Search NASA⌕ Search

SEARCH · Search NASA

Results for “Control Room Modernization”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 37 records · Page 2

Design Philosophy for Accelerator Control Rooms

This report describes the foundational human factors principles needed to design user interfaces for accelerator control rooms. These principles are presented as recommendations for accelerator control system interface design and are illustrated with examples drawn from accelerator operations at Fermi National Accelerator Laboratory (Fermilab). These high-level principles are intended to serve as design objectives that apply generally across all control system interfaces developed for the accelerator complex. This design philosophy document is a high-level roadmap to approach the general interface design for the accelerator complex. This philosophy applies state-of-the-art human factors principles and evidence-based design standards to an accelerator environment, which will transform the next era of accelerator interfaces as outlined by the Accelerator Controls Operations Research Network (ACORN) Project. Further work will include mapping the general design principles included in this report to more specific guidance in the form of a user interface style guide.

43 PARTICLE ACCELERATORS↗

Scale Model Icing Research Tunnel

NASA Lewis Research Center's Icing Research Tunnel (IRT) is the world's largest refrigerated wind tunnel and one of only three icing wind tunnel facilities in the United States. The IRT was constructed in the 1940's and has been operated continually since it was built. In this facility, natural icing conditions are duplicated to test the effects of inflight icing on actual aircraft components as well as on models of airplanes and helicopters. IRT tests have been used successfully to reduce flight test hours for the certification of ice-detection instrumentation and ice protection systems. To ensure that the IRT will remain the world's premier icing facility well into the next century, Lewis is making some renovations and is planning others. These improvements include modernizing the control room, replacing the fan blades with new ones to increase the test section maximum velocity to 430 mph, installing new spray bars to increase the size and uniformity of the artificial icing cloud, and replacing the facility heat exchanger. Most of the improvements will have a first-order effect on the IRT's airflow quality. To help us understand these effects and evaluate potential improvements to the flow characteristics of the IRT, we built a modular 1/10th-scale aerodynamic model of the facility. This closed-loop scale-model pilot tunnel was fabricated onsite in the various shops of Lewis' Fabrication Support Division. The tunnel's rectangular sections are composed of acrylic walls supported by an aluminum angle framework. Its turning vanes are made of tubing machined to the contour of the IRT turning vanes. The fan leg of the tunnel, which transitions from rectangular to circular and back to rectangular cross sections, is fabricated of fiberglass sections. The contraction section of the tunnel is constructed from sheet aluminum. A 12-bladed aluminum fan is coupled to a turbine powered by high-pressure air capable of driving the maximum test section velocity to 550 ft/sec (Mach 0.45). The air turbine and instrumentation are housed inside a fiberglass nacelle. Total and static pressure measurements can be taken around the loop, and velocity and flow angularity measurements can be taken with hot-wire and five-hole probes at specific locations. The Scale Model Icing Research Tunnel (SMIRT) is undergoing checkout tests to determine how its airflow characteristics compare with the IRT. Near-term uses for this scale-model tunnel include determining the aerodynamic effects of replacing the 52-yearold W-shaped heat exchanger with a flat-faced heat exchanger. SMIRT is an integral part of the improvements planned for the IRT because testing the proposed IRT improvements in a scale-model tunnel will lower costs and improve productivity.

Canacci, Victor A.↗

DEMONSTRATION OF A MULTI-STAGE TESTING AND EVALUATION APPROACH FOR A SAFETY-RELATED DIGITAL UPGRADE AT A NUCLEAR POWER PLANT

There is an imminent need for existing United States nuclear power plants to reduce their operating and maintenance costs to remain economically viable. Digital technology provides significant opportunity for the existing nuclear power plant fleet to transform that way in which work is accomplished to reduce costs and allow the fleet to remain economically competitive. However, a careful understanding of the human-technology integration is needed to ensure the continued safe and reliable operation of these existing plants with new digital capabilities. This work presents interim findings in applying human factors engineering to a safety-significant digital upgrade for a United States nuclear power plant, following the new Alternative Review Process in the recently revised Digital Instrumentation and Control Interim Staff Guidance Licensing Process, Revision 2. The interim results described in this work provides an industry perspective, based on ongoing work, to recent work published from Vazquez, Green, and Desaulniers (2022).

