Search NASA⌕ Search

SEARCH · Search NASA

Results for “Design Reference Mission”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 37 records · Page 2

A Faster-Than-Real-Time Framework for Reliability-Oriented Simulation of PV Inverters

Physics-of-Failure (PoF) based reliability assessment for photovoltaic (PV) inverters requires long-duration electrical and electrothermal stress histories, yet generating such stress histories with high-fidelity switching models over year long mission profiles is computationally prohibitive. Conventional methods either sacrifice modeling fidelity for speed or require runtimes that are impractical for design iteration and uncertainty studies. To address this bottleneck, this paper presents a High-Performance Computing (HPC) based simulation frame work for faster-than-real-time reliability-oriented simulation. The proposed framework integrates the Average-to-Switching (A2S) method with parallel computing techniques to accelerate switching-level waveform reconstruction. We further introduce optimization strategies, including cluster merging and sensitivity based mission profile screening, to reduce the computational burden. Evaluated using real-world mission profile inputs and a MATLAB/Simulink switching-model reference, the framework reduces the simulation time for a one-year mission from an intractable multi-year duration to approximately 7.3 minutes while maintaining low waveform error. This acceleration provides a practical reliability-oriented simulation engine that can be coupled with component-specific aging models for subsequent PV inverter PoF assessment.

High-performance Computing↗

Vitrification of Hanford Tank 241-AP-107 with Recycled Condensate

During the vitrification of nuclear waste at the Hanford Waste Treatment and Immobilization Plant (WTP) – the primary mission of the U.S. Department of Energy Office of River Protection – the offgas condensate generated from the waste-to-glass conversion is currently planned to be concentrated by evaporation in the Effluent Management Facility (EMF). This concentrated condensate can then be recycled back to the incoming waste and vitrified. To test the recycle process, a test apparatus was designed to mimic the EMF evaporator and used to concentrate a volume of condensate that had been previously produced during the vitrification of Hanford tank 241-AP-107 (referred to herein as AP-107) waste in a continuous laboratory-scale melter (CLSM). The test apparatus successfully concentrated the AP-107 condensate by a factor of 10 while retaining over 90 % of the technetium-99 ( 99 Tc), Cs, and I inventory. A second portion of AP-107 waste was retrieved by Washington River Protection Solutions, LLC, given to Pacific Northwest National Laboratory, and combined with the AP-107 condensate concentrate after undergoing solids filtration and cesium removal by ion exchange. This combination served to approximate the recycling action to be performed at the WTP. After the addition of glass-forming chemicals (GFCs), the combined AP-107 waste and AP-107 condensate concentrate were processed in the CLSM to produce a glass, called AP-107-1R, that was designed to satisfy the WTP baseline requirements (Kim et al. 2012). During the 8.87 hours of processing, 7.27 kg of AP-107-1R glass were produced for an average glass production rate of 1739 kg m 2 d -1 . Compared to the previous run in the CLSM without recycled condensate, the run with the recycle had a greater average glass production rate, but the rate was within the potential range of variability when processing melter feeds with similar composition in the CLSM. The glass produced from the AP-107 recycle run in the CLSM was within 10 % of the target AP-107-1R glass composition with respect to the primary glass components. Analysis of the minor component impurities revealed that their content in the glass product had approached their nominal target after 2 turnovers of the glass inventory in the CLSM while the activity of the minor radionuclides was retained in the glass product. The 99 Tc and total cesium content in the combined AP-107 waste and recycled condensate were maintained at concentrations expected to be experienced at the WTP. During processing in the CLSM, at discrete sampling time periods, the target 99 Tc/Cs mass ratio in the glass formulation varied from 0.9 to 62.9. Across this range, the Cs retention in the glass ranged from 53 to 60 %, while the retention from the entire runtime totaled 68 %, values which align with Cs retention in other scaled melter systems while processing LAW melter feeds at 99 Tc/Cs mass ratios ranging from 1 to 100. The 99 Tc retention in the glass ranged from 22 to 32 %, primarily due to the cold-cap coverage on the glass melt surface, the area covered by reacting melter feed, varying from ~80 % to ~95 % during processing, demonstrating greater volatility of 99 Tc from the glass while more surface was exposed, as expected based on previous 99 Tc volatility studies.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Vitrification of Hanford Tank Wastes for Condensate Recycle and Feed Composition Changeover Testing

