Search NASA⌕ Search

SEARCH · Search NASA

Results for “scheduler development”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 343 records · Page 19

G3P3 Phase 3 Project Execution Plan. Issue 1

The National Solar Thermal Test Facility (NSTTF) at Sandia National Laboratories New Mexico (SNL/NM) developed this Project Execution Plan (PEP) to document its process for executing, monitoring, controlling and closing-out Phase 3 of the Gen 3 Particle Pilot Plant G3P3. This plan serves as a resource for stakeholders who wish to be knowledgeable of project objectives and how they will be accomplished. The plan is intended to be used by the development partners, principal investigator, and the federal project director. Project objectives are derived from the mission needs statement, and an integrated project team assists in development of the PEP. This plan is a living document and will be updated throughout the project to describe current and future processes and procedures. The scope of the PEP covers: Cost, schedule, and scope Project reporting Staffing plan Quality assurance plan Environment, safety, security, and health This document is a tailored approach for the Facilities Management and Operations Center (FMOC) to meet the project management principles of DOE Order 413.3B, Program and Project Management for the Acquisition of Capital Assets , and DOE G 413.3-15, DOE Guide for Project Execution Plans. This document will elaborate on content as knowledge of the project is gained or refined.

14 SOLAR ENERGY↗

Controls Status for Fermilab’s PIP-II Project

Testing of Cryomodule first articles at PIP-II's on-site Cryomodule Test Facility (CMTF), where EPICS based controls are already being used, has been invaluable to the project. In addition to validating hardware and controls components, it has provided opportunities to build buy-in and illicit meaningful feedback early-on. A device naming convention has also been significantly refined with an internal working group and the PIP-II integration team. Compressed air and Process Control Water (PCW) systems have been installed, and operations has been engaged in Phoebus display development in preparation for a transition to operations for these systems by 2026. Cryoplant hardware has been put in place, and collaboration between controls and PIP-IIs cryo group for IOC and display development is well underway for commissioning of cryoplant systems to begin early 2026. The project has also received beneficial occupancy of the High-Bay Building in October 2025, keeping us on schedule for Warm Front End commissioning to begin in 2027.

Crisp, Dan [Fermilab]↗

Versatile Link+ Transceiver Production Readiness

The Versatile Link + project is about to enter its production phase, ready for the Phase 2 HL-LHC detector upgrades. We present the status of the front-end part of the Versatile Link$^+$ project: the Versatile Link$^+$ Transceiver, which provides a low-mass, radiation tolerant, optical transmit- and receive module for tight integration in the upgrading HL-LHC detectors. We describe the development and thorough testing carried out with the transceiver prototypes and their sub-components and the design decisions that have led to the final production-ready prototype. The planned production schedule is also presented.

46 INSTRUMENTATION RELATED TO NUCLEAR SCIENCE AND ↗

Data Analytics Methods to Measure Plant Outage Resilience

Every 18 or 24 months nuclear power plants (depending on plant configuration, pressurized or boiling water reactor respectively) undergo a period of outage where the plant is taken offline and a large number of maintenance and surveillance activities (that cannot be performed while plant is running) are performed in typically 2–3 weeks. Planning of a plant outage is very challenging since all the activities are required to be performed in the shortest amount of time given available resources (typically contractor crews hired for the duration of the outage). Consequently, plant outages can be costly due the actual loss of power generation and crew costs and, because of it, there is a need to maximize resource usage in the outage planning phase and reduce the risk of outage delays. This paper is addressing these needs by providing a set of analytical methods designed to analyze plant outage schedule and identify critical elements based on available resources (time and crews). These methods are based on natural language processing and optimization algorithms. In this respect, two classes of methods have been developed: one that focuses on the time resource and how variability in the time to complete outage tasks may impact outage delays, and one that minimizes the risk of outage delays by integrating available resources to assess when daily activities should be performed.

