Search NASA⌕ Search

SEARCH · Search NASA

Results for “DSCC”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

32 records · Page 2

DSN frequency and timing system, Mark 4-85

As part of the Deep Space Network (DSN) Mark IVA implementation program, the DSN frequency and timing system is currently undergoing changes. With the implementation of signal processing centers (SPC) at each deep space communications complex (DSCC), major changes to the frequency and timing distribution equipment were necessary. A functional description of the Mark IVA frequency and timing system (FTS) as it exists today and planned capabilities through 1988 is given.

Falin, B. W.↗

Environmental projects. Volume 2: Underground storage tanks compliance program

Six large parabolic dish antennas are located at the Goldstone Deep Space Communications Complex north of Barstow, California. As a large-scale facility located in a remote, isolated desert region, the GDSCC operations require numerous on-site storage facilities for gasoline, diesel and hydraulic oil. These essential fluids are stored in underground storage tanks (USTs). Because USTs may develop leaks with the resultant seepage of their hazardous contents into the surrounding soil, local, State and Federal authorities have adopted stringent regulations for the testing and maintenance of USTs. Under the supervision of JPL's Office of Telecommunications and Data Acquisition, a year-long program has brought 27 USTs at the Goldstone Complex into compliance with Federal, State of California and County of San Bernadino regulations. Of these 27 USTs, 15 are operating today, 11 have been temporary closed down, and 1 abandoned in place. In 1989, the 15 USTs now operating at the Goldstone DSCC will be replaced either by modern, double-walled USTs equipped with automatic sensors for leak detection, or by above ground storage tanks. The 11 inactivated USTs are to be excavated, removed and disposed of according to regulation.

Kushner, L.↗

Report from Orroral

The National Mapping (Natmap) laser ranging system (NLRS) at Orroral, Australia, designed for satellite and lunar ranging is described. The system is well connected to Doppler, VLBI, and astrometric sites located nearby (the 65-m antenna at Tidbinbilla DSCC 42/43, the Mount Stromlo Photographic Zenith Tube, and the old SAO laser cite) and is now producing results from Lageos and the moon. The operational features of the system's telescope are described together with the principal operating characteristics of the satellite and the lunar ranging. Special consideration is given to the system's errors. The Orroral site is being considered as a base site for GPS programs.

Luck, J. MCK.↗

The 8.4-GHz low-noise maser pump source assembly

Improved pump source assemblies and new 8.4-GHz low noise traveling-wave masers (TWMs) were installed at the same time at Deep Space Stations 14 and 43 as part of the Mark IVA DSCC Antenna Microwave Subsystems upgrade. The pump source assemblies are part of the new 8.4-GHz TWMs, which are identified as Block IIA Low-Noise TWMs. Improved reliability of the pump source assemblies was required to meet stress analysis criteria.

Cardenas, R.↗

Development of realtime connected element interferometry at the Goldstone Deep Space Communications Complex

Connected-element interferometry (CEI) has the potential to provide high-accuracy angular spacecraft tracking on short baselines by making use of the very precise phase delay observable. Within the Goldstone Deep Space Communications Complex (DSCC), one of three tracking complexes in the NASA Deep Space Network, baselines of up to 21 km in length are available. Analysis of data from a series of short-baseline phase-delay interferometry experiments are presented to demonstrate the potential tracking accuracy on these baselines. Repeated differential observations of pairs of angularly close extragalactic radio sources were made to simulate differential spacecraft-quasar measurements. Fiber-optic data links and a correlation processor are currently being developed and installed at Goldstone for a demonstration of real-time CEI in 1990.

Edwards, C. D.↗

Using manufacturing message specification for monitor and control at Venus

The flexibility and robustness of a monitor and control (M&C) system are a direct result of the underlying interprocessor communications architecture. A new architecture for M&C at the Deep Space Communications Complexes (DSCC's) has been developed based on the Manufacturing Message Specification (MMS) process control standard of the Open System Interconnection (OSI) suite of protocols. This architecture has been tested both in a laboratory environment and under operational conditions at the Deep Space Network (DSN) experimental Venus station (DSS-13). The Venus experience in the application of OSI standards to support M&C has been extremely successful. MMS meets the functional needs of the station and provides a level of flexibility and responsiveness previously unknown in that environment. The architecture is robust enough to meet current operational needs and flexible enough to provide a migration path for new subsystems. This paper will describe the architecture of the Venus M&C system, discuss how MMS was used and the requirements this imposed on other parts of the system, and provide results from systems and operational testing at the Venus site.

