Search NASA⌕ Search

SEARCH · Search NASA

Results for “CAPACITY PLANNING”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 343 records · Page 19

Market Pricing and Settlements Analysis Considering Capacity Sharing and Reserve Substitutions of Operating Reserve Products

Electricity market pricing and settlement are the key signals for real-time dispatch and long-term investment decisions. Regional transmission operators (RTOs) in the U.S. adopt uniform pricing scheme, which is based on the marginal costs of supplying an incremental MW of electric services. The marginal cost of an electric service is highly dependent on the constraints in the pricing models of RTOs. A slight difference in constraint modeling of pricing model on energy and ancillary services could result in drastically different market clearing prices (MCPs), cleared reserve quantities, and associated revenue. RTOs in the U.S. have various market designs and assumptions in ancillary services modeling in capacity sharing and reserve substitutes. This paper examines four combination models of capacity sharing and reserve substitutes and analyzes the associated market implications. The numerical results present that 1) cascading reserve requirements have direct impact on reserve pricing schemes 2) both cascading reserve requirements and sharing capacity have significant impact on reserve MCPs and locational marginal prices, and thus result in drastically different reserve revenue, energy revenue, generation cost, and generation profit.

ancillary services↗

Profile of Resource Adequacy in the MISO Region

MISO is facing a number of generation resource challenges, ranging from large amounts of retirements, behind schedule retrofit projects, and internal resources committed to exporting power to PJM's capacity market. This report identifies potential issues with generator retirements and retrofits, as well as potential transmission issues, including the impact of imports and exports in a short-term outlook for resource adequacy in the MISO region, including specific concerns with the generation capacity expected to be available in the MISO North and Central regions from 2014 to 2016, as well as additional risks from proposed environmental regulations.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Novel Harsh Environment Materials and Fabrication Techniques for Wireless Sensor Applications (Final Report)

The overarching goal of this project is to establish a center of excellence program at the University of Maine that is focused on Harsh Environmental Materials and Fabrication Techniques for Wireless Sensor Applications. UMaine is well-positioned to build on previous successes in the areas of materials science research and sensor engineering. Since 1980, the Laboratory for Surface Science & Technology (LASST) has been a very successful interdisciplinary UMaine research center with a well-established infrastructure to investigate surfaces, interfaces, thin films, and micro/nano-fabrication. This infrastructure established through NSF, DOE, DOD, NASA, the State of Maine, and industry includes (i) a 3,500 ft2 clean room with nano/microfabrication and photolithography instrumentation, (ii) thin film synthesis, processing and characterization, (iii) surface and thin film analytical chemistry tools, and (iv) device packaging, electronic testing, wireless devices, system fabrication, and sensor test facilities. This strong foundation is the basis for a planned significant growth in R&D capacity currently underway. To that end, since the start of this project in the Fall of 2019, LASST has undergone a transition to become a new interdisciplinary center at UMaine, named the Frontier Institute for Research in Sensor Technologies (FIRST). This new focus represents a commitment and investment by UMaine that aligns with the proposed DOE-EPSCoR theme, capitalizing on the state-of-the-art instrumentation to form an energized group of faculty and students pursuing advances in sensor materials, devices, and applications.

36 MATERIALS SCIENCE↗

Analytics Supporting Stockpile and Enterprise Planning [Slides]

A robust and growing modeling effort supports Los Alamos weapons leadership as well as NNSA (NA18, NA12, NA19) and DoD (DASD-NM, USSTRATCOM). Current work are valuable to several key NNSA working groups supporting strategic planning: Stockpile Stewardship Management Plan (SSMP); Requirements & Planning Document (RPD) analysis; Requirements and Capacity Working Group (RCWG); Production Integration Collaboration Working Group (PICWG); Enterprise Modeling and Analysis Consortium (EMAC); Cost Estimating Analysis Group (CEAG).

45 MILITARY TECHNOLOGY, WEAPONRY, AND NATIONAL DEF↗

New Resource Adequacy Criteria for the Energy Transition: Modernizing Reliability Requirements

The transition toward a cleaner and more weather-dependent power system brings with it unprecedented challenges and opportunities for maintaining resource adequacy—namely, a future that includes rapid load growth, plant retirements, and a shift toward variable and energy-limited resources. Resource adequacy analyses, capacity accreditation, and the resource adequacy planning criteria are becoming increasingly important for power system planning and investment decisions. While previous ESIG reports evaluated the changing resource adequacy risks and planning practices created by the energy transition, none specifically examined potential changes to the resource adequacy criterion used for planning. The resource adequacy criterion sets the level of supply- and demand-side resources that are required for a given power system to meet reliability objectives. It is a pivotal standard that influences billions of dollars of investment decisions.