97 - MATHEMATICS AND COMPUTING↗

iDDS: intelligent distributed dispatch and scheduling for workflow orchestration

The intelligent distributed dispatch and scheduling (iDDS) service is a versatile workflow orchestration system designed for large-scale, distributed scientific computing. iDDS extends traditional workload and data management by integrating data-aware execution, conditional logic, and programmable workflows, enabling automation of complex and dynamic processing pipelines. Originally developed for the ATLAS experiment at the large hadron collider, iDDS has evolved into an experiment-agnostic platform that supports both template-driven workflows and a Function-as-a-Task model for Python-based orchestration. This paper presents the architecture and core components of iDDS, highlighting its scalability, modular message-driven design, and integration with systems such as PanDA and Rucio. We demonstrate its versatility through real-world use cases: fine-grained tape resource optimization for ATLAS, orchestration of large Directed Acyclic Graph (DAG) workflows for the Rubin Observatory, distributed hyperparameter optimization for machine learning applications, active learning for physics analyses, and AI-assisted detector design at the electron–ion collider. By unifying workload scheduling, data movement, and adaptive decision-making, iDDS reduces operational overhead and enables reproducible, high-throughput workflows across heterogeneous infrastructures. We conclude with current challenges and future directions, including interactive, cloud-native, and serverless workflow support.

97 MATHEMATICS AND COMPUTING↗

A new database of building-space-specific internal loads and load schedules for performance based code compliance modeling of commercial buildings

Building-level loads and load profiles prescribed by current modeling rules save modelers time and avoid gaming during whole building performance modeling. However, recent studies show that they sometimes insufficiently capture the entire building performance due to the varied loads and load profiles for different space types. As a solution to this issue, this paper develops a database of building-space-specific loads and load profiles used in code compliance modeling. The existing sets of loads and load profiles are reviewed and the challenges behind using them for specific research topics are discussed. Then, the proposed method to develop the building-space-specific loads and load profiles is introduced. After that, the database for these building-space-specific loads and load profiles is presented. In addition, one case is studied to demonstrate the applications of these loads and load profiles. In this case study, three methods are used to develop building energy models: space-specific (using knowledge of the distribution and location of space types and applying the space-specific data in the developed database), building-level (assuming a lack of knowledge of the space types and using the building-level data in the developed database), and calculated-ratio (assuming knowledge of the distribution of space types but not their locations and calculating weighted average values based on the space-specific data in the developed database). Finally, the energy results simulated by using these three methods are compared, which show building-level methods can produce energy results up to 20% different than the space-specific methods. Finally, this paper discusses the application scope and maintenance of this new database.

32 ENERGY CONSERVATION, CONSUMPTION, AND UTILIZATI↗

A Q-Learning-Based Approach for Distributed Beam Scheduling in mmWave Networks

We consider the problem of distributed downlink beam scheduling and power allocation for millimeter-Wave (mmWave) cellular networks where multiple base stations (BSs) belonging to different service operators share the same unlicensed spectrum with no centralized control or explicit coordination among them. Our goal is to design efficient distributed beam scheduling and power allocation schemes such that the network-level payoff, defined as the weighted sum of the total throughput and a power penalization term, can be maximized. To this end, we propose a distributed scheduling approach to power allocation and adaptation for efficient interference management over the shared spectrum by modeling each BS as an independent Q-learning agent. As a baseline, we compare the proposed approach to the state-of-the-art non-cooperative game-based approach which was previously developed for the same problem. We conduct extensive experiments under various scenarios to verify the effect of multiple factors on the performance of both approaches. Experiment results show that the proposed approach adapts well to different interference conditions by learning from experience and thus can achieve higher payoff than the game-based approach. The proposed approach can also be integrated into our previously developed Lyapunov stochastic optimization framework for the purpose of network utility maximization with optimality guarantee. As a result, the weights in the payoff function can be automatically and optimally determined by the virtual queue values from the sub-problems derived from the Lyapunov optimization framework.

99 GENERAL AND MISCELLANEOUS↗

EQSIM—A multidisciplinary framework for fault-to-structure earthquake simulations on exascale computers part I: Computational models and workflow

Computational simulations have become central to the seismic analysis and design of major infrastructure over the past several decades. Most major structures are now “proof tested” virtually through representative simulations of earthquake-induced response. More recently, with the advancement of high-performance computing (HPC) platforms and the associated massively parallel computational ecosystems, simulation is beginning to play a role in increased understanding and prediction of ground motions for earthquake hazard assessments. However, the computational requirements for regional-scale geophysics-based ground motion simulations are extreme, which has restricted the frequency resolution of direct simulations and limited the ability to perform the large number of simulations required to numerically explore the problem parametric space. In this article, recent developments toward an integrated, multidisciplinary earth science-engineering computational framework for the regional-scale simulation of both ground motions and resulting structural response are described with a particular emphasis on advancing simulations to frequencies relevant to engineered systems. This multidisciplinary computational development is being carried out as part of the US Department of Energy (DOE) Exascale Computing Project with the goal of achieving a computational framework poised to exploit emerging DOE exaflop computer platforms scheduled for the 2022–2023 timeframe.