During the vitrification of Hanford Site nuclear waste at the Waste Treatment and Immobilization Plant (WTP), which is a part of the safe and efficient retrieval, treatment, and disposal mission of the U.S. Department of Energy Office of River Protection, the offgas condensate generated from the waste-to-glass conversion is currently planned to be concentrated by evaporation in the Effluent Management Facility (EMF). This concentrated condensate can then be recycled back to the incoming waste and vitrified. To test the recycle process, an apparatus was designed and built to mimic the EMF evaporator and was then used to concentrate a volume of condensate produced during the vitrification of a sample of Hanford tank 241-AP-107 (referred to herein as AP-107) waste in a continuous laboratory-scale melter (CLSM). The concentrated condensate was added to an additional sample of AP-107 waste, to mimic one round of the recycle process, and the combined solution was vitrified, producing a second round of recycle condensate. In the current study, the EMF test apparatus was used to concentrate the second-round recycle condensate under evaporation conditions (at 45 °C and 1.4 psia) designed to emulate EMF operation. The condensate was successfully concentrated by a factor of ~10 while retaining over 95 % of the technetium-99 ( 99 Tc), Cs, and I inventories in the concentrate. Another portion of AP-107 waste was retrieved by Washington River Protection Solutions, LLC (WRPS) and transferred to Pacific Northwest National Laboratory (PNNL), where it was pretreated and then combined with the second-round recycle AP-107 condensate concentrate and glass-forming chemicals (GFCs) to form the two-time recycle AP-107 melter feed, approximating a second round to the recycling action to be performed at the WTP. A portion of AP-105 waste was also retrieved by WRPS and provided to PNNL for pretreatment and combining with GFCs to form AP-105 melter feed. The two-time recycle AP-107 and AP-105 melter feeds were processed consecutively in the CLSM. The CLSM run proceeded for 13.63 hours, producing 9.70 kg of glass for an average glass production rate of 1464 kg m 2 d -1 during the two-time recycle AP-107 feed charging and 1568 kg m 2 d -1 during the AP-105 feed charging. The rate during AP-107 charging was essentially equivalent to the rate when processing no-recycle AP-107 feed and lower than that achieved when processing one-time recycle AP-107 feed. However, all rates were within the potential range of variability when processing melter feeds with similar composition in the CLSM. Likewise, the rate during AP-105 charging was higher than the previous rate processing AP-105, but within the potential CLSM range. The cold-cap characteristics changed from the typically thin AP-107 cold cap to a foamy-edged cold cap as previously seen with AP-105 shortly after transitioning to the AP-105 melter feed. The glass produced during the CLSM run was within 10 % of its target composition for the primary glass components. The CaO and Li 2 O targets varied by more than 1 wt% between the two-time recycle AP-107 and AP-105 glass targets and it took about 2 turnovers of the CLSM glass inventory to reach a relative chemical steady state in the glass for CaO and Li 2 O after the melter feed inputs were switched. The 99 Tc and total cesium content in the melter feeds were maintained at concentrations expected to be experienced at the WTP. During the CLSM run, while processing the two-time recycle AP-107 melter feed at a relative chemical steady state, the 99 Tc/Cs ratio was 10, and 34% of 99 Tc and 74% of Cs were retained in the glass. These values were higher than those measured in the CLSM run with one-time recycle AP-107 melter feed. After the transition to processing the AP-105 melter feed, when the production reached a relative chemical steady state, the 99 Tc/Cs ratio was 77 while 44% of 99 Tc was retained in the glass. The C's retention during this time frame reached 200% due to the excess C's in the glass after the target content decreased to 15% of its initial level in the two-time recycle AP-107 melter feed to the lower target in the Ap-105 melter feed. While iodine was below inductively coupled plasma mass spectrometry analytical reporting limits in the melter feed and glass samples, it was detected in quantities above the analytical reporting limits in the liquid and filter samples collected from the CLSM offgas treatment system. The behavior of iodine in the CLSM offgas treatment system followed a similar pattern to those of 99 Tc and Cs.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Vitrification of Hanford Tank Wastes for Condensate Recycle and Feed Composition Changeover Testing (Rev. 1)