Heuser, W. Randy↗

DSMS investment in support of satellite constellations and formation flying

Over the years, NASA has supported unmanned space missions, beyond earth orbit, through a Deep Space Mission System (DSMS) that is developed and operated by the Jet Propulsion Laboratory (JPL) and subcontractors. The DSMS capabilities have been incrementally upgraded since its establishment in the late '50s and are delivered primarily through three Deep Space Communications Complexes (DSCC 's) near Goldstone, California, Madrid, Spain, and Canberra, Australia and from facilities at JPL. Traditionally, mission support (tracking, command, telemetry, etc) is assigned on an individual-mission basis, between each mission and a ground-based asset, independent of other missions. As NASA, and its international partners, move toward flying fullconstellations and precision formations, the DSMS is developing plans and technologies to provide the requisite support. The key activities under way are: (1) integrated communications architecture for Mars exploration, including relays on science orbiters and dedicated relay satellites to provide continuous coverage for orbiters, landers and rovers. JPL is developing an architecture, as well as protocols and equipment, required for the cost-effective operations of such an infrastructure. (2) Internet-type protocols that will allow for efficient operations across the deep-space distances, accounting for and accommodating the long round-trip-light-time. JPL is working with the CCSDS to convert these protocols to an international standard and will deploy such protocol, the CCSDS File Delivery Protocol (CFDP), on the Mars Reconnaissance Orbiter (MRO) and on the Deep Impact (01) missions. (3) Techniques to perform cross-navigation between spacecrafi that fly in a loose formation. Typical cases are cross-navigation between missions that approach Mars and missionsthat are at Mars, or the determination of a baseline for missions that fly in an earth-lead- lag configuration. (4) Techniques and devices that allow the precise metrology and controllability of tightformations for precision constellation missions. In this paper we discuss the four classes of constellatiodformation support with emphasis of DSMS current status (technology and implementation) and plans in the first three areas.

space operations↗

Packaging Concerns and Techniques for Large Devices: Challenges for Complex Electronics

NASA is going to have to accept the use of non-hermetic packages for complex devices. There are a large number of packaging options available. Space application subjects the packages to stresses that they were probably not designed for (vacuum for instance). NASA has to find a way of having assurance in the integrity of the packages. There are manufacturers interested in qualifying non-hermetic packages to MIL-PRF-38535 Class V. Government space users are agreed that Class V should be for hermetic packages only. NASA is working on a new Class for non-hermetic packages for M38535 Appendix B, "Class Y". Testing for package integrity will be required but can be package specific as described by a Package Integrity Test Plan. The plan is developed by the manufacturer and approved by DSCC and government space.

LaBel, Kenneth A.↗

Infusion of New Technology into the QML System

QML stands for the Qualified Manufacturer List. It is maintained by DLA-Land and Maritime (formerly known as the Defense Supply Center Columbus, DSCC). This talk will address how we are bringing new technology products into the QML system. The focus will be on microcircuit parts used in space application. A new effort championed by NASA will be described. NASA EEE Parts Assurance Group (NEPAG) is making every effort to strengthen the MIL system and thereby support the space flight projects

Class Y↗

Characterization of High-Speed IF Digitizers for Use by NASA Deep Space Network

My project primarily focused on the evaluation of several candidate converters to determine which provides the best overall performance for the needs of the DSCC Downlink Array (DDA). Of particular concern was the flatness of the gain and group delay of the converter over the Intermediate Frequency (IF) bandwidth, as excessive variation interferes with the beam forming that occurs when combining the signals from many antennas. In addition, converter nonlinearity and noise were evaluated as these could limit the DDA's ability to resolve weak signals, particularly in the presence of large interferers. The sensitivity of the noise at the output of the converters due to noise in the power supplies and jitter in the analog-to-digital converters (ADC) and the reference clock were also evaluated. Specifically, I worked with various high speed (1280 to 2000 megahertz sampling clock) ADCs.

