Search NASA⌕ Search

SEARCH · Search NASA

Results for “BEB”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 37 records · Page 2

A novel method for co-optimizing battery sizing and charging strategy of battery electric bus fleets: An application to the city of Paris

Battery-electric buses (BEBs) are a promising technology for replacing diesel buses and reducing their environmental burden. However, their charging process can take several hours, depending on the charging technique and strategy, making them susceptible to schedule disruptions. Furthermore, the selection of the charging strategy and battery size can increase the total capital investment and operational expenses of a BEB fleet, which is a major obstacle to its adoption. Therefore, to minimize the total cost of ownership (TCO) and prevent schedule disruptions, it is essential to establish a well-defined approach to determine an appropriate battery size and charging strategy for BEB fleets. This paper presents a method for reducing the TCO of BEB by determining the optimal battery size and charging strategy for each bus while satisfying operating constraints. The method involves a two-step optimization algorithm that uses Dynamic Programming and Genetic Algorithm. Further, the study applies this approach to the bus fleet serving line 21 in Paris and generates the optimal battery sizing, charging strategy, and required charging infrastructure. The results indicate that 100 kWh batteries offer the best trade-off between capital and operational expenditure for the fleet deployment if used with 65–85 kW chargers at bus terminals.

33 ADVANCED PROPULSION SYSTEMS↗

A faster and more reliable data acquisition system for the full performance of the SciCRT

The SciBar Cosmic Ray Telescope (SciCRT) is a massive scintillator tracker to observe cosmic rays at a very high-altitude environment in Mexico. The fully active tracker is based on the Scintillator Bar (SciBar) detector developed as a near detector for the KEK-to-Kamioka long-baseline neutrino oscillation experiment (K2K) in Japan. Since the data acquisition (DAQ) system was developed for the accelerator experiment, we determined to develop a new robust DAQ system to optimize it to our cosmic-ray experiment needs at the top of Mt. Sierra Negra (4600 m). One of our special requirements is to achieve a 10 times faster readout rate. We started to develop a new fast readout back-end board (BEB) based on 100 Mbps SiTCP, a hardware network processor developed for DAQ systems for high energy physics experiments. Then we developed the new BEB which has a potential of 20 times faster than the current one in the case of observing neutrons. Lastly, we installed the new DAQ system including the new BEBs to a part of the SciCRT in July 2015. The system has been operating since then. In this article, we describe the development, the basic performance of the new BEB, the status after the installation in the SciCRT, and the future performance.

46 INSTRUMENTATION RELATED TO NUCLEAR SCIENCE AND ↗

Joint optimization of electric bus charging infrastructure, vehicle scheduling, and charging management

High upfront costs of vehicles and charging infrastructure as well as the lack of knowledge related to infrastructure planning and electric bus system operation are major obstacles to the implementation of battery electric buses (BEBs). To tackle the obstacles and promote BEB adoption, a comprehensive optimization framework was developed to address the combined charging infrastructure planning, vehicle scheduling, and charging management problem for BEB systems, with the goal to minimize the total cost of ownership. The problem was formulated as a mixed-integer non-linear problem. A genetic algorithm-based approach was then proposed to solve the problem. Last, three alternative scenarios based on a sub-transit network in Salt Lake City, Utah, were analyzed and compared with the optimal scenario results in the numerical experiments. Our comparison results demonstrate the effectiveness of the proposed model and solution algorithm in determining a cost-efficient planning strategy for BEB systems.

33 ADVANCED PROPULSION SYSTEMS↗

Fast Charge Battery Electric Transit Bus In-Use Fleet Evaluation

The focus of this interim fleet evaluation is to characterize and evaluate the operating behavior of Foothill Transit's fast charge battery electric buses (BEBs). Future research will compare the BEBs' performance to conventional vehicles. In an effort to better understand the impacts of drive cycle characteristics on advanced vehicle technologies, researchers at the National Renewable Energy Laboratory analyzed over 148,000 km of in-use operational data, including driving and charging events. This analysis provides an unbiased evaluation of advanced vehicle technologies in real-world operation demonstrating the importance of understanding the effects of road grade and heating, ventilating and air conditioning requirements when deploying electric vehicles. The results of this analysis show that the Proterra BE35 demonstrated an operating energy efficiency of 1.34 kWh/km over the data reporting period.

33 ADVANCED PROPULSION SYSTEMS↗

Validating Simulated Models of Energy Consumption by a Battery Electric Motorcoach: A real-world deployment in a harsh climate.

