EXERGETIC: De-Risking Next-Generation Resilient Geothermal Hybrids via At-Scale Evaluation Using Virtual Emulation Digital Twin Environment for Efficient Operation

The DOE-GTO-funded project, award number 5.1.2.12, entitled "EXERGETIC - De-risking Next Generation Resilient Geothermal Hybrids via at-Scale Evaluation Using a Virtual Emulation Digital Twin Environment for Efficient Operation," advances the solution to these challenges by developing and validating a geothermal co-emulation environment implemented at the National Laboratory of the Rockies (NLR)'s Advanced Research on Integrated Energy Systems (ARIES) platform. This framework enables the de-risking of next-generation geothermal and geothermal hybrid systems through high-fidelity modeling, real-time digital emulation, advanced control strategies, and techno-economic assessment. The project focused on geothermal hybrid configurations that integrate geothermal power plants with concentrated solar power and underground thermal energy storage, enabling enhanced efficiency, flexibility, and grid support capabilities. The main goal of this project was the development of a geothermal digital co-emulation environment to demonstrate the technical and economic value of geothermal hybrid systems and their contribution to grid stability and flexibility. The EXERGETIC framework combined physics-based models, controls, and real assets at ARIES, including digital real-time simulators (DRTS), a 20-MW-scale controllable grid interface (CGI), and a 2-MW conventional generator. Detailed transient models were developed for the key subsystems of a hybrid geothermal plant, including parabolic trough solar collectors, reservoir thermal energy storage (RTES), and a binary Organic Rankine Cycle (ORC) power plant. The ORC model explicitly captured thermal inertia and off-design operation and integrated control strategies to dynamically respond to electric load profiles. The models were validated against published experimental and numerical studies, demonstrating strong agreement and confirming the accuracy and robustness of the modeling approach. The resulting digital twin represents geothermal-solar-storage systems at multiple scales (1 MW to 100 MW) and enables realistic emulation of grid-connected operation. The control architecture allows the geothermal resource to provide stable baseload generation, while solar and stored thermal energy supply flexible, dispatchable support during periods of high demand or variable grid conditions. A key contribution of the EXERGETIC project is the demonstration that geothermal hybrid systems can be designed to be active grid assets rather than passive baseload generators. Using the ARIES platform, the digital twin was evaluated under multiple grid scenarios, including load following, voltage support at the distribution level, and frequency response at the transmission level. Results show that hybrid geothermal systems can respond effectively to dynamic grid conditions, providing inertia-like behavior, primary frequency support, and voltage regulation through coordinated control. In addition to the performance and grid services capability analysis of geothermal and hybrid geothermal systems, the EXERGETIC project also focused on scalability and techno-economic analysis of geothermal hybrid plants. In particular, for the scalability analysis, machine-learning (ML)-based surrogate models were trained using data generated from the geothermal digital twin under different grid-connected scenarios and plant capacities. These ML models demonstrated strong interpolation and extrapolation capabilities across plant sizes, accurately reproducing both steady-state and transient responses with very low errors. Regarding the techno-economic analysis, plant performance results were integrated with cost models for hybrid geothermal systems, and the levelized cost of electricity (LCOE) was used as the main economic metric to evaluate system performance across a range of system capacities, solar shares, solar multiples, and storage durations. Results indicate that economies of scale significantly reduce geothermal LCOE as plant capacity increases, with large-scale systems (25-100 MW) achieving substantially lower costs than small plants. Hybridization with solar thermal energy and storage further improves economic performance by increasing capacity utilization and enabling flexible dispatch. In addition, thermal storage plays a critical role in reducing LCOE by maximizing geothermal, solar, and stored energy resources. In summary, the results from this project demonstrate that geothermal hybrid systems represent a promising alternative for increasing the energy conversion efficiency of geothermal technologies, contributing to the preservation of geothermal resources, and supporting the transition of geothermal plants from traditional baseload resources into flexible, resilient, and cost-competitive energy conversion technologies.

15 GEOTHERMAL ENERGY

Full-core high-burnup BWR LOCA fuel performance analysis and FFRD susceptibility

The susceptibility of the boiling water reactor (BWR) Limerick Unit 1 to fuel fragmentation, relocation, and dispersal during a postulated large-break loss-of-coolant accident (LBLOCA) was calculated using a multiphysics framework. The simulations include full-core, rod-resolved neutronic, thermal hydraulic, and fuel performance models using the VERA, TRACE, and BISON codes. This work focused on the transient BISON simulations, which include both the normal operation and LBLOCA periods in the same simulations. Cladding integrity was assessed using two correlations that are included with BISON. make page break Several new BWR-specific features were recently added to BISON. This work represents the first time these features have been included in a core-scale set of simulations. This study hence evaluates the performance of these new models for an operating reactor with realistic operating conditions. Simulation results showed that cladding integrity was maintained (i.e., no rods burst). Finally, future work to improve BWR and PWR predictions using this framework is suggested.

