Search NASA⌕ Search

SEARCH · Search NASA

Results for “CEBAF”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 37 records · Page 2

Optimization of the cavity heat load and trip rate for CEBAF

The Continuous Electron Beam Accelerator Facility at JLab has 200 RF cavities in the north linac and the south linac respectively after the 12 GeV upgrade. The purpose of this work is to simultaneously optimize the heat load and the trip rate for the cavities and to reconstruct the pareto-optimal front in a timely manner when some of the cavities are turned off. Various optimizers are investigated to find the one with the best efficiency on this specific problem. The derivative information of the heat load is used to effectively create the initial populations. With less than 20 cavities off, the pareto-optimal front can be reestablished within a minute.

Zhang, H.↗

Beam correction for multi-pass arcs in FFA@CEBAF: status update

This work examines the multi-pass steering of six electron beams in an FFA arc ranging from approximately 10.5 GeV to 22 GeV. Shown here is an algorithm based on singular value decomposition (SVD) to successfully steer all six beams through the arc given precise knowledge of all beam positions at each of one hundred and one diagnostic locations with one hundred individual corrector magnets: that is successive application of SVD to different 100 × 101 response matrices—one for each beam energy. Further, a machine learning scheme is developed which only requires knowledge of the energy-averaged beam position at each location to provide equivalent steering. Extension of this scheme to other beam optics quantities as well as transverse and longitudinal coupling is explored.

Accelerator Physics↗

CEBAF Injector for K Long Beam Conditions

The Continuous Electron Beam Accelerator Facility (CEBAF) at Jefferson Lab concurrently operates four experimental Halls with distinct bunch charge specifications and repetition rates. Numerous critical beam parameters within CEBAF are configured in the injector, some remaining unchanged throughout the accelerator. Consequently, the injector plays a crucial role in determining final beam characteristics, including bunch structure, beam sizes, bunch lengths, energy spread, and beam transmission. The Jefferson Lab KL experiment is scheduled to take place at CEBAF in Hall D, featuring a much lower bunch repetition rate of 7.80 MHz or 15.59 MHz, below the nominal values of 249.5 MHz or 499 MHz. Although the proposed average current of 5 ?A or 10 ?A is low compared to the maximum CEBAF cur- rent of approximately 180 ?A, the corresponding bunch charge is unusually high for CEBAF injector operation. This study focuses on the behavior of low-repetition-rate, high-bunch- charge (0.32 to 0.64 pC) beams in the CEBAF injector. We investigated the evolution and transmission of low-charge beams to space-charge dominated high-charge beams in the front end of the CEBAF injector for two configurations: the pre-existing CEBAF Phase 1 injector upgrade, operated at 130 kV, and the existing CEBAF Phase 2 injector upgrade, operated at 140 kV, 180 kV, and to be operated at 200 kV. The electron beam through the CEBAF injector is characterized using beam dynamics simulations and comparisons with the available measurements performed at 130 kV. Multi-objective genetic optimizations of the CEBAF injector were performed to determine the operating magnetic elements and RF settings for the evolution and transmission of low, moderate, and high charge beams in the CEBAF injector at 180 kV and 200 kV DC gun voltages. Subsequently, simulations at the same voltages were conducted to obtain the beam characteristics at the front end of the CEBAF injector. The laser spot size and laser pulse length at the cathode were varied to observe their effects on beam transmission in the injector at different voltages (130 kV, 180 kV, and 200 kV). Experimental studies at 130 kV, 140 kV, and 180 kV validate the simulations. Beam study measurements are carried out using EPICS tools, while optimizations and simulations are facilitated by General Particle Tracer. Based on the findings, optimal parameters for the upcoming Jefferson Lab KL experiment are proposed, utilizing a lower repetition rate and higher bunch charge

Pokharel, Sunil↗

Commissioning of the prototype C75 cavities in a CEBAF cryomodule

Prototype cavities have been built at Jefferson Lab to increase the energy of future refurbished CEBAF cryomodules to 75 MeV in the most cost efficient way. Three such cavities, named "C75", have been built from ingot Nb material of different purity and have been processed and tested. The two better performing cavities have been assembled into a "cavity pair" and installed in the latest refurbished original CEBAF cryomodule. The cryomodule was installed and commissioned in CEBAF. The results from the commissioning of the C75 cavities, compared with the original CEBAF cavities, are presented in this article. The vertical test performance of the C75 cavities was preserved in the cryomodule with one of the cavities achieving the performance specification of an accelerating gradient of 19 MV/m with a quality factor of ~8×109 at 2.07 K. The performance in terms of microphonics and tuner operation was similar to that of original CEBAF cavities, as expected, and the high-order modes are properly damped. The quality factor of the two C75 cavities was the highest achieved in a CEBAF cryomodule, possibly due to the better magnetic flux expulsion of ingot Nb than standard fine-grain Nb.