29 ENERGY PLANNING, POLICY, AND ECONOMY↗

Wholesale Electricity Market Design to Support Resource Adequacy

Wholesale electricity markets are intended to incentivize system generation investments and operations outcomes that meet evolving system needs. In this work, we evaluate the effectiveness of wholesale market structures, rules and policies in achieving system resource adequacy (RA) and clean energy targets in the presence of self-interested generation investors using the Electricity Markets and Investment Suite Agent-based Simulation (EMIS-AS) model. Results highlight that both capacity markets and operating reserve demand curves (ORDCs) can help achieve a reliable system but with different RA compliance timelines and distribution of generation technologies. Structures with capacity markets tend to favor more capital-intensive peaking technologies while reducing wind and solar build-outs due to suppressed energy and clean energy market prices, particularly in the absence of strong clean energy targets. Conversely, ORDCs improve the commitment of available generation units, but this comes at the expense of higher system costs and renewable generation curtailment. We also find that well-calibrated static capacity demand curves can yield similar reliability and total cost compared to capacity market demand curves informed dynamically by resource adequacy while also yielding stable annual capacity prices. Different approaches to formulating ORDC curves can also yield key trade-offs, namely that a more efficient treatment of storage chronology results in lower ORDC curves and prices, yielding less investment and cost but at the expense of reliability. Finally, the effectiveness of wholesale electricity markets in practically achieving very high clean energy generation targets highly depends on the cost-competitiveness of clean energy technologies that can support critical balancing needs across multiple timescales.

agent based modeling↗

Predicting Field Efficiency of Round-Baling Operations in High-Yielding Biomass Crops

Model simulations for bioenergy harvest planning need to utilize equipment-capacity relationships for equipment operating under the high-yield conditions typical of a biomass crop. These performance assumptions have a direct bearing on the estimates of machine capacity, the number of machines required, and, therefore, the cost to fulfill the biorefinery plant demands for a given harvest window. Typically, two major issues in these models have been poorly understood: the available time required to complete the harvest operation (often called probability of workdays) and the capacity of the harvest equipment as impacted by yield. Simulations use annual yield estimates, which incorporate weather events, to demonstrate year-to-year effects. Some simulations also incorporate potential yield increases from genetically modified energy crops. There are limited field performance data for most current forage equipment used for harvesting high-yield biomass crops. Analysis shows that the impact of wrap/eject time for round balers resulted in a 50% reduction in achieved throughput capacity (Mg/h). After the maximum throughput is reached, the cost of the round bale operation (3.23 USD/Mg) is double that of the large-square baler (1.63 USD/Mg). The round baler achieved throughput capacity is 50% less (32.7 Mg/h compared to 71.0 Mg/h) than the large-square baler.

09 BIOMASS FUELS↗

NAS Demand Predictions, Transportation Systems Analysis Model (TSAM) Compared with Other Forecasts

The current work incorporates the Transportation Systems Analysis Model (TSAM) to predict the future demand for airline travel. TSAM is a multi-mode, national model that predicts the demand for all long distance travel at a county level based upon population and demographics. The model conducts a mode choice analysis to compute the demand for commercial airline travel based upon the traveler s purpose of the trip, value of time, cost and time of the trip,. The county demand for airline travel is then aggregated (or distributed) to the airport level, and the enplanement demand at commercial airports is modeled. With the growth in flight demand, and utilizing current airline flight schedules, the Fratar algorithm is used to develop future flight schedules in the NAS. The projected flights can then be flown through air transportation simulators to quantify the ability of the NAS to meet future demand. A major strength of the TSAM analysis is that scenario planning can be conducted to quantify capacity requirements at individual airports, based upon different future scenarios. Different demographic scenarios can be analyzed to model the demand sensitivity to them. Also, it is fairly well know, but not well modeled at the airport level, that the demand for travel is highly dependent on the cost of travel, or the fare yield of the airline industry. The FAA projects the fare yield (in constant year dollars) to keep decreasing into the future. The magnitude and/or direction of these projections can be suspect in light of the general lack of airline profits and the large rises in airline fuel cost. Also, changes in travel time and convenience have an influence on the demand for air travel, especially for business travel. Future planners cannot easily conduct sensitivity studies of future demand with the FAA TAF data, nor with the Boeing or Airbus projections. In TSAM many factors can be parameterized and various demand sensitivities can be predicted for future travel. These resulting demand scenarios can be incorporated into future flight schedules, therefore providing a quantifiable demand for flights in the NAS for a range of futures. In addition, new future airline business scenarios are investigated that illustrate when direct flights can replace connecting flights and larger aircraft can be substituted, only when justified by demand.

