Integrating regulatory, programmatic and technical needs for modeling tools to support decision-making - 15219

The U.S. Department of Energy (US DOE) Office of Environmental Management (EM), Office of Soil and Groundwater Remediation, is supporting development of the Advanced Simulation Capability for Environmental Management (ASCEM). ASCEM provides a modeling work-flow to support decision-making for site restoration, tank closure and waste management activities. Potential users involved in regulatory applications (e.g., performance and risk assessments and other activities supporting regulatory decisions) are a key target group for the tool-set. Decision-making in these applications often requires consideration of multiple perspectives, including: regulators and the public, oversight and project management personnel, as well as practitioners involved in conducting the calculations, each with different interests. From its inception, a key objective of the ASCEM project has been to actively seek input from these different user perspectives to help guide development. ASCEM formed a User Steering Committee (USC) with membership representing interests from management/staff at DOE Site Contractors, DOE-HQ and Field offices and Regulators (State and Federal). The project also provides opportunities for input from the broader user community through participation in meetings of the Performance and Risk Assessment (P and RA) Community of Practice (CoP), routine briefings and participation in meetings of the Low-Level Waste Disposal Facility Federal Review Group, and direct interactions with users involved in regulatory applications. Interactions with users involved in regulatory applications have influenced the requirements for the tool-sets and are reflected in capabilities that have been and are being implemented. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Investigation of Public Discourse Methods in Energy Policy Decision-Making: A Summary of What You Told Us and What We Learned

The ground is littered with projects that failed because of strong public opposition, including natural gas and coal power plants proposed in Idaho over the past several years. This joint project , of the Idaho National Laboratory, Boise State University, Idaho State University and University of Idaho has aimed to add to the tool box to reduce project risk through encouraging the public to engage in more critical thought and be more actively involved in public or social issues. Early in a project, project managers and decision-makers can talk with no one, pro and con stakeholder groups, or members of the public. Experience has shown that talking with no one outside of the project incurs high risk because opposition stakeholders have many means to stop most (if not all) energy projects. Talking with organized stakeholder groups provides some risk reduction from mutual learning, but organized groups tend not to change positions except under conditions of a negotiated settlement. Achieving a negotiated settlement may be impossible. Furthermore, opposition often arises outside pre-existing groups. Standard public polling provides some information but does not reveal underlying motivations, intensity of attitudes, etc. Improved methods are needed that probe deeper into stakeholder (organized groups and members of the public) values and beliefs (sometimes called /heuristics) to increase the potential for change of opinions and/or out-of-box solutions. The term “heuristics” refers to the mental short-cuts, underlying beliefs, and paradigms that everyone uses to filter and interpret information, to interpret what is around us, and to guide our actions and decisions. This document is the final report of a 3-year effort to test different public discourse methods in the subject area of energy policy decision-making. We analyzed 504 mail-in surveys and 80 participants in groups on the Boise State University campus for their preference, financial support, and evaluations of eight attributes for energy conservation and efficiency, fossil fuels, nuclear energy, hydropower, and renewable energy. All participants saw a 7-person diverse energy expert panel. Some participants attended deliberation sessions; some received a 35-page briefing document that included pros and cons of the different energy options.