58 GEOSCIENCES↗

EVs@Scale Next-Gen Profiles - Fleet Utilization 2023

As U.S. fleet operators begin transitioning to electric vehicles (EVs), critical questions arise regarding how to manage this shift without disrupting fleet operations or placing undue stress on the electric grid. A major challenge for fleets is maintaining effective operational schedules while accommodating charging requirements, particularly with high-power charging (HPC) infrastructure, which presents grid stability concerns for utilities. Proposed solutions such as charging substations, megawatt charging systems (MCS), and smart charge management systems (SCMS) offer potential pathways forward, but their effectiveness depends on alignment with real-world fleet behavior and operational constraints. This report investigates the charging and utilization behavior of EV and EVSE fleets actively employing HPC technologies by conducting detailed case study analyses based on telematics data. A suite of predefined metrics—covering charging, routing, and other operational behaviors—is developed to evaluate the impact of fleet activities on grid infrastructure and identify opportunities for optimization. Results highlight variations in charging behavior across fleets, such as weekday versus weekend usage, diurnal charging trends, and the role of operational predictability in enabling SCMS effectiveness. While SCMS can help lower costs and improve energy efficiency for fleets with stable schedules, they may be insufficient for fleets with highly variable or long-haul operations, which may require more robust solutions like MCS. Visualization of aggregated hourly energy metrics reveals that while fleet behaviors are diverse, there are common temporal patterns that could inform infrastructure planning and energy management. These insights emphasize the need for fleet-specific charging strategies that minimize grid impact while supporting reliable fleet operations. Additionally, the report underscores the broader economic stakes of electrification, particularly in high-value markets such as freight, where misaligned transitions could stall EV adoption. By examining current EV and EVSE fleet deployments using predetermined standardized metrics, this study offers a foundation for developing technologies and operational frameworks that support scalable, grid-compatible electrification across a variety of fleet types while establishing a baseline understanding of operational behaviors. In doing so, we aim to ensure that future charging solutions reflect actual fleet needs and grid constraints—an essential step toward maintaining operational continuity and achieving a successful transition to electric fleet operations.

Charging↗

ATLAS ITk strip sensor quality control procedures and testing site qualification

Abstract The high-luminosity upgrade of the Large Hadron Collider, scheduled to become operational in 2029, requires the replacement of the ATLAS Inner Detector with a new all-silicon Inner Tracker. Radiation hard n + -in-p micro-strip silicon sensors were developed by the ATLAS Inner Tracker strip collaboration and are produced by Hamamatsu Photonics K.K. Production of the total amount of 22000 strip sensors has started in 2020 and will continue until 2025. The ATLAS strip sensor collaboration has the responsibility to monitor the quality of the fabricated devices by performing detailed measurements of individual sensor characteristics and by comparing the obtained results with the tests done by the manufacturer. Dedicated Quality Control procedures were developed to check whether the delivered large-format sensors adhere to the ATLAS specifications. The institutes performing the Quality Control testing of the pre-production and production ATLAS ITk strip sensors had to initially be qualified for multiple high-throughput tests by successfully completing the Site Qualification process. The Quality Control procedures and the qualification process are described in this paper.

Instruments & Instrumentation↗

Intelligent Control of Thermal Energy Storage in the Manufacturing Sector for Plant-Level Grid Response

Industrial facilities are seeking new strategies that help in providing savings mechanisms for demand charges. Demand charges are the charges incurred by industrial facilities as a result of power usage. Thermal energy storage has advanced significantly with lots of new applications, garnering the interest of many industrial facilities. These applications could be used to shave the industrial facilities’ peak electric demand and reduce their demand charges. This paper aims to demonstrate the efficacy of thermal energy storage in reducing demand charges and highlight new developments in the integration of smart control systems with thermal energy storage. The study compares energy consumption and peak demand for a facility equipped with and without thermal energy storage tanks using a fixed schedule for charging and discharging. Additionally, the paper examines the impact of incorporating a smart controller to determine when to charge and discharge the tank based on the facility’s real-time power usage and a given setpoint. The results indicate cost savings from the use of thermal energy storage tanks under two proposed scenarios, reflected in the reduced cost of power consumption for the studied facility. The incorporation of a smart controller with the thermal energy storage tank in the facility studied could provide estimated savings of 3.3% per year of power consumption charges, without considering the contribution of any incentives. The estimated savings provided by the fixed schedule scenario are 2.7% per year.