During the vitrification of Hanford Site nuclear waste at the Waste Treatment and Immobilization Plant (WTP), which is a part of the safe and efficient retrieval, treatment, and disposal mission of the U.S. Department of Energy Office of River Protection, the offgas condensate generated from the waste-to-glass conversion is currently planned to be concentrated by evaporation in the Effluent Management Facility (EMF). This concentrated condensate can then be recycled back to the incoming waste and vitrified. To test the recycle process, an apparatus was designed and built to mimic the EMF evaporator and was then used to concentrate a volume of condensate produced during the vitrification of a sample of Hanford tank 241-AP-107 (referred to herein as AP-107) waste in a continuous laboratory-scale melter (CLSM). The concentrated condensate was added to an additional sample of AP-107 waste, to mimic one round of the recycle process, and the combined solution was vitrified, producing a second round of recycle condensate. In the current study, the EMF test apparatus was used to concentrate the second-round recycle condensate under evaporation conditions (at 45 °C and 1.4 psia) designed to emulate EMF operation. The condensate was successfully concentrated by a factor of ~10 while retaining over 95 % of the technetium-99 (99Tc), Cs, and I inventories in the concentrate. Another portion of AP-107 waste was retrieved by Washington River Protection Solutions, LLC (WRPS) and transferred to Pacific Northwest National Laboratory (PNNL), where it was pretreated and then combined with the second-round recycle AP-107 condensate concentrate and glass-forming chemicals (GFCs) to form the two-time recycle AP-107 melter feed, approximating a second round to the recycling action to be performed at the WTP. A portion of AP-105 waste was also retrieved by WRPS and provided to PNNL for pretreatment and combining with GFCs to form AP-105 melter feed. The two-time recycle AP-107 and AP-105 melter feeds were processed consecutively in the CLSM. The CLSM run proceeded for 13.63 hours, producing 9.70 kg of glass for an average glass production rate of 1464 kg m 2 d -1 during the two-time recycle AP-107 feed charging and 1568 kg m 2 d -1 during the AP-105 feed charging. The rate during AP-107 charging was essentially equivalent to the rate when processing no-recycle AP-107 feed and lower than that achieved when processing one-time recycle AP-107 feed. However, all rates were within the potential range of variability when processing melter feeds with similar composition in the CLSM. Likewise, the rate during AP-105 charging was higher than the previous rate processing AP-105, but within the potential CLSM range. The cold-cap characteristics changed from the typically thin AP-107 cold cap to a foamy-edged cold cap as previously seen with AP-105 shortly after transitioning to the AP-105 melter feed. The glass produced during the CLSM run was within 10 % of its target composition for the primary glass components. The CaO and Li 2 O targets varied by more than 1 wt% between the two-time recycle AP-107 and AP-105 glass targets and it took about 2 turnovers of the CLSM glass inventory to reach a relative chemical steady state in the glass for CaO and Li 2 O after the melter feed inputs were switched.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Physics basis for the reference flat-top plasma scenario in the ST–E1 fusion power plant

As part of the U.S. Department of Energy’s Milestone-Based Fusion Energy Development Program, Tokamak Energy has completed the pre-concept design of the ST–E1 fusion power plant. ST–E1 is envisaged to operate in two phases: a pilot plant phase, targeting sustained net power production of 300 - 500 MWe for a duration >1 hr, followed by a commercial power plant phase targeting steady-state operations and a normalised overnight capital cost of ⩽12 000 $\$$/kWe. The design process adopted was highly iterative, integrating all major plant systems and progressing in a phased fidelity approach. At the pre-conceptual stage, the emphasis has been on exploring the design space, identifying the main system-level trade-offs, and making the key decisions that define the overall plant concept, rather than optimising a single operating point. This paper, part of a focused collection detailing the ST–E1 pre-concept design, addresses the development of a series of reference flat-top plasma operating points for the pilot plant phase. A modelling workflow was established to develop and assess candidate plasma design points and explore key dependencies. The workflow includes integrated core plasma modelling, magnetohydrodynamic (MHD) stability assessment, equilibrium generation, scrape-off-layer and exhaust modelling, heating & current drive design and optimisation, and turbulent transport modelling. Using this framework, the impact of several key parameters on the flat-top operating space was investigated, including the density limit, core radiation fraction and divertor power loading, level of external heating and curent drive power and assumed pedestal characteristics. The MHD stability, controllability and micro-stability characteristics of these plasmas were also analysed. These investigations informed the definition of a set of fully non-inductive, flat-top reference operating points that satisfy the high-level ST–E1 mission, including a low and high density case, a case that is stable to resistive wall modes and a case with reduced divertor power loading.

