Search NASA⌕ Search

SEARCH · Search NASA

Results for “PROJECTION”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 343 records · Page 19

Properties, Theory, and Measurements for Understanding the Function of Heavy Elements (Project 20180474CR, Final Technical Report)

The FY18-20 Laboratory Directed Research and Development (LDRD) funded Properties, Theory, and Measurements for Understanding the Function of Heavy Elements Project aim has been to advance heavy element science in a comprehensive project connecting targeted research with Los Alamos mission imperatives. The mechanisms for project implementation were (1) support of a multi-year broad-based postdoctoral fellows project, (2) a summer student fellows research project and two seminar series, and (3) organization of structured workshops and integrated educational and career development opportunities. The project was successfully administered by the Glenn T. Seaborg Institute (GTSI) for Transactinium Science and has shown to be an exceptional investment in supporting the Los Alamos National Laboratory (LANL) mission areas requiring heavy element and actinide science by attracting and funding the future generation of scientists and engineers. This project exhibited its value across the laboratory in heavy element and actinide science areas include materials, material properties, signatures, modeling, predictions, fabrication, detection, disposal, global security implications, forensics, and the specialized science surrounding plutonium, uranium, and their surrogates as fuels for energy and nuclear weapons. In this report, the GTSI project staff documents the “high return on investment” implementation as measured against the successes of previous actinide research and science-based projects and as evidenced by the retention of 30% of G.T. Seaborg Postdoctoral Fellows as permanent employees. With additional funding through LDRD Reserve funding during this project period, the GTSI expanded its support for heavy element and actinide science research with a Visiting Research Seaborg Scholar and a Rapid Response Small Projects call. These innovations have served to advance GTSI pursuits as communicated in our FY21-23 LDRD Proposal Project#: 20210527CR Seaborg Institute: Center for Advancing Actinide Science and Technology at LANL

36 MATERIALS SCIENCE↗

HERO CarbonSAFE Phase 2 Project in the Columbia River Basalt Group

The Hermiston, Oregon Basalt CarbonSAFE Phase II project (HERO CarbonSAFE) seeks to accelerate the deployment of commercial carbon dioxide (CO2) storage projects in basaltic rocks. Basalt CO2 storage has several advantages to conventional saline storage reservoirs including 1. The potential for rapid mineralization of CO2, 2. Associated decreases in pressure and CO2 migration risks, 3. Reduced long-term monitoring requirements with respect to plume tracking, 4. Widespread geographic distribution and, 5. Large storage potential due to thickness, porosity, and CO2 interactions with basalt. And for locations such as the Pacific Northwest, Hawaii, Iceland, India and Japan, basalts may offer the only economically feasible option for local CO2 storage. However, there are limited field-scale assessments of CO2 storage in basalt, and current carbon capture utilization and storage (CCUS) permitting and regulatory frameworks were developed for conventional saline reservoirs. HERO CarbonSAFE is designed to address research gaps and uncertainties associated with basalt storage. Specifically, the project will assess the feasibility of CO2 injection in the deep layered basalts, long-term storage (mineralization), practical approaches for large-scale implementation (50+ million metric tons of CO2 over 30 years), lithology-specific risks, and the technoeconomic potential for CO2 storage in basalts. The HERO CarbonSAFE project will assess feasibility of developing a commercial-scale (50+ million metric tons of CO2) geological storage complex within the Columbia River Basalt Group (CRBG), a layered continental flood basalt complex that underlies Calpine’s natural gas-fired Hermiston Power Project (HPP) in Hermiston, OR (Figure 1). Under this 2-year CarbonSAFE Phase II project, the HERO team will conduct a data acquisition campaign that includes drilling a stratigraphic well to a total depth of ~1,500 m into the thick layered basalts proximal to HPP. A comprehensive well logging and hydrologic testing program will be augmented with new core collected from flow zones and sealing units, and comprehensive laboratory testing to help refine the kinetic rates of mineralization. The newly acquired information will be integrated with existing data from regional wells to correlate basalt injection zone properties to develop storage hub/commercial-scale models. Using these models, the project team will evaluate injection scenarios to define the technical and economic potential for storing a minimum of 50 million metric tons of CO2 over a 30-year period, along with a robust sensitivity analysis on key parameters governing reservoir viability for sustainable injection over a commercial project lifetime. Specific technical objectives of HERO are: (1) assessing the reservoir response of a series of stacked layered reservoir flowtop sequences occurring in this area of the CRBG to commercial-scale injection volumes; (2) extending prior efforts by the project team to characterize the deep layered basalts encountered in regional studies, to leverage prior investments by U.S. Department of Energy’s (DOE) Carbon Storage program; (3) leveraging DOE’s mineralization characterization efforts to advance model parametrization for commercial scale injection of CO2 in basalts; (4) conducting risk assessments associated with scaling up to commercial storage hub injection goals, while validating DOE’s National Risk Assessment Partnership (NRAP) tools, to identify potential constraints that would prevent the CRBG from serving as a commercial-scale storage complex; (5) developing mitigation plans to address identified risks; (6) developing a commercial-scale injection and monitoring, verification and accounting (MVA) strategy; (7) utilizing computational models to define and minimize, if possible, the Area of Review (AoR) under Class VI regulations; and (8) developing a robust CO2 management strategy for CRBG that also considers a regional source/sink approach that is responsive to stakeholder needs and industrial demand. Specific institutional objectives are: (1) identifying and developing plans to mitigate the nontechnical challenges associated with the build-out of a commercial-scale storage complex within the CRBG with integrated CO2 sources; (2) implementing the community outreach plan; (3) conducting regulatory research, including a survey of issues related to pore space ownership, MVA and long-term assurance of mineralization-based storage, to support an eventual application for a UIC Class VI permit; (4) advancing the project’s plan for CO2 liability management; and (5) continuing to refine and update the project’s economic model. The final objective is the preparation of a comprehensive Site Characterization Plan that draws upon the technical and institutional feasibility assessments to prepare the project for future commercialization efforts.