25 ENERGY STORAGE↗

Bridging Equipment Reliability Data and Risk Informed Decisions in a Plant Operation Context

Industry equipment reliability and asset management programs are essential elements that help ensure the safe and economical operation of nuclear power plants. The effectiveness of these programs is addressed in several industry-developed and regulatory programs. The Risk-Informed Asset Management (RIAM) project is tasked to develop tools in support of the equipment reliability and asset management programs at nuclear power plants. These tools are designed to create a direct bridge between component health/lifecycle data and decision making (e.g., maintenance scheduling and project prioritization). The goal of this article is to provide a guide for specific use cases that the RIAM project is targeting. We have grouped uses cases into three main areas. The first area focuses on the analysis of equipment reliability data with a particular emphasis on condition-based data, such as test/surveillance reports and component monitoring data. The second area focuses on the integration of equipment reliability into system/plant reliability models to determine system/plant health and identify the components that are critical to maintain an operational system. Lastly, the third area manages plant resources, such as maintenance activities and replacement scheduling using optimization methods. Here the primary focus is on supporting typical system engineer decisions regarding maintenance activity scheduling and component aging management. This is performed in a risk-informed context where the term “risk” is broadly constructed to include both plant reliability and economics. This framework combines data analytics tools to analyze equipment reliability data with risk-informed methods designed to support system engineer decisions (e.g., maintenance and replacement schedules, optimal maintenance posture) in a customizable workflow.

97 - MATHEMATICS AND COMPUTING↗

Tri-Level Scheduling Model Considering Residential Demand Flexibility of Aggregated HVACs and EVs Under Distribution LMP

Residential loads, especially heating, ventilation and air conditioners (HVACs) and electric vehicles (EVs), have great potentials to provide demand flexibility which is an attribute of grid-interactive efficient buildings (GEB). Under this new paradigm, first, EV and HVAC aggregator models are developed in this paper to represent the fleet of GEBs, in which the aggregated parameters are obtained based on a new approach of data generation and least squares parameter estimation (DG-LSPE), which can deal with heterogeneous HVACs. Then, a tri-level bidding and dispatching framework is established based on competitive distribution operation with distribution locational marginal price (DLMP). Furthermore, the first two levels form a bilevel model to optimize the aggregators’ payment and to represent the interdependency between load aggregators and the distribution system operator (DSO) using DLMP, and the third level is to dispatch the optimal load aggregation to all residents by the proposed priority list-based demand dispatching algorithm. Finally, case studies on a modified IEEE 33-Bus system illustrate three main technical reasons of payment reduction due to demand flexibility: load shift, DLMP step changes, and power losses. They can be used as general guidelines for better decision-making for future planning and operation of demand response programs.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Scheduling and Performance of Asynchronous Tasks in Fortran 2018 with FEATS

Most parallel scientific programs contain compiler directives (pragmas) such as those from OpenMP (Hermanns in Parallel programming in Fortran 95 using openMP, 2002. School of Aeronautical Engineering, Universidad Politécnica de Madrid, España, 2011), explicit calls to runtime library procedures such as those implementing the Message Passing Interface (MPI) (in A message-passing interface standard version 4.0, 2021. https://www.mpi-forum.org/docs/mpi-4.0/mpi40-report.pdf), or compiler-specific language extensions such as those provided by CUDA (Ruetsch and Fatica in CUDA Fortran for scientists and engineers: best practices for efficient CUDA Fortran programming, Elsevier, 2013). By contrast, the recent Fortran standards empower developers to express parallel algorithms without directly referencing lower-level parallel programming models (Numrich in Parallel programming with co-arrays, CRC Press, 2018, and Curcic in Modern Fortran: building efficient parallel applications, Manning Publications, 2020). Fortran’s parallel features place the language within the Partitioned Global Address Space (PGAS) class of programming models. When writing programs that exploit data parallelism, application developers often find it straightforward to develop custom parallel algorithms. Problems involving complex, heterogeneous, staged calculations, however, pose much greater challenges. Such applications require careful coordination of tasks in a manner that respects dependencies prescribed by a directed acyclic graph. When rolling one’s own solution proves difficult, extending a customizable framework becomes attractive. Further, the paper presents the design, implementation, and use of the Framework for Extensible Asynchronous Task Scheduling (FEATS), which we believe to be the first task scheduling tool written in modern Fortran. We describe the benefits and compromises associated with choosing Fortran as the implementation language, and we propose ways in which future Fortran standards can best support the use case in this paper.

