Search NASASearch

SEARCH · Search NASA

Results for “Hadronic transport”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

327 records · Page 19

Motor Configuration Selection for A New Technical Challenge to Develop A 5 MW Cryogenic Motor and Drive

Due to aviation’s appreciable and growing share of humanity’s impact on our environment and estimates that CO2emissions only account for 34% of aviation’s total effective radiative forcing [1], there is a need to reach beyond climate goals that focus only on CO2emissions, such as the US Aviation Climate Action Plan’s [3] goal to reach net-zero carbon emissions by 2050.There is motivation to develop technology that pushes toward future large transport aircraft with net zero climate impact that are highly electrified (i.e., have higher power electrical propulsion system components). This paper describes a new, 6-year technical challenge to address this need by developing a 5 MW superconducting motor and cryogenic drive. Section 1 will detail the motivation for this work. Section 2 will describe the technical challenge and the selected specifications for the motor. Section 3 will present the results of a motor configuration trade study and the down selection of one configuration to develop a detailed design for. The technical challenge focuses on the design of a5 MW superconducting motor and cryogenic drive and demonstration of it at a 2+ MW scale to achieve TRL 3. Both fully superconducting (superconducting stator and rotor) and fully cryogenic (superconducting rotor and cryogenic stator) machine configurations will be explored. An emphasis will be placed on addressing the key tall poles for high power superconducting machines. Further details will be included in the full paper. The requirements and goals of the motor will be detailed. The rated speed (2,000 to 3,000 rpm) is defined to be appropriate for directly driving multi-MW fans or propellers. A range of rated speed is permitted because the motor is not designed for a specific aircraft and to provide design flexibility if AC losses in the stator winding are found to be a significant constraint (i.e., a lower speed can be selected to reduce electrical frequency). Relatively conservative requirements for efficiency (99%) and specific power (20 kW/kg) are defined, because TRL advancement and pushing toward flight readiness is emphasized over performance optimization. However, more aggressive efficiency and specific power goals are specified (99.9% and 40 kW/kg). The 3rd section will present the results of a motor configuration trade study. The study started with a qualitative assessment of sixteen motor configurations based on geometric, mechanical, thermal, and electromagnetic criteria. This assessment has been completed with three evaluators scoring all nine criteria. A configuration down select was made by prioritizing the sixteen configurations into four tiers based on each configuration’s total score and consideration of manufacturability, complexity, and support hardware (e.g., rotary vacuum seals, bearings). Configurations in priority A and B will be further evaluated through quantitative assessments, whereas those in priority C will only be further evaluated if time permits and priority D will not be further evaluated. Eight of the sixteen configurations were down selected for quantitative assessment, which will include analytical calculations and low-to moderate-fidelity finite element analysis to produce a preliminary Pareto front of efficiency versus specific power for each configuration. This assessment emphasizes the calculation of AC losses in the stator winding and an exploration of thermal management approaches to remove that heat and maintain cryogenic temperature. The final paper will include a description of each motor configuration that was considered. The quantitative assessments are underway, and an assessment of one configuration is complete for multiple stator conductor options. The remaining assessments are scheduled to be completed by late March so that the final down select to one configuration can be included in this paper.

Net Zero

Gear Test Assembly - Experimental Testing and Analysis of Gears and Bearings - FY2026