58 GEOSCIENCES↗

LAMP Project Facility and Space Requirements

The project will require significant space over the lifetime of the project to successfully execute design, technology maturation, component testing and verification, and final removal and installation. The types of space required falls into three general categories: office, storage, and laboratory. Figure 1 below summarizes the project space requirements by project lifecycle. The specific color coding indicates the availability (and potential risk to the project) of the particular type of space: green indicates space that is already allocated and in use by the LAMP project; yellow indicates space that is expected to be easily transitioned from its current use to the project; red indicates a space that is use by multiple users or other projects, and will most likely require high-level negotiations and planning to become available to the project. Figure 2 summarizes the LAMP Space Requirements by calendar year and type throughout the duration of the project. As can be seen in Fig. 2, the maximum space needed by the project exceeds 40,000 square feet, with an average space requirement over the lifetime of the project equal to approximately 25,000 square feet.

43 PARTICLE ACCELERATORS↗

Projections of leaf area index in earth system models

The area of leaves in the plant canopy, measured as leaf area index (LAI), modulates key land–atmosphere interactions, including the exchange of energy, moisture, carbon dioxide (CO 2 ), and other trace gases and aerosols, and is therefore an essential variable in predicting terrestrial carbon, water, and energy fluxes. Here our goal is to characterize the LAI projections from the latest generation of earth system models (ESMs) for the Representative Concentration Pathway (RCP) 8.5 and RCP4.5 scenarios. On average, the models project increases in LAI in both RCP8.5 and RCP4.5 over most of the globe, but also show decreases in some parts of the tropics. Because of projected increases in variability, there are also more frequent periods of low LAI across broad regions of the tropics. Projections of LAI changes varied greatly among models: some models project very modest changes, while others project large changes, usually increases. Modeled LAI typically increases with modeled warming in the high latitudes, but often decreases with increasing local warming in the tropics. The models with the most skill in simulating current LAI in the tropics relative to satellite observations tend to project smaller increases in LAI in the tropics in the future compared to the average of all the models. Using LAI projections to identify regions that may be vulnerable to climate change presents a slightly different picture than using precipitation projections, suggesting LAI may be an additional useful tool for understanding climate change impacts. Going forward, users of LAI projections from the CMIP5 ESMs evaluated here should be aware that model outputs do not exhibit clear-cut relationships to vegetation carbon and precipitation. Lastly, our findings underscore the need for more attention to LAI projections, in terms of understanding the drivers of projected changes and improvements to model skill.

54 ENVIRONMENTAL SCIENCES↗

Climate projections over the Great Lakes Region: using two-way coupling of a regional climate model with a 3-D lake model