Drury, Michael A.↗

Large-Volume Resonant Microwave Discharge for Plasma Cleaning of a CEBAF 5-Cell SRF Cavity

We report the preliminary results on plasma generation in a 5-cell CEBAF superconducting radio-frequency (SRF) cavity for the application of cavity interior surface cleaning. CEBAF currently has {approx}300 of these five cell cavities installed in the Jefferson Lab accelerator which are mostly limited by cavity surface contamination. The development of an in-situ cavity surface cleaning method utilizing a resonant microwave discharge could lead to significant CEBAF accelerator performance improvement. This microwave discharge is currently being used for the development of a set of plasma cleaning procedures targeted to the removal of various organic, metal and metal oxide impurities. These contaminants are responsible for the increase of surface resistance and the reduction of RF performance in installed cavities. The CEBAF five cell cavity volume is {approx} 0.5 m2, which places the discharge in the category of large-volume plasmas. CEBAF cavity has a cylindrical symmetry, but its elliptical shape and transversal power coupling makes it an unusual plasma application, which requires special consideration of microwave breakdown. Our preliminary study includes microwave breakdown and optical spectroscopy, which was used to define the operating pressure range and the rate of removal of organic impurities.

43 PARTICLE ACCELERATORS↗

USING ER@CEBAF TO SHOW THAT A MULTIPASS ERL CAN DRIVE AN XFEL

A multi-pass recirculating superconducting CW linac offers a cost effective path to a multi-user facility with unprecedented scientific and industrial reach over a wide range of disciplines. We propose such a facility as an option for a potential UK-XFEL. Energy Recovery enables multi-MHz FEL sources, for example, an X-ray FEL oscillator or regenerative amplifier FEL. Additionally, combining with external lasers and/or self-interaction would provide access to MeV and GeV gamma-rays via inverse Compton scattering at high average power for nuclear and particle physics applications. An opportunity exists to demonstrate the necessary point-to-parallel longitudinal matches to drive an XFEL and successfully energy recover at the upcoming 5-pass up, 5-pass down Energy Recovery experiment on CEBAF at JLab termed ER@CEBAF. We show candidate matches and simulations supporting the minimal necessary modifications to CEBAF this will require. This includes linearisation of the longitudinal phase space in the injector and a reduction in the dispersion of the arcs, both of which increase the energy acceptance of CEBAF. We expect to commence initial tests of these adaptations on CEBAF during 2021.

Perez-Segurana, G.↗

Beam study on low dispersion CEBAF arcs

The Continuous Electron Beam Accelerator Facility (CEBAF) at Jefferson Lab employs recirculating linac SRF technology to generate a high polarization 12 GeV electron beam for nuclear physics users. New opportunities to study multipass energy recovery have also emerged with the proposal of a 5-pass energy recovery demonstration, ER@CEBAF. New beam optics with minimized beta functions have been developed and tested to avoid collective beam instabilities for multi-pass beams and meet the beam requirements of the nuclear physics community. To enable energy recovery for a common arc beam transport of five passes, achromatic and isochronous arc optics conditions were satisfied by re-designing the transverse optics of CEBAF. This paper focuses on beam studies conducted to study the newly-designed, low-dispersion, lowest energy arcs for CEBAF operations and ER@CEBAF.

Neththikumara, I.↗

SINGLE BUNCH TRACKING ON THE TEN-PASS ER@CEBAF ENERGY RECOVERY BEAMLINE

The proposed ten-pass energy recovery linac (ERL) demonstration (five accelerating, five decelerating) at the CEBAF accelerator, ER@CEBAF, involves a multi-GeV en- ergy range of a continuous electron beam. New CEBAF transverse optics were designed for this ERL demonstration. This redesign incorporates additional components in Arc A, including a path length chicane and new quadrupoles to ensure proper dispersion localization. The new five energy recovery passes with a shared arc transport scheme chal- lenge the overall beamline optics design, including large beta functions in the CEBAF spreaders and recombiners. Here we discuss results of bunch tracking performed using the elegant tracking code for the full ER@CEBAF beamline

Neththikumara, I.↗

22 GeV CEBAF with Novel Fixed Field Alternating Gradient Design

Extending the energy reach of CEBAF up to 22 GeV within the existing tunnel is being explored. Proposed energy upgrade can be achieved by increasing the number of recirculations, while using the existing CEBAF SRF cavity system. Presented scheme is based on an exciting new approach to acceleratie electrons efficiently with multiple passes in a single FFA beam line. Encouraged by recent success of the CBETA Test Accelerator, a proposal was formulated raise CEBAF energy by replacing the highest-energy arcs with Fixed Field Alternating Gradient (FFA) arcs. The new pair of arcs configured with FFA lattice would support simultaneous transport of additional 6 passes with energies spanning a factor of two, using the non-scaling FFA principle implemented with Halbach-derived permanent magnets - a novel magnet technology that significantly saves energy and lowers operating costs. One of the challenges of the multi-pass (11) linac optics is to provide uniform focusing in a vast range of energies, using fixed field lattice. Here, we propose a triplet lattice scaled up with increasing momentum along the linac. This would provide a stable periodic solution covering energy ratio of 1:33. The current CEBAF configured with a 123 MeV injector, makes optical matching in the first linac virtually impossible due to extremely high energy span ratio (1:175). Therefore, we envision replacement of the current injector with a 650 MeV 3-pass recirculating injector based on the existing LERF facility. Finally, the 22 GeV CEBAF would promise to deliver in 10-passes a beam with normalized emittance of 80 mm·mrad and with a relative energy spread of 1.5 × 10-3. Further recirculation beyond 22 GeV is limited by large, 974 MeV per electron, energy loss due to synchrotron radiation.

Bogacz, Slawomir↗

Magnetic Flux Generated by Thermal Current in CEBAF 5-Cell Cavity System

The unloaded quality factor Q0 of many 5-cell CEBAF cavities were lowered by a factor of ~2 from their vertical qualification testing to their beam operation in CEBAF tunnel. Causes of this Q0 degradation were studied previously, including a more recent one addressing static fluxes arising from magnetic components near a 5-cell cavity. This paper reports on a preliminary study of the dynamic fluxes generated by a thermal current. Such a thermal current arises from the Seebeck effect and flows in closed loops formed by a niobium cavity and its surrounding tuner rods and liquid helium vessel that are made of stainless-steel. The behaviors of magnetic fluxes in response to various thermal profiles on a 5-cell CEBAF cavity with integrated tuner rods were studied in a JLAB VTA dewar. An outcome of this study is a proposed cool-down procedure for eliminating the thermal current generated magnetic fluxes around 5-cell cavities placed in CEBAF tunnels. This procedure may be useful to improve cavity Q0 in a cost-effective manner, which in turn saves cryogenic expenditures for sustaining CEBAF operation.

Geng, Rongli↗

Pulsed Operation of CEBAF for JLEIC Injection

JLab Electron Ion Collider (JLEIC) is planning to use the recently upgraded 12 GeV CEBAF 1497 MHz SRF CW recirculating linac as a full-energy injector for the electron collider ring. The JLEIC electron injection requires 3-4µs long bunch trains with a 20-400ms spacing in between, resulting in uneven beam loading for the CW CEBAF. With the high beam current in JLEIC collider rings, the low duty factor of injection also requires to a very high pulsed beam current from CEBAF, exacerbating the transient beam loading issue. In this paper, we will present CEBAFs detailed pulsed operation scheme for JLEIC injection, as well as some experimental results at CEBAF.

Guo, J.↗

UPGRADING THE CEBAF INJECTOR WITH A NEW BOOSTER, HIGHER VOLTAGE GUN, AND HIGHER FINAL ENERGY

The Continuous Electron Beam Accelerator Facility (CEBAF) accelerator at Jefferson Lab will be upgraded from 6 GeV to 12 GeV in the next few years. To meet the requirement of the new machine and to take the opportunity to improve the beam quality, the CEBAF injector will be upgraded with a higher voltage gun, a new booster, and a new accelerating RF module. The CEBAF injector creates and accelerates three beams at different currents simultaneously. The beams are interleaved, each at one third of the RF frequency, traveling through the same beam line. The higher voltage gun will lower the space charge effects. The new booster with optimized beam dynamics will complete the bunching process and provide initial acceleration matched to the new gun voltage. Using our latest SRF design, the new booster has significantly lower x/y coupling effects that should improve our beam setup and operation for the highly sensitive parity experiments scheduled for the CEBAF's future. Finally, the new accelerating RF module will roughly double the injector final energy to match the rest of the 12 GeV accelerator. In this paper we will provide more detail about this upgrade.

43 PARTICLE ACCELERATORS↗

Commissioning of the 123 MeV injector for 12 GeV CEBAF

The upgrade of CEBAF to 12GeV included modifications to the injector portion of the accelerator. These changes included the doubling of the injection energy and relocation of the final transport elements to accommodate changes in the CEBAF recirculation arcs. This paper will describe the design changes and the modelling of the new 12GeV CEBAF injector. Stray magnetic fields have been a known issue for the 6 GeV CEBAF injector, the results of modelling the new 12GeV injector and the resulting changes implemented to mitigate this issue are described in this paper. The results of beam commissioning of the injector are also presented.

