Search NASA⌕ Search

SEARCH · Search NASA

Results for “Artemis power system”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 37 records · Page 2

Artemis I Orion ESM Propulsion System Engine Performance

NASA's Orion spacecraft transports humans and cargo into cislunar space for the Artemis program. The European Service Module (ESM), supplied by ESA and its European industry partners, provides Orion with power and in-space propulsion. The Orion-ESM propulsion system is a bipropellant hypergolic propulsion system using monomethyl hydrazine (MMH) and nitrogen tetroxide (MON-3). Primary translational propulsion is provided by the Orbital Maneuvering System Engine (OMS-E), with backup translational propulsion provided by eight Auxiliary thrusters (AUX). Attitude control and small translational maneuvers are provided by twenty-four Reaction Control System (RCS) engines. The 2022 Artemis I mission was the first integrated flight test of the Orion-ESM spacecraft and its propulsion system. The OMS-E used on Artemis I was a refurbished Space Shuttle OMS-E that previously flew on nineteen missions ranging from STS-41G in 1984 to STS-112 in 2002. The Auxiliary engines are modified Aerojet Rocketdyne R4D-11 engines produced specifically for the Orion program. The RCS engines are Ariane Group engines originally used for the Automated Transfer Vehicle (ATV) program. This paper will discuss the unique operational requirements for each engine on Orion and the development and qualification effort sat both the engine and system-level that were completed to enable a successful Artemis I mission. Next the paper will evaluate the in-f light performance of the engines during the Artemis I mission showing nominal performance as expected. Additionally, comparisons to models will be presented showing very good correlation. Finally, the paper will address the plan for the engines on future Orion missions and the evolution of the system operation.

liquid propulsion systems↗

Real-Time Simulation of Ares I Launch Vehicle

The Ares Real-Time Environment for Modeling, Integration, and Simulation (ARTEMIS) has been developed for use by the Ares I launch vehicle System Integration Laboratory (SIL) at the Marshall Space Flight Center (MSFC). The primary purpose of the Ares SIL is to test the vehicle avionics hardware and software in a hardware-in-the-loop (HWIL) environment to certify that the integrated system is prepared for flight. ARTEMIS has been designed to be the real-time software backbone to stimulate all required Ares components through high-fidelity simulation. ARTEMIS has been designed to take full advantage of the advances in underlying computational power now available to support HWIL testing. A modular real-time design relying on a fully distributed computing architecture has been achieved. Two fundamental requirements drove ARTEMIS to pursue the use of high-fidelity simulation models in a real-time environment. First, ARTEMIS must be used to test a man-rated integrated avionics hardware and software system, thus requiring a wide variety of nominal and off-nominal simulation capabilities to certify system robustness. The second driving requirement - derived from a nationwide review of current state-of-the-art HWIL facilities - was that preserving digital model fidelity significantly reduced overall vehicle lifecycle cost by reducing testing time for certification runs and increasing flight tempo through an expanded operational envelope. These two driving requirements necessitated the use of high-fidelity models throughout the ARTEMIS simulation. The nature of the Ares mission profile imposed a variety of additional requirements on the ARTEMIS simulation. The Ares I vehicle is composed of multiple elements, including the First Stage Solid Rocket Booster (SRB), the Upper Stage powered by the J- 2X engine, the Orion Crew Exploration Vehicle (CEV) which houses the crew, the Launch Abort System (LAS), and various secondary elements that separate from the vehicle. At launch, the integrated vehicle stack is composed of these stages, and throughout the mission, various elements separate from the integrated stack and tumble back towards the earth. ARTEMIS must be capable of simulating the integrated stack through the flight as well as propagating each individual element after separation. In addition, abort sequences can lead to other unique configurations of the integrated stack as the timing and sequence of the stage separations are altered.

