feedstocks in the northeastern United States

A mixed-integer linear programming model was developed to optimize the multiple biomass feedstock supply chains, including feedstock establishment, harvest, storage, transportation, and preprocessing. The model was applied for analyses of multiple biomass feedstocks at county level for 13 states in the northeastern United States. In the base case with a demand of 180,000 dry Mg/year of biomass, the delivered costs ranged from $\$67.90$ to $\$86.97$ per dry Mg with an average of $\$79.58$ /dry Mg. The biomass delivered costs by county were from $\$67.90$ to 150.81 per dry Mg across the northeastern U.S. Considered the entire study area, the delivered cost averaged $\$85.30$ /dry Mg for forest residues, $\$84.47$ /dry Mg for hybrid willow, $\$99.68$ for switchgrass and $\$97.87$ per dry Mg for Miscanthus. Seventy seven out of 387 counties could be able to deliver biomass at $84 per dry Mg or less a target set by US DOE by 2022. A sensitivity analysis was also conducted to evaluate the effects of feedstock availability, feedstock price, moisture content, procurement radius, and facility demand on the delivered cost. Lastly, our results showed that procurement radius, facility capacity, and forest residue availability were the most sensitive factors affecting the biomass delivered costs.

09 BIOMASS FUELS↗

Reserve and energy scarcity pricing in United States power markets: A comparative review of principles and practices

Here, errors in forecasting load and renewable-based generation in restructured power systems mean that independent system operators (ISOs) must procure sufficient operating reserves to keep the real-time operation of the system reliable and secure. But when procured reserves turn out to be insufficient in real-time due to the lack of resource capacity or ramp capability, operators often set higher prices for reserves and energy to encourage more supply, and to motivate consumers to decrease usage or shift it to other times. This procedure, which is called scarcity or shortage pricing, is a core feature of U.S. electricity markets. It is receiving increased attention from market designers and stakeholders because scarcity will become more important for spot price formation in the future with the increased penetration of zero-marginal cost renewables, and the shrinking role of fuel costs in setting prices. Scarcity pricing is implemented in various ways by different ISOs. These differences have practical implications for the level of prices and incentives for investment, operations, and demand modification. In this paper, general approaches and specific calculation procedures for reserve and energy scarcity pricing practices and calculations across the seven ISO-based U.S. power markets are reviewed and compared. A consistent terminology is used to facilitate the comparison. Current scarcity pricing practices are grouped into three approaches: (1) imposing an adder after the spot market is run; (2) including stepwise demand curves within market clearing procedures for non-contingency reserve products (e.g., the novel flexiramp product), which tends to yield longer right tails for energy scarcity premium curves; and (3) having stepwise demand curves for traditional contingency reserve products only, which results in shorter right tails in energy scarcity curves. A generic numerical example is presented to highlight the large practical differences among the reserve scarcity pricing approaches and specific implementations. To further investigate factors that contribute the most to demand curves differences among ISOs, a sensitivity analysis is performed. This analysis shows that the largest source of differences among the curves is the scarcity prices assumed in the case of severe scarcity, while the number of steps used and whether flexiramp is considered also yields important differences in scarcity prices. As renewable penetration increases, it will become increasingly crucial to employ administrative demand curves so that spot prices more effectively motivate supply and demand adjustments exactly when and where they are needed. This study shows that the different assumptions yield very different scarcity premiums for reserves and energy, and are likely to provide divergent incentives for resources to respond to shortages. It is concluded that to promote market efficiency, a reserve shortage demand curve should have at least three features: inclusion of the marginal value of reserve products at each shortage level, consideration of the magnitude and probability of supply contingencies, and avoidance of abrupt price discontinuities that can cause excessively volatile market outcomes.

29 ENERGY PLANNING, POLICY, AND ECONOMY↗

A Lower Hybrid Current Drive System for ITER and High Power CW Klystron Development

A 20 MW/5 GHz Lower Hybrid Current Drive (LHCD) system was initially due to be commissioned and used for the second mission of ITER, i.e. the Q = 5 steady state target. Though not part of currently planned procurement phase, it is now under consideration for an earlier delivery. An LH program has been initiated under EFDA, following the ITER STAC recommendation, to provide a pre-design document including the conceptual design, costing, possible procurement allocation, WBS and R and D needs.

70 PLASMA PHYSICS AND FUSION TECHNOLOGY↗

FRIB cryogenic distribution system

The Michigan State University Facility for Rare Isotope Beams (MSU-FRIB) helium distribution system has been revised to include bayonet/warm valve type disconnects between each cryomodule and the transfer line distribution system, similar to the Thomas Jefferson National Accelerator Facility (JLab) and the Spallation Neutron Source (SNS) cryogenic distribution systems. The heat loads at various temperature levels and some of the features in the design of the distribution system are outlined. The present status, the plans for fabrication, and the procurement approach for the helium distribution system are also included.

71 CLASSICAL AND QUANTUM MECHANICS, GENERAL PHYSIC↗

AN INTERPRETATION OF THE POSSIBLE MECHANISMS OF TWO GROUND-LEVEL ENHANCEMENT EVENTS

We have carried out this work to clarify the possible mechanisms of two important high-energy particle events (GLE69 2005 January 20, 06:46 UT and GLE70 2006 December 13, 02:45 UT). For this purpose, the cosmic-ray intensities registered by neutron monitors at several sites have been analyzed and studied with concurrent solar flares of different energy bands. To determine whether the ground-level enhancement (GLE) might be caused by the energy released from a solar flare or a CME-driven shock, we identify the particle injection time in terms of the lowest value of the spectral indices deduced from proton fluxes. If the GLE is caused by the energy released from particle acceleration in a solar flare, the intensive phase of the flare representing extreme emission should lie within the injection time. While fulfilling this criterion, it is further necessary to understand the possible relativistic energy computed in terms of the possible travel time deduced by employing the observational time lag between the GLE and the concurrent solar flare. Accordingly, we have found that GLE69 is procured with sufficient possible relativistic energy ({approx}1.619 GeV) by the energy released from particle accelerations in the intensive phases of a solar flare components that have been corroborated by the injection time. The intensive phases of the flare components have also been justified with the prominent phases of a solar radio type III burst. For event GLE70, the particle injection time lies within the CME-driven shock justified by a solar radio type II burst which seems to be capable of procuring sufficient possible relativistic energies ({approx}1.231 to {approx}2.017 GeV). It is also noted that any fractional amount of energy ({approx}0.226 to {approx}0.694 GeV) from preceding flare components might be considered as a contribution to the shock acceleration process. Thus, GLE70 is presumably caused by the sum of the energy released mostly from a CME-driven shock and partially from preceding flare components.

79 ASTRONOMY AND ASTROPHYSICS↗

Science and Technology Research and Development in Support to ITER and the Broader Approach at CEA

In parallel to the direct contribution to the procurement phase of ITER and Broader Approach, CEA has initiated research & development programmes, accompanied by experiments together with a significant modelling effort, aimed at ensuring robust operation, plasma performance, as well as mitigating the risks of the procurement phase. This overview reports the latest progress in both fusion science and technology including many areas, namely the mitigation of superconducting magnet quenches, disruption-generated runaway electrons, edge-localized modes (ELMs), the development of imaging surveillance, and heating and current drive systems for steady-state operation. The WEST (W Environment for Steady-state Tokamaks) project, turning Tore Supra into an actively cooled W-divertor platform open to the ITER partners and industries, is presented.

Becoulet, A.↗