29 ENERGY PLANNING, POLICY, AND ECONOMY↗

Public Discourse in Energy Policy Decision-Making: Final Report

The ground is littered with projects that failed because of strong public opposition, including natural gas and coal power plants proposed in Idaho over the past several years. This joint project , of the Idaho National Laboratory, Boise State University, Idaho State University and University of Idaho has aimed to add to the tool box to reduce project risk through encouraging the public to engage in more critical thought and be more actively involved in public or social issues. Early in a project, project managers and decision-makers can talk with no one, pro and con stakeholder groups, or members of the public. Experience has shown that talking with no one outside of the project incurs high risk because opposition stakeholders have many means to stop most (if not all) energy projects. Talking with organized stakeholder groups provides some risk reduction from mutual learning, but organized groups tend not to change positions except under conditions of a negotiated settlement. Achieving a negotiated settlement may be impossible. Furthermore, opposition often arises outside pre-existing groups. Standard public polling provides some information but does not reveal underlying motivations, intensity of attitudes, etc. Improved methods are needed that probe deeper into stakeholder (organized groups and members of the public) values and beliefs/heuristics to increase the potential for change of opinions and/or out-of-box solutions. The term “heuristics” refers to the mental short-cuts, underlying beliefs, and paradigms that everyone uses to filter and interpret information, to interpret what is around us, and to guide our actions and decisions. This document is the final report of a 3-year effort to test different public discourse methods in the subject area of energy policy decision-making. We analyzed 504 mail-in surveys and 80 participants in groups on the Boise State University campus for their preference, financial support, and evaluations of eight attributes for energy conservation and efficiency, fossil fuels, nuclear energy, hydropower, and renewable energy. All participants saw a 7-person diverse energy expert panel. Some participants attended deliberation sessions; some received a 35-page briefing document that included pros and cons of the different energy options.

29 ENERGY PLANNING, POLICY, AND ECONOMY↗

State Geological Survey Contributions to the National Geothermal Data System (Final Technical Report)

The State Geological Survey Contributions to the National Geothermal Data System project is built on the work of the project managed by Boise State University to design and build the National Geothermal Data System, by deploying it nationwide and populating it with data principally from State Geological Surveys through collaboration with the Association of American State Geologists (AASG). This project subsequently incorporated the results of the design-build and other DOE-funded projects in support of the NGDS. The NGDS (www.geothermaldata.org) provides free open access to millions of data records, images, maps, and reports, sharing relevant geoscience, production, and land use data in 30+ categories to propel geothermal development and production in the U.S. NGDS currently serves information gathered from hundreds of the U.S. Department of Energy sponsored development and research projects and geologic data feeds from 60+ data providers throughout all 50 states. These data are relevant to geothermal energy exploration and development, but also have broad applicability in other areas including natural resources (e.g., energy, minerals, water), natural hazards, and land use and management.

15 GEOTHERMAL ENERGY↗

Accomplishments in Field Period Assembly for NCSX* This is how we did it

The National Compact Stellarator Experiment (NCSX) was a collaborative effort between ORNL and PPPL. PPPL provided the assembly techniques with guidance from ORNL to meet design criteria. The individual vacuum vessel segments, modular coils, trim coils, and toroidal field coils components were delivered to the Field Period Assembly (FPA) crew who then would complete the component assemblies and then assemble the final three field period assemblies, each consisting of two sets of three modular coils assembled over a 120o vacuum vessel segment with the trim coils and toroidal field coils providing the outer layer. The requirements for positioning the modular coils were found to be most demanding. The assembly tolerances required for accurate positioning of the field coil windings in order to generate sufficiently accurate magnetic fields strained state of the art techniques in metrology and alignment and required constant monitoring of assembly steps with laser trackers, measurement arms, and photogrammetry. The FPA activities were being performed concurrently while engineering challenges were being resolved. For example, it was determined that high friction electrically isolated shims were needed between the modular coil interface joints and low distortion welding was required in the nose region of those joints. This took months of analysis and development yet the assembly was not significantly impacted because other assembly tasks could be performed in parallel with ongoing assembly tasks as well as tasks such as advance tooling setup preparation for the eventual welding tasks. The crew technicians developed unique, accurate time saving techniques and tooling which provided significant cost and schedule savings. Project management displayed extraordinary foresight and every opportunity to gain advanced knowledge and develop techniques was taken advantage of. Despite many risk concerns, the cost and schedule performance index was maintained nearly 1.0 during the assembly phase until project cancellation. In this paper, the assembly logic, the engineering challenges, solutions to those challenges and some of the unique and clever assembly techniques, will be presented.