The Gear Test Assembly (GTA) is an experimental test apparatus built and installed in the Mechanisms and Engineering Test Loop (METL) at Argonne National Laboratory (ANL). While designed to accommodate a variety of components intended for use in advanced compact in-vessel transfer machine, the focus of GTA been the testing of large radial spur gears. The performance of the components used in GTA motivates the choices made in the design, components, and material choices for the forthcoming METL test articles; the Gripper Test Assembly (GrTA), and the Bearing Test Assembly (BTA). To date, GTA has completed nine experimental testing campaigns and achieved over 21 million revolutions under prototypic sodium fast reactor loads and operating conditions. This report provides an overview and results for the two most recent experiments Campaign #8 and Campaign #9. `Campaign #8 was the first campaign to make use of a set of nickel alloy radial spur gears, made from Hastelloy C-22HS, and combined with heat-treated tapered roller bearings. The bearings and torque profile used allowed Campaign #8 to be directly compared with Campaign #1 where Inconel 718 gears were used instead. Campaign #8 attained 1,058,880 shaft revolutions within 23% of the 1,314,855 revolutions achieved in Campaign #1. These results demonstrate that the heat-treated tapered roller bearings show consistent increased lifetimes, approximately three times longer than for non heat-treated taper rollers, and that the particular material of the gear does not play a substantial role in performance. Similar to Campaign #7 where bearing failure resulted in fragmentation and transport of bearing material into the gear teeth led to tooth damage in the Inconel gears, a similar process led to the damage of the Hastelloy gears. Subsequent NDE analysis showed that the damage was only limited to the tooth surface and does not extend into the gear interiors. Based on the NDE reports, the Hastelloy gears can be reconditioned and put back into service for future campaigns as was done for the Inconel gears. Reconditioned Inconel 718 gears damaged in Campaign #7 were returned to service in Campaign #9 and paired with non heat-treated tapered roller bearings. In Campaign #9 a novel set of operating conditions were implemented whereby the gears and bearings were cycled between hot, submerged refueling conditions where fuel handling operations occurred and cold, dry, and inert conditions where the sodium was drained and the vessel was allowed to cool simulating long, ex-vessel storage of the fuel handling machine. A total of eight of these operating cycles were achieved before a bearing failure occurred after the accumulation of 475,692 shaft revolutions were achieved. During Campaign #9, one of the drive motors was damaged and over the course of a 240 day standby period, the entire GTA drive system was upgraded from a 480VAC system to a 240VAC system that provided the opportunity to consolidate wall-space in the METL facility and provide more space for additional test articles being installed in the coming year. The over 475,000 shaft revolutions achieved in Campaign #9 eclipses the previous record for lifetime of non heat-treated tapered roller bearings held by Campaign #3 of 392,000 shaft revolutions. Further analysis and future campaigns hope to shed light on the cause of this approximately 17% increase in lifetime.

42 ENGINEERING

Physics basis for the reference flat-top plasma scenario in the ST–E1 fusion power plant

As part of the U.S. Department of Energy’s Milestone-Based Fusion Energy Development Program, Tokamak Energy has completed the pre-concept design of the ST–E1 fusion power plant. ST–E1 is envisaged to operate in two phases: a pilot plant phase, targeting sustained net power production of 300 - 500 MWe for a duration >1 hr, followed by a commercial power plant phase targeting steady-state operations and a normalised overnight capital cost of ⩽12 000 $\$$/kWe. The design process adopted was highly iterative, integrating all major plant systems and progressing in a phased fidelity approach. At the pre-conceptual stage, the emphasis has been on exploring the design space, identifying the main system-level trade-offs, and making the key decisions that define the overall plant concept, rather than optimising a single operating point. This paper, part of a focused collection detailing the ST–E1 pre-concept design, addresses the development of a series of reference flat-top plasma operating points for the pilot plant phase. A modelling workflow was established to develop and assess candidate plasma design points and explore key dependencies. The workflow includes integrated core plasma modelling, magnetohydrodynamic (MHD) stability assessment, equilibrium generation, scrape-off-layer and exhaust modelling, heating & current drive design and optimisation, and turbulent transport modelling. Using this framework, the impact of several key parameters on the flat-top operating space was investigated, including the density limit, core radiation fraction and divertor power loading, level of external heating and curent drive power and assumed pedestal characteristics. The MHD stability, controllability and micro-stability characteristics of these plasmas were also analysed. These investigations informed the definition of a set of fully non-inductive, flat-top reference operating points that satisfy the high-level ST–E1 mission, including a low and high density case, a case that is stable to resistive wall modes and a case with reduced divertor power loading.

ST–E1