analog-to-digital converters (ADC)↗

Delay-Throughput Performance of the Deep-Space Ka-band Link

In this paper, performance of a first-in, first-out (FIFO), selective retransmission scheme for the deep-space Ka-band link is presented and compared to the performance of a comparable X-band link. In this analysis, 16 months of water vapor radiometer (WVR) and advanced water vapor radiometer (AWVR) data from the three Deep Space Network (DSN) Communication Complexes (DSCC) were used to emulate weather effects on X-band and Ka-band links from Mars. Mars Reconnaissance Orbiter (MRO) X-band and Ka-band telecommunications parameters were used for spacecraft telecommunications capabilities. One pass per week per complex was selected from MRO's Deep Space Network (DSN) schedule from April 1, 2006 to August 31, 2007 for a total of 207 passes (69 passes per complex) for this analysis. For each pass both X-band and Ka-band links were designed using at most two data rates so that the expected pass capacity would be maximized subject to a minimum availability requirement (MAR). In conjunction with the WVR/AWVR data, elevation profiles of the selected passes and models for the performance of the antennas in the DSN were used to emulate the performance of both links. It was assumed that the retransmission of the data takes place not on the same pass as the original transmission but during subsequent passes. The data collected before a pass was assumed to be a fraction of the expected capacity of the pass as calculated through the link design process. Infinite spacecraft storage was assumed to obtain an upper bound on the spacecraft storage requirement. The independent parameters of this analysis were MAR and the ratio of data collected before a pass to the expected pass capacity. Since the selected passes did not occur at regular intervals, the delay in this analysis was measured in terms of number of passes. The throughput was measured in terms of number of bits received successfully on the ground. The results indicate that reasonable delay performance could be achieved with very high throughput for relatively low MAR values for data collection to expected pass capacity ratio of around 97% for Ka-band. The results indicate that, except for very low average delay requirements, the Ka-band link provides more than twice the throughput of the X-band link for the same amount of power consumed by the spacecraft. In addition, the results indicate that the required storage onboard the spacecraft is not prohibitive and good performance could be achieved by using a buffer size less than three times the maximum amount of data collected before a pass.

Shambayati, Shervin↗

Delay-Throughput Performance the Deep-Space Ka-Band Link

In this paper, performance of a first-in, first-out (FIFO), selective retransmission scheme for the deep-space Ka-band link is presented and compared to the performance of a comparable X-band link. In this analysis, 16 months of water vapor radiometer (WVR) and advanced water vapor radiometer (AWVR) data from the three Deep Space Network (DSN) Communication Complexes (DSCC) were used to emulate weather effects on X-band and Ka-band links from Mars. Mars Reconnaissance Orbiter (MRO) X-band and Ka-band telecommunications parameters were used for spacecraft telecommunications capabilities. One pass per week per complex was selected from MRO's Deep Space Network (DSN) schedule from April 1, 2006 to August 31, 2007 for a total of 207 passes (69 passes per complex) for this analysis. For each pass both X-band and Ka-band links were designed using at most two data rates so that the expected pass capacity would be maximized subject to a minimum availability requirement (MAR). In conjunction with the WVR/AWVR data, elevation profiles of the selected passes and models for the performance of the antennas in the DSN were used to emulate the performance of both links. It was assumed that the retransmission of the data takes place not on the same pass as the original transmission but during subsequent passes. The data collected before a pass was assumed to be a fraction of the expected capacity of the pass as calculated through the link design process. Infinite spacecraft storage was assumed to obtain an upper bound on the spacecraft storage requirement. The independent parameters of this analysis were MAR and the ratio of data collected before a pass to the expected pass capacity. Since the selected passes did not occur at regular intervals, the delay in this analysis was measured in terms of number of passes. The throughput was measured in terms of number of bits received successfully on the ground. The results indicate that reasonable delay performance could be achieved with very high throughput for relatively low MAR values for data collection to expected pass capacity ratio of around 97% for Ka-band. The results indicate that, except for very low average delay requirements, the Ka-band link provides more than twice the throughput of the X-band link for the same amount of power consumed by the spacecraft. In addition, the results indicate that the required storage onboard the spacecraft is not prohibitive and good performance could be achieved by using a buffer size less than three times the maximum amount of data collected before a pass.

Shambayati, Shervin↗

Complexity-Based Link Assignment for NASA’s Deep Space Network for Follow-the-Sun Operations

NASA’s Deep Space Network (DSN) recently underwent a paradigm shift in its operations approach called Follow the Sun Operations (FtSO) in an effort to increase efficiency for forthcoming expansion of the network. This change requires each Deep Space Communications Complex (DSCC) to remotely control the other two complexes’ antennas during their local day shift, in contrast to locally controlling only their own antennas 24x7. Remote operations increases the workload of each complex during their day shift, specifically that of the Link Control Operators (LCOs), and presents a new challenge for planning and managing the distribution of responsibility for each link. A new DSN software assembly, the Link Complexity and Maintenance (LCM) software, was developed to support workload management for LCOs, as well as for planning site-local maintenance activities. The LCM deployment was a vital part of the transition to FtSO in November 2017. This paper discusses the architecture of LCM, its feature set, and lessons learned during its development and rollout.

Lee, Carlyn↗