BISON

Mercury Corrosion Loop Testing Program

The Mercury Corrosion Loop Testing Program continued through the second quarter. Materials to be tested in the 10 forced-convection test loops were selected; the materials are: Haynes 25, 9 Cr-1Mo alloy clad with Type 316 stainless steel, AM 350 stainless steel, and columbium (niobium) clad with Type 316 stainless steel. The eight-test-cell facility was completed and all utilities were installed. Pneumatic and electronic instrumentation for all test cells was installed and calibrated. Fabrication was initiated on the first four Haynes 25 loops. The first loop was 85% assembled at the end of the quarter. A centrifugal pump made from Type 316 stainless steel was tested; bearing modifications were made to improve operation.

Corrosion

Outgassing Characterization of Common Trash Items for Disposal By Nanoracks Airlock on the International Space Station

The arrival of the Nanoracks Airlock to the International Space Station (ISS) has provided the ISS program the capability to dispose of common trash items. The concept of operations involved the crew bagging up those items into a trash bag and then utilizing the robotic arm and the airlock to jettison the trash bag. Because of the unknown thermal vacuum stability of some of the items, a molecular contamination concern was raised by the ISS program as the trash is exposed to vacuum upon the evacuation of air from the airlock and the robotic arm moving the airlock to its jettison location. In order to characterize the representative outgassing rates for ISS trash, thermal vacuum testing was performed at White Sands Test Facility. Trash was sorted into a “lower” outgassing bag and a “mixed” bag. The “mixed” trash bag contained more items that were suspected to be not vacuum stable. Load cells were chosen as the primary means for measuring mass loss. A sharp decay in the outgassing rate was observed in the first 30 minutes followed by a slower decay. As expected, the “mixed” bag lost more mass. While Quartz Crystal Microbalances (QCMs) are often utilized to measure long term outgassing rates and the sticking coefficients of contaminants at different operating temperatures for vacuum stable materials, these measurements proved difficult due to the amount and the inclusion of materials with suspect thermal vacuum stability. Because of high rates of material outgassing, the facility was unable to maintain the CQCM temperature setpoint of 80 K QCMs.. The QCMs operating at the warmer temperatures also saturated on occasion due to high levels of condensed matter. Though testing was able to confirm high risk of outgassing contamination for the program, true sticking coefficients could not be determined, available measurements are provided herein.

Alvin Y Huang

Variational Quantum Circuits to Prepare Low Energy Symmetry States

We explore how to build quantum circuits that compute the lowest energy state corresponding to a given Hamiltonian within a symmetry subspace by explicitly encoding it into the circuit. We create an explicit unitary and a variationally trained unitary that maps any vector output by ansatz A(α → ) from a defined subspace to a vector in the symmetry space. The parameters are trained varitionally to minimize the energy, thus keeping the output within the labelled symmetry value. The method was tested for a spin XXZ Hamiltonian using rotation and reflection symmetry and H 2 Hamiltonian within S z = 0 subspace using S 2 symmetry. We have found the variationally trained unitary gives good results with very low depth circuits and can thus be used to prepare symmetry states within near term quantum computers.

71 CLASSICAL AND QUANTUM MECHANICS, GENERAL PHYSIC

POWER ELECTRONICS GRID TIED SYSTEM FINAL REPORT

Across the country, electric utilities are grappling with the persistent hurdles of integrating Distributed Energy Resources (DERs). Managing these assets safely and effectively is a complex endeavor, complicated by varying ownership structures, management philosophies, and the diversity of the technologies themselves. Consequently, the industry has seen a proliferation of bespoke system designs, control strategies, and communication frameworks—forcing utilities to spend significant time and resources developing one-off integration solutions. This project addressed these integration hurdles through a scalable demonstration of intelligent devices designed to coordinate and control diverse resources in low-voltage applications. This concept minimized the need for complex integration by transforming the separate DERs into a dispatchable virtual power plant (VPP) with integrated resiliency functions (called a Node). By collaborating with a utility partner, the project focused on developing rapidly implementable use cases that bridged the gap between theoretical control and real-world deployment

99 GENERAL AND MISCELLANEOUS

Performance of Heterostructural TaC/AlGaN Schottky Diodes Based on First Principles Electronic Structure Properties

Advances in ultra-wide bandgap materials, such as high Al-content AlxGa1-xN (AlGaN), are essential for next generation power electronics, but the requirement for lattice matched substrates is currently a significant obstacle. Recently, conductive TaC has emerged as a promising virtual substrate for AlGaN heteroepitaxy, with wurtzite (0001) AlxGa1-xN lattice-matched to rocksalt (111) TaC at x ~ 0.5. Thus, understanding and controlling the electronic properties of the TaC/AlGaN interface is key for developing technological applications based on TaC/AlGaN devices. Using density functional theory and electronic structure calculations, we here investigate TaC/Al0.5Ga0.5N interfaces, where we include explicit alloy models in the slab calculations. We predict the Schottky barrier height and the electric field discontinuity resulting from interface charges. Considering all possible combinations of (Ta, C) substrate termination, (Al/Ga, N) nucleation, and (Al/Ga, N) polarity, we construct a chemical potential phase diagram to identify the stable interfaces that can be accessed through variation of the synthesis conditions. The predicted interface electronic properties are implemented in device performance simulations to demonstrate a practical design for a strain-free, high-efficiency TaC/AlGaN Schottky diode with a low barrier height and without interface charges, underscoring the potential of TaC as a substrate for ultra-wide bandgap devices.