99 GENERAL AND MISCELLANEOUS↗

Bridging the Gap Between Modern UX Design and Particle Accelerator Control Room Interfaces

Accelerator control systems often represent relatively complex and safety-sensitive human-machine interfaces within process control industries. These systems are technically robust and reflect the cumulative integration of solutions built and adapted across decades. One of the regular, unfortunate casualties of provisional accelerator control system updates is their human-system interfaces (HSIs) which often lag behind modern usability and design standards. An additional challenge is that although there is a multitude of established human factors (HF), and user experience (UX) principles for everyday digital applications, there are very few (if any) established principles for complex and safety-critical applications for an accelerator. This paper argues for the importance of established HF and UX principles (herein referred to as human-centered design principles) into the development of accelerator HSIs, emphasizing the need for clarity, consistency, responsiveness, and cognitive accessibility. Drawing from HF/UX best practices and human-centered design, this paper discusses how these approaches can enhance operator performance, reduce human error, and improve accelerator personnel collaboration. Case studies from Accelerator Control Operations Research Network (ACORN) at Fermilab are explored to demonstrate how interfaces built with human-centered design principles can scale with system complexity while remaining intuitive and efficient for diverse user roles including operators, machine experts, and engineers. By bridging the gap between traditional control system design and modern human-centered design methods, this paper provides a roadmap for evolving accelerator HSIs into more usable, maintainable, and effective tools.

Hill, Rachael [Idaho Natl. Lab.]↗

Using Qualified On-Site Nuclear Power Plant Simulators in Human Factors Validations of Control Room Upgrades

Existing commercial nuclear power plants (NPPs) are valuable assets in the infrastructure portfolio of the United States (U.S.) because they safely and reliably generate about 1/5th of all the electricity used. The instrumentation and control (I&C) systems in commercial NPPs are the ‘eyes and ears' of the operator, allowing operators to maintain situation awareness, thereby allowing the plant to operate safely and efficiently for all phases of operation. Because the I&C systems in NPPs are still mostly based on analog technologies, which are reliable but not especially cost-effective, upgrading the existing I&C in com-mercial NPPs to new digital I&C is very important. Furthermore, simulators and simulation are critical human factors engineering tools for this I&C modernization work. NPP control room simulators are essential test beds to simulate normal, abnormal, and emergency operations that allow human factors researchers to safely and realistically evaluate early design phase prototypes of the upgraded digital I&C, and validate final as-built digital I&C systems that have been modernized deployed in NPPs. This paper describes research performed using qualified on-site NPP simulators to perform human factors validations of digital I&C control room upgrades.

99 GENERAL AND MISCELLANEOUS↗

Report for 2.2.1 Task 5: Develop and Document a State-Based Alarm System for a Nuclear Power Plant Control Room Using Machine Learning

Idaho National Laboratory (INL) has contracted IFE to support human factors research and the development of leading-edge technology to support control room operators as the U.S. fleet undergoes modernization and digitalization in legacy plants and control rooms. As the nuclear industry starts to shift to more digital controls and systems, these upgrades provide more information to the main control room in the form of digital signals and values. Also, an increase in the number of alarms points is provided by the vendors. New digital control rooms shift from main control boards to soft controls, and alarm panels to a single display. This change to a single display has created a problem of alarm waterfall, a situation in which the addition of new alarm points causes an overload of information to the operator during either a plant disturbance or other than normal full power operations. IFE’s goal is to find a workable solution to assist operators in both handling and understanding incoming alarms during emergency situations under these waterfall conditions.

99 GENERAL AND MISCELLANEOUS↗

Safety-Related Instrumentation and Control Pilot Upgrade: Initial Scoping Phase Implementation and Lessons Learned