ST–E1↗

AFC Metallic Fuel Research and Development 5-Year Plan

The mission of the U.S. Department of Energy (DOE) Advanced Fuel Campaign (AFC) program is conducting R&D on nuclear fuel technology that enables near- and long-term implementation of the reactor systems necessary to meet national nuclear energy objectives. Its primary goals align with goals of the DOE Office of Nuclear Energy in sustaining the current LWR fleet through Accident Tolerant Fuels program and Enabling Advanced Reactors. The latter goal is to be achieved through the following subgoals in order of logistical priority: • Establish the qualification basis for reference metallic fuel designs for sodium-cooled fast reactors. • Develop next generation metallic fuel fabrication and design for improved fissile utilization and management. • Develop accelerated fuel development and qualification methodologies. • Identify next generation fuel technologies. The purpose of this document is to serve as a five-year research and development (R&D) plan to achieve the goals identified to support enabling advanced reactor deployment related to metallic fuels starting in 2025. The specific objectives of this document are to: • align program R&D work across technical areas, national laboratories, and with stakeholder interests, and • aid yearly and outyear scope and budgetary planning activities. This plan lays the foundation of databases, capabilities, expertise, and research-commercial-regulatory integration for launching next-generation initiatives in advanced fuel technologies (fuel and cladding) and improved methodologies for achieving accelerated qualification of next generation fuel technologies.

11 NUCLEAR FUEL CYCLE AND FUEL MATERIALS↗

Update on Integrity Monitoring, Prediction and Assessment, Corrosion Control, and Repair of the Hanford Storage Tanks

DOE has launched a multi-year research program with the focus of preserving and increasing available volume for waste storage at Hanford. The long-term availability and operability of the Hanford Double Shell Tanks (DST) is critical to the completion of the Hanford mission. Maintaining the integrity of the tank will involve having a technology for repair or refurbishment of a DST should the tank function be compromised by degradation, monitoring the tank for indications of accelerated degradation, developing a means for mitigating accelerated degradation, and evaluating options for increasing the storage capacity in the tank farm without constructing new tanks. The project work was started in the middle of 2024; significant progress has been made in the following four areas: (i) tank refurbishment using a high performance grout and an epoxy sealant layer system, (ii) developing a chemically and radiologically stable reference electrode, (iii) designing and implementing a cathodic protection system to mitigate underside corrosion of DST secondary shells, and (iv) exploring evaporation to increase waste storage capacity.

Shukla, Pavan [Savannah River National Laboratory ↗

Graphical User Interface for a Biasing Board for the PSEC6

The PSEC6 is an application-specific integrated circuit (ASIC) designed for a readout system for a large area picosecond photodetector (LAPPD). The PSEC6 is currently in fabrication and pending testing. The testing system for the PSEC5, the previous iteration of the ASIC, required expensive and non-portable equipment, because the ASIC needs twelve adjustable reference voltages. The new testing system consists of an low-cost, open-source, cross-platform graphical user interface (GUI), a digital system, and a biasing board. The digital system is the interface between the GUI and biasing board, and can be implemented on a microcontroller or field-programmable gate array (FPGA). The biasing board contains twelve digital-to-analog converters (DACs) that are configurable via the GUI, which gives users the ability to write voltage values to all or specific DACs. The GUI was developed in C on Linux using the widget library GTK4 and cross-compiled for Windows compatibility. I2C and SPI protocols were implemented on an Adafruit Feather ESP32-S3 microcontroller to write commands to the DACs and PSEC6. A hardware implementation of the I2C protocol is in development on an FPGA. Since LAPPDs will be used by the Accelerator Neutrino Neutron Interaction Experiment (ANNIE) at Fermilab, the PSEC6 testing system in this internship project can potentially benefit future neutrino research. The project is relevant to the Department of Energy’s microelectronics mission, because the PSEC6 is an ASIC that will handle fast time signals arriving from the detector for readout. It also provided experience with building a cross-platform user interface, practicing digital design and implementation in hardware description language (HDL), and using simulations to inform new design iterations.