Abstract. Warming trends in the Laurentian Great Lakes and surrounding areas have been observed in recent decades, and concerns continue to rise about the pace and pattern of future climate change over the world's largest freshwater system. To date, most regional climate models used for Great Lakes projections either neglected the lake-atmosphere interactions or are only coupled with a 1-D column lake model to represent the lake hydrodynamics. This study presents a Great Lakes climate change projection that has employed the two-way coupling of a regional climate model with a 3-D lake model (GLARM) to resolve 3-D hydrodynamics essential for large lakes. Using the three carefully selected Coupled Model Intercomparison Project Phase 5 (CMIP5) general circulation models (GCMs), we show that the GLARM ensemble average substantially reduces surface air temperature and precipitation biases of the driving GCM ensemble average in present-day climate simulations. The improvements are not only displayed from an atmospheric perspective but are also evident in the accurate simulations of lake temperature and ice coverage. We further present the GLARM projected climate change for the mid-21st century (2030–2049) and the late 21st century (2080–2099) in the Representative Concentration Pathway (RCP) 4.5 and RCP 8.5 scenarios. Under RCP 8.5, the Great Lakes basin is projected to warm by 1.3–2.1 ∘C by the mid-21st century and 4.1–5.0 ∘C by the end of the century relative to the early century (2000–2019). Moderate mitigation (RCP 4.5) reduces the mid-century warming to 0.8–1.8 ∘C and late-century warming to 1.8–2.7 ∘C. Annual precipitation in GLARM is projected to increase for the entire basin, varying from 0 % to 13 % during the mid-century and from 9 % to 32 % during the late century in different scenarios and simulations. The most significant increases are projected in spring and fall when current precipitation is highest and a minimal increase in winter when it is lowest. Lake surface temperatures (LSTs) are also projected to increase across the five lakes in all of the simulations, but with strong seasonal and spatial variability. The most significant LST increases occur in Lakes Superior and Ontario. The strongest warming is projected in spring that persists into the summer, resulting from earlier and more intense stratification in the future. In addition, diminishing winter stratification in the future suggests the transition from dimictic lakes to monomictic lakes by the end of the century. In contrast, a relatively smaller increase in LSTs during fall and winter is projected with heat transfer to the deep water due to the strong mixing and energy required for ice melting. Correspondingly, the highest monthly mean ice cover is projected to reduce to 3 %–15 % and 10 %–40 % across the lakes by the end of the century in RCP 8.5 and RCP 4.5, respectively. In the coastal regions, ice duration is projected to decrease by up to 60 d.

Xue, Pengfei (ORCID:000000025702421X)↗

IM3 + EPRI Data Center Load Projections

This dataset contains scenarios of hourly total electricity demand with and without projected loads from data centers over the period 2022-2040. The root projections without data center demands are identical to those documented in Burleyson et al. 2024. In short, those projections encompass hourly electricity demands for 54 Balancing Authorities (BAs) in the United States across a range of eight of weather and socioeconomic scenarios. Refer to the root dataset and accompanying publication, Burleyson et al. 2025, for information about how those projections were generated. For this derivative dataset we used the base loads from the following scenarios: rcp45hotter_ssp3 rcp45hotter_ssp5 rcp85hotter_ssp3 rcp85hotter_ssp5 The root load projections did not reflect the drastic expansion of data centers that has occurred in the last several years to support artificial intelligence and cloud computing. To reflect growth in data center demand, a second set of load projections were created in which we layered in additional data center load projections based on the data center load growth scenarios described in a 2024 report by the Electric Power Research Institute (EPRI): "Powering Intelligence: Analyzing Artificial Intelligence and Data Center Energy Consumption". The EPRI projections from the report are included in this dataset (EPRI_2024_Projections.xlsx). That report contained annual state-level data center load projections for four year-over-year growth rates for data center demands: Low (3.71% annual growth) Moderate (5% annual growth) High (10% annual growth) Higher (15% annual growth) To homogenize the load projections with and without data centers we had to get them to a common scale. The first step was to take the EPRI annual state-level data center energy consumption values and convert them to 8760-hr loads for each year. We did that by assuming a flat (e.g., not weather- or time-sensitive) load profile and distributing the data center loads in each state evenly across all hours in a year. From there the loads were downscaled from the state-level to the county-level using 2019 county-level populations as weights. Finally, the county-level hourly data center loads were summed to the BA-level using the county-to-BA mapping underpinning the root load projections. The net result is 16 (4 weather and socioeconomic scenarios crossed with 4 data center load growth scenarios) unique load projections for the period 2022-2040. The file format follows that of the root dataset with a single additional column "Scaled_TELL_BA_Load_with_DC_MWh" that contains the hourly loads with the added data center loads for a given BA-year-scenario combination. Please refer to the readme file in the root dataset for more information on the file format.