In May 2016, the U.S. Nuclear Regulatory Commission (NRC) staff provided a digital instrumentation and control (I&C) regulatory infrastructure integrated action plan to the NRC for approval. One of the objectives of that plan was to establish a clear regulatory structure with reduced regulatory uncertainty to enable the expanded safe use of digital I&C in commercial nuclear reactors while continuing to ensure safety and security. To achieve this end, the NRC, with collaboration from industry, developed a streamlined License Amendment Request Alternate Review (AR) process for safety-related (SR) digital I&C upgrades. In spite of this effort, the industry has remained reluctant to perform such I&C upgrades because of perceived regulatory and financial risks associated with being the first or an early adopter of the AR process for SR I&C upgrades. The U.S. Department of Energy Light Water Reactor Sustainability Program at the Idaho National Laboratory performed Initial Scoping Phase research to help break this impasse by supporting a SR I&C Pilot Upgrade, working with MPR Associates, ScottMadden Inc., and Exelon Generation. Exelon’s Limerick Generating Station (LGS) was selected as the target for this research. This paper summarizes the Initial Scoping Phase engineering and operations, licensing, and project management activities necessary to bound the scope, schedule, and estimated cost of the project sufficiently to enable utility management authorization of Conceptual Design Phase activities. These efforts and associated products are intended to provide a template to support larger industry efforts to perform similar upgrades as a foundation stone for a digital transformation that will improve plant safety, reliability, and operational performance while lowering plant total cost of ownership. As a result of the combined effort of Exelon Generation and research participants, Conceptual Design Phase activities for the subject upgrade at LGS were approved by Exelon. Further, the U.S. Department of Energy also awarded a $50 million cost share award to Exelon in order to pave the way for SR I&C modernization and associated control room upgrades across the U.S. nuclear fleet. Additional research reports are planned for the Conceptual Design Phase, Detailed Design Phase, and the Implementation Phase of the LGS project to document the process followed and promulgate lessons learned to industry.

22 GENERAL STUDIES OF NUCLEAR REACTORS↗

An Overview of Renewable Energy Desk Activities for Power Grid Operations and Planning

This document summarizes how grid operators can address gaps in their planning and operations to maintain reliability as they pursue clean energy goals. When transitioning to higher renewable energy levels, many system operators configure a dedicated renewable energy desk to manage variable renewable energy resource operation. Establishing such a desk in the control room can be a key step in the modernization effort. A renewable energy desk in a control room is a specialized hub focused solely on monitoring, predicting, and managing the influx of energy from renewable sources.

ENERGY PLANNING, POLICY, AND ECONOMY,POWER TRANSMI↗

Human Factors Design for Particle Accelerator Control Room Interfaces

Fermilab, the birthplace of many scientific discoveries in physics and particle accelerator sciences, is in the midst of a widescale modernization effort. The Accelerator Control Operations Research Network (ACORN project’s goal is to modernize the accelerator control system by replacing end-of-life power supplies and enhance future operations of the Fermilab accelerator complex with megawatt particle beams. Within ACORN, opportunities for process improvement concerning software development, human-system interface design, and task performance are also being considered. Human factors researchers from Idaho National Laboratory in collaboration with usability experts from Fermilab, are currently investigating human-centered design improvements for the accelerator control system. For example, substantial tribal knowledge and memory recall are required to effectively operate the accelerator system. This contributes to high cognitive workload and potential burnout of accelerator operators. Developing guidance for consistent visual and functional design enables a more intuitive interaction and relieves operators of cognitive burden. Additionally, developing more intuitive and integrated interfaces can also lead to improved accelerator efficacy by empowering operators with greater understanding and control of the systems. The challenge in developing such interfaces is in designing for a wide variety of user goals, system specifications, and level of experience in users. The challenges need to be met while e also considering the maintainability of the control system. The purpose of this paper is to detail the human factors process and design within the ACORN project, describe results gathered thus far, and discuss the larger implications for this work.

43 PARTICLE ACCELERATORS↗

The human as supervisor in automated systems

This hierarchical approach to information display forces the development of a set of human oriented system models which will guide the design of the displays. If the appropriate information is provided at the appropriate time, it is likely that less information will be displayed at any given time, and the quality of the displayed information will require less operator effort to integrate into an assimilatable form. A problem with contemporary control rooms is that there is too much information for an operator to be able to assimilate quickly, easily, and accurately. It is suggested that necessary direction for research in the area of automated control room design is to develop displays which provide active decision aiding for the modern controller. Displays are needed which provide information compatible with the operator's current internal model, filter out irrelevant information, and summarize and condense lower level information.