Viken, Jeff↗

Validating the Airspace Concept Evaluation System for Different Weather Days

This paper extends the process for validating the Airspace Concept Evaluation System using real-world historical flight operational data. System inputs such as flight plans and airport en-route capacities, are generated and processed to create a realistic reproduction of a single day's operations within the National Airspace System. System outputs such as airport throughput, delays, and en-route sector loads are then compared to real world operational metrics and delay statistics for the reproduced day. The process is repeated for 4 historical days with high and low traffic volume and delay attributed to weather. These 4 days are simulated using default en-route capacities and variable en-route capacities used to emulate weather. The validation results show that default enroute capacity simulations are closer to real-world data for low weather days than high weather days. The use of reduced variable enroute capacities adds a large delay bias to ACES but delay trends between weather days are better represented.

Zelinski, Shannon↗

Utilizing Traveler Demand Modeling to Predict Future Commercial Flight Schedules in the NAS

The current work incorporates the Transportation Systems Analysis Model (TSAM) to predict the future demand for airline travel. TSAM is a multi-mode, national model that predicts the demand for all long distance travel at a county level based upon population and demographics. The model conducts a mode choice analysis to compute the demand for commercial airline travel based upon the traveler s purpose of the trip, value of time, cost and time of the trip,. The county demand for airline travel is then aggregated (or distributed) to the airport level, and the enplanement demand at commercial airports is modeled. With the growth in flight demand, and utilizing current airline flight schedules, the Fratar algorithm is used to develop future flight schedules in the NAS. The projected flights can then be flown through air transportation simulators to quantify the ability of the NAS to meet future demand. A major strength of the TSAM analysis is that scenario planning can be conducted to quantify capacity requirements at individual airports, based upon different future scenarios. Different demographic scenarios can be analyzed to model the demand sensitivity to them. Also, it is fairly well know, but not well modeled at the airport level, that the demand for travel is highly dependent on the cost of travel, or the fare yield of the airline industry. The FAA projects the fare yield (in constant year dollars) to keep decreasing into the future. The magnitude and/or direction of these projections can be suspect in light of the general lack of airline profits and the large rises in airline fuel cost. Also, changes in travel time and convenience have an influence on the demand for air travel, especially for business travel. Future planners cannot easily conduct sensitivity studies of future demand with the FAA TAF data, nor with the Boeing or Airbus projections. In TSAM many factors can be parameterized and various demand sensitivities can be predicted for future travel. These resulting demand scenarios can be incorporated into future flight schedules, therefore providing a quantifiable demand for flights in the NAS for a range of futures. In addition, new future airline business scenarios are investigated that illustrate when direct flights can replace connecting flights and larger aircraft can be substituted, only when justified by demand.

Viken, Jeff↗

Research on the International Space Station: Understanding Future Potential from Current Accomplishments

In November 2007, the International Space Station (ISS) will have supported seven years of continuous presence in space, with 15 Expeditions completed. These years have been characterized by the numerous technical challenges of assembly as well as operational and logistical challenges related to the availability of transportation by the Space Shuttle. During this period, an active set of early research objectives have also been accomplished alongside the assembly. This paper will review the research accomplishments on ISS to date, with the objective of drawing insights on the potential of future research following completion of ISS assembly. By the end of Expedition 15, an expected 121 U.S.-managed investigations will have been conducted on ISS, with 91 of these completed. Many of these investigations include multiple scientific objectives, with an estimated total of 334 scientists served. Through February 2007, 101 scientific publications have been identified. Another 184 investigations have been sponsored by ISS international partners, which independently track their scientists served and results publication. Through this survey of U.S. research completed on ISS, three different themes will be addressed: (1) How have constraints on transportation of mass to orbit affected the types of research successfully completed on the ISS to date? What lessons can be learned for increasing the success of ISS as a research platform during the period following the retirement of the Space Shuttle? (2) How have constraints on crew time for research during assembly and the active participation of crewmembers as scientists affected the types of research successfully completed on the ISS to date? What lessons can be learned for optimizing research return following the increase in capacity from 3 to 6 crewmembers (planned for 2009)? What lessons can be learned for optimizing research return after assembly is complete? (3) What do early research results indicate about the various scientific disciplines represented in investigations on ISS? Are there lessons specific to human research, technology development, life sciences, and physical sciences that can be used to increase future research accomplishments? Research has been conducted and completed on ISS under a set of challenging constraints during the past 7 years. The history of research accomplished on ISS during this time serves as an indicator of the value and potential of ISS when full utilization begins. By learning from our early experience in completing research on ISS, NASA and our partners can be positioned to optimize research returns as a full crew complement comes onboard, assembly is completed, and research begins in full.