Burleyson, Casey [Pacific Northwest National Labor↗

Neurochemical, morphologic, and laminar characterization of cortical projection neurons in the cingulate motor areas of the macaque monkey

The primate cingulate gyrus contains multiple cortical areas that can be distinguished by several neurochemical features, including the distribution of neurofilament protein-enriched pyramidal neurons. In addition, connectivity and functional properties indicate that there are multiple motor areas in the cortex lining the cingulate sulcus. These motor areas were targeted for analysis of potential interactions among regional specialization, connectivity, and cellular characteristics such as neurochemical profile and morphology. Specifically, intracortical injections of retrogradely transported dyes and intracellular injection were combined with immunocytochemistry to investigate neurons projecting from the cingulate motor areas to the putative forelimb region of the primary motor cortex, area M1. Two separate groups of neurons projecting to area M1 emanated from the cingulate sulcus, one anterior and one posterior, both of which furnished commissural and ipsilateral connections with area M1. The primary difference between the two populations was laminar origin, with the anterior projection originating largely in deep layers, and the posterior projection taking origin equally in superficial and deep layers. With regard to cellular morphology, the anterior projection exhibited more morphologic diversity than the posterior projection. Commissural projections from both anterior and posterior fields originated largely in layer VI. Neurofilament protein distribution was a reliable tool for localizing the two projections and for discriminating between them. Comparable proportions of the two sets of projection neurons contained neurofilament protein, although the density and distribution of the total population of neurofilament protein-enriched neurons was very different in the two subareas of origin. Within a projection, the participating neurons exhibited a high degree of morphologic heterogeneity, and no correlation was observed between somatodendritic morphology and neurofilament protein content. Thus, although the neurons that provide the anterior and posterior cingulate motor projections to area M1 differ morphologically and in laminar origin, their neurochemical profiles are similar with respect to neurofilament protein. This suggests that neurochemical phenotype may be a more important unifying feature for corticocortical projections than morphology.

NASA Discipline Neuroscience↗

Shared Voyage: Learning and Unlearning from Remarkable Projects

Shared Voyage is about four remarkable projects: the Advanced Composition Explorer (NASA), the Joint Air-to-Surface Standoff Missile (U.S. Air Force), the Pathfinder Solar-Powered Airplane (NASA), and the Advanced Medium Range Air-to-Air Missile (U.S.Air Force). Each project is presented as a case study comprised of stories collected from key members of the project teams. The stories found in the book are included with the purpose of providing an effective learning source for project management, encouraging the unlearning of outdated project management concepts, and enhancing awareness of the contexts surrounding different projects. Significantly different from project concepts found in most project management literature, Shared Voyage highlights concepts like a will to win, a results-oriented focus, and collaboration through trust. All four project teams researched in this study applied similar concepts; however, they applied them differently, tailoring them to fit the context of their own particular projects. It is clear that the one best way approach which is still the prevailing paradigm in project management literature should be replaced by a new paradigm: Even though general project management principles exist, their successful application depends on the specifics of the situation.

Laufer, Alexander↗

Guidance and Control Software Project Data - Volume 1: Planning Documents

The Guidance and Control Software (GCS) project was the last in a series of software reliability studies conducted at Langley Research Center between 1977 and 1994. The technical results of the GCS project were recorded after the experiment was completed. Some of the support documentation produced as part of the experiment, however, is serving an unexpected role far beyond its original project context. Some of the software used as part of the GCS project was developed to conform to the RTCA/DO-178B software standard, "Software Considerations in Airborne Systems and Equipment Certification," used in the civil aviation industry. That standard requires extensive documentation throughout the software development life cycle, including plans, software requirements, design and source code, verification cases and results, and configuration management and quality control data. The project documentation that includes this information is open for public scrutiny without the legal or safety implications associated with comparable data from an avionics manufacturer. This public availability has afforded an opportunity to use the GCS project documents for DO-178B training. This report provides a brief overview of the GCS project, describes the 4-volume set of documents and the role they are playing in training, and includes the planning documents from the GCS project. Volume 1 contains five appendices: A. Plan for Software Aspects of Certification for the Guidance and Control Software Project; B. Software Development Standards for the Guidance and Control Software Project; C. Software Verification Plan for the Guidance and Control Software Project; D. Software Configuration Management Plan for the Guidance and Control Software Project; and E. Software Quality Assurance Activities.

Hayhurst, Kelly J.↗

A Statistical Project Control Tool for Engineering Managers

This slide presentation reviews the use of a Statistical Project Control Tool (SPCT) for managing engineering projects. A literature review pointed to a definition of project success, (i.e., A project is successful when the cost, schedule, technical performance, and quality satisfy the customer.) The literature review also pointed to project success factors, and traditional project control tools, and performance measures that are detailed in the report. The essential problem is that with resources becoming more limited, and an increasing number or projects, project failure is increasing, there is a limitation of existing methods and systematic methods are required. The objective of the work is to provide a new statistical project control tool for project managers. Graphs using the SPCT method plotting results of 3 successful projects and 3 failed projects are reviewed, with success and failure being defined by the owner.