Tobbe, Patrick↗

Analysis of Glint During the Artemis I Mission

Glint occurs when light reflects off a specular (mirror-like) surface. In the context of spacecraft, glinted light can land in places that may cause unintended, negative effects. During the Artemis I mission in November and December of 2022, glint was forced to occur in order to study its effect on the Orion electrical power system (EPS). With the vehicle in a nose-to-sun attitude, light was reflected off the crew module’s reflective skin and onto forward pointed solar array wings (SAWs), producing more current than would result from direct solar flux alone. The goal of this in-flight test was to anchor the models previously used to study this phenomenon and to understand what parameters have the most significant impact on glinted current generation. In this presentation, the two models used for estimating optical properties for glint analysis will be discussed, as well as a worst-case study that was performed before the Artemis I mission. In-flight telemetry data will be compared to values of SAW section current produced by the models. Each of the optical properties and parameters studied will be outlined and their significance on the impact of glint will be discussed.

Glint↗

Solar Array System Combined Environmental Effects Tests: Gateway Power and Propulsion Element

The NASA Lunar Orbital Platform-Gateway (LOP-G), a vital component of NASA’s Artemis program, will serve as a multi-purpose outpost orbiting the Moon. A foundational component of LOP-G is the Power and Propulsion Element (PPE). The PPE is a high-power, +60-kilowatt solar electric propulsion spacecraft that will provide power, high-rate communications, attitude control, and orbital transfer capabilities for the Gateway. The solar array system will utilize 4-junction photovoltaic cell technology on a flexible substrate (roll-out solar array or ROSA) in combination with multiple diode assemblies to combine the power of the solar array strings. NASA’s Marshall Space Flight Center, together with the PPE developer, Maxar, are in the midst of completing a rigorous combined environments test campaign of 3 solar array coupons and 1 array blocking diode board coupon. The campaign includes Ultra-Violet Radiation, Charged Particle Radiation, Ion Erosion, Thermal Cycles, and Electrostatic Discharge tests. The environments are applied in 3 separate incremental stages reflecting the various mission phases: 460 days of Earth-to-Lunar Transit, with much of that time through the Van Allen Belts, 5-years in Lunar Near-Rectilinear Halo Orbit (NRHO) at the Moon, and finally 15-years in Lunar NRHO, which represents the end of the design life. This paper will report on the state of the testing for each coupon, and brief look at the array performance, including some unexpected sensitivities of array blocking diodes.

Gateway↗

Powering the Lunar Surface: Managing Dust, Extreme Environments, and Power Needs

Power availability remains one of the primary constraints for lunar surface science. This talk reviews power requirements from previously flown instruments to help prepare future payloads for upcoming CLPS opportunities and highlights the testing and environmental simulation capabilities at NASA JSC that enable reliable lunar payload development. It also outlines the power needs, environmental challenges, and emerging technologies required to support sustained human and robotic operations on the lunar surface as part of NASA’s Moon to Mars strategy. Key challenges include variable solar illumination at polar and equatorial regions, extreme thermal environments, and dust driven degradation that limit current surface power systems. The science data needed for resource identification and landing site planning will allow for the successful preparation of crewed Artemis activities and long-term presence. Building on recent missions, current test infrastructure, and emerging power technology pathways, this presentation equips industry, academia, and government teams with the information needed to design robust lunar payloads, reduce development risk, and fully leverage the increasing cadence of CLPS missions. These developments will form a critical technical foundation for long duration lunar presence and future Mars exploration.

Anastasia Ford↗

Powering the Lunar Surface: Managing Dust, Extreme Environments, and Power Needs

Power availability remains one of the primary constraints for lunar surface science. This talk reviews power requirements from previously flown instruments to help prepare future payloads for upcoming CLPS opportunities and highlights the testing and environmental simulation capabilities at NASA JSC that enable reliable lunar payload development. It also outlines the power needs, environmental challenges, and emerging technologies required to support sustained human and robotic operations on the lunar surface as part of NASA’s Moon to Mars strategy. Key challenges include variable solar illumination at polar and equatorial regions, extreme thermal environments, and dust driven degradation that limit current surface power systems. The science data needed for resource identification and landing site planning will allow for the successful preparation of crewed Artemis activities and long-term presence. Building on recent missions, current test infrastructure, and emerging power technology pathways, this presentation equips industry, academia, and government teams with the information needed to design robust lunar payloads, reduce development risk, and fully leverage the increasing cadence of CLPS missions. These developments will form a critical technical foundation for long duration lunar presence and future Mars exploration.