Mitchell, C. M.↗

Optimizing Information Automation Using a New Method Based on System-Theoretic Process Analysis: Tool Development and Method Evaluation

This report is an update to a prior report that describes progress and findings for a program of research supporting the design and optimization of information automation systems for nuclear power plants. Much of the domestic nuclear fleet is currently focused on modernizing technologies and processes, including transitioning toward digitalization in the control room and throughout the plant, along with a greater interest in the use of automation, artificial intelligence, robotics, and other emerging technologies. While there are significant opportunities to apply these technologies toward greater plant safety, efficiency, and overall cost-effectiveness, optimizing their design and avoiding potential safety and performance risks depends on ensuring that human performance-related organizational and technical design issues are identified and addressed early in the design process. This report describes modeling tools and techniques, based on sociotechnical systems theory, to support these design goals and their application in the current research effort. The report is primarily intended for senior nuclear energy stakeholders, including regulators, corporate management, and senior plant management. We have developed and employed a method to design an optimized information automation ecosystem (IAE) based on the systems-theoretic constructs underlying sociotechnical systems theory in general and the Systems-Theoretic Accident Modeling and Processes (STAMP) approach in particular. We argue that an IAE can be modeled as an interactive information control system whose behavior can be understood in terms of dynamic control, feedback, and communication relationships amongst the system’s technical and organizational components. We have employed two STAMP-based tools in this effort. The first is Causal Analysis based on STAMP (CAST), an accident and incident analysis technique that was used to examine a performance- and safety-related incident at an industry partner’s plant involving the unintentional activation of an emergency diesel generator. This analysis provided insight into the behavior of the plant’s current information control structure within the context of a specific, significant event. The second tool is Systems Theoretic Process Analysis (STPA) which is a proactive risk analysis tool used to examine existing and potential, planned sociotechnical systems. STPA was used to identify risk factors in the current design of a generic nuclear power plant (NPP) preventive maintenance system. Our analyses focused on identifying near-term system improvements and longer-term design requirements for an optimized IAE system. CAST analysis findings indicate an important underlying contributor to the incident under investigation, and a significant risk to information automation system performance, was perceived time and schedule pressure, which exposed weaknesses in interdepartmental coordination between and within responsible plant organizations and challenged the resilience of established plant processes, until a human caused the eventual event. These findings are discussed in terms of their risk to overall system performance and their implications for information automation system resilience and brittleness. STPA findings exposed several areas of concern in the design of current preventive maintenance systems. We also present two preliminary information automation models. The proactive issue resolution (PIR) model is a test case of an information automation concept with significant near-term potential for application and subsequent reduction in significant plant events. The IAE model is a more general representation of a broader, plantwide information automation system and represents an end-state vision for our work. From our results, we have generated an initial set of preliminary system-level requirements and safety constraints for these models. We have also focused on early development of easy to learn, easy to use “transportable” tools for sociotechnical systems analysis. We intend these to be used by NPP personnel as a means of gaining reliable and relatively quick insight into (1) sociotechnical systems factors impacting incidents and accidents, (2) potential sociotechnical risk factors in existing or planned system designs, and (3) potential weaknesses in a system’s safety and/or information control structure. We conclude the report with a set of summary recommendations, a discussion of planned and potential follow-on research and development, and a draft list of system-level requirements and safety constraints for optimized information automation systems.

99 GENERAL AND MISCELLANEOUS↗

Light Water Sustainability Program: Optimizing Information Automation Using a New Method Based on System-Theoretic Process Analysis