Bauch, Garland T.↗

A Brief Description of My Projects

My internship was in the IDC which consist of a machine shop and an array of design space. During my tour I worked on a wide variety of projects some of which included design, research, machining and fabrication. I gained further knowledge on some machines that I have had prior experience on such as the lathe and Hurco CNC machines. The first thing we did was complete our checkout in the machine shop which went pretty well, since I was already familiar with most of the machines. I also did a couple of practice parts on some of the machines, I made a name block on the CNC machine and I also used the vertical milling machine to complete this project. One of the other projects that I did was machine a hammer with my initials with the use of the lathe and CNC machine, this project took much longer since I had to set up a cylindrical piece on the CNC machine. The first project that I began work on was the Systems Engineering & Management Advancement Program (SEPMAP) Hexacopter project and helped them to assemble and modify one of their particle capture doors on their boxes. After a while we ended up helping them make a hinge and holes to reduce the weight of their design. We helped the NASA Extreme Environment Mission Operations (NEEMO) team a bit with some of their name tags and assembly of some of their underwater parts. One of the more challenging projects was a rail that came in with a rather weirdly drawn part. The biggest project that I worked on was the solar array project. Which consisted of a variety of machining and 3D printing and it took me about 3 different times of re-designing to come up with a final prototype. Along with this project I also had to complete a project in which I had to modify a thermos. This was rather simple since I just had to draw up a part and print it out on the 3D printer. I also learned how to use Pro E/Creo parametric to design a square block and print it on the 3D Printer. All of these projects increased my experience on all of the machines and equipment that I used. I also got to tweak my design skills and better understand how to modify my designs and how to improve those specific designs.

Barnes, Tobin↗

Quantitative Risk Management - Risk Informed Decision Making on High-Risk Waste Remediation Projects - 19022

For every $1 billion invested in projects, $97 million is wasted due to poor project performance. That means 9.7% of money spent on projects is wasted due to poor risk and uncertainty management. High-risk projects, similar to those in waste remediation, have the most to lose. A solid quantitative risk management program is one of the keys to increasing the likelihood that a project will succeed. A quantitative risk program solves two major problems that challenge the effective management of risk and uncertainty: 1. Risks arise at all levels of an organization; however, not all organizational levels have an effective way to identify and resolve them. This can lead to risks that, even if identified, are not reported. 2. Decision-makers are often forced to operate solely on intuition when implementing mitigation strategies, not fully understanding the effects that certain decisions have on the program's cost and schedule. A quantitative risk program uses a risk register and builds it into the project/program integrated schedule to assess the impact of these risks, typically at the 80% confidence contingency level for specific milestones and/or project completion. Implementing a quantitative risk program drives a forward-thinking, proactive mentality to problem solving into all levels of the organization. A healthy risk program for regular reporting and communication ensures that all members of an organization are thinking about risks and using their communication channels to resolve them. It gives a method of communication and incentive for all levels in the organization and helps to ensure that risks will be reported and resolved. Pacific Northwest National Laboratory (PNNL) has developed tools and methods that provide a level of realism for analyzing different scenarios and estimating contingency that does not exist in the standard industry risk tool kit. These tools and methods provide decision-makers with actionable, quantitatively based information to guide their decision making. The first tool is a probabilistic branching risk model for mitigation strategies. Current quantitative risk analysis tools in the industry simulate two cases: fully mitigated and un-mitigated. In the fully mitigated case, the user assumes that every planned mitigation activity is successful. In the un-mitigated case, the user assumes that none are successful. The truth lies between these two extremes. The PNNL team has developed a probabilistic risk model for mitigation scenarios that includes a probability that a mitigation activity will succeed and a probability that a mitigation action will be funded. These probabilities are elicited from subject matter experts and ensure that the contingency calculations at the specified confidence are approaching reality. The second tool developed at PNNL is the Risk Box, which is a tool that integrates with different scenarios in the risk register. For example, say the user is faced with two different and mutually exclusive mitigation actions to reduce a risk. The Risk Box methodology performs the contingency calculations and then displays them on a time-phased graph that shows how each scenario reduces the risk contingency needed on the project/program. This graph then provides quantitative information to show decision-makers which mitigation action provides the greatest reduction (cost and schedule) in risk contingency for the program. Implementing these and other tools within a structured risk program increases the likelihood that a project will come in on schedule and budget, ensures that all personnel are proactively thinking about problems and resolutions, creates communication channels for all members to submit and resolve potential problems, produces a prioritized list of risk rankings to focus leadership on issues that may cause the biggest problems, and implements processes that drive updates to the risk program as the risk profile changes. PNNL has been developing these methods and using them on projects for over 20 years. They have been successfully applied on waste management projects, high-tech research and development projects, and construction projects, and they continue to be used on a number of U.S. Department of Energy projects today. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Spin-projected generalized Hartree-Fock method as a polynomial of particle-hole excitations