Many efforts have been made to simulate energy consumption of battery electric buses (BEBs) to optimize their deployment into existing fleets. The models produced, however, are rarely validated against real-world consumption data, limiting their generalizability and widespread application to fleets around the US. Furthermore, a major concern specific to BEBs is the effects of harsh climates on their performance. We build upon the state-of-the-art energy consumption modeling techniques developed for BEBs and apply them to a unique geographic context and a unique electrified vehicle. This geography, climate, and vehicle further the existing understanding of the factors affecting medium- and heavy-duty electric vehicles (MHDEVs) by allowing for new relationships to be tested and by assessing the generalizability of known relationships to new contexts. We find that temperature is less predictive of energy consumption for the battery electric motorcoach (BEM) in the case study environment than it is for BEBs in other studies. A mitigating factor that we presume to be working on the relationship between temperature and energy consumption is the fact that the BEM route does not stop between origin and destination to exchange passengers, and in turn, conditioned cabin air. Our model also incorporates wind speed and direction relative to travel, which is a novel contribution of our methodology. Results from our study are helpful for transit service planners, fleet operators, and logistics firms for improving their ability to predict performance of potential deployments of MHDEVs into existing operations.

32 - ENERGY CONSERVATION, CONSUMPTION, AND UTILIZA↗

Foothill Transit Agency Battery Electric Bus Progress Report, Data Period Focus: Jan. 2018 through Jun. 2018

This report summarizes results of a battery electric bus (BEB) evaluation at Foothill Transit, located in the San Gabriel Valley area of Los Angeles. Foothill Transit is collaborating with the California Air Resources Board and the U.S. Department of Energy's National Renewable Energy Laboratory (NREL) to evaluate the buses in revenue service. The focus of this evaluation is to compare the performance and the operating costs of the BEBs to that of conventional technology buses and to track progress over time. Previous reports documented results from April 2014 through December 2017. This report extends the data analysis through June 2018. NREL plans to publish progress reports on the Foothill Transit fleet every six months through 2020. performance and the operating costs of the BEBs to that of conventional technology buses and to track progress over time. Previous reports documented results from April 2014 through December 2017. This report extends the data analysis through June 2018. NREL plans to publish progress reports on the Foothill Transit fleet every six months through 2020.

33 ADVANCED PROPULSION SYSTEMS↗

Zero-Emission Bus Evaluation Results: County Connection Battery Electric Buses

The U.S. Department of Transportation's (DOT's) Federal Transit Administration (FTA) supports the research, development, and demonstration of low- and zero-emission technology for transit buses. FTA funds research projects with a goal of facilitating commercialization of advanced technologies for transit buses that will increase efficiency and improve transit operations. DOT's Research, Development, and Technology Office (OST-R) also has an interest in zero-emission bus (ZEB) technology deployment and commercialization. OST-R is coordinating and collaborating with FTA on the evaluation process and results by providing funding to cover additional evaluations. FTA and OST-R are collaborating with the U.S. Department of Energy (DOE) and DOE's National Renewable Energy Laboratory (NREL) to conduct in-service evaluations of advanced technology buses developed under its programs. NREL uses a standard evaluation protocol for evaluating the advanced technologies deployed under the FTA programs. FTA seeks to provide results from new technologies being adopted by transit agencies. The eight evaluations selected to date include battery electric buses (BEBs) and fuel cell electric buses (FCEBs) from different manufacturers operating in fleets located in both cold and hot climates. The purpose of this report is to present the results from Central Contra Costa Transit Authority (County Connection) deployment of four BEBs in Concord, California. NREL's evaluation of the BEBs at County Connection was funded by OST-R.

33 ADVANCED PROPULSION SYSTEMS↗

Jamaica Urban Transit Company Drive-Cycle Analysis

NREL partnered with the Jamaica Urban Transit Company (JUTC) to investigate the suitability of implementing battery electric buses (BEB) on JUTC bus routes in the Kingston vicinity. In December 2017 NREL captured drive cycle data of select buses to define the utilization patterns of existing buses and to estimate which routes could be best suited for electrification based on (1) the ability of available BEB options to cover the route distance while allowing sufficient time to recharge, and (2) the route drive cycle statistics that would allow for the greatest energy efficiency gains from switching from a diesel bus to a BEB.

33 ADVANCED PROPULSION SYSTEMS↗

Battery Electric Bus Deployment Considerations in Developing Countries

Electrifying the transportation sector holds many promises and there are numerous strategies for doing so, including the deployment of battery electric buses (BEBs). BEBs can improve air quality (particularly in urban areas), may help curb greenhouse gas emissions, and can have positive impacts on public health and the quality of life for city inhabitants. This fact sheet steps through the six essential BEB considerations: 1) implementation planning, 2) technology selection, 3) economic impacts, 4) charging infrastructure, 5) operational, and 6) maintenance.