97 MATHEMATICS AND COMPUTING↗

An end-to-end workflow for executing a classically bootstrapped variational quantum algorithm on an academic quantum computer

Academic quantum computing platforms often face unique challenges in executing quantum workloads due to fragmented software environments and limited engineering support. Unlike commercial ecosystems, academic devices typically evolve without full-stack integration in mind, making it difficult to run complex applications—such as variational quantum algorithms (VQA)—reliably and efficiently. Issues such as incompatible software layers and lack of automated job management significantly increase the overhead of theory-experiment collaboration. To address these challenges, we develop a modular, end-to-end workflow that decouples application-layer code from low-level hardware control, automates circuit submission and result collection, and supports fine-grained circuit-level job scheduling and recovery. The architecture employs a dual-end application programming interface (API) design, enabling robust operation across unstable or resource-constrained hardware backends. For practical use, the framework is lightweight and user-friendly, allowing rapid prototyping of full-stack workflows using basic Python tools. We validate this workflow on a high-fidelity trapped-ion quantum computer by demonstrating a variational quantum eigensolver (VQE) experiment with a classically bootstrapped ansatz initialization technique. The system successfully executed over 60,000 circuits across multiple molecular test cases with minimal human intervention, highlighting the framework’s effectiveness in enabling reproducible, resilient quantum experimentation in academic settings.

Clifford↗

QASMBench: A Low-Level Quantum Benchmark Suite for NISQ Evaluation and Simulation

The rapid development of quantum computing (QC) in the NISQ era urgently demands a low-level benchmark suite and insightful evaluation metrics for characterizing the properties of prototype NISQ devices, the efficiency of QC programming compilers, schedulers and assemblers, and the capability of quantum system simulators in a classical computer. In this work, we fill this gap by proposing a low-level, easy-to-use benchmark suite called QASMBench based on the OpenQASM assembly representation. It consolidates commonly used quantum routines and kernels from a variety of domains including chemistry, simulation, linear algebra, searching, optimization, arithmetic, machine learning, fault tolerance, cryptography, and so on, trading-off between generality and usability. To analyze these kernels in terms of NISQ device execution, in addition to circuit width and depth, we propose four circuit metrics including gate density, retention lifespan, measurement density, and entanglement variance, to extract more insights about the execution efficiency, the susceptibility to NISQ error, and the potential gain from machine-specific optimizations. Applications in QASMBench can be launched and verified on several NISQ platforms, including IBM-Q, Rigetti, IonQ and Quantinuum. For evaluation, we measure the execution fidelity of a subset of QASMBench applications on 12 IBM-Q machines through density matrix state tomography, comprising 25K circuit evaluations. In addition we also compare the fidelity of executions among the IBM-Q machines, the IonQ QPU and the Rigetti Aspen M-1 system.

97 MATHEMATICS AND COMPUTING↗

Irradiation Characterization of Pressure Transducers

The advancement of reactor technologies for space and remote applications requires further investigation into the long-term operation of instrumentation without the chance for standard scheduled maintenance. Specifically, the degradation of instrumentation due to exposure to nuclear radiation needs to be understood. Determining the methods of degradation can improve material selection for instrument construction and provide foundational data for the development of corrective algorithms. Initial work has been focused on the development of nuclear thermal rocket technology and the instrumentation needs that will led to its eventual deployment.

Floyd, Dan↗

Building Automation

In this chapter, we focus on both need-based and vision-based control innovation for building automation for HVAC systems. After providing a brief background that describes different HVAC architectures and products, we describe the control challenges and opportunities from a needs-based point of view, at the equipment level, the systems level, and the building level. At the equipment level, increased use of continuously variable actuation such as variable speed compressors and fans, requires application of robust multivariable control that must consider various types of nonlinear behavior across increasingly larger operating envelopes. The objective at this level is to achieve robust and energy efficient operation. At the system level, coupled and interactive dynamics among subsystems are increasingly important to consider, and functional integration of these subsystems, along with set points and operating schedules are designed to minimize energy consumption and improve occupant comfort. At the building level, issues such as integration among other building systems, such as the building envelope and the electric grid, offer opportunities to develop new types of demand response and grid-interactive behaviors and technologies. At the higher levels, system dynamics and robust stability are less of an issue, similar to process control applications, while optimization and integration are more important, although dynamic stability is increasing an issue at the higher levels too. From a vision-driven innovation point of view, we describe three areas that will require sustained research efforts and will eventually impact building automation: Digital Twins, Model Predictive Control, and Grid Interactive Buildings.

Bortoff, Scott↗