The past several years have seen renewed interest in the use of symmetry-projected Hartree-Fock for the description of strong correlations. Unfortunately, these symmetry-projected mean-field methods do not adequately account for dynamic correlation. Presumably, this shortcoming could be addressed if one could combine symmetry-projected Hartree-Fock with a many-body method such as coupled-cluster theory, but this is by no means straightforward because the two techniques are formulated in very different ways. However, we have recently shown that the singlet S 2 -projected unrestricted Hartree-Fock wave function can in fact be written in a coupled-cluster-like wave function. That is, the spin-projected unrestricted Hartree-Fock wave function can be written as a polynomial of a double-excitation operator acting on some closed-shell reference determinant. Here, we extend this result and show that the spin-projected generalized Hartree-Fock wave function (which has both S 2 and S z projection) is likewise a polynomial of low-order excitation operators acting on a closed-shell determinant and provide a closed-form expression for the resulting polynomial coefficients. The spin projection of the generalized Hartree-Fock wave function introduces connected triple and quadruple excitations which are absent when spin-projecting an unrestricted Hartree-Fock determinant. We include a few preliminary applications of the combination of this spin-projected Hartree-Fock and coupled-cluster theory to the Hubbard Hamiltonian and comment on generalizations of the methodology. Results here are not for production level, but a similarity-transformed theory that combines the two offers the promise of being accurate for both weak and strong correlation, and may offer significant improvements in the intermediate correlation regime where neither projected Hartree-Fock nor coupled cluster is particularly accurate.

74 ATOMIC AND MOLECULAR PHYSICS↗

Envision Charlotte Project Final Report

The Envision Charlotte Project (EC Project), supported by partners at the Center for Climate and Energy Solutions, the University of North Carolina at Charlotte’s Center for Sustainably Integrated Buildings and Sites and the City of Charlotte, has successfully demonstrated that existing buildings can benefit from operations improvements and low-cost efficiency upgrades, and that behavioral change campaigns can be effectively designed for measurability, longevity and impact. Support from this grant gave Envision Charlotte and its partners the resources and flexibility to demonstrate a variety of approaches to improve coordination with stakeholders in the implementation of programs to reduce the consumption of energy, water and waste. The project team also gained insights into the motivations and abilities that influence stakeholder engagement in sustainability initiatives at multiple levels. Importantly, as this report describes, strong partnerships between nonprofits, industry partners and research institutions can produce tangible impacts and replicable results in building efficiency. Further, building operators working alongside student researchers can form productive relationships that can advance building energy management goals. Key Findings of the EC Project This project focused on advancing solutions to energy efficiency in U.S. commercial buildings. The Building Re-Tuning™ Training (BRT) developed by the U.S. DOE’s Pacific Northwest National Lab (PNNL), designed to detect energy savings opportunities and implement improvements with resources and online tools, provided the starting point for the curriculum developed by stakeholders in the EC Project. Although the project partners encountered some issues with data consistency, the overall project outcomes fell short of the energy savings stated in the original proposal, and the total participating building targets were lower than anticipated, important findings, outcomes and lessons learned were achieved. EC Project grantees observed that the PNNL BRT, as currently written, was not compatible with the skills of average frontline mechanical personnel in the Charlotte region where the grant program was performed. Frontline staff are not, typically, energy managers, engineers or building commissioning agents, but they can play a key role in building performance. As detailed in this report, the grantees therefore focused on changes to the BRT that improved the level of training and competency of the frontline workers in this region. Among the technical observations related to improving the BRT that were observed in the EC Project: centralized facilities management often has an impact on building performance; operators can be overly reliant on service contracts; individual behaviors matter, and technology cannot be viewed as a crutch; current Building Automation Systems (BAS) are often too complex to support building efficiency optimization, but BAS coupled with appropriate training can support better outcomes; the “perfectly optimized” building is not a near-term possibility, but better education, especially of executives and managers, on the role of behavioral intervention is a promising direction the building science community can and should pursue; a lack of standards and protocols, and competition between proprietary software from service contracts, remain challenges for this industry. These technical observations, in turn, informed the EC Project’s overall findings, which were: Accomplishing building efficiency is a process of education for all involved in the building design, construction and operation supply chain. Building operators, as a professional class, have an opportunity for further training and education that will lead to better on-the-job performance. An updated Building Re-Tuning™ Training curriculum, based on the findings of this report, could be an avenue for these operators’ professional development.