71 CLASSICAL AND QUANTUM MECHANICS, GENERAL PHYSIC

Field Validation of Thermoelectric Generation System at Holcim Cement Plant in Alpena, Michigan

Executive Summary Project Background The Industrial Technology Validation (ITV) program aims to identify and demonstrate the performance of new, emerging, and underutilized energy-saving technologies in the industrial sector to help inform decisions to help accelerate their commercialization and deployment, as well as to help make industries more competitive. This ITV demonstration evaluated a thermoelectric generation (TEG) technology at a cement plant, aiming to reduce energy demand in the cement industry. A median cement plant consumes 5.73 million British thermal units per ton of clinker production (resulting in 0.838 metric tons of carbon dioxide [CO₂] emissions per ton of clinker) (Boyd and Zhang 2011, EPA 2021), equivalent to approximately 6.9 trillion British thermal units (TBtu) per year in energy consumption at a cement plant producing 3,300 tons of clinker per day.¹ Collaborating with Holcim, Advanced Thermovoltaic Systems (ATS) developed and deployed a pilot-scale thermoelectric power system to efficiently capture and convert waste heat to electricity. The system leverages the Seebeck effect to convert temperature differences on two sides of semiconductor cartridges into electrical power (ScienceDirect, n.d.). This generation is realized with minimal moving parts compared to existing waste-heat-to-generation solutions and allows capture from heat sources with temperatures as low as 150°C. This project aimed to validate a scalable solution applicable for capturing medium-temperature waste heat, including ambient losses from other high-temperature processes, and high-temperature sources less suitable for other waste-heat-to-power solutions. By recovering this otherwise wasted heat, this project intends to validate improvements to overall process efficiency through reduction in purchased electricity, thereby reducing operational costs while enhancing resiliency and competitiveness. Description and Scope This study evaluated the performance of a TEG system from ATS as a solution to convert waste heat into useful power at a Holcim cement plant in Alpena, Michigan. This plant is a fully integrated cement plant that has been operating since 1907. The facility operates continuously (24/7/365) with approximately 250 employees and five long dry kilns, yielding a total production capacity of 7,852 tons of cement per day (EPA 2023). Currently, the Alpena plant uses waste heat boilers to convert waste heat from the exhaust of each kiln into steam, which drives steam turbine generators. The ATS TEG is being evaluated for its potential to supplement the steam turbines by capturing the remaining lower grade heat. This technology is also being considered for other Holcim plants where steam turbines are not a viable option. ATS installed a pilot-scale TEG unit with an array of 582 individual thermoelectric semiconductor cartridges, of which 573 were operational. The cartridges are sandwiched between 48 hot plates and 49 cold plates. Each cartridge is designed to generate 20 watts (W) of gross power at a hot-side temperature of 240°C and cold-side temperature of 20°C. As such, the total gross generation capacity of the installed system is 11.5 kilowatts (kW) at design conditions. The system configuration for the evaluation was designed to prioritize convenience of installation and minimize disruption to production at the site, while ensuring that the heat required can be obtained for evaluating the TEG system at various operational conditions. To accomplish this, a portion of the steam supplied to Alpena’s steam turbine generation system was diverted to be used as the heat source for the TEG system, while water was supplied to the cold side of the system from nearby Lake Huron. This configuration was designed for the evaluation of the pilot-scale system to assess the performance at different conditions. A commercial-scale system will likely vary from the pilot system depending on typical configurations, including both scale and application. Future commercial applications of the ATS system would involve integrating the system into the exhaust from kiln preheaters, clinker coolers, or radiant heat capture from kiln shells for the heat source. For the cold source, a range of cooling solutions can be considered, including a mechanical cooling system, depending on the location and the application. To increase the generation capacity for commercial applications, the technology provider is working toward developing a commercial-scale TEG system, which would combine multiple TEG units (each similar in design to the pilot system) together. The scope of this evaluation includes the pilot-scale TEG system and all impacted equipment including pumps, controllers, and power handling equipment. Study Objectives The evaluation's goal was to assess the potential of the ATS TEG system to generate useful electrical power by capturing waste heat from cement production kilns. The objectives of this study are to evaluate and verify the following claims made by ATS regarding the pilot-scale system installed at the Holcim Alpena plant. The following design parameters and claims are also outlined in Table ES- 1 and Table ES- 2: • Gross Power: The thermoelectric system converts heat into power to create gross power, the total measured power generated by the system. The 573 active cartridge pilot-scale system is expected to generate 11.5 kW of gross power at the designed hot-side temperature of 240°C and cold-side temperature of 20°C. Power production is dependent on the temperature difference between the heat source (ultimately from the waste heat) and cold temperature supply source. • Net Power: The net power is the total usable power provided to the site by the TEG system after deducting parasitic power loads from the gross generated power. Supplementary equipment is required to operate the TEG system including pumps, controllers, and, in certain anticipated applications, mechanical cooling, which introduce parasitic loads to system operation. After deducting the parasitic loads from the gross power generation, ATS anticipates achieving a net power generation of 7.5 kW from the pilot-scale system. • Thermal Efficiency: The thermal efficiency is the percent of the total heat transferred to the TEG system that is converted to gross power. Historically, TEGs have a thermal efficiency of 2%–5% (DOE 2008). Prior industrial-scale TEG systems, such as the E1 TEG offered by Alphabet Energy, operated at an efficiency of 2.5% (Lamonica, 2014). ATS anticipates achieving an average efficiency of 4.8% or higher in converting heat energy to usable electricity. • Cartridge Performance: The TEG system comprises 573 active individual semiconductor cartridges, each of which generates a portion of the total power. Cartridge optimization and selection is an important design consideration for potential future TEG system design performance. Therefore, understanding the distribution of gross power and efficiency within the pilot system is vital to understanding what is achievable. At a design hot-side temperature of 240°C and cold-side temperature of 20°C, ATS anticipates a cartridge performance of 20 W of gross power per cartridge at an efficiency of 4.8% per cartridge. In addition to evaluating the claimed performance of the TEG pilot-scale unit, the study estimated the potential annual impacts of a scaled-up commercial system used to capture kiln waste heat over annual operations. The evaluation estimated the gross and net annual electric generation achievable by capturing heat from the two proposed tap-in points: the kiln exhaust and the clinker cooler exhaust; see Section 2.1 for details. Two use cases were examined: • Holcim Alpena: The Holcim Alpena site consists of long dry kilns