Search NASA⌕ Search

SEARCH · Search NASA

Results for “CEBAF”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 19 records

Electron Spin Precession at CEBAF

The nuclear physics experiments at the Thomas Jefferson National Accelerator Facility often require longitudinally polarized electrons to be simultaneously delivered to three experimental halls. The degree of longitudinal polarization to each hall varies as function of the accelerator settings, making it challenging in certain situations to deliver a high degree of longitudinal polarization to all the halls simultaneously. Normally, the degree of longitudinal polarization the halls receive is optimized by changing the initial spin direction at the beginning of the machine with a Wien filter. Herein, it is shown that it is possible to further improve the degree of longitudinal polarization for multiple experimental halls by redistributing the energy gain of the CEBAF linacs while keeping the total energy gain fixed.

43 PARTICLE ACCELERATORS↗

The CEBAF e{sup +} Footprint

The Continuous Electron Beam Accelerator Facility (CEBAF) at the Jefferson Laboratory (JLAB) is capable of accelerating e{sup -} to 6 GeV in energy. Presently CEBAF is being upgraded to a maximum energy of 12 GeV. In addition to e{sup -} scattering, the user community has expressed interest in performing e{sup +} scattering experiments with the upgraded CEBAF accelerator. This paper describes the existing and planned CEBAF accelerator complex, possible e{sup +} production locations and the expected e{sup +} beam qualities. Possibilities for production of e{sup +} at the JLAB free electron laser (FEL) is also briefly described.

43 PARTICLE ACCELERATORS↗

Admittance Test and Conceptual Study of a CW Positron Source for CEBAF

A conceptual study of a Continuous Wave (CW) positron production is presented in this paper. The Continuous Electron Beam Accelerator Facility (CEBAF) at Jefferson Lab (JLAB) operates with a CW electron beam with a well-defined emittance, time structure and energy spread. Positrons created via bremsstrahlung photons in a high-Z target emerge with a large emittance compared to incoming electron beam. An admittance study has been performed at CEBAF to estimate the maximum beam phase space area that can be transported in the LINAC and in the Arcs. A positron source is described utilizing the CEBAF injector electron beam, and directly injecting the positrons into the CEBAF LINAC.

43 PARTICLE ACCELERATORS↗

JEFFERSON LAB 12 GEV CEBAF UPGRADE

The existing continuous electron beam accelerator facility (CEBAF) at Thomas Jefferson National Accelerator Facility (TJNAF) is a 5-pass, recirculating cw electron Linac operating at approx6 GeV and is devoted to basic research in nuclear physics. The 12 GeV CEBAF Upgrade is a $310 M project, sponsored by the Department of Energy (DOE) Office of Nuclear Physics, that will expand its research capabilities substantially by doubling the maximum energy and adding major new experimental apparatus. The project received construction approval in September 2008 and has started the major procurement process. The cryogenic aspects of the 12 GeV CEBAF Upgrade includes: doubling the accelerating voltages of the Linacs by adding ten new high-performance, superconducting radiofrequency (SRF) cryomodules (CMs) to the existing 42 1/4 cryomodules; doubling of the 2 K cryogenics plant; and the addition of eight superconducting magnets.

43 PARTICLE ACCELERATORS↗

ER@CEBAF: A test of 5-pass energy recovery at CEBAF

Jefferson Lab personnel have broad expertise in the design, commissioning, and operation of multiple energy recovery linacs (ERLs): the CEBAF Front-End Test (early 1990s), CEBAF-ER (2003), the IR Free Electron Laser (FEL) Demo, the IR FEL Upgrade, and the UV FEL Driver (1997-2014). Continued development of this core competency has led to this collaborative proposal to explore the forefronts of ERL technology at high energy in a unique expansion of CEBAF capability to a 5-pass ERL with negligible switchover time and programmatic impact to the CEBAF physics program. Such a capability would enable world-class studies of open issues in high-energy ERL beam dynamics that are relevant to future facilities such as electron-ion colliders (EICs). This proposal requests support from the CEBAF Program Advisory Committee to seek funding for hardware installation, and a prospective 12 days of beam time circa Fall 2018 for commissioning this high-energy multi-pass ERL experiment in CEBAF.