43 PARTICLE ACCELERATORS↗

TRANSFER LEARNING FOR FIELD EMISSION MITIGATION IN CEBAF SRF CAVITIES

The Continuous Electron Beam Accelerator Facility (CEBAF) at Jefferson Lab operates hundreds of super-conducting radio frequency (SRF) cavities in its two linear accelerators (linacs). Field emission (FE) is an ongoing operational challenge in higher gradient SRF cavities. FE generates high levels of neutron and gamma radiation leading to damaged accelerator hardware and a radiation hazard environment. During machine development periods, we performed gradient scans to record data capturing the relationship between cavity gradients and radiation levels measured throughout the linacs. However, the field emission environment at CEBAF varies considerably over time as the configuration of the radio frequency (RF) gradients changes and due to the changing behaviour of field emitters. An artificial intelligence/machine learning (AI/ML) approach with transfer learning could be a valuable tool to mitigate FE and lower the radiation levels. In this work, we mainly focus on leveraging the RF trip data gathered during CEBAF operations. We develop a transfer learning-based surrogate model for radiation detector readings given RF cavity gradients to track the CEBAF?s changing configuration and environment. Then, we could use the developed model as an optimization process for redistributing the RF gradients within a linac to minimize radiation levels.

Ahammed, K.↗

Identifying Downtime Sources in CEBAF SRF Linac Systems for Improving Its Reliability

In this work, we will present some recent analysis of the reliability statistics of the CEBAF SRF linac systems. Based on the data collected by the existing Down Time Manager (DTM), the year-to-year downtime evolution trend of linac zones over the six-year period from FY18 to FY23 is established. An in-depth downtime analysis at a resolution beyond the linac zone level was carried out by introducing a new system hierarchy, consisting of the SRF linac sub-systems and components. This new paradigm was implemented in a pilot downtime study over the two-month period of CEBAF operation from 9/13/23 to 11/13/23, enabling localization of the responsible sub-systems (SRF, HPRF, LLRF, Beamline vacuum, Cryogenics, etc.) and hardware components (cavity, tuner, RF coupler, etc.) in the CEBAF SRF linac systems. Pinpointing downtime sources over long operation periods at the sub-systems and component levels holds the key to improving the CEBAF SRF systems reliability. It also helps identify areas of SRF technology development needed by future high-power high-reliability CW SRF linacs.

Hryhorenko, Oleksandr↗

TRANSFER LEARNING FOR FIELD EMISSION MITIGATION IN CEBAF SRF CAVITIES

The Continuous Electron Beam Accelerator Facility (CEBAF) at Jefferson Lab operates hundreds of super-conducting radio frequency (SRF) cavities in its two linear accelerators (linacs). Field emission (FE) is an ongoing operational challenge in higher gradient SRF cavities. FE generates high levels of neutron and gamma radiation leading to damaged accelerator hardware and a radiation hazard environment. During machine development periods, we performed gradient scans to record data capturing the relationship between cavity gradients and radiation levels measured throughout the linacs. However, the field emission environment at CEBAF varies considerably over time as the configuration of the radio frequency (RF) gradients changes and due to the changing behaviour of field emitters. An artificial intelligence/machine learning (AI/ML) approach with transfer learning could be a valuable tool to mitigate FE and lower the radiation levels. In this work, we mainly focus on leveraging the RF trip data gathered during CEBAF operations. We develop a transfer learning-based surrogate model for radiation detector readings given RF cavity gradients to track the CEBAF?s changing configuration and environment. Then, we could use the developed model as an optimization process for redistributing the RF gradients within a linac to minimize radiation levels.

Ahammed, K.↗

AI-Ready Semantic Infrastructure for CEBAF: From CED to PALS Knowledge Graphs

JLab and PNNL are jointly developing an AI-ready data ecosystem that exposes the Continuous Electron Beam Acceleration Facility’s (CEBAF’s) operational configuration, lattice description, and control-system channels to agentic optimization frameworks through a standards-based semantic layer. The effort integrates the existing facility-specific CEBAF Element Database (CED) with extensions of the emerging facility-agnostic Particle Accelerator Lattice Standard (PALS) to produce a knowledge graph (KG) containing coherent, machine-interpretable views of devices, signals, and regions. With this KG, CEBAF’s setpoints, readbacks, and device hierarchies become queryable using a uniform declarative graph query language (e.g., Neo4j Cypher), providing intents and inspectable semantics suitable for agentic control. The resulting graph-backed interfaces will allow autonomous agents to retrieve authoritative machine configurations, reason over device- and signal-level relationships, and execute tuning and diagnostic workflows without bespoke CEBAF-specific logic, thereby delivering a scalable pathway from operational data to trustworthy agentic accelerator tuning frameworks.

Zhang, He [Thomas Jefferson National Accelerator F↗