with superheater boilers, which differs from the rest of Holcim’s cement plant portfolio and results in lower waste heat temperatures. The study estimates gross and net annual generation using the superheater boiler exhaust and clinker cooler exhaust, based on 2023 operational data. • Typical Installation: Common cement plants have preheater kilns with higher exhaust temperatures than Holcim Alpena across a range of production rates. The study estimates gross and net annual generation using the preheater exhaust and clinker cooler exhaust, with a sensitivity analysis to account for the typical range of preheater exhaust temperatures, clinker cooler exhaust temperatures, and clinker production rates. Methodology The evaluation methodology followed a measurement and verification (M&V) strategy based on the International Performance Measurement and Verification Protocol Option B through comprehensive measurements and analyses of the affected systems. Evaluation data was collected from March 9 to March 11, 2024, the test period of the pilot TEG system. During the test period, in coordination with the ITV team, the ATS team adjusted system operations to capture the range of variability expected for each of the variables pertinent to performance of the system. The methodology consisted of two parts: evaluating the performance of the pilot unit's TEG system and estimating the annual TEG impact in terms of gross and net power based on a given waste heat profile. First, the evaluation of the thermoelectric generation performance of the pilot unit relative to the claims was performed by analyzing the collected test data. Gross power of the pilot TEG system was directly measured. Net power was determined by deducting the measured parasitic power from the gross power. The gross power generation was compared to heat transferred to the system by the working fluid (which was heated by steam generated from the kiln waste heat) to calculate the thermal efficiency achieved by the system. Performance of individual semiconductor cartridges within the pilot array was also assessed in terms of measured gross cartridge power and calculated cartridge thermal efficiency. The second part of the evaluation estimated the annual TEG impacts in terms of gross power and net power (calculated from the difference between gross power and parasitic power). This analysis comprised development of mathematical regression models for gross power and parasitic power, with assessment of each model’s goodness-of-fit characteristics to ensure satisfaction of statistical requirements. The models predicted the gross power generation, the parasitic load based on the temperature difference between the hot working fluid and the cold-side fluid (cold water from Lake Huron) entering the system, the volumetric flow rate of the cold-side fluid at the inlet, and the volumetric flow rate of the hot working fluid at the inlet. The annual impact analysis considered a theoretical commercial-scale system sized to capture the available waste heat at a cement plant, consisting of linked pilot-scale units that receive heat from a theoretical gas-to-working-fluid heat exchanger. To estimate annual impacts at the Alpena plant, the gross power and parasitic power regression models were applied to the arrays in the theoretical commercial-scale system. The heat supplied to the unit was calculated based on the kiln run time, annual production, kiln exhaust waste heat, and clinker cooler waste heat derived from 2023 Holcim Alpena kiln operational data. Net power impacts were calculated by deducting the resulting parasitic power from the estimated gross power. Inputs for the model were generated from a combination of hourly data, assumed design considerations for TEG system scale-up from the pilot-scale unit, and assumptions regarding TEG system operations. This analysis was then used as the basis for estimating annual impacts of typical TEG installation at cement plants, by applying sensitivity analyses to key kiln operational characteristics including kiln preheater exhaust temperatures, cooler clinker exhaust temperatures, and plant daily production rates across a range of expected values. Project Results/Findings Table ES- 2 and Table ES- 2 provide a summary of the operating conditions and evaluation results compared to the stated claims from the technology provider. Key takeaways include: • Gross Power: The peak gross power achieved during the testing period was 10.0 kW, compared to the 11.5 kW expected for 573 active cartridges. The claimed gross power was associated with a target hot side of 240°C; however, the system only received a maximum hot-side mean plate temperature of 212°C during the testing period. • Net Power: The pilot-scale unit exceeded the claims for net power, achieving a peak of 7.7 kW net compared to a claim of 7.5 kW. One factor contributing to the higher achieved net power is the relatively high water pressure available through Lake Huron. The pilot TEG system did not require cold-side pumps during the test, whereas most installations would. This reduced the parasitic loads on the system, ultimately contributing to higher net power relative to the gross power. • Thermal Efficiency: The pilot-scale unit outperformed the claimed efficiency, achieving a peak system efficiency of 5.0% thermal efficiency compared to the stated 4.8%. • Cartridge Performance: To compare cartridge performance against claims, the study focused on the third day of testing, which aimed for conditions closest to the design specifications, with a hot side of 240°C and cold-side exit temperature of 6.4°–30°C. On this day, the mean gross power observed in the cartridges within the TEG array was 18.1 W/cartridge, and the peak performance was 34.7 W/cartridge. The estimated mean cartridge efficiency was 5.2%, and the estimated efficiency at peak gross cartridge power was 10%. The regression models developed for gross power generation and parasitic loads were used to estimate the generation impact for given heat input to the TEG from the working fluid (captured from the waste heat) and from the cold loop (Lake Huron) on an hourly basis for a year of operation. Based on this analysis, installation of a commercial-scale TEG system at the Holcim cement plant in Alpena, Michigan, with a waste heat exchanger of 0.85 effectiveness, would generate up to 391 kW of net power, translating to between 920,000 and 1,800,000 kilowatt-hours (kWh) in net electricity per year. Based on typical grid emissions for Alpena, this would avoid estimated net emissions by 752 metric tons of CO₂ annually.² The sensitivity analysis estimated that typical TEG system installations at cement plants could generate an average of 56–1,040 kW of net power, or between 488,000 and 9,110,000 kWh of net energy. This generation potential is most significantly affected by plant production rates and also influenced by preheater and clinker cooler exhaust temperatures. Applying the national average emission rate, typical commercial-scale installations at Holcim plants are projected to avoid between 182 and 3,401 metric tons of CO₂ annually per site. Table ES- 3 shows a summary of the estimated annual impacts.³ While parasitic loads are significant and vary by application, this analysis assumed the use of heating loop pumps and access to Lake Huron as a cold sink. This setup assumed no need for cooling loop pumps due to the available water pressure at the test site. Applications that require cooling towers or additional equipment are likely to experience higher parasitic loads. Therefore, the study’s estimates are most applicable to scenarios with similar parasitic load configurations—namely, access to a high-pressure cold sink. Applicability to other locations may be limited, as differing conditions could necessitate additional pumps and cooling systems, potentially impacting performance significantly.