lunar power↗

Trajectory Shaping of Lunar Descent Approach Phase for Human Landing Systems

NASA’s Artemis program will have many mission phases but perhaps the most dangerous and dynamic is the powered descent and landing phase. NASA’s HLS Program has developed a candidate lunar approach concept of operations to address the needs of both hazard detection sensors and crew visibility of the landing site. The descent trajectory is shaped such that the approach phase is initiated at a steep trajectory path angle for hazard map generation then transitions to a shallow trajectory path angle to facilitate crew landing site visibility. The results show this tailored approach concept is a viable option to reduce risk during landing with minimal performance impacts.

Trajectory Optimization↗

Hardware Systems and EDU Demonstration of the Tall Lunar Tower Project

The Tall Lunar Tower (TLT) project developed a robotic tower assembly system (RTAS) and TLT Truss engineering development units (EDUs) to perform a ground demonstration of supervised semi-autonomous robotic assembly of a truss-based tall tower. Truss structures provide exceptional strength-to-weight ratios for payload capabilities supporting large masses. On the lunar surface, tall towers are a critical structural system that will enable significant solar power generation by supporting vertical solar arrays and beyond-the-horizon communications at the lunar south pole, supporting the Artemis mission architecture, as well as a lunar economy. Tall towers, greater than 30-meters-tall, provide the elevation needed for more consistent solar power generation due to low inclination sunlight and deep shadowing from surface features on the lunar surface at the poles. The robotic structural assembly technologies developed for truss-based tall towers will also enable other large-scale functional lunar structures to be built, including launch plume deflectors, lunar safe havens for astronauts and assets, surface transportation for cargo, and other critical infrastructure. Robotic assembly of truss structures for lunar surface infrastructure is near-term enabling for future Artemis mission campaign and Moon to Mars Objectives needs for power and communication. The project team designed, fabricated, tested, and demonstrated the RTAS EDU by assembling a TLT Truss EDU in a laboratory environment. The hardware systems and the supervised semi-autonomous assembly process for a TLT assembled EDU design, along with descriptions of a hardware demonstration are presented.

In-space Assembly↗

Hardware Systems and EDU Demonstration of the Tall Lunar Tower Project

The Tall Lunar Tower (TLT) project developed a robotic tower assembly system (RTAS) and TLT Truss engineering development units (EDUs) to perform a ground demonstration of supervised semi-autonomous robotic assembly of a truss-based tall tower. Truss structures provide exceptional strength-to-weight ratios for payload capabilities supporting large masses. On the lunar surface, tall towers are a critical structural system that will enable significant solar power generation by supporting vertical solar arrays and beyond-the-horizon communications at the lunar south pole, supporting the Artemis mission architecture, as well as a lunar economy. Tall towers, greater than 30-meters-tall, provide the elevation needed for more consistent solar power generation due to low inclination sunlight and deep shadowing from surface features on the lunar surface at the poles. The robotic structural assembly technologies developed for truss-based tall towers will also enable other large-scale functional lunar structures to be built, including launch plume deflectors, lunar safe havens for astronauts and assets, surface transportation for cargo, and other critical infrastructure. Robotic assembly of truss structures for lunar surface infrastructure is near-term enabling for future Artemis mission campaign and Moon to Mars Objectives needs for power and communication. The project team designed, fabricated, tested, and demonstrated the RTAS EDU by assembling a TLT Truss EDU in a laboratory environment. The hardware systems and the supervised semi-autonomous assembly process for a TLT assembled EDU design, along with descriptions of a hardware demonstration are presented.