Guerrero, Sasha Camila [North Central Coll.]↗

Graphical User Interface for a Biasing Board for the PSEC6

The PSEC6 is an application-specific integrated circuit (ASIC) designed for a readout system for a large area picosecond photodetector (LAPPD). The PSEC6 is currently in fabrication and pending testing. The testing system for the PSEC5, the previous iteration of the ASIC, required expensive and non-portable equipment, because the ASIC needs twelve adjustable reference voltages. The new testing system consists of an low-cost, open-source, cross-platform graphical user interface (GUI), a digital system, and a biasing board. The digital system is the interface between the GUI and biasing board, and can be implemented on a microcontroller or field-programmable gate array (FPGA). The biasing board contains twelve digital-to-analog converters (DACs) that are configurable via the GUI, which gives users the ability to write voltage values to all or specific DACs. The GUI was developed in C on Linux using the widget library GTK4 and cross-compiled for Windows compatibility. I2C and SPI protocols were implemented on an Adafruit Feather ESP32-S3 microcontroller to write commands to the DACs and PSEC6. A hardware implementation of the I2C protocol is in development on an FPGA. Since LAPPDs will be used by the Accelerator Neutrino Neutron Interaction Experiment (ANNIE) at Fermilab, the PSEC6 testing system in this internship project can potentially benefit future neutrino research. The project is relevant to the Department of Energy’s microelectronics mission, because the PSEC6 is an ASIC that will handle fast time signals arriving from the detector for readout. It also provided experience with building a cross-platform user interface, practicing digital design and implementation in hardware description language (HDL), and using simulations to inform new design iterations.

Guerrero, Sasha Camila [North Central Coll.]↗

TREAT Slide Decks for Alabama A&M

Slides to introduce TREAT and two senior design projects to a professor and senior engineering students at Alabama A&M. Slide Deck 1 is an overview of the TREAT Reactor and its mission. Use for Space Nuclear Thermal Propulsion Testing is mentioned, but no details of space reactor fuel are included. Review for unlimited release is requested. Slide deck 2 presents technical background for neutron radiography, with contrast to x-radiography, and then presents the application of TREAT for Flash Radiography. Slide Deck 3 describes the background behind the second senior design project, which is to design powered actuators for TREAT core clamps. Slide Deck 3 includes photos of different sides of the TREAT reactor and sketches of internal components associated with the core clamping system. These were presented via Teams on October 5, but we want to provide the slidedeck files to the university for student reference.

21 SPECIFIC NUCLEAR REACTORS AND ASSOCIATED PLANTS↗

MRT 7365: Power flow physics and key physics phenomena

The Z accelerator at Sandia National Laboratories conducts z-pinch experiments at 26 MA in support of DOE missions in stockpile stewardship, dynamic materials, fusion, and other basic sciences. Increasing the current delivered to the z-pinch would extend our reach in each of these disciplines. To achieve increases in current and accelerator efficiency, a fraction of Z’s shots are set aside for research into transmission-line power flow. These shots, with supporting simulations and theory, are incorporated into this Advanced Diagnostics milestone report. The efficiency of Z is reduced as some portion of the total current is shunted across the transmission-line gaps prior to the load. This is referred to as “current loss”. Electrode plasmas have long been implicated in this process, so the bulk of dedicated power-flow experiments are designed to measure the plasma environment. The experimental analyses are enhanced by simulations conducted using realistic hardware and Z voltage pulses. In the same way that diagnostics are continually being improved for sensitivity and resolution, the modeling capability is continually being improved to provide faster and more realistic simulations. The specifics of the experimental hardware, diagnostics, simulations, and algorithm developments are provided in this report. The combined analysis of simulation and data confirms that electrode plasmas have the most detrimental impact on current delivery. Experiments over the last three years have tested the theoretical current-loss mechanisms of enhanced ion current, plasma gap closure, and Hall-related current. These mechanisms are not mutually exclusive and may be coincident in the final feed as well as in upstream transmission lines. The final-feed geometries tested here, however, observe lower-density plasmas without dominant ion currents which is consistent with a Hall-related current. The picture of plasma formation and transport formed from experiment and simulation is informing hardware designs being fielded on Z now and being proposed for the Next-Generation Pulsed Power (NGPP) facility. In this picture, the strong magnetic fields that heat the electrodes above particle emission thresholds also confine the charged particles near the surface. Some portion of the plasmas thus formed is transported into the transmission-line gap under the force of the electric field, with aid from plasma instabilities. The gap plasmas are then transported towards the load by a cross-field drift, where they accumulate and contribute to a likely Hall-related cross-gap current. The achievements in experimental execution, model validation, and physical analysis presented in this report set the stage for continued progress in power flow and load diagnostics on Z. The planned shot schedule for Z and Mykonos will provide data for extrapolation to higher current to ensure the predicted performance and efficiency of a NGPP facility.