32 ENERGY CONSERVATION, CONSUMPTION, AND UTILIZATI

Measuring Climate and Water Risk across the Bulk Power System

As climate impacts increase and power systems transition to renewables, planners and operators need insights into climate risks to power generation and infrastructure to ensure reliable decision-making in the short and long-term. We present a standardized, consistent mechanism for utilities and system operators to evaluate the climate- and water-related risks of their current and future grid assets. Using a risk-based approach on the combined outcomes of high-fidelity climate drivers together with water and power system models, we examine the temperature and water availability impacts within the contiguous United States to power system assets at the water basin level in three different time periods and report resulting outcomes on lost capacity across different expansion scenarios and climate models. The results indicate that air temperature has the highest effect on derating. Changes in streamflow do not have a large impact on generation capacity at the national level. Electric sector buildout scenarios each have a unique regional risk profile, depending on the technology mix and total capacity, although risks from high temperatures are significant for both traditional and renewable energy generation. Stakeholders can use this approach to monitor effects of generation capacity losses and potential impacts as climate, generation mix, and infrastructure change.

24 POWER TRANSMISSION AND DISTRIBUTION

Chlorine isotope separations using thermal diffusion

In a chloride molten salt fast reactor (Cl-MSFR), the fuel salt might be comprised of a specific eutectic composition of alkali and alkaline chlorides that solubilize major and minor actinide chlorides as the fertile component(s). Each of the chloride species contain the natural abundance ( 35 Cl ~76% and 37 Cl ~24%) of the two stable isotopes of chlorine 35 Cl and 37 Cl. There has been an ongoing controversy for the operation of the Cl-MSFRs concerning the potential of the 35 Cl(n,γ) 36 Cl, 35 Cl(n,p) 35 S, 35 Cl(n,α) 32 S reactions to produce 36 Cl, 32 S, and 32 P at relevant energies [Bulmer 1956]. The undesirable attributes of irradiated 35 Cl are enumerated further below.

07 ISOTOPE AND RADIATION SOURCES

Spatiotemporal Studies of Soluble Inorganic Nanostructures with X‐rays and Neutrons

This Review addresses the use of X-ray and neutron scattering as well as X-ray absorption to describe how inorganic nanostructured materials assemble, evolve, and function in solution. We first provide an overview of techniques and instrumentation (both large user facilities and benchtop). We review recent studies of soluble inorganic nanostructure assembly, covering the disciplines of materials synthesis, processes in nature, nuclear materials, and the widely applicable fundamental processes of hydrophobic interactions and ion pairing. Reviewed studies cover size regimes and length scales ranging from sub-Ångström (coordination chemistry and ion pairing) to several nanometers (molecular clusters, i.e. polyoxometalates, polyoxocations, and metal-organic polyhedra), to the mesoscale (supramolecular assembly processes). Reviewed studies predominantly exploit 1) SAXS/WAXS/SANS (small- and wide-angle X-ray or neutron scattering), 2) PDF (pair-distribution function analysis of X-ray total scattering), and 3) XANES and EXAFS (X-ray absorption near-edge structure and extended X-ray absorption fine structure, respectively). While the scattering techniques provide structural information, X-ray absorption yields the oxidation state in addition to the local coordination. Our goal for this Review is to provide information and inspiration for the inorganic/materials science communities that may benefit from elucidating the role of solution speciation in natural and synthetic processes.

37 INORGANIC, ORGANIC, PHYSICAL, AND ANALYTICAL CH

Dissipative Phase Transition in the Two-Photon Dicke Model

We explore the dissipative phase transition of the two-photon Dicke model, a topic that has garnered significant attention recently. Our analysis reveals that while single-photon loss does not stabilize the intrinsic instability in the model, the inclusion of two-photon loss restores stability, leading to the emergence of superradiant states, which coexist with the normal vacuum states. Using a second-order cumulant expansion for the photons, we derive an analytical description of the system in the thermodynamic limit, which agrees well with the exact calculation results. Additionally, we present the Wigner function for the system, shedding light on the breaking of the 𝑍4 symmetry inherent in the model. These findings offer valuable insights into stabilization mechanisms in open quantum systems and pave the way for exploring complex nonlinear dynamics in two-photon Dicke models.

71 CLASSICAL AND QUANTUM MECHANICS, GENERAL PHYSIC

Investigation of Lunar-Inspired Geopolymer Concrete Formulations Mixed and Cured in Microgravity on the International Space Station (ISS)

The research outlined in this presentation investigates the use of various lunar regolith simulants in geopolymer lunar concrete mixes mixed and cured on the International Space Station (ISS). The motivation for this work is to study the effects of gravity on the microstructure of alkali-activated materials cured with heat, and to develop materials for the construction of long-term infrastructure on the lunar surface with in-situ resource utilization (ISRU). ISRU for construction materials reduces the cost and mass of payloads related to lunar construction. The advantage of geopolymer concrete as opposed to traditional portland cement concrete is that water acts as a medium for the polymerization reaction and leaves the system throughout the process, reducing its demand. Twelve samples of lunar regolith simulant and a solution composed of sodium hydroxide and sodium silicate were sent to the ISS. The three simulants were OPRH2N, OPRL2N, and JSC-1AF, using only particles less than 53 µm in diameter to increase reactivity of the simulant. Simulant to solution ratios were determined by workability while mixing. The simulant and solution were sealed Burst Pouches® along with 2 other sealed bags to prevent material from leaking. Crew member F-14 conducted testing on the ISS by introducing the solution to the simulant in the Burst Pouch®, mixing the sample with a spatula, and then clamping the specimen in the fresh state to prevent flow inside the Burst Pouch®. These specimens were then put in a thermos heated to 80C via sealed drinking water bags to cure for 24 hours with a temperature logger. The cured specimens remained in microgravity for at least 28 days and were returned from the ISS in February 2025. The specimens were then brought to the NASA Marshall Space Flight Center (MSFC) to analyze. Material characterization consisted of conducting Micro-CT tests of entire samples in their sealed apparatus to a resolution of 25µm. 2D image slices were saved in each orthogonal direction of each specimen at a 0.03 mm step size from the 3D model to conduct analytical porosity calculations. Representative samples from each specimen were sampled to perform helium gas pycnometery and were then mounted in resin for SEM imaging, EDS, and nanoindentation. Porosity was analyzed analytically using micromechanics modelling with the assistance of the NASA Multiscale Analysis Tool (NASMAT), as well as the NASA Advanced Supercomputing (NAS) servers (V. Saseendran & N. Yamamoto, 2024). Density was measured using helium gas pycnometery and was then compared to the theoretical density for experimental porosity calculation. Due to the samples’ non-uniform shape being cured in a pouch, traditional compression and tensile strength testing could not be performed. Nanoindentation was conducted at Clarkson University to determine the microhardness and reduced modulus of elasticity. Results from flight samples can be compared to ground samples currently in DLR’s possession to determine the effect on microstructure from being mixed and cured in microgravity. This study gives further insight and understanding of geopolymer lunar concrete and its viability as a lunar construction material with ISRU.

Adam Johnson

Pivotal role of organic adsorbates for the creation of catalytic sites during dry reforming of methane

Inadvertent factors can sometimes be crucial for synthesis of catalysts. The use of polyalcohols is common in the synthesis of heterogeneous catalysts. Interactions between alcohols and heterogeneous catalysts have been shown to induce surface reconstructions that greatly impact catalytic performance. Thus, traces of these alcohol functionalities on the as-synthesized catalysts, combined with heat treatment, could be critical in the generation of catalytic sites. Here, we show that during the synthesis of a Ni–Mo/MgO catalyst using a polyol process, residual ethylene glycol (EG) on the surface plays a significant role in the generation of catalytic sites for dry reforming of methane (DRM). The as-synthesized catalyst presents dispersed cationic Ni. Under DRM reaction conditions, the presence of EG, and H2 generated in situ, promote the generation of co-localized Ni–Mo nanoparticles (NPs). Greater amount of EG in the as-synthesized catalyst prevented sintering, leading to better catalyst stability and higher rates. If the residual EG remaining post-synthesis is removed through calcination, before conducting DRM, NiO NPs are formed and the material is completely inactive for catalyzing the reaction. When using a different support, denoted MgO*, EG also proved indispensable to generate active sites, although Ni–Mo co-localization was not evident, and a combination of DRM-related species was needed to activate the catalyst, not just H2. This work systematically uncovers how the interactions between organic adsorbates, the supported metals and the catalyst support dictate the creation of catalytic active sites.

Polo Garzon, Felipe [ORNL] (ORCID:0000000265076183

Direct observation of diamond formation in a shock-compressed high explosive

Understanding the formation timescale and structure of carbonaceous reaction products is critical for modeling the high-pressure equation-of-state of organic materials. We use the National Ignition Facility to shock-compress polycrystalline TATB (C 6 H 6 N 6 O 6 ) samples to ~70–130 GPa and ~4000–5500 K, employing in situ nanosecond X-ray diffraction to probe reaction products and velocimetry to measure transmitted compression wave profiles. Our diffraction data is consistent with the formation of diamond over timescales less than ~60 ns. This represents carbon condensation from a molecular explosive on timescales three times faster than previously reported and the earliest observation of diamond produced from reacting TATB. Reactive flow simulations with explicit chemistry reproduce the observed temporal structure within wave profiles to inform the distribution of P-T states. These findings provide direct evidence of ultrafast diamond formation in a reactive system at extreme conditions and provide new constraints for models of shock and detonation chemistry.

Clarke, Samantha M. [Lawrence Livermore National L

Nuclear Safety [Vol. 30, No. 3, July-September 1989]

Nuclear Safety is a review journal that covers significant developments in the field of nuclear safety. Its scope includes the analysis and control of hazards associated with nuclear energy, operations involving fissionable materials, and the products of nuclear fission and their effects on the environment. Primary emphasis is on safety in reactor design, construction, and operation; however, the safety aspects of the entire fuel cycle, including fuel fabrication, spent-fuel processing, nuclear waste disposal, handling of radioisotopes, and environmental effects of these operations, are also treated. Table of Contents for this issue follows. GENERAL SAFETY CONSIDERATIONS: 325 Safety of Framatome Advanced Nuclear Steam Supply Systems Designs by J. A. Charles and D. Lange, 333 Book Review of Nuclear Accidents: Intervention Levels for the Protection of the Public by H. B. Piper; ACCIDENT ANALYSIS: 335 Living PRA Computer Systems by S. C. Dinsmore and H.-P. Balfanz, 343 Summary of ICAP Assessments of RELAP5/MOD2 by W. E. Driskell and R. G. Hanson; CONTROL AND INSTRUMENTATION: 352 Thermal Performance Monitoring System at Maanshan Nuclear Power Plant by H.-J. Chao, Y.-P. Lin, G.-H. Jou, L.-Y. Liao, and Y.-B. Chen; DESIGN FEATURES: 358 Warning Systems for Nuclear Power Plant Emergencies by J. H. Sorensen and D. S. Mileti; WASTE AND SPENT FUEL MANAGEMENT: 371 Activities Related to Waste Management Compiled by E G. Silver; OPERATING EXPERIENCES: 382 Steam Generator Tube Performance: Experience with Water-Cooled Nuclear Power Reactors During 1985 by O. S. Tatone and R. L. Tapping, 400 Systems Interaction Analyses: Concepts and Techniques (Part II) by M. D. Muhlheim and G. A. Murphy, 413 Reactor Shutdown Experience Compiled by J. W. Cletcher, 416 Operating U.S. Power Reactors Compiled by E G. Silver; RECENT DEVELOPMENTS: 440 General Administrative Activities Compiled by E G. Silver, 460 Reports, Standards, and Safety Guides by D. S. Queener, 466 Status of Power-Reactor Licensing Activities Compiled by E G. Silver, 470 Proposed Rule Changes as of Mar. 31, 1989; ANNOUNCEMENTS: 334 Proceedings Published, 351 CEC Seminar on Methods and Codes for Assessing the Off-Site Consequences of Nuclear Accidents, 357 Short Course on Multiphase Flow and Heat Transfer: Bases and Applications in A: The Nuclear Power Industry B: The Process Industries, 357 International Conference on Probabilistic Safety Assessment and Management, 478 International Topical Meeting on the Safety, Status, and Future of Non-Commercial Reactors and Irradiation Facilities, 475 The Authors.