32 ENERGY CONSERVATION, CONSUMPTION, AND UTILIZATI↗

W.A. Parish Post-Combustion CO 2 Capture and Sequestration Demonstration Project (Final Technical Report)

The Petra Nova Project (Project) is a commercial scale post-combustion carbon capture project developed by a joint venture between NRG Energy, Inc. (NRG) and JX Nippon Oil Exploration (EOR) Limited (JX). The Project is designed to separate and capture carbon dioxide (CO2) from an existing coal-fired unit’s flue gas slipstream at NRG’s W.A. Parish Electric Generating Station (WAP) located southwest of Houston, Texas. The captured CO2 is dried, compressed, and transported via an 81-mile pipeline to the West Ranch oilfield (West Ranch) in Jackson County, Texas, where it is injected to boost oil production. The Project, which is partially funded by a grant (Grant) from the United States (U.S.) Department of Energy (DOE) under the Clean Coal Power Initiative (CCPI) Round 3, uses the Kansai Mitsubishi Carbon Dioxide Recovery advanced amine-based CO 2 absorption technology (KM-CDR Process®), which was jointly developed by Mitsubishi Heavy Industries, Ltd. (MHI) and the Kansai Electric Power Co. Inc., to treat and capture at least ninety percent (90%) of the CO 2 from a 240-megawatt equivalent (MWe) flue gas slipstream off of Unit 8 at WAP. When operating at full capacity, the Project captures approximately 5,200 short tons of CO 2 per day, which would otherwise be emitted into the atmosphere, representing the largest commercial scale deployment of post-combustion CO2 capture technology at a coal power plant to date. Under the Grant, the Project was managed in 3 phases: (1) Phase 1: Project Definition / Front End Engineering Design (FEED) (2) Phase 2: Detailed Engineering, Procurement & Construction (3) Phase 3: Demonstration and Monitoring. On December 29, 2016, commercial operation of the Project was achieved, ending Phase 2 and starting Phase 3, a 3-year demonstration period running from January 1, 2017 through December 31, 2019. The key objectives of Phase 3 were to (a) demonstrate the specific advanced technologies constructed during Phase 2 and (b) monitor the injected CO 2 at West Ranch to demonstrate technologies and protocols for monitoring, verification, and accounting (MVA). As of the end of Phase 3, Petra Nova captured 3,904,978 short tons of CO 2 (3,542,537 metric tons) that was transported to West Ranch. To support the DOE obligation to monitor, verify, and account for the sequestered CO 2 at West Ranch, Petra Nova contracted with the Bureau of Economic Geology (in the Jackson School of Geosciences at The University of Texas at Austin) to (a) design a monitoring program, (b) draft an MVA Plan for DOE review and approval, and (c) working with Petra Nova and the operator of West Ranch to manage and report on the MVA activity. This report discussed the technical aspects of the project during each of the 3 phases of the project as identified above.

01 COAL, LIGNITE, AND PEAT↗

G3P3 Phase 3 Project Execution Plan. Issue 1

The National Solar Thermal Test Facility (NSTTF) at Sandia National Laboratories New Mexico (SNL/NM) developed this Project Execution Plan (PEP) to document its process for executing, monitoring, controlling and closing-out Phase 3 of the Gen 3 Particle Pilot Plant G3P3. This plan serves as a resource for stakeholders who wish to be knowledgeable of project objectives and how they will be accomplished. The plan is intended to be used by the development partners, principal investigator, and the federal project director. Project objectives are derived from the mission needs statement, and an integrated project team assists in development of the PEP. This plan is a living document and will be updated throughout the project to describe current and future processes and procedures. The scope of the PEP covers: Cost, schedule, and scope Project reporting Staffing plan Quality assurance plan Environment, safety, security, and health This document is a tailored approach for the Facilities Management and Operations Center (FMOC) to meet the project management principles of DOE Order 413.3B, Program and Project Management for the Acquisition of Capital Assets , and DOE G 413.3-15, DOE Guide for Project Execution Plans. This document will elaborate on content as knowledge of the project is gained or refined.

14 SOLAR ENERGY↗

Integrated Mid-Continent Stacked Carbon Storage Hub Project Phase II (Final Summary Report)