Lunar Infrastructure↗

ExMC Systems Engineering Developments

The Exploration Medical Capability (ExMC) Element within the Human Research Program (HRP) applies systems engineering (SE) principles along with the use of Model-Based Systems Engineering (MBSE) tools to identify and communicate the requirements for medical and crew health and performance (CHP) systems. In the past fiscal year, the MBSE approach sought to advance the digital engineering toolset for medical and CHP system representation. These digital artifacts provide enhanced views of the relationships among requirements, standards, functions, and capabilities, to name a few, that is best suited for a user’s objectives. The MBSE tools and SE practices were applied to the development of the revised Earth Independent Medical Operations (EIMO) medical system and the Artemis III and IV CHP System models. In addition, a System of Systems concept was integrated into the EIMO model to facilitate the identification of system interfaces that interact with the medical system. Finally, the ExMC SE team has initiated several efforts to bring operationally relevant digital engineering practices to the Human Health and Performance Directorate (HHPD). This included the development of a pilot program within the directorate to help foster utilization of tools such as MagicDraw for system modeling and Power BI for visualizing extracted data in an easily accessible dashboard format. Additionally, with the increase in complexity of the integration effort for Artemis missions, ExMC has endeavored to bring digital engineering strategies to potentially increase efficiency in review processes. This talk will provide a high-level overview of the ExMC SE team accomplishments since the last Investigators’ Workshop, an introduction to upcoming SE talks, and the ongoing systems engineering work.

systems engineering↗

NASA's Space Launch System Begins Integration, Stacking in Preparation for Artemis I Launch

The Artemis era of human lunar exploration is nearing take-off as NASA’s new super heavy-lift launch vehicle, the Space Launch System (SLS), begins stack-ing and integration operations in mid-2020 at Kennedy Space Center (KSC) in Florida. With a planned upgrade path to progressively more powerful vehicles and availability in crew and cargo configurations, SLS provides a unique and flexible launch solution to send crew, large-scale infrastructure and robotic probes to deep space. The SLS Block 1 vehicle, the initial variant to fly, is optimized for lunar missions with a proven propulsion system consisting of four liquid hydrogen (LH2)/liquid oxygen (LOX)-fed RS-25 engines and twin five-segment solid rocket boosters (SRBs). The Block 1 vehicle can also be outfitted with an industry-standard 5 m-class payload fairing (the “cargo” configuration) and will launch at least 27 metric tons (t) of mass to trans-lunar injection (TLI). SLS is the backbone of NASA’s Artemis program, which will return the agency’s human spaceflight program to the Moon for the first time since 1972. For the Artemis I mission, SLS will send an uncrewed Orion spacecraft to TLI, where it will enter a distant retrograde lunar orbit and fly 38,000 nmi past the Moon – farther than any spacecraft built for humans has ever traveled. The SLS Block 1 vehicle for Artemis I completed manufacturing in 2019. Several elements, including the upper stage, have been delivered to the Exploration Ground Systems (EGS) program at KSC and are being prepped for integration and stack-ing. The five-segment solid rocket boosters – the largest and most powerful ever built for flight – are also complete. The booster motor segments for the Artemis I flight are scheduled to ship from prime contractor Northrop Grumman’s Utah facilities and begin stacking and integration at KSC in June 2020. The SLS core stage is the largest rocket stage NASA has ever built in terms of volume and height, and includes the avionics and the tanks that feed cryogenic propellant to the four RS-25s (formerly Space Shuttle Main Engines [SSMEs]). They have been modified with an updated controller and nozzle insulation to protect them from the hotter launch environment. The SLS core stage is currently being test-ed at NASA’s Stennis Space Center (SSC) in a series of “green run” tests to verify it meets design and performance requirements. Following the green run test series, which is scheduled to culminate with a full-duration hot-fire of the four RS-25 engines, the core stage will ship to KSC and be stacked between the sol-id rocket boosters in the Vehicle Assembly Building (VAB). Integration of the vehicle will continue with the upper stage, known as the Interim Cryogenic Propulsion Stage (ICPS) and the Launch Vehicle Stage Adapter (LVSA) on the core stage. Another adapter, the Orion Stage Adapter (OSA), connects SLS to Orion and provides housing for 13 6U CubeSat payloads manifested on Artemis I. The CubeSats will be released in deep space after Orion separates from the vehicle, and the flight marks the first ride share opportunity for independent small-sats to deep space. The second major SLS variant to come online, Block 1B, replaces the single-engine ICPS with a four-engine LH2/LOX Exploration Upper Stage (EUS). This more powerful upper stage, along with other vehicle up-grades, will enable the Block 1B vehicle to launch 38-42 t to TLI, depending on crew or cargo configuration. The final evolution of the vehicle, Block 2, will onramp evolved solid rocket boosters to increase mass to TLI to 43-46 t, de-pending on crew or cargo configuration. The Block 1B/Block 2 vehicles can be outfitted with an 8.4 m-diameter payload fairing in 19.1 m or 27.4 m lengths, to provide unprecedented volume for payloads. With the initial Block 1 vehicle completely manufactured and the core stage in final testing before shipping to KSC, the SLS Program and its industry partners have made significant progress manufacturing subsequent vehicles. For the second Block 1 vehicle, the solid rocket motor segments are complete, as are the RS-25 engines with controllers. All five major components of the Artemis II core stage – the forward skirt, LOX and LH2 tanks, intertank and engine section – are manufactured and technicians are installing subsystems at NASA’s rocket factory, Michoud Assembly Facility. The RL-10 engine for the Artemis II ICPS is complete and panels have been machined for its LH2 tank. In addition, panels are machined for the vehicle’s two adapters, with welding scheduled to begin in summer 2020. Flight hard-ware is also in production for the third SLS vehicle, with several booster motor segments cast. The pace of development on the EUS has increased, with the goal to complete Critical Design Review (CDR) in December 2020. Several EUS test rings have been machined at Michoud. The EUS is designed to exe-cute a variety of missions – human spaceflight, deployment of deep-space infra-structure, or high-C3 missions to the outer solar system – with crew and cargo configurations available beginning in the mid-2020s. The near-term goal for the nation’s powerful new space exploration asset, however, is to launch the Arte-mis program, and send the first woman and the next man to the lunar surface. At the Astrodynamics Specialist Conference, the SLS program will update the community on the progress of the initial Block 1 vehicle in final green run test-ing, integration and stacking. In addition, this paper will provide an update to the community on the manufacturing status of subsequent Block 1 and Block 1B vehicles.