11 NUCLEAR FUEL CYCLE AND FUEL MATERIALS

Nuclear Safety [Vol. 29, No. 3, July-September 1988]

Nuclear Safety is a review journal that covers significant developments in the field of nuclear safety. Its scope includes the analysis and control of hazards associated with nuclear energy, operations involving fissionable materials, and the products of nuclear fission and their effects on the environment. Primary emphasis is on safety in reactor design, construction, and operation; however, the safety aspects of the entire fuel cycle, including fuel fabrication, spent-fuel processing, nuclear waste disposal, handling of radioisotopes, and environmental effects of these operations, are also treated. Table of Contents for this issue follows. GENERAL SAFETY CONSIDERATIONS: 259 Fifteenth Water Reactor Safety Information Meeting by E. G. Silver; CONTROL AND INSTRUMENTATION: 284 Reliability Technology to Improve and/or Maintain Emergency Diesel Generator Performance by S. Karimian and J. H. Taylor, 293 A Noise Diagnostics System for Operator Advice by G. Hessel, P. Liewers, P. Schumann, W. Schmitt, and F.-P. Weiss; PLANT SAFETY FEATURES: 307 A Passive Containment System for Advanced Light-Water Reactors by O. B. Falls, Jr., and F. W. Kleimola; ENVIRONMENTAL EFFECTS: 318 Data Base Construction for a Computerized Radiological Risk Investigation System by L. M. Hively, J. E. Nyquist, J. L. Bledsoe, and A. L. Sjoreen, 326 Erratum to "Radiation Hormesis and Nuclear Safety," Vol. 29, No. 1; OPERATING EXPERIENCES: 327 Operational Safety Experience and Passive Safety Testing at the Fast Flux Text Facility by Q. L. Baird, J. L. Rathbun, D. D. Stepnewski, R. L. Stover, and A. E. Waltar, 344 Backfilling of Independent Residual Heat Removal Systems in West Germany and Switzerland by G. Eckert and Y. Salomon, 353 Reactor Shutdown Experience Compiled by J. W. Cletcher, 356 Selected Safety-Related Events Compiled by G. A. Murphy, 363 Operating U.S. Power Reactors Compiled by E. G. Silver; RECENT DEVELOPMENTS: 384 General Administrative Activities Compiled by E. G. Silver, 390 Reports, Standards, and Safety Guides by D. S. Queener, 395 Status of Power-Reactor Projects Undergoing Licensing Review Compiled by E. G. Silver, 400 Proposed Rule Changes as of Mar. 31,1988; ANNOUNCEMENTS: 283 International ENS/ANS Conference on Thermal Reactor Safety "NUCSAFE 88", 317 Northwestern University Short Course on Radiation Safety, 407 Second International Seminar on Small- and Medium-Sized Nuclear Reactors, 407 International Workshop on New Developments in Occupational Dose Control and ALARA Implementation at Nuclear Power Plants and Similar Facilities, 408 Fourth International Topical Meeting on Nuclear Reactor Thermal Hydraulics (NURETH-4), 404 The Authors.

11 NUCLEAR FUEL CYCLE AND FUEL MATERIALS

Value of Geothermal Energy Storage for Supply-Side and Demand-Side Applications

This report presents the results of a study examining the value potential for geothermal energy storage (GES), a long-duration energy storage resource that stores thermal and/or geomechanical energy in the subsurface. GES could benefit the overall U.S. power system by temporally shifting electricity generation (supply-side) or meeting building heating and cooling load (demand-side). This report analyzes supply-side and demand-side opportunities independently because of differences in applications and models. Currently there is significant uncertainty about the development costs for GES, with only a limited number of demonstration plants for electric energy storage and building heating and cooling storage developments. In this report, we estimate the value of supply-side and demand-side GES to the bulk power system in the contiguous United States. Because of the significant uncertainty about GES development costs, this analysis does not consider GES deployment costs but instead focuses on the value of GES to the U.S. electricity system. The estimated values of GES provide reference points for economically competitive commercial cost targets. Supply-side GES is modeled as part of an enhanced geothermal system (EGS) generation plant in NREL's Regional Energy Deployment System (ReEDS) capacity expansion model (Ho et al. 2021). In contrast to conventional geothermal plants, which generate constant power, EGS plants have unique features that may allow for in-reservoir energy storage for flexible generation. Demand-side GES for heating and cooling, including seasonal hot and cold storage and short-duration heat pump storage, is incorporated into a price-taker model using Cambium electricity marginal cost projections. To establish an upper bound for the value of GES, analysis focused on favorable scenarios for storage with high generation from zero marginal cost, variable renewable energy resources. High penetrations of variable renewable energy generation can increase hourly electricity price variability, which increases the value of temporal energy arbitrage for storage technologies like GES.

15 GEOTHERMAL ENERGY