43 PARTICLE ACCELERATORS↗

Massachusetts Institute of Technology Reactor LEU Fuel Element Flow Test Preliminary Design

As part of the U.S. National Nuclear Security Administration’s (NNSA) mission to minimize the civilian use of weapon-grade highly enriched uranium (HEU) fuels, the NNSA Office of Material Management and Minimization Conversion Program is collaborating with six U.S. High Performance Research Reactors (USHPRR), including one critical facility, to convert from the use of HEU to low-enriched uranium (LEU) fuel. The conversion objectives for the USHPRR are to develop LEU fuel element designs that will ensure safe reactor operations and maintain the existing experimental facilities performance. The work is being conducted through many interrelated activities that are being completed by stakeholders across organizations. Within the Reactor Conversion (RC) Pillar of the USHPRR Project, four of the USHPRR, including the Massachusetts Institute of Technology Reactor (MITR-II, also referred to as MITR), have progressed through preliminary fuel element design using the proposed monolithic alloy of uranium- 10 wt% molybdenum (U-10Mo). Preliminary fuel element design and safety analyses have been completed for MITR. This work has relied on preliminary data for properties, performance, and fabrication tolerances for the fuel systems that have been produced by the Fuel Qualification (FQ), Fuel Fabrication (FF), and RC Pillars of the USHPRR Project.

11 NUCLEAR FUEL CYCLE AND FUEL MATERIALS↗

HPC Center of the Future: R&D Acquisition Intent

This document contains intended technical requirements for an anticipated future procurement for Lawrence Livermore National Laboratory (LLNL), hereafter referred to as “LLNL” or “the Laboratory”, which seeks to fund a few new and innovative proposals for developing concepts and performing studies that would lead to products available in the 2029-2030 timeframe. Our interest is to incentivize explorations and evaluations of technical capabilities in support of our vision for a High Performance Computing (HPC) center of the future at Livermore Computing (LC), the HPC center at LLNL. To realize this vision a new approach to our approach to acquisition is being considered by LC. The approach is designed to decrease risks for the vendors, while encouraging a broader set of vendors able and we hope willing to partner with LLNL and LC. The future HPC Center vision and acquisition approach was conceived to meet the future mission needs of the Advanced Simulation and Computing (ASC) Program within the National Nuclear Security Administration (NNSA).

97 MATHEMATICS AND COMPUTING↗

FY 2022 Idaho National Laboratory Site Sustainability Plan

The mission of the Department of Energy (DOE) is to ensure America’s security and prosperity by addressing its energy, environmental and nuclear challenges through transformative science and technology solutions. This FY 2022 Idaho National Laboratory Site Sustainability Plan (SSP) was developed to enable and sustain Idaho National Laboratory’s (INL’s) mission to discover, demonstrate, and secure innovative nuclear solutions, clean energy options, and critical infrastructure. DOE Order 436.1, “Departmental Sustainability,” provides requirements and assigns responsibilities for managing sustainability within DOE to ensure that DOE missions are carried out in a sustainable manner, to institute wholesale cultural change to factor sustainability into all DOE decisions, and to ensure DOE achieves sustainability goals. DOE Order 436.1 also requires DOE sites to commit appropriate personnel resources, establish a financing plan that prioritizes the use of life-cycle cost effective private-sector financing, optimize the application of appropriations and budgeted funds, and establish specific performance measures and deliverables designed to achieve the listed requirements. The SSP was developed according to the narrative requirements from the “FY 2022 DOE Site Sustainability Plan Guidance” document issued in September 2021. The SSP contains strategies and activities that will lead to continual energy, water, and waste reductions that move the INL site toward meeting DOE sustainability goals and requirements. The SSP summarizes energy and available fuel use reporting requirements and references criteria for instituting sustainable design. SSP requirements are integrated into each INL site contractor’s Integrated Safety Management System and Environmental Management System (EMS). Finally, the Sustainability Program directives, based on this SSP, are integrated into INL/LTD-21-62463, Annual Laboratory Plan 2021, and operations and acquisition systems.