Steve Creech↗

Probabilistic Risk Assessment of a Sustained Lunar Presence

The Artemis Base Camp will be our first sustainable foothold on the lunar frontier. The base camp includes a lunar surface habitat, power systems, and infrastructure needed to develop capabilities on future missions to Mars. NASA Probabilistic Risk Assessment (PRA) methodologies tend to focus on in-flight Loss of Crew (LOC) or Loss of Vehicle (LOV) risk estimates for short mission durations. However, lunar habit support systems and power generation systems will need to continuously operate. Existing risk methodologies will need to adapt to understand risk drivers in new environments under different operating conditions, such as lunar dust and increased micro-meteoroid exposure. Insights from the nuclear and oil industries can provide guidance to NASA risk practitioners to tackle this new challenge.

risk assessment↗

RTG Radiator Efficiency in the Presence of Lunar Dust

The accumulation of Lunar dust on various surfaces is the subject of much recent study, yet is still poorly understood. Recent plans to return humans to the Moon as part of the Artemis program mean that the presence of robust infrastructure to support a permanent human presence is inevitable. Power supply systems, such as Radioisotope Thermoelectric Generators are a likely part of that infrastructure, but require radiative thermal dissipation through a series of radiator fins to function effectively. In this work, the results of a parametric study of the impact on radiator efficiency due to various quantities and types of lunar dust simulants are presented, determining that the impact from low levels of lunar dust accumulation is not significantly detrimental to the efficiency of Multi-Mission Radioisotope Thermoelectric Generator performance in a vacuum, but increased fidelity of data would improve these findings.

Dust↗

NASA’s Space Launch System: Progress Toward Launch

The Space Launch System (SLS), NASA’s cornerstone launch capability for a new generation of deep space exploration, has begun assembly at Kennedy Space Center (KSC) in preparation for launch in 2021. SLS will provide an unparalleled launch capability for human and robotic deep space exploration missions. Its proven propulsion system, upgrade path to more powerful vehicles, and high-volume payload fairings make it the foundation for ambitious and demanding as part of the Artemis program. Artemis is NASA’s 21st-century plan to put boots on the Moon and to perform sustainable, long-term science in deep space, with eyes toward sending explorers to Mars. The initial SLS vehicle to fly, Block 1 in the crew configuration – with the new Orion spacecraft – is scheduled to lift off from revitalized launch facilities at KSC in 2021 for an uncrewed test flight known as Artemis I. Manufacturing is complete on the vehicle and all elements have been delivered to the Exploration Ground Systems (EGS) Program, except the core stage. The program’s all-new development, the core stage is currently in the midst of a “Green Run” test campaign at Stennis Space Center (SSC). Eight progressively more challenging tests in the Green Run series will culminate in a hot-fire of four flight-proven liquid hydrogen/liquid oxygen (LH2/LOX) RS25 engines. Following the Green Run hotfiring, the core stage will ship to KSC. Already at KSC, aft sections of the fivesegment solid rocket boosters are being assembled. Previously delivered elements, including the upper stage, are undergoing final checkouts in preparation for stacking. An exciting 2021 will include such milestones as stacking SLS and Orion in KSC’s Vehicle Assembly Building (VAB), modal testing, roll out to Launch Pad 39B, Wet Dress Rehearsal (WDR), and launch. Teams across the country are preparing for launch by finalizing procedures, defining launch constraints and flight rules, training console operators, performing simulations, and more. With the SLS Block 1 vehicle for Artemis I nearing integration and launch, the second Block 1 vehicle in the crew configuration, which will carry astronauts on an Artemis II hybrid lunar flyby mission, has several elements manufactured. In fact, the solid rocket motor segments and RS-25 engines are complete. Those program elements are processing hardware for the third flight and working toward manufacturing the second SLS variant to fly, Block 1B, which will onramp a powerful new upper stage, the Exploration Upper Stage (EUS).

John Honeycutt↗

Multiphase Simulations of the SLS Launch Environment

NASA’s Space Launch System (SLS), which will send astronauts back to the Moon in the next few years, is powered by four RS-25 engines and two RSRMV solid rocket boosters (SRBs). During launch the SLS propulsion system generates intense acoustics and other powerful waves, such as ignition overpressure (IOP) which, if unmitigated, have the potential to damage the vehicle and possibly cause loss of mission or crew. To protect the vehicle from these powerful waves, the SLS launch pad design includes an ignition overpressure/sound suppression (IOP/SS) system which sprays 270,000 gallons per minute of water very close to the SRB and RS-25 nozzles. The SRB and RS-25 engine plumes, and the proximity of the IOP/SS water, create a complex multiphase (gas and liquid) environment during the SLS ignition sequence. The interplay among these systems creates challenges related to water spray into/onto engine nozzles, potential debris transport, and additional transient loads due to strong plume-water interactions - all of which the SLS vehicle must be able to withstand. Prior to the Artemis I launch, the SLS multiphase liftoff environment was largely unknown due to differences from the Space Shuttle and other programs. Some data was available from tests of individual systems, but no integrated testing or analysis was available. Even post-launch analysis of Artemis I cannot provide a full understanding of the complex physics involved due to limited (or obstructed) camera views and instrumentation. Computational fluid dynamics (CFD) is being used to investigate the details of the multiphase environment which could not be measured, help comprehend the data gathered from the launch, and ultimately identify phenomena that are a concern for future flights. Project Details Engineers at NASA’s Marshall Space Flight Center (MSFC) have executed simulations using the Loci/STREAM-Volume of Fluid (VoF) multiphase CFD solver to understand this environment. Initial efforts successfully validated the CFD solver on various tests, giving confidence to simulate the SLS multiphase liftoff environment prior to the Artemis I launch. The CFD simulation of the SLS ignition sequence was conducted in three phases. First the IOP/SS water system was simulated for approximately 6 seconds to reach a quasi-steady state. Next, the RS-25 engine plumes were activated and held at full power for 1 second. Lastly, the SRB booster was activated and the simulation was carried out until just prior to vehicle motion. This simulation process mimics the conditions that exist at launch. Results and Impact The SLS ignition sequence simulation results provide deep understanding of the underlying physics occuring during launch. Observations from the simulation include reduction of water splashing into/onto the engine nozzles, change in angling of the dense water sheets, and the origin of the powerful ignition overpressure (IOP) wave. These observations directly inform the SLS program on subjects including plume-water induced side loads, debris transport, and the acoustic launch environment. Additionally, with post launch comparison of CFD observations to flight data, these tools can be applied to launch vehicles and environments other than SLS with confidence. Why HPC Matters The SLS ignition sequence CFD simulations are conducted on meshes up to hundreds of millions of cells on thousands of processors for weeks at a time. These simulations generate terabytes of data that must also be stored and archived for future use on HPC systems. Simply put, the CFD simulations would not be possible without NASA HPC resources. What’s Next Comparisons between the Artemis I flight data and the CFD simulations will be continued to both improve confidence in the CFD results and provide deeper understanding into the SLS multiphase launch environment. This will be used to provide insight for decision making for the first manned SLS flight, Artemis II. Future simulations will target new configurations of the SLS IOP/SS water required to support the more powerful variants of the SLS vehicle, such as Block 1B. Additionally, this capability provides NASA the ability to investigate launch environments for vehicles other than SLS to support other missions.

Travis Rivord↗

LESSH Lunar Experiment Support System and Handling Battery Charger Module

Beginning with Artemis III, NASA plans to deploy science instruments on the moon near a South Pole landing site. To extend lunar science operations, an EVA compatible LESSH Battery Charger Module (BCM) enables recharging and hard-line data transfer at the modular GFP Interface Bank on the Human Landing System (HLS) or other Artemis vehicles. The LESSH BCM provides an ergonomic interface for astronauts to connect instruments to HLS power and data interfaces. The BCM provides battery charge monitoring and enables data transfer via a flexible harness. LESSH-Placed is an instrument package that can be deployed by astronauts and re-charged via an Artemis vehicle, enabling extended science operations.

LESSH↗

Eleven Countries, an Integrated Spacecraft: the Story of International Collaboration that Built the Orion Spacecraft and Powered the Success of the Artemis I Mission

The quest to return humans to the Moon in the next step towards humanity's exploration of space is more alive than ever. After a great deal of achievements, failures, and lessons learned, the Artemis I mission set o to the Moon on November 16, 2022, with the goal of testing a new rocket, the Space Launch System, and a new spacecraft, Orion: designed, assembled, and tested across two continents, and 11 countries. Behind this mission, decades of experience with the International Space Station, Autonomous Transfer Vehicle operations, and many other program collaborations built the know-how on how to succeed together in the toughest environment | deep space. The Artemis I mission proved to be an incredible success, meeting 161 total mission objectives, including 21 developed during the flight based on outperforming spacecraft. It was also a case-study in international collaboration, given that ESA, NASA, and industry partners Airbus and Lockheed Martin for the first time had to design, build, test, and fly a fully integrated human-rated spacecraft, with most critical functions dependent and interconnected across U.S. and European systems. The U.S.-built Orion Crew Module and Crew Module Adapter and European-built European Service Module (ESM) shared critical interfaces and commodities, from propulsion, avionics, active/passive thermal, electrical power generation, storage and distribution to the software that managed it all. In this paper, we will describe relevant aspects of the integrated spacecraft design, providing context for the challenges that the team faced in all phases required to get Orion ready to fly, and provide a direct account of how the joint team formed, trained, and supported the operations of the successful Artemis I mission. We will also explore the evolution of the partnerships, given that these allow a multi-national e ort to sustain the program production, share costs, leverage a broader base of engineering expertise, and build more diverse capabilities over the long haul to support the Artemis goals and objectives. Lastly, we will cover critical lessons learned and how the Orion Program has implemented these in preparation of the next Artemis missions to repeat the success of Artemis I. The purpose of this paper is to document knowledge we gained and lessons we learned through the development of an integrated Orion spacecraft, since it is imperative we build on this now, at the dawn of the Artemis Program, an international endeavor to push human space exploration.

Deep Space Exploration↗