29 ENERGY PLANNING, POLICY, AND ECONOMY↗

Materials Data on Be3B3P6N3O25 by Materials Project

(BeB(PO4)2)6(N2)3O2 is quartz (alpha)-derived structured and crystallizes in the cubic P2_13 space group. The structure is three-dimensional and consists of twelve ammonia molecules, four water molecules, and one BeB(PO4)2 framework. In the BeB(PO4)2 framework, Be2+ is bonded to four O2- atoms to form BeO4 tetrahedra that share corners with four PO4 tetrahedra. There is two shorter (1.61 Å) and two longer (1.62 Å) Be–O bond length. B3+ is bonded to four O2- atoms to form BO4 tetrahedra that share corners with four PO4 tetrahedra. All B–O bond lengths are 1.47 Å. There are two inequivalent P5+ sites. In the first P5+ site, P5+ is bonded to four O2- atoms to form PO4 tetrahedra that share corners with two equivalent BeO4 tetrahedra and corners with two equivalent BO4 tetrahedra. There are a spread of P–O bond distances ranging from 1.52–1.56 Å. In the second P5+ site, P5+ is bonded to four O2- atoms to form PO4 tetrahedra that share corners with two equivalent BeO4 tetrahedra and corners with two equivalent BO4 tetrahedra. There are a spread of P–O bond distances ranging from 1.52–1.56 Å. There are eight inequivalent O2- sites. In the first O2- site, O2- is bonded in a distorted bent 150 degrees geometry to one B3+ and one P5+ atom. In the second O2- site, O2- is bonded in a bent 150 degrees geometry to one Be2+ and one P5+ atom. In the third O2- site, O2- is bonded in a distorted bent 150 degrees geometry to one B3+ and one P5+ atom. In the fourth O2- site, O2- is bonded in a bent 150 degrees geometry to one B3+ and one P5+ atom. In the fifth O2- site, O2- is bonded in a bent 150 degrees geometry to one Be2+ and one P5+ atom. In the sixth O2- site, O2- is bonded in a bent 150 degrees geometry to one Be2+ and one P5+ atom. In the seventh O2- site, O2- is bonded in a bent 150 degrees geometry to one B3+ and one P5+ atom. In the eighth O2- site, O2- is bonded in a bent 150 degrees geometry to one Be2+ and one P5+ atom.

36 MATERIALS SCIENCE↗

Foothill Transit Battery Electric Bus Demonstration Results

Foothill Transit is collaborating with the California Air Resources Board and the U.S. Department of Energy's (DOE's) National Renewable Energy Laboratory (NREL) to evaluate its fleet of Proterra battery electric buses (BEBs) in revenue service. The focus of this evaluation is to compare performance of the BEBs to that of conventional technology and to track progress over time toward meeting performance targets. This project has also provided an opportunity for DOE to conduct a detailed evaluation of the BEBs and charging infrastructure. This report provides data on the buses from April 2014 through July 2015. Data are provided on a selection of compressed natural gas buses as a baseline comparison.

30 DIRECT ENERGY CONVERSION↗

Financial Analysis of Battery Electric Transit Buses

A baseline bus fleet and battery electric bus investment scenario was developed based on the average or common parameters of existing battery electric bus (BEB) fleets. A discounted cashflow analysis was done that found the baseline fleet to have a net present value of $785,000 and simple payback of 3.3 years. The 33 main parameters were then swung ±50% to determine their relative influence on NPV and were ranked accordingly. Then parameter volatility was estimated by dividing the range of observed values by the baseline value. The parameters that are most influential and volatile were highlighted as the ones fleet managers should focus on when determining if BEBs are a good investment option for them. These top parameters are 1) BEB purchase price, 2) purchase price of foregone diesel bus, 3) grant amount, 4) maintenance costs of foregone diesel bus, 5) annual vehicle miles traveled.