This report describes the interim progress for research supporting the design and optimization of information automation systems for nuclear power plants. Much of the domestic nuclear fleet is currently focused on modernizing technologies and processes, including transitioning toward digitalization in the control room and elsewhere throughout the plant, along with a greater use of automation, artificial intelligence, robotics, and other emerging technologies. While there are significant opportunities to apply these technologies toward greater plant safety, efficiency, and overall cost-effectiveness, optimizing their design and avoiding potential safety and performance risks depends on ensuring that human-performance-related organizational and technical design issues are identified and addressed. This report describes modeling tools and techniques, based on sociotechnical system theory, to support these design goals and their application in the current research effort. The report is intended for senior nuclear energy stakeholders, including regulators, corporate management, and senior plant management. We have developed and employed a method to design an optimized information automation ecosystem (IAE) based on the systems-theoretic constructs underlying sociotechnical systems theory in general and the Systems-Theoretic Accident Modeling and Processes (STAMP) approach in particular. We argue that an IAE can be modeled as an interactive information control system whose behavior can be understood in terms of dynamic control and feedback relationships amongst the system’s technical and organizational components. Up to this point, we have employed a Causal Analysis based on STAMP (CAST) technique to examine a performance- and safety-related incident at an industry partner’s plant that involved the unintentional activation of an emergency diesel generator. This analysis provided insight into the behavior of the plant’s current information control structure within the context of a specific, significant event. Our ongoing analysis is focused on identifying near-term process improvements and longer-term design requirements for an optimized IAE system. The latter analyses will employ a second STAMP-derived technique, System-Theoretic Process Analysis (STPA). STPA is a useful modeling tool for generating and analyzing actual or potential information control structures. Finally, we have begun modeling plantwide organizational relationships and processes. Organizational system modeling will supplement our CAST and STPA findings and provide a basis for mapping out a plantwide information control architecture. CAST analysis findings indicate an important underlying contributor to the incident under investigation, and a significant risk to information automation system performance, was perceived schedule pressure, which exposed weaknesses in interdepartmental coordination between and within responsible plant organizations and challenged the resilience of established plant processes, until a human caused the initiating event. These findings are discussed in terms of their risk to overall system performance and their implications for information automation system resilience and brittleness. We present two preliminary information automation models. The proactive issue resolution model is a test case of an information automation concept with significant near-term potential for application and subsequent reduction in significant plant events. The IAE model is a more general representation of a broader, plantwide information automation system. From our results, we have generated a set of preliminary system-level requirements and safety constraints. These requirements will be further developed over the remainder of our project in collaboration with nuclear industry subject matter experts and specialists in the technical systems under consideration. Additionally, we will continue to pursue the system analyses initiated in the first part of our effort, with a particular emphasis on STPA as the main tool to identify weak or weakening control structures that affect the resilience of organizations and programs. Our intent is to broaden the scope of the analysis from an individual use case to a related set of use cases (e.g., maintenance tasks, compliance tasks) with similar human-system performance challenges. This will enable more generalized findings to refine the Proactive Issue Resolution and IAE models, as well as their system-level requirements and safety constraints. We will use organizational system modeling analyses to supplement STPA findings and model development. We conclude the report with a set of summary recommendations and an initial draft list of system-level requirements and safety constraints for optimized information automation systems.

99 GENERAL AND MISCELLANEOUS↗

Moonwalk Series: The Day Before - Program 1

This episode (first in a four-part series introduced by NASA Lewis Research Center's Lynn Bondurant), shows the preparation on the night before and the day of the launch of Apollo 11. Shots of the crowds waiting to view the launch help convey the excitement that accompanied the launch. The launch and ascent are shown, followed by views of the congratulations in the control room and a brief salute to Robert Goddard, the father of modern rocketry.

Source record↗

Real-Time Early Warning Techniques

Contemporary approaches to aerospace vehicle system monitoring rely heavily on thresholds that represent a compromise between providing warning early enough to avert a mishap while simultaneously minimizing false alarms. While this reliance on thresholds has been in place for decades and has permeated both cockpits and control rooms, we often find it insufficient when retrospectively analyzing data from an accident. To modernize and enhance flight test safety, we introduce new methods of monitoring for anomalous patterns of interaction rather than for thresholds exceedance. For systems with a well characterized baseline we show how the Inductive Monitoring System (IMS), utilized by NASA in the aftermath of the Columbia accident, might be implemented in real-time to provide earlier warning than currently employed techniques. For systems without such a baseline, we introduce new developments in statistical methods relating to critical slowing down, first applied in medicine and physics, which show promise for adaptation to flight test. Finally, the familiar resource constrained environment leads to a reliance on increased instrumentation that is challenging the limits of the current one-sensor, one-indicator threshold paradigm. Existing methods thus fail to accurately reflect the true complexity of a vehicle rich with interdependent interacting systems. We highlight these concepts in a brief summary of the 2001 Air Transat Flight 236 deadstick landing in the Azores. We then suggest control room and cockpit modifications to better display the information gleaned using these novel monitoring methods.

Javorsek, Dan↗

Enhancing Flight Test Safety with Real-Time Early Warning Techniques

Contemporary approaches to aerospace vehicle system monitoring rely heavily on thresholds that represent a compromise between providing warning early enough to avert a mishap while simultaneously minimizing false alarms. While this reliance on thresholds has been in place for decades and has permeated both cockpits and control rooms, we often find it insufficient when retrospectively analyzing data from an accident. To modernize and enhance flight test safety, we introduce new methods of monitoring for anomalous patterns of interaction rather than for thresholds exceedance. For systems with a well characterized baseline we show how the Inductive Monitoring System (IMS), utilized by NASA in the aftermath of the Columbia accident, might be implemented in real-time to provide earlier warning than currently employed techniques. For systems without such a baseline, we introduce new developments in statistical methods relating to critical slowing down, first applied in medicine and physics, which show promise for adaptation to flight test. Finally, the familiar resource constrained environment leads to a reliance on increased instrumentation that is challenging the limits of the current "one-sensor, one-indicator" threshold paradigm. Existing methods thus fail to accurately reflect the true complexity of a vehicle rich with interdependent interacting systems. We highlight these concepts in a brief summary of the 2001 Air Transat Flight 236 deadstick landing in the Azores. We then suggest control room and cockpit modifications to better display the information gleaned using these novel monitoring methods.