43 PARTICLE ACCELERATORS↗

Beam Performance of the Positron Transport Line for CEBAF Positron Upgrade

The Low Energy Recirculator Facility (LERF) at Jefferson Lab, formerly operated for the Free-Electron Laser program, has been proposed as the injector complex for the planned 12 GeV CEBAF positron upgrade (Ce+BAF), with an additional pathway to support a potential 22 GeV CEBAF electron upgrade. In this configuration, LERF would generate and pre-accelerate positrons to 123 MeV, matching the present injection energy into the North Linac. Due to the relatively large emittance expected from the positron source, a comprehensive acceptance study has been performed from LERF through the CEBAF recirculating linacs and beam transport lines to the experimental halls. The objective is to establish the positron phase-space acceptance and provide design feedback to the positron production and capture systems. Furthermore, given CEBAF’s capability to deliver highly polarized beams, spin-tracking simulations have been carried out including magnet imperfections, alignment errors, and synchrotron-radiation–induced energy spread. Particular attention is given to the evolution of the spin tune and the corresponding depolarization mechanisms along the beam delivery path, especially for providing longitudinal polarization at the experimental halls. These results inform injector design choices and assess the overall feasibility of delivering high-polarization positron beams in CEBAF.

Ogur, S. [Thomas Jefferson National Accelerator Fa↗

Optics Studies for Multipass Energy Recovery at CEBAF: ER@CEBAF

Energy recovery linacs (ERLs), focus on recycling the kinetic energy of electron beam for the purpose of accelerating a newly injected beam within the same accelerating structure. The rising developments in the super conducting radio frequency technology, ERL technology has achieved several noteworthy milestones over the past few decades. In year 2003, Jefferson Lab has successfully demonstrated a single pass energy recovery at the CEBAF accelerator. Furthermore, they conducted successful experiments with IR-FEL demo and upgrades, as well as the UV FEL driver. This multi-pass, multi-GeV range energy recovery demonstration proposed to be carried out at CEBAF accelerator at Jefferson Lab focuses on demonstrating highest energy recovery in super conducting linac in the low-current range. Continuous electron beam accelerate up to 7.5 GeV within 5-passes and decelerate in the next 5-passes recovering RF energy and dumps at a low energy dump. The beamline optics design for recirculating linacs require special attention to avoid beam instabilities due to RF wakefields. Usually, multi-pass linac beam lines require stronger focusing at lower energies as that is necessary to avoid beam breakup (BBU) instabilities, even with this small beam current. The CEBAF linac optics optimization is focused on balancing over-focusing at higher energies and beta excursions at lower energies. The race-track-shaped geometry of CEBAF accelerator allows its linacs to accommodate multiple energy beams simultaneously, while individual recirculating arcs transporting one beam energy, are shared between accelerating/decelerating beams. For the linac optics optimization process, an extended strategy is used that is originally used in 6-pass Recirculating Linac design of the LHeC, to represent the ten passes through a single linac. Using proper mathematical expressions, linac optics optimization can be achieved with evolutionary genetic algorithms, with Multi-Objective optimization. This thesis introduces a CEBAF optics redesign tailored to accommodates the ER@CEBAF multi-pass ER scheme. The isochronous arcs were retuned to match into optics solutions for optimized 10-pass linacs. Within this work, a single bunch particle tracking analysis presented here focuses on the further improvements of the beamline and beam transportation.

Neththikumara, Isurumali↗

CONCEPT OF A POLARIZED POSITRON SOURCE FOR CEBAF

Positron beams would provide new and meaningful probes for the experimental program at the Thomas Jefferson National Accelerator Facility (JLab), including but not limited to future hadronic physics and dark matter experiments. Critical requirements involve generating positron beams with a high degree of spin polarization, sufficient intensity and a continuous-wave (CW) bunch train compatible with acceleration to 12 GeV at the Continuous Electron Beam Accelerator Facility (CEBAF). To address these requirements, a polarized positron injector based upon the bremsstrahlung of an intense CW spin polarized electron beam is considered*. First a polarized electron beam line provides >1 mA of polarized electrons at ~120 MeV to a high-power target for positron production. Next, a second beam line collects, shapes and aligns the spin of positrons for users. Finally, the positron beam is matched into the CEBAF acceptance for acceleration and transport to the end stations with energies up to 12 GeV. An optimized layout to provide positrons beams with intensity >100 nA (polarized) or intensity >3 µA (unpolarized) will be discussed in this poster.

Habet, S. H.↗

SRF cavity instability detection with machine learning at CEBAF

During the operation of the Continuous Electron Beam Accelerator Facility (CEBAF), one or more unstable superconducting radio-frequency (SRF) cavities often cause beam loss trips while the unstable cavities themselves do not necessarily trip off. The present RF controls for the legacy cavities report at only 1 Hz, which is too slow to detectfast transient instabilities during these trip events. These challenges make the identification of an unstable cavity out of the hundreds installed at CEBAF a difficult and time-consuming task. To tackle these issues, a fast data acquisition system (DAQ) for the legacy SRF cavities has been developed, which records the sample at 5 kHz. An unsupervised learning framework has been developed to identify anomalous SRF cavity behavior. We will discuss the present status of the DAQ system and our framework, along with recent successes in detecting anomalous cavity behavior. Overall, our method offers a practical solution for identifying unstable SRF cavities, contributing to increased beam availability and machine reliability.

Accelerator Physics↗

Status of permanent magnet radiation resiliency studies at CEBAF

An ongoing investigation for the future of Jefferson Lab’s Continuous Electron Beam Accelerator Facility (CEBAF) lies in upgrading its maximum nominal energy using Fixed-Field Alternating-gradient (FFA) technology for its recirculating arcs, using permanent magnets for the FFA arcs. A common concern among the community is the degradation of these permanent magnets during operation due to the radiation environment in which they will be present. This work, funded by a Laboratory Directed R&D grant, aims to measure the permanent magnet degradation in the CEBAF tunnel enclosure, and extrapolate to the energies expected from the upgrade. We present the latest results of this study, as well as plans moving forward.

Accelerator Physics↗

A Polarized Positron Source for CEBAF

A compact polarized positron source for Jefferson Lab is discussed. This scheme relies upon a high polarization (85%), high current (1 mA), low-energy (<100 MeV) electron beam to generate polarized positrons in a conversion target via polarized bremsstrahlung and pair creation. GEANT4 is used to simulate source distributions suitable for a CEBAF-like injector with positron polarization approx60% and nano-Ampere intensity. An experiment to test this scheme is outlined.

43 PARTICLE ACCELERATORS↗

Upgrade of CEBAF from 6 Gev To 12 Gev: Status

The CEBAF accelerator is being upgraded from 6 GeV to 12 GeV by the US Department of Energy. The accelerator upgrade is being done within the existing tunnel footprint. The accelerator upgrade includes: 10 new srfbased high-performance cryomodules plus RF systems, doubling the 2K helium plant's capability, upgrading the existing beamlines to operate at nearly double the original performance envelope, and adding a beamline to a new experimental area. Construction is over 75% complete with final completion projected for late FY13. Details of the upgrade and status of the work will be presented.

43 PARTICLE ACCELERATORS↗

Nucleon Form Factors experiments with 12 GeV CEBAF

A number of precision form factor experiments at high momentum transfer will be performed with the 11 GeV electron beam of CEBAF. We review the approved proposals and the conceptual schemes of several new suggestions. Form factor data will serve as a major input for the construction of a tomographic image of the nucleon.

72 PHYSICS OF ELEMENTARY PARTICLES AND FIELDS↗

Forward Drift Chamber for the GlueX Experiment at the 12 GeV CEBAF Machine

The GlueX experiment will search for exotic mesons produced by 9 GeV linearly polarized photons from the upgraded CEBAF machine. It is critical to detect and measure the four-momenta of all the charged particles and photons resulting from the decays of the mesons. The solenoid-based detector system includes tracking detectors and calorimeters. The Forward Drift Chamber, FDC, consists of 24 circular planar drift chambers of 1m diameter. Additional cathode readout is required to achieve efficient pattern recognition. The detection of photons by the electromagnetic calorimeters imposes constraints on the amount of material used in the FDC. The specific features of the detector and the readout electronics will be described. Results from the tests of the full scale prototype will be presented, as well.

72 PHYSICS OF ELEMENTARY PARTICLES AND FIELDS↗

Status of 22 GeV CEBAF Upgrade Using FFA Arcs

Jefferson Lab is exploring an upgrade to extend CEBAF’s energy to ~22 GeV within the existing tunnel by incorporating Fixed-Field Alternating-Gradient (FFA) arcs. In this scheme, the two lowest-energy electromagnetic arcs are removed, the remaining arcs are reassigned to lower energies, and a new pair of high-energy FFA arcs enables six additional recirculations using the existing SRF linacs. The non-scaling FFA lattice employs Halbach-derived permanent magnets with provisions for dipole, quadrupole, and higher-order components, offering large momentum acceptance and reduced operating cost. Implementing this concept requires updated linac optics, modifications to the remaining arcs, and a redesigned electromagnetic switchyard. Ongoing beam-dynamics studies address synchrotron-radiation–induced energy loss and emittance growth, along with strategies for their mitigation.

Ogur, S. [Thomas Jefferson National Accelerator Fa↗

Design progress for the 22 GeV CEBAF energy upgrade

In this work we examine the progress made in the design of the proposed FFA upgrade to the Continuous Electron Beam Accelerator Facility (CEBAF). This proposed upgrade will double the number of passes through the two linacs by replacing the two highest energy arcs with new Fixed Field Alternating Gradient (FFA) arcs, roughly doubling the energy. These FFA arcs will use permanent magnets in a Halbach configuration to shape their fields. The design involves new optics for the linacs and remaining electromagnetic arcs, as well as new electromagnetic separators. These feed into the permanent magnet FFA arcs. We also report on ongoing studies of the dynamics of the beams, and an experiment to measure the effects of radiation on the permanent magnets.

Accelerator Physics↗

Permanent Magnets for the CEBAF 24GeV Upgrade

An upgrade of the CEBAF facility to double its present energy of 12GeV has been proposed. To provide double the number of linac passes using the existing five stacked arc beamlines, some beamlines are replaced by fixed-field accelerator (FFA) arcs, allowing multiple energies to pass through the same magnets. A solution is presented in which two of the existing electromagnetic beamlines are replaced with permanent magnet non-scaling FFA arcs, as demonstrated at CBETA. The two-stage design reduces peak magnetic field and synchrotron radiation loss compared to using a single stage. FFAs do not pulse their magnets, making permanent magnets a promising and power-efficient technology option. However, the magnetic field requirements are still at the high end of accelerator permanent magnets produced thus far (1.6T peak on beam), while the magnets must also be combined-function, having a gradient with a dipole offset. Designs using a novel oval aperture and open midplane within an adapted Halbach magnet are presented.

Brooks, S. J.↗

Study of Few-Nucleon Systems with the CEBAF Large Acceptance Spectrometer

The study of few-nucleon systems at intermediate energies is an important aspect of the nuclear-physics program carried out by the CLAS Collaboration at Jefferson Laboratory. Our investigations aim at understanding the nuclear dynamics at short distances, the transition from hadronic to partonic description of nuclei, and how nuclei can be described in the framework of Quantum Chromodynamics. Our data on photodisintegration of {sup 3}He and {sup 4}He at beam energies from 0.3 GeV to 1.5 GeV strongly favor theoretical calculations that include three-body mechanisms and indicate significant contributions of these mechanisms at large momentum transfer, especially in the range of photon energies from 0.6 GeV to 0.8 GeV. Our investigations of exclusive and inclusive electron scattering off nuclear targets have yielded the determination of the ratio of pp to pn correlated pairs in {sup 3}He and of the probabilities of short-range correlations in nuclei. We have studied the transition from hadronic to partonic dynamics in nuclear processes by searching for the onset of scaling of the invariant cross sections of photoinduced reactions on few-nucleon systems. Our data are consistent with scaling at momentum transfer as low as 1 (GeV/c){sup 2}.

72 PHYSICS OF ELEMENTARY PARTICLES AND FIELDS↗