29 ENERGY PLANNING, POLICY, AND ECONOMY↗

FY 2023 Idaho National Laboratory Site Sustainability Plan

The mission of the Department of Energy (DOE) is to ensure America’s security and prosperity by addressing its energy, environmental and nuclear challenges through transformative science and technology solutions. This FY 2022 Idaho National Laboratory Site Sustainability Plan (SSP) was developed to enable and sustain Idaho National Laboratory’s (INL’s) mission to discover, demonstrate, and secure innovative nuclear solutions, clean energy options, and critical infrastructure. DOE Order 436.1, “Departmental Sustainability,” provides requirements and assigns responsibilities for managing sustainability within DOE to ensure that DOE missions are carried out in a sustainable manner, to institute wholesale cultural change to factor sustainability into all DOE decisions, and to ensure DOE achieves sustainability goals. DOE Order 436.1 also requires DOE sites to commit appropriate personnel resources, establish a financing plan that prioritizes the use of life-cycle cost effective private-sector financing, optimize the application of appropriations and budgeted funds, and establish specific performance measures and deliverables designed to achieve the listed requirements. The SSP was developed according to the narrative requirements from the “FY 2022 DOE Site Sustainability Plan Guidance” document issued in September 2021. The SSP contains strategies and activities that will lead to continual energy, water, and waste reductions that move the INL site toward meeting DOE sustainability goals and requirements. The SSP summarizes energy and available fuel use reporting requirements and references criteria for instituting sustainable design. SSP requirements are integrated into each INL site contractor’s Integrated Safety Management System and Environmental Management System (EMS). Finally, the Sustainability Program directives, based on this SSP, are integrated into INL/LTD-21-62463, Annual Laboratory Plan 2021, and operations and acquisition systems.

29 ENERGY PLANNING, POLICY, AND ECONOMY↗

Proceedings of RIKEN BNL Research Center Workshop: Predictions for sPHENIX [Slides]

To complete the RHIC mission, sPHENIX was specifically designed to measure jet and heavy-flavor observables with a level of precision not previously achievable at RHIC. This will enhance our understanding of the quark-gluon plasma (QGP) properties and their temperature dependence beyond what is possible with existing and planned data from the LHC and other RHIC experiments. A major goal of the sPHENIX program is to address the question of the approach to thermalization of the quark-gluon plasma and its transport properties using hard probes such as jets and heavy flavor. The current three-year run plan includes Au+Au, p+Au and p+p collisions at 200 GeV. The Au+Au dataset provides a large QGP system to study the QGP properties. The p+Au dataset will allow for additional studies of the intriguing behavior observed in flow measurements from other RHIC experiments as well as transport properties of cold QCD matter and proton/nuclear structure. The p+p collisions provide a necessary reference for Au+Au and p+Au collisions and also allow for additional studies of proton structure. Anticipated measurements include but are not limited to, jet substructure observables, photon and heavy flavor tagged jets as well as comparisons of the production of the different upsilon states in all three collision systems. To maximize the rich physics sPHENIX is capable of accessing, this workshop will enhance the discussions between the experimentalists making the measurements and the theorists whose models will be tested and constrained by the new data. Since sPHENIX will start taking data in early 2023, this workshop is timely for theorists wishing to make final predictions of anticipated observables before data collection commences. In addition, it will provide an opportunity for theorists and experimentalists to propose and discuss new observables.

73 NUCLEAR PHYSICS AND RADIATION PHYSICS↗

Internship Work Report

I worked on two projects during my summer internship at Sandia. My official title was “Intern - Mission Tech Electrical Eng./Computer Eng.- R&D Undergraduate Summer.” I worked at the central location, which is Albuquerque, New Mexico. The department you are placed in at Sandia doesn’t always correspond to the people you will be working with. For example, I only directly worked with one person from my department this summer. On one of my projects, I worked with a diverse team of engineers from many different departments. On my other project, I mainly worked with two departments, as the project had two distinct parts. As mