Search NASA⌕ Search

SEARCH · Search NASA

Results for “Injectors”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 343 records · Page 19

Breakup dynamics in a pressure-swirl injector for urea-water solution applications: A computational study

The co-optimization of in-cylinder combustion and after-treatment technology has become a major aspect in engine design and development, with the goal of meeting the increasingly restrictive emission regulations in the transportation industry. Selective Catalytic Reduction is a robust technology to control the emission of NO x , and the injection of urea in water solution is the exhaust tailpipe is a key aspect of its operation. The proposed work uses high-fidelity Computational Fluid Dynamics to characterize the atomization dynamics of the liquid jet in relevant cross-flow conditions. The study focuses on a commercial low-pressure (9 bar) pressure-swirl injector which is characterized in its internal geometry through high-resolution X-ray micro-computational tomography. The internal two-phase flow has been modeled according to the volume-of-fluid approach in a large eddy simulation framework and validated against near-nozzle X-ray radiography measurement. Moreover, characterizing the breakup dynamics for the swirling hollow cone formation, and assessing the influence of the cross-flow in the breakup dynamics was completed. The results have been reported proposing Re-Oh maps and probability density functions of the spray kinematics. Higher cross-flow momentum generates an increase in the jet intact length and a reduction of the liquid droplet diameters. The axial momentum of the jet is affected by the cross-flow already in the near-nozzle region, determining a relevant deviation of the spray velocities. In conclusion, this work aims to inform the initialization of Eulerian-Lagrangian spray models through the assignment of droplet kinematics and static one-way coupling between volume-of-fluid results and Lagrangian spray parcels, to be used for system-size domain simulations.

33 ADVANCED PROPULSION SYSTEMS↗

Control of microphonics for a superconducting radio-frequency photo-injector cryomodule

A superconducting radio-frequency photo-injector cryomodule is being developed for the high-energy upgrade of the Linac Coherent Light Source (LCLS-II-HE). This effort is a collaboration between the Facility for Rare Isotope Beams at Michigan State University (MSU), Argonne National Laboratory, Helmholtz-Zentrum Dresden-Rossendorf, and SLAC National Accelerator Laboratory. The cryomodule features a 185.7 MHz superconducting quarter-wave resonator (QWR) designed to operate with an RF electric field of 30 MV/m at the photo-cathode. Mechanical vibrations must be controlled for operation with stable amplitude and phase. The first prototype cryomodule was cold-tested at MSU with a QWR, fundamental power coupler, tuner, and cathode stalk. In the cold test, we observed microphonics that made it difficult to control the RF phase at high gradient. The cryogenic circuit was identified as a likely culprit. This paper presents our studies of microphonics during the cryomodule cold test and follow-up investigations at room temperature. Our findings provided valuable feedback for modifications to the cryogenic circuit and a successful second cold test of the cryomodule.

Accelerator Physics↗

Towards large phase space beams at the CEBAF injector

We report on the status of a degrader device to generate large phase space beams for machine acceptance studies in the Continuous Electron Beam Accelerator Facility (CEBAF) at Jefferson Lab. The degrader device consists of thin, low-Z targets to degrade the electron beam phase space through multiple scattering, two apertures to define the maximum transverse emittance, and a solenoid to aid in matching to the rest of the injector beamline. The engineering design of the degrader device and projected degraded beam phase space parameters are presented.

Sy, A.↗

Measurement techniques using the electron beam profile scanner at the Fermilab Main Injector

This work presents techniques for non-invasive transverse profile measurements of high-intensity proton beams using an Electron Beam Profile Scanner (EBPS). The EBPS utilizes low-energy electrons as a probe to analyze the transverse size of proton beams, allowing for potential analysis on a single-bunch basis. Recent upgrades to the Fermilab Main Injector have enhanced beam power on target to 1 MW, with future developments targeting 2 MW. The higher beam power has increased the demand for non-invasive diagnostics, as invasive methods can disrupt operations.The techniques presented include 1) the slow scan technique, which serves as a proof of concept for the probe beam, 2) the one-shot scan technique for measuring horizontal beam profiles, and 3) the raster scan technique for analyzing horizontal beam profiles as a function of the longitudinal distribution of the beam. The profiles obtained will be crucial for studying and understanding instabilities in high-power, high-intensity proton beams. This will contribute to optimizing the operation of high-power proton accelerators by minimizing beam loss, activation, and damage to both the diagnostics and the accelerator components.

Mwaniki, Matilda [IIT, Chicago]↗

First degraded beams in the CEBAF injector

The electron beam degrader in the Continuous Electron Beam Accelerator Facility (CEBAF) injector at Jefferson Lab serves to generate electron beams with transverse emittance over 10x the nominal values, with the ultimate goal of using degraded electron beams to measure machine acceptance. Electron beams are degraded through multiple scattering in thin carbon foils, and maximum transverse emittance is defined through two collimating apertures. The degrader device was installed in late 2024, with commissioning and first beams on degrader targets during the 2025 physics run. We report on first operation of the degrader device. This material is based upon work supported by the U.S. Department of Energy, Office of Science, Office of Nuclear Physics under contract DE-AC05-06OR23177.

Sy, A. [Thomas Jefferson National Accelerator Faci↗

Extraction and Injection in the Electron Injector for the Electron-Ion Collider

The electron injector for the Electron-Ion Collider (EIC) consists of a linear accelerator, a beam accumulation ring, and the Rapid Cycling Synchrotron (RCS) before the electrons are injected into the Electron Storage Ring (ESR) and collided. Extraction out of the RCS is complicated by limited space and the nominal beam pipe aperture, while injection into the ESR is complicated due to the limitation of kicker strength, so that the kickers will not impact the proton beam in the adjacent Hadron Storage Ring (HSR); additionally, the ESR kickers must also provide enough kick to the stored bunch for the swap-out scheme. This paper covers the injection into and extraction out of the RCS, as well as injection into the ESR, detailing layout, optics, and anticipated parameters of the septa and different kickers.

Deitrick, K. [Thomas Jefferson National Accelerato↗

CW copper injector for SRF industrial cryomodules

Compact SRF industrial linacs can provide unique parameters of the beam (>1 MW and >1-10 MeV) hardly achievable by normal conducting linacs within limited space. SRF technology was prohibitively expensive until the development of conduction cooling which opened the way for compact stand alone SRF systems suitable for industrial and research applications. Limited cooling capacity puts strict requirements on the beam parameters with zero losses of the beam on the SRF cavity walls. This implies strict requirements on the beam energy to be accepted by the cryomodule and most importantly the beam bunching with zero particles in between. We designed a CW normal conducting RF injector which consists of a gridded RF gun integrated with a first cell of a copper booster cavity to satisfy these requirements. Here we present a complete design of a booster cavity including beam dynamics, RF, thermomechanical and engineering design.

43 PARTICLE ACCELERATORS↗

Analog Signal Multiplexing System for the Iota Proton Injector

The Fermilab Accelerator Science and Technology (FAST) Facility at FNAL is a dedicated research and development center focused on advancing particle accelerator technologies for future applications worldwide. Currently, a key objective of FAST Operations is to commission the 2.5 MeV IOTA Proton Injector (IPI) and enable proton injection into the Integrable Optics Test Accelerator (IOTA) storage ring. The low and medium-energy sections of the IPI include four frame-style dipole trims and two multi-function correctors with independently controlled coils, requiring readout of 32 analog channels for current and voltage monitoring in total. To reduce cost and optimize rack space within the PLC-based control system, a 32-to-4 analog signal multiplexing system was designed and implemented. This system enables real-time readback of excitation parameters from all magnetic correctors. This paper presents the design, construction, implementation, and performance of the multiplexing system.

MacLean, Daniel R. [Fermilab] (ORCID:0000000210103↗

Evaluating a Transition-jump System for the Fermilab Main Injector Using Xsuite

We describe an Xsuite simulation framework for the Fermilab Main Injector (MI) along with an evaluation of transition-crossing behaviors in the accelerator. In particular, we studied the introduction of quadrupole magnets into the lattice as part of a transition-jump system that will be implemented through the $2^{nd}$ Proton Improvement Plan (PIP-II). Simulated beam losses spurred by transition-induced instabilities were assessed under several systematic effects, including MI quad errors, magnet-to-magnet variability in the jump magnets, power-supply errors, and timing jitter.

Schreckenberger, A. P. [Fermilab] (ORCID:000000016↗

A simulation of the Fermilab Main Injector dual power amplifier cavities

The Fermilab Main Injector accelerating cavities have sparking issues when they are run at voltages higher than those required by the PIP-II project. This is a problem Fermilab is working on as planning begins for the next upgrade to the accelerator complex. One of the methods being used to address the issue is the development of a CST Microwave Studio simulation to accurately model the PIP-II dual power amplifier cavities and identify which part(s) of the cavity is causing sparking to develop. The model will also be used to determine if changes to the cavity geometry may allow the cavity to be used at higher voltages before sparking occurs.

Stevenson, Susanna [Fermilab] (ORCID:0009000891261↗

The 2023 Gold Run in the Injectors

RHIC Run 23 used Gold beam from Tandem with an AGS extraction energy of 9.8 GeV. The same basic setup, 8 single bunch transfers from the Booster and a 12-6 merge in the AGS to provide 4 bunches at extraction, had been used before to deliver Tandem Au to RHIC. But in those cases, it was used for low energy runs (3.85 GeV in 2021 and 5.75 GeV in 2020) where extraction was below transition energy (7.9 GeV). Tandem beam was used for this run because the intensity and stability of EBIS Au did not meet the requirements for RHIC. Physics was first declared in RHIC on May 22 nd and on August 1 st the run was cut short by about 2 months due to a major failure in RHIC. Prior to the advent of EBIS as the preinjector in 2012, 9.8 GeV Tandem Au was regularly delivered to RHIC but the setup in the Booster and AGS was quite different: Four Booster transfers of 6 bunches each were merged into 4 bunches using a 24-12-4 merge scheme. The supercycle length was 6.0 sec before June 29 th when it was extended to 6.6 sec to accommodate EBIS commissioning. The Tandem, Booster, and AGS were on user 1 for the 9.8 GeV setup. Some work with EBIS Au 32+ took place on EBIS, Booster, and AGS user 5 using the standard 9.8 GeV injector setup with a 4 to 1 merge in Booster and a 6-3-1 type merge in AGS. The Siemens motor generator was used for the entire run. An intensity limit of 8.0e9 Au 77+ ions in the AGS was in effect during the run to protect the J7 plunging stripping foil and the Copper absorber of the AGS beam dump. This corresponds to a merged bunch intensity limit of 2.0e9 Au 77+ ions for 4 equal intensity bunches. The per bunch intensity limit can be increased to 2.67e9 by reducing the number of BtA transfers from 8 to 6. There was also a Booster Late intensity limit of 16e9 Au ions in effect to protect the BtA stripping foil from damage due to overheating. Lowering the number of transfers also makes this limit less of a constraint. BtA foil 5, which was installed in 2020 and had not been used regularly prior to this run was used all run and showed no obvious signs of deterioration. In May, a Tandem Au 3.85 GeV setup from 2021 was also re-established on AGS user 2. It was used for APEX on May 24 and July 26. Initial work with 3.85 GeV beam was on May 19. Proton beam was also set up during the run and extracted to W dump on July 10. It was used for APEX on July 12. Although the OPPIS source was used the AGS setup was without snakes.

43 PARTICLE ACCELERATORS↗

A Mechanically Tuned Superconducting Main Injector Cavity

Radio Frequency (RF) superconductivity has been a mainstay of accelerator science for decades. However, its benefits have yet to be applied to proton synchrotrons with demanding tuning requirements. For example, the Main Injector (MI), Fermilab's high-energy proton synchrotron, currently utilizes 20+ ferrite-loaded cavities for a targeted 1.2 s acceleration cycle. Harnessing the extremely high gradients associated with superconductivity, the required number of cavities could be reduced by an order of magnitude, dramatically lowering operational power requirements even with cryogenic considerations. Additionally, the current plans for the Fermilab Accelerator Complex Evolution (ACE) initiative involve almost doubling the number of cavities in MI if the same designs are to be used, further highlighting the potential benefits of superconductivity. These advantages are attractive, but to date, no tunable superconducting cavity suitable for MI has been proposed due to the incompatibility of conventional broadband tuning methods with superconductivity. Here, we present a tunable superconducting cavity concept capable of record-breaking performance. Tuning will be accomplished by using high-speed linear actuators to vary the insertion depth of metallic plungers into the cavity volume. This tuning concept is theoretically viable with currently available technology and will be fully compatible with a superconducting cavity.

43 PARTICLE ACCELERATORS↗

Interface Box for Dual Power Amplifier Modulators in Main Injector

The Proton Improvement Plan II (PIP-II) aims to enhance the current Fermilab particle accelerator complex to intensify and accelerate more beam. To achieve this, a second power amplifier will be added to the Main Injector (MI) cavities. However, the control unit could only read signals coming from the previous power supplies, so the interface box was designed to facilitate the issue.

Ayala, Diana↗

Performance of the Fermilab Linac Injector

The Fermilab Linac injection line consists of a 35 keV magnetron-type H- ion source, two-solenoid Low Energy Beam Transport (LEBT), 201 MHz 4-rod 750 keV Radio Frequency Quadrupole (RFQ), and a Medium Energy Transport (MEBT) containing 4 quadrupoles and a bunching cavity. The injector delivers 25 mA, 48 s pulses to drift-tube Linac at a repetition rate of 15Hz. The transmission efficiency has been lower than expected since commissioning. Recent beam current measurements suggest that the beam is primarily lost upstream of the RFQ exit. Numerical simulations indicate that ions passing through the non-linear field region of the solenoids could produce a beam with an increased emittance resulting in up to 50 % of the LEBT beam current failing to meet the RFQ acceptance. An aperture restriction was installed upstream of the first solenoid to remove these ions. This report describes the results of measurements and simulations as well as the LEBT tuning.

Jones, Daniel C.↗

Development and Evaluation of a Novel Fuel Injector Design Method using Hybrid-Additive Manufacturing (Final Report)

The widespread application of metal additive manufacturing (AM) technologies has enabled exploration of complex design spaces to achieve optimally performing components. Current optimization techniques make use of several advanced methods to provide designs that are superior to existing versions. However, they seldom discuss the manufacturability of the optimal designs. The objective of this project was to develop a design optimization tool that simultaneously optimizes fuel injector hardware and the combustor flow field with optimization functions and constraints that consider both combustor performance and manufacturability using advanced AM methods and post-processing. In this way, the resultant hardware design is inherently imbued with our most advanced knowledge of combustion physics and AM methods from its conception.

36 MATERIALS SCIENCE↗

Evaluating a Transition-Jump System for the Fermilab Main Injector Using Xsuite

We describe an Xsuite simulation framework for the Fermilab Main Injector (MI) along with an evaluation of transition-crossing behaviors in the accelerator. In particular, we studied the introduction of quadrupole magnets into the lattice as part of a transition-jump system that will be implemented through the $2^{nd}$ Proton Improvement Plan (PIP-II). Simulated beam losses spurred by transition-induced instabilities were assessed under several systematic effects, including MI quad errors, magnet-to-magnet variability in the jump magnets, power-supply errors, and timing jitter.

Schreckenberger, Adam Paul [Fermilab] (ORCID:00000↗

A Simulation of the Fermilab Main Injector Cavities

The Fermilab Main Injector accelerating cavities have sparking issues when they are run at voltages higher than those required by the PIP-II project. This is a problem Fermilab is working on as planning begins for the next upgrade to the accelerator complex. One of the methods being used to address the issue is the development of a CST Microwave Studio simulation to accurately model the PIP-II dual power amplifier cavities and identify which part(s) of the cavity is causing sparking to develop. The model will also be used to determine if changes to the cavity geometry may allow the cavity to be used at higher voltages before sparking occurs

Stevenson, Susanna M. [Fermilab] (ORCID:0009000891↗