Robinson, Julie A.↗

Conducting Research on the International Space Station Using the EXPRESS Rack Facilities

EXPRESS Racks provide capability for payload access to ISS resources. The successful on-orbit operations and versatility of the EXPRESS Rack has facilitated the operations of many scientific areas, with the promise of continued payload support for years to come. EXPRESS Racks are currently deployed in the US Lab, Columbus and JEM. Process improvements and enhancements continue to improve the accommodations and make the integration and operations process more efficient. Payload Integration Managers serve as the primary interface between the ISS Program and EXPRESS Payload Developers. EXPRESS Project coordinates across multiple functional areas and organizations to ensure integrated EXPRESS Rack and subrack products and hardware are complete, accurate, on time, safe, and certified for flight. NASA is planning to expand the EXPRESS payload capacity by developing new Basic Express Racks expected to be on ISS in 2018.

Thompson, Sean W.↗

Variable Renewable Energy in Long-Term Planning Models: A Multi-Model Perspective

Long-term capacity expansion models of the U.S. electricity sector have long been used to inform electric sector stakeholders and decision-makers. With the recent surge in variable renewable energy (VRE) generators — primarily wind and solar photovoltaics — the need to appropriately represent VRE generators in these long-term models has increased. VRE generators are especially difficult to represent for a variety of reasons, including their variability, uncertainty, and spatial diversity. This report summarizes the analyses and model experiments that were conducted as part of two workshops on modeling VRE for national-scale capacity expansion models. It discusses the various methods for treating VRE among four modeling teams from the Electric Power Research Institute (EPRI), the U.S. Energy Information Administration (EIA), the U.S. Environmental Protection Agency (EPA), and the National Renewable Energy Laboratory (NREL). The report reviews the findings from the two workshops and emphasizes the areas where there is still need for additional research and development on analysis tools to incorporate VRE into long-term planning and decision-making. This research is intended to inform the energy modeling community on the modeling of variable renewable resources, and is not intended to advocate for or against any particular energy technologies, resources, or policies.

29 ENERGY PLANNING, POLICY, AND ECONOMY↗

Regional Energy Deployment System (ReEDS) Model Documentation: Version 2019

The Regional Energy Deployment System (ReEDS) model is a capacity expansion and dispatch model that is primarily used for the contiguous U.S. electric power sector. The model relies on system-wide least cost optimization to estimate the type and location of future generation and transmission capacity. This document describes details of how the model is formulated, how it functions, and many of the key inputs.

24 POWER TRANSMISSION AND DISTRIBUTION↗

An Action Plan for Maritime Energy and Emissions Innovation

The Action Plan for Maritime Energy and Emissions Innovation (the action plan) lays out a strategy to reduce and eliminate nearly all greenhouse gas (GHG) emissions in the U.S. maritime sector by 2050, in line with the U.S. economy-wide goal of net-zero GHG emissions by 2050. To reach this goal, the action plan outlines actions, objectives, targets, and activities to scale low- and net-zero emissions fuels, energies, and technologies; strengthen the maritime workforce; bolster shipbuilding capacity; and expand complementary landside infrastructure. The action plan supports industry, mariners, communities, civil society, sub-national governments, and other interested parties that will decarbonize the maritime sector alongside the U.S. government.

09 BIOMASS FUELS↗

Regional Energy Deployment System (ReEDS) Model Documentation (Version 2020)

The Regional Energy Deployment System (ReEDS) model is a capacity expansion and dispatch model that is primarily used for the contiguous U.S. electric power sector. The model relies on system-wide least cost optimization to estimate the type and location of future generation and transmission capacity. This document describes details of how the model is formulated, how it functions, and many of the key inputs.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Average and Marginal Capacity Credit Values of Renewable Energy and Battery Storage in the United States Power System

As deployment of renewable resources and storage continue to significantly grow in the coming decades, these technologies will play increasingly important roles in maintaining power systems' resource adequacy. Few analyses so far offer comprehensive comparisons of forward-looking average and marginal capacity credits of variable renewable energy and storage in the U.S. interconnections across a wide range of possible futures. To fill this research gap, we quantify the average and marginal capacity credits of solar PV, onshore and offshore wind, and batteries between 2026 and 2050 across the U.S power systems to examine the temporal trends, spatial patterns, and trade-offs between these two capacity accreditation approaches. Across technologies, capacity credits of solar PV most clearly follow downward trends over time, reflecting the significant rise in solar PV generation share as the grid decarbonizes. While battery storages' generation shares also rise significantly over time, their capacity credits always remain stably high due to their capabilities to be dispatched strategically during critical periods to maintain reliability. On the other hand, capacity credits of wind technologies in general follow slight upward trends as their generation shares level off. There are strong spatial variabilities of both average and marginal capacity credits across technologies, but capacity credits of solar PV displaying the most obvious spatial patterns with high capacity credits concentrating in wind-rich, solar-poor regions in SPP, PJM, and MISO, suggesting potential reliability benefits of interconnection-wide planning for renewable energy deployments. Additionally, except for offshore wind, average capacity credits of all other renewable technologies tend to be higher than their marginal capacity credits, indicating that existing renewable resources tend to be accredited higher than new resources at almost any time.

25 ENERGY STORAGE↗