25 ENERGY STORAGE↗

Zero-Emission Transit Bus Needs Assessment

The transition to zero-emissions vehicles (ZEVs) in public transit has gained traction due to significant federal investments from the Bipartisan Infrastructure Law (BIL) and the Inflation Reduction Act (IRA). This needs assessment, commissioned by the Joint Office of Energy and Transportation and conducted by researchers at the Idaho National Laboratory, explores the current state of electrification in transit agencies, identifying barriers to implementation, potential funding sources, and operational considerations necessary for a successful transition. The assessment involved qualitative interviews with representatives from 19 transit service providers across diverse geographic regions. Key findings highlight the challenges related to bus facilities and operations, which require careful planning for charging infrastructure and maintenance capabilities to accommodate battery electric buses (BEBs) and hydrogen fuel cell buses (HFCBs). Agencies reported operational hurdles due to the shorter range of BEBs compared to diesel buses, necessitating revised scheduling and routing strategies. Despite these challenges, many agencies expressed optimism about their capacity to adapt. Funding availability emerged as a critical factor influencing the transition to ZEVs. While agencies welcomed increased financial support, particularly from the Low or No Emission Grant Program (Lo-No), concerns about the sustainability of this funding and the ongoing operational costs were prevalent. The need for a comprehensive funding inventory was underscored to ensure transit agencies are aware of all available resources. Technological constraints were significant barriers to ZEV adoption. The limited range of BEBs was frequently cited as a concern, leading to operational challenges and reliability issues. Agencies reported difficulties in sourcing replacement parts, which exacerbated downtime and maintenance challenges. Workforce development and training were identified as pivotal for a successful transition. Many agencies rely heavily on manufacturers for technician training, highlighting the need for scalable training programs that equip staff with the necessary skills to maintain electric powertrains effectively. This assessment offers actionable recommendations for the Joint Office, including enhancing outreach to transit agencies, developing resources for effective utility partnerships, and facilitating comprehensive training programs. Establishing a zero-emission bus evaluation program to track performance metrics such as cost, range, and reliability could provide valuable insights for transit agencies. The needs assessment provides a detailed examination of the challenges and opportunities facing transit agencies in their transition to zero-emissions bus fleets. By addressing these issues through targeted support, stakeholders can collaboratively work towards a cleaner, more sustainable public transportation system that benefits all communities.

33 - ADVANCED PROPULSION SYSTEMS↗

In-Use Fleet Evaluation of Fast-Charge Battery Electric Transit Buses

With support from the U.S. Department of Energy's Vehicle Technologies Office, the National Renewable Energy Laboratory (NREL) conducts real-world performance evaluations of advanced medium- and heavy-duty fleet vehicles. Evaluation results can help vehicle manufacturers fine-tune their designs and assist fleet managers in selecting fuel-efficient, low-emission vehicles that meet their economic and operational goals. In 2015, NREL launched an in-service evaluation of 12 battery electric buses (BEBs) compared to conventional compressed natural gas (CNG) buses operated by Foothill Transit in West Covina, California. The study aims to improve understanding of the overall usage and effectiveness of fast-charge BEBs and associated charging infrastructure in transit operation. To date, NREL researchers have analyzed more than 148,000 km of in-use operational data, including driving and charging events. Foothill Transit purchased the BEBs with grant funding from the Federal Transit Administration's Transit Investments for Greenhouse Gas and Energy Reduction Program.

33 ADVANCED PROPULSION SYSTEMS↗

Foothill Transit Agency Battery Electric Bus Progress Report, Data Period Focus: Jan. 2017 through Dec. 2017

This report summarizes results of a battery electric bus (BEB) evaluation at Foothill Transit, located in the San Gabriel Valley area of Los Angeles. Foothill Transit is collaborating with the California Air Resources Board and the U.S. Department of Energy's National Renewable Energy Laboratory (NREL) to evaluate the buses in revenue service. The focus of this evaluation is to compare the performance and the operating costs of the BEBs to that of conventional technology buses and to track progress over time. Previous reports documented results from April 2014 through December 2016. This report extends the data analysis through December 2017. NREL plans to publish progress reports on the Foothill Transit fleet every six months through 2020.

33 ADVANCED PROPULSION SYSTEMS↗

Foothill Transit Agency Battery Electric Bus Progress Report, Data Period Focus: Jul. 2018 through Dec. 2018

This report summarizes results of a battery electric bus (BEB) evaluation at Foothill Transit, located in the San Gabriel Valley area of Los Angeles. Foothill Transit is collaborating with the California Air Resources Board and the U.S. Department of Energy's National Renewable Energy Laboratory (NREL) to evaluate the buses in revenue service. The focus of this evaluation is to compare the performance and the operating costs of the BEBs to that of conventional technology buses and to track progress over time. Previous reports documented results from April 2014 through June 2018. This report extends the data analysis through the end of 2018. The data period focus of this report is July 2018-December 2018. NREL plans to publish progress reports on the Foothill Transit fleet every 6 months through 2020.

33 ADVANCED PROPULSION SYSTEMS↗

Foothill Transit Agency Battery Electric Bus Progress Report, Data Period Focus: Jan. 2019 through Jun. 2019 [Slides]

This report summarizes results of a battery electric bus (BEB) evaluation at Foothill Transit, located in the San Gabriel Valley area of Los Angeles. Foothill Transit is collaborating with the California Air Resources Board and the U.S. Department of Energy's National Renewable Energy Laboratory (NREL) to evaluate the buses in revenue service. The focus of this evaluation is to compare the performance and the operating costs of the BEBs to that of conventional technology buses and to track progress over time. Previous reports documented results from April 2014 through December 2018. This report extends the data analysis through June 2019. The data period focus of this report is January 2019-June 2019. NREL plans to publish progress reports on the Foothill Transit fleet every 6 months through 2020.

33 ADVANCED PROPULSION SYSTEMS↗