The Phase II Integrated Midcontinent Stacked Carbon Storage Hub (IMSCS-HUB) is part of the Carbon Storage Assurance Facility Enterprise (CarbonSAFE) established by the United States Department of Energy (DOE) National Energy Technology Laboratory (NETL). CarbonSAFE is phased to support the development of commercial-scale (50 million metric tonnes [Mt] over a 30-year period) carbon capture, utilization, and storage (CCUS) in the United States. The IMSCS-HUB study area comprises carbon dioxide (CO 2 ) sources in Iowa, Kansas, and Nebraska (the source corridor), and CO 2 sinks in Kansas and Nebraska (the storage corridor), representing the first large-scale project for the Midcontinent region. The stacked storage corridor is characterized by alternating sequences of deep saline formations, oil-bearing reservoirs, shale, and evaporite units that are conducive to vertically stacked CO 2 injection for geologic storage and enhanced oil recovery (EOR). Three sites within the IMSCS-HUB stacked storage corridor were evaluated in Phase II for commercial CCUS feasibility: one in southwest-central Nebraska, Sleepy Hollow Field (SHF), a second in southwestern Nebraska near Madrid (Madrid), and a third in southwestern Kansas, the Patterson Site (composed of the Patterson, Heinitz, Hartland, and Oslo fields). In Phase II, the team assessed the feasibility of storage complexes at the potential storage sites in Nebraska and Kansas to support a commercial-scale storage hub that integrates proven CO 2 capture technology and transport from nearby ethanol sources. Building on lessons learned from the DOE-NETL Regional Carbon Sequestration Partnerships (RCSPs), the Project Team has identified a clear strategy to meet DOE’s 2025 objective of commercial carbon capture and storage (CCS) implementation by developing a CO 2 market and infrastructure that relies on multiple ethanol-based CO 2 sources in the short term and the incorporation of multiple coal-fired power plant CO 2 sources when commercial capture is economically viable. The team also leveraged the updated 45Q tax credit to develop capture and transport infrastructure. Commercial-scale CCUS is feasible at two candidate storage sites studied, the Madrid, Nebraska Site and the Patterson Site in Kearny County, Kansas. The Sleepy Hollow Field in Nebraska was found to be an attractive candidate for stacked storage with CO 2 -EOR (Battelle 2020e). Outreach efforts facilitated engagement from industry, government, and research sectors (Battelle and GPI, 2020) and an outreach plan for future phases of the project was developed to address issues that are of concern in the IMSCS-HUB project area (Battelle, 2020f). All components of a CCUS project were determined to be feasible in the IMSCS-HUB region and Risk Mitigation Plan was developed and includes strategies to mitigate risks associated with each project component (Battelle, 2020j). A roadmap was developed to obtain the required UIC permits for an integrated CCUS project (Battelle, 2020k). The regional storage resource characterization demonstrated significant opportunity for commercial-scale projects in the IMSCS-HUB storage corridor with 577.4 Mt of stacked CO 2 storage capacity and the potential to produce 181.9 MMbbls of oil via EOR across 17 individual storage areas (Battelle and ARI, 2020). The pipeline assessment study found viable pipeline routes that connected 45Q-eligible ethanol plants, coal fired power plants, and other sources in the IMSCS-HUB corridor. The comprehensive results of subsurface characterization, modeling efforts, outreach assessment, and regulatory analysis from were integrated to develop a Detailed Commercial Development Plan for the IMSCS-HUB (Battelle, 2020n). Commercialization efforts will involve obtaining Class VI UIC permits, establishing and finalizing the pipeline route, and evaluating capture projects at participating CO 2 sources. Phases I and II of the IMSCS-HUB CarbonSAFE provide a strong foundation for safely, efficiently, and cost-effectively characterizing and permitting commercial-scale project sites in the region. The plan for implementation of commercial-scale CCUS projects in the IMSCS-HUB is aligned with the objectives of CarbonSAFE Phase III: Site Characterization and CO 2 Capture Assessment.

20 FOSSIL-FUELED POWER PLANTS↗

Tracking the PACE of household energy usage: Energy usage impacts of projects financed through Property Assessed Clean Energy programs in California

This report examines the household-level energy impacts of residential property assessed clean energy (R-PACE) projects using normalized metered energy consumption methods. Our analysis covers projects that occurred through an R-PACE program between 2009 and 2017 and includes more than 25,000 electricity meters and 15,000 gas meters. We employ a comparison group, drawn from other R-PACE households with similar locational and usage characteristics whose projects were implemented at different times, to control for some non-project and non-weather factors that may impact energy use. We find that projects consisting of energy efficiency technologies save, on average, about 3% of household electricity usage and 3.5% of household gas usage. R-PACE financing, however, can be used to install central heating or air conditioning equipment for the first time. These projects would be expected to increase energy consumption. Since our data do not directly indicate which projects are new installations, we develop a simple algorithm for identifying them. Removing these inferred installation projects yields average savings of about 5% for electricity and 6% for gas for those households that remain in the sample. Given the mild California climate and the results of another study of similar California projects using similar methods, these results are in line with expectations. Solar PV projects yield large reductions in grid electricity use, averaging 69% of household consumption. We estimate that, collectively, all R-PACE projects installed in California through 2019 would generate annual reductions in grid-tied electricity consumption of 506 GWh (mostly due to solar PV) and gas consumption reductions of 2 million therms in a normal weather year. These impacts are equivalent to the electricity consumption of about 74,000 California households (including both efficiency and PV generation) and the gas consumption of about 4700 California households.

32 ENERGY CONSERVATION, CONSUMPTION, AND UTILIZATI↗