Javorsek, Daniel, II↗

Updating the Thermal Vacuum Chambers at the NASA Johnson Space Center

Chambers A and B are two large thermal vacuum chambers at Johnson Space Center which enable space simulation for unmanned and human-rated missions, respectively. With the resurgence in deep space missions for scientific research and various private commercial ventures, these chambers are expected to be used frequently for at least the next decade. For qualifying the James Webb Space Telescope, upgrades to Chamber A were performed which included the addition of a 12.5 kW refrigeration system with helium shrouds capable of simulating deep space environment and an efficient and reliable LN2 natural flow thermosiphon system for the thermal shield. Continuous improvements since then have focused on ensuring operational readiness by modernizing the data acquisition, recording, controls, and visualization systems for both chambers and clean room. These upgrades will be the focus of this paper. Controlling the Cryochambers was enhanced by moving from a 32-bit SCADA system to a 64-bit architected system. Infrastructural changes involved installing redundant power circuits, adding new servers, network switches, and including load balancing with fail-over between servers to minimize downtime. Instead of distributed servers, 3 redundant servers are used to share configurations. Configurations are now kept in a shared SQL instance making it easy to deploy and maintain. During this upgrade process many sub-systems (PLCs and NI PXI interfaces to sensors) were upgraded from the prior OPC-DA to the more secure OPC-UA protocol. Cryo-system PLCs were updated to allow Ganni cycle floating pressure calculations from any cold box to be sent to any compressor. During the project, the team recreated over 70,000 live data points, 50000 historical data points, and 4000 alarms. Finally, the graphical interfaces were upgraded to support HTML 5 in conjunction shared pages were implemented reducing the total number of webpages by over 75%. These system updates reinvigorated the previous SCADA system which had reached its end of life. The same look and feel was maintained while providing operators with an updated interface to control, troubleshoot, and record. The new system architecture is more robust and easier to maintain creating a path forward to address remaining problem points and implement additional features.

Cody Schaefer↗

Updating the Thermal Vacuum Chambers at the NASA Johnson Space Center

Chambers A and B are two large thermal vacuum chambers at Johnson Space Center which enable space simulation for unmanned and human-rated missions, respectively. With the resurgence in deep space missions for scientific research and various private commercial ventures, these chambers are expected to be used frequently for at least the next decade. For qualifying the James Webb Space Telescope, upgrades to Chamber A were performed which included the addition of a 12.5 kW refrigeration system with helium shrouds capable of simulating deep space environment and an efficient and reliable LN2 natural flow thermosiphon system for the thermal shield. Continuous improvements since then have focused on ensuring operational readiness by modernizing the data acquisition, recording, controls, and visualization systems for both chambers and clean room. These upgrades will be the focus of this paper. Controlling the Cryochambers was enhanced by moving from a 32-bit SCADA system to a 64-bit architected system. Infrastructural changes involved installing redundant power circuits, adding new servers, network switches, and including load balancing with fail-over between servers to minimize downtime. Instead of distributed servers, 3 redundant servers are used to share configurations. Configurations are now kept in a shared SQL instance making it easy to deploy and maintain. During this upgrade process many sub-systems (PLCs and NI PXI interfaces to sensors) were upgraded from the prior OPC-DA to the more secure OPC-UA protocol. Cryo-system PLCs were updated to allow Ganni cycle floating pressure calculations from any cold box to be sent to any compressor. During the project, the team recreated over 70,000 live data points, 50000 historical data points, and 4000 alarms. Finally, the graphical interfaces were upgraded to support HTML 5 in conjunction shared pages were implemented reducing the total number of webpages by over 75%. These system updates reinvigorated the previous SCADA system which had reached its end of life. The same look and feel was maintained while providing operators with an updated interface to control, troubleshoot, and record. The new system architecture is more robust and easier to maintain creating a path forward to address remaining problem points and implement additional features.

Cody Schaefer↗