70 PLASMA PHYSICS AND FUSION TECHNOLOGY↗

Site 200 #1400 Block Area New Trailers Project, Soil Sampling and Analysis Plan/Quality Assurance Plan

Lawrence Livermore National Laboratory's (LLNL) Project Management Office (PMO) is proposing to install a series of modular trailers and install associated underground utilities in the 1400 Block at the Livermore Site. This Sampling and Analysis Plan (SAP) outlines the processes and procedures to collect environmental and geotechnical soil samples from the project area and to send the samples to the appropriate laboratory or laboratories for analysis or testing. The resulting environmental laboratory data will determine whether excavated soils can be reused on the project, or which type of landfill or landfills the soils may be sent for disposal. This SAP has been prepared and is organized to be consistent with LLNL's Soils Screening and Management Plan (SSMP) (LLNL, 2019), as well as the U.S. Environmental Protection Agency's (EPA) Data Quality Objectives programs (EPA, 2006).

54 ENVIRONMENTAL SCIENCES↗

Innovation in Contracting Strategy for a Master Services Agreement for Remediation of Low Level Radioactive Waste - 18381

The Port Hope Area Initiative (PHAI) is a federal environmental clean-up program. Its mandate is the remediation and local, long-term, safe management of approximately 1.7 million cubic metres of historic low-level radioactive waste in the adjacent communities of Port Hope and Port Granby in Southern Ontario, Canada. The PHAI is being undertaken by Canadian Nuclear Laboratories (CNL), on behalf of Atomic Energy of Canada Limited, a federal Crown corporation. It is currently one of the largest environmental remediation projects in Canada. The safety of workers, the public and the environment while delivering the PHAI on time and within budget is CNL's number one priority. The PHAI is being carried out as two projects - the Port Hope Project and the Port Granby Project. The Port Hope Project is the larger of the two and includes the cleanup of approximately 1.2 million cubic metres of historic waste from several locations, including the Port Hope Harbour, a closed municipal landfill and approximately 800 residential properties. This complex project requires contracting the services of qualified, skilled and experienced environmental remediation contractors to meet the diverse needs of the myriad tasks that comprise the remediation and restoration of all properties. This paper will highlight how the CNL contracting services team developed an innovative approach to a contracting strategy designed to deliver the safe execution of work and keep the project on time and within budget. The approach addresses the complexities of a scope of work that consists of multiple work packages to be executed both concurrently and in tandem, and that require highly specialized trades/skills, as well as high-level project management expertise to ensure seamless coordination among the various contractors. The author will discuss CNL's strategy to engage the market with a Request for Expression of Interest to identify potential qualified suppliers and gauge their level of interest, issue a Request for Prequalification (RFPQ) to determine eligible contractors and, ultimately, issue a Request for Proposal for a Master Services Agreement (MSA) that would competitively evaluate each contractor's direct experience, technical expertise, quality management programs, safety systems compliance and track record. Using CNL's experience as a case study, the paper will highlight how an innovative approach can positively affect project timelines by describing how CNL addressed the challenge associated with the limited time available to implement procurement processes and deliver a series of executed agreements while ensuring that work would begin on time and key project milestones would be met. The author will summarize how CNL's strategy put the project back on schedule, without compromising the process guideline/requirements, and ensured that a qualified and experienced set of contractors, committed to a strong safety culture, will be available to perform the work required when the cleanup in the Port Hope community begins in 2018. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

AmeriFlux FLUXNET-1F US-RGo Glenn County Organic Rice Farm

This is the AmeriFlux Management Project (AMP) created FLUXNET-1F version of the carbon flux data for the site US-RGo Glenn County Organic Rice Farm. This is the FLUXNET version of the carbon flux data for the site US-RGo Glenn County Organic Rice Farm produced by applying the standard ONEFlux (1F) software. Site Description - Organically farmed medium-grain brown rice field in Glenn County, California. Part of a five-year, ground-truthing field study under the DOE ARPA-E SMARTFARM project. Field check is approx. 7 ha in size (1,250 ft by 250 ft), part of a 75+ acre site in several checks with commercial rice over rice rotation on Tehama silt loam, management practices include winter cover crops and AWD.

Schuppenhauer, Michael R.↗

Power Electronics Thermal Management R&D; NREL (National Renewable Energy Laboratory)

Presentation containing an update for the Power Electronics Thermal Management project in the Electric Drive Train task funded by the Vehicle Technology Office of DOE. This presentation outlines the purpose, plan, and results of research thus far for cooling and material selection strategies to manage heat in power electronic assemblies such as inverters, converters, and chargers.

30 DIRECT ENERGY CONVERSION↗

Management on Hazardous Materials During Decommissioning - 18310

Non-radiological contaminants in site systems, on structures, and in site media (soil, groundwater, sediment, and surface water) often become a significant driver to cost and schedule in nuclear power plant decommissioning. This is borne out by historical experience in decommissioning projects. Management of non-radiological issues in site decommissioning is complicated by the site-specific nature of non-radiological contaminants in systems, structures and media; the variety of regulatory programs potentially applicable to compliance management; how these issues impact planning and execution of decommissioning elements; and interface with the management of site radiological issues in the decommissioning process. To address the importance of management of non-radiological hazards during decommissioning, EPRI recently issued the report Guidance for Management of Hazardous Materials during Decommissioning (EPRI 3002010592) [1]. The report provides an experience-based framework for identifying nonradiological issues at plants early in the decommissioning process, planning for regulatory compliance, options for remedial management, and considerations for integration into the plant decommissioning process. This paper summarizes the content of the EPRI report, including description of a framework for identifying non-radiological issues early in the decommissioning planning process such that site-specific issues can be optimally addressed, and funding to manage those issues can be established. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Natural Resources Assessment for the SNS Second Target Station, Oak Ridge, Tennessee

The US Department of Energy’s Oak Ridge National Laboratory (ORNL) is a leading institution in advanced materials, supercomputing, neutrons, and nuclear science. As a research laboratory managed by UT-Battelle, LLC for DOE, ORNL has national priorities in energy, security, and scientific discovery that necessitate facility improvements and expansions. DOE is also committed to environmental stewardship. The laboratory is located on the ~32,000-acre Oak Ridge Reservation (ORR), much of which is categorized as a National Environmental Research Park and a state Wildlife Management Area. DOE works with the Tennessee Wildlife Resources Agency (TWRA), Tennessee Department of Environment and Conservation (TDEC), US Fish and Wildlife Service (USFWS), US Department of Agriculture, and other agencies to serve as an effective steward of the ORR. Accordingly, project managers must conform to environmental regulations, agreements, and policies at the federal, state, and institutional levels. Per 40 CFR (Code of Federal Regulations) 1508.14, potential effects on research and science education on the National Environmental Research Park represent potential impacts of federal actions. Moreover, federal actions that affect the quantity and quality of hunting opportunities and deer reduction harvest on the Oak Ridge Wildlife Management Area must be considered whenever other aspects of the human environment (as defined by NEPA) are affected. The Spallation Neutron Source (SNS) is a premiere facility at ORNL that provides advanced capabilities in neutron scattering to promote new discoveries and research opportunities in material sciences, physics, chemistry, biological sciences, and others. A conceptual design for a Second Target Station (STS) has been in consideration for several years. The STS is intended to complement and enhance existing ORNL capabilities, notably research and exploration of complex materials. The proposed STS will involve development of existing natural areas on the ORR, which might contain sensitive resources that require mitigation or avoidance in accordance with existing policies and regulation. This report summarizes current knowledge of natural and cultural resources within the STS project area. At the time of this report, the proposed STS project consisted of an operations area comprising 55.4 acres (22.4 ha) and a total review area for potential construction comprising ~224 acres (90.6 ha). The review area is located primarily within forested natural areas of the ORR with minor development in the form of power-line rights-of-way and secondary/graveled roads (Figure 1). The primary goal was to evaluate potential effects on sensitive resources that might result from development of the STS. In addition to onthe-ground surveys during summer 2009 and fall 2019 to summer 2020 by ORNL Natural Resources Management Program and Aquatic Ecology Group staff, this report makes use of historical (pre-1995) and contemporary (1995 to present) data from additional confirmed sources (e.g., TDEC). Likewise, forest conditions were compiled primarily from a 2013 forest inventory effort for Forest Management Compartment 17 and supplemented with limited ground observations in 2019. The individuals who obtained and compiled the data that are presented here are familiar with and routinely assess sensitive resources on the ORR.

54 ENVIRONMENTAL SCIENCES↗

FECM/NETL CO2 Saline Storage Cost Model CO2_S_COM 2024 (v4)

The U.S. Department of Energy's (DOE) Office of Fossil Energy and Carbon Management (FECM), in collaboration with the National Energy Technology Laboratory (NETL), has developed the FECM/NETL CO2 Saline Storage Cost Model (CO2_S_COM). This Excel-based tool provides a comprehensive framework for estimating the costs and breakeven prices associated with storing carbon dioxide (CO2) in deep saline formations. Designed from the perspective of a CO2 storage site owner, the CO2_S_COM incorporates four integrated modules—project management, financial analysis, activity cost estimation, and geological evaluation—to deliver fast, robust and actionable insights for screening project finances.

CO2 storage↗

FECM/NETL CO 2 Saline Storage Cost Model (2024): User’s Manual

The U.S. Department of Energy's (DOE) Office of Fossil Energy and Carbon Management (FECM), in collaboration with the National Energy Technology Laboratory (NETL), has developed the FECM/NETL CO 2 Saline Storage Cost Model (CO2_S_COM). This Excel-based tool provides a comprehensive framework for estimating the costs and breakeven prices associated with storing carbon dioxide (CO 2 ) in deep saline formations. Designed from the perspective of a CO 2 storage site owner, the CO2_S_COM incorporates four integrated modules—project management, financial analysis, activity cost estimation, and geological evaluation—to deliver fast, robust, and actionable insights for evaluating project finances. This is the user's manual for CO2_S_COM. The model may be accessed at this link: FECM/NETL CO2 Saline Storage Cost Model CO2_S_COM 2024 (v4) - Submissions - EDX

54 ENVIRONMENTAL SCIENCES↗

Carbon Utilization and Storage Partnership of the Western United States

This technical report documents research conducted under DOE Award No. DE-FE0031837 focused on evaluating the feasibility of carbon capture, utilization, and storage (CCUS) systems in the central and western United States. The project integrated geologic characterization, reservoir simulation, infrastructure modeling, and economic analysis to assess CO₂ storage potential near industrial sources and develop strategies for transport and sequestration. The work included subsurface modeling, risk assessment, monitoring and verification (MRV) planning, and evaluation of regulatory pathways such as EPA Underground Injection Control (UIC) Class VI permitting and IRS 45Q tax credit eligibility. Results demonstrate the viability of multiple storage approaches, including saline formations, enhanced coalbed methane recovery, and basalt mineralization, supported by data-driven workflows and regional analyses. The project also produced permitting templates, technology transfer activities, and stakeholder engagement efforts to support deployment readiness. These findings contribute to the development of scalable, economically viable CCUS systems and provide a repeatable framework for future carbon management projects.

20 FOSSIL-FUELED POWER PLANTS↗

Advanced Assay Systems for Radionuclide Contamination in Soils

Through the support of the Department of Energy (DOE) Office of Environmental Management (EM) Technical Assistance Program, the Idaho National Laboratory (INL) has developed and deployed a suite of systems that rapidly scan, characterize, and analyze surface soil contamination. The INL systems integrate detector systems with data acquisition and synthesis software and with global positioning technology to provide a real-time, user-friendly field deployable turn-key system. INL real-time systems are designed to characterize surface soil contamination using methodologies set forth in the Multi-Agency Radiation Surveys and Site Investigation Manual (MARSSIM). MARSSIM provides guidance for planning, implementing, and evaluating environmental and facility radiological surveys conducted to demonstrate compliance with a dose or risk-based regulation and provides real-time information that is immediately available to field technicians and project management personnel. This paper discusses the history of the development of these systems and describes some of the more recent examples and their applications. In summary: INL mobile real-time systems have been successfully used as pre-certification devices for contaminated soils under specific conditions, and accepted by regulators as an approved method to replace or significantly reduce physical sampling and laboratory analysis. These systems coupled with advanced data collection and analysis software developed at the INL to perform production pre-screening soil surveys are also used to determine final analytical sample locations for final validation of sites. The success of the real-time soil characterization program at DOE-Ohio field office sites at Mound and Fernald provided the driver for use of some of these systems at the current INL ICP. Additionally, the use of INL real-time advanced assay systems at Fernald resulted in overall cost savings to the soil remediation project totaling $34 M by the end of the project in 2006. Although the genesis of these systems occurred in the DOE Environmental Management program, other agencies have examined the use of real-time mobile spectrometry in cross-cutting applications such as National Homeland Security; where modified versions of these systems could be applied to monitoring, and surveillance of facilities and events as well as event-response to terrorist attacks using radioactive materials. (authors)

54 ENVIRONMENTAL SCIENCES↗

Safety Design Strategy for the Advanced Test Reactor Primary Coolant Pump and Motor Replacement Project

In accordance with the requirements of U.S. Department of Energy (DOE) Order 413.3B, “Program and Project Management for the Acquisition of Capital Assets,” safety must be integrated into the design process for new or major modifications to DOE Hazard Category 1, 2, and 3 nuclear facilities. The intended purpose of this requirement involves the handling of hazardous materials, both radiological and chemical, in a way that provides adequate protection to the public, workers, and the environment. Requirements provided in DOE Order 413.3B and DOE Order 420.1B, “Facility Safety,” and the expectations of DOE-STD-1189-2008, “Integration of Safety into the Design Process,” provide for identification of hazards early in the project and use of an integrated team approach to design safety into the facility. This safety design strategy provides the basic safety-in-design principles and concepts that will be used for the Advanced Test Reactor Reliability Sustainment Project. While this project does not introduce new hazards to the ATR, it has the potential for significant impacts to safety-related systems, structures, and components that are credited in the ATR safety basis and are being replaced. Thus the project has been determined to meet the definition of a major modification and is being managed accordingly.

21 SPECIFIC NUCLEAR REACTORS AND ASSOCIATED PLANTS↗

Safety Design Strategy for the Advanced Test Reactor Emergency Firewater Injection System Replacement Project

In accordance with the requirements of U.S. Department of Energy (DOE) Order 413.3B, “Program and Project Management for the Acquisition of Capital Assets,” safety must be integrated into the design process for new or major modifications to DOE Hazard Category 1, 2, and 3 nuclear facilities. The intended purpose of this requirement involves the handling of hazardous materials, both radiological and chemical, in a way that provides adequate protection to the public, workers, and the environment. Requirements provided in DOE Order 413.3B and DOE Order 420.1B, “Facility Safety,” and the expectations of DOE-STD-1189-2008, “Integration of Safety into the Design Process,” provide for identification of hazards early in the project and use of an integrated team approach to design safety into the facility. This safety design strategy provides the basic safety-in-design principles and concepts that will be used for the Advanced Test Reactor Reliability Sustainment Project. While this project does not introduce new hazards to the ATR, it has the potential for significant impacts to safety-related systems, structures, and components that are credited in the ATR safety basis and are being replaced. Thus the project has been determined to meet the definition of a major modification and is being managed accordingly.

21 SPECIFIC NUCLEAR REACTORS AND ASSOCIATED PLANTS↗

Safety Design Strategy for the Advanced Test Reactor Diesel Bus (E-3) and Switchgear Replacement Project

In accordance with the requirements of U.S. Department of Energy (DOE) Order 413.3B, “Program and Project Management for the Acquisition of Capital Assets,” safety must be integrated into the design process for new or major modifications to DOE Hazard Category 1, 2, and 3 nuclear facilities. The intended purpose of this requirement involves the handling of hazardous materials, both radiological and chemical, in a way that provides adequate protection to the public, workers, and the environment. Requirements provided in DOE Order 413.3B and DOE Order 420.1B, “Facility Safety,” and the expectations of DOE-STD-1189-2008, “Integration of Safety into the Design Process,” provide for identification of hazards early in the project and use of an integrated team approach to design safety into the facility. This safety design strategy provides the basic safety-in-design principles and concepts that will be used for the Advanced Test Reactor Reliability Sustainment Project. While this project does not introduce new hazards to the ATR, it has the potential for significant impacts to safety-related systems, structures, and components that are credited in the ATR safety basis and are being replaced. Thus the project has been determined to meet the definition of a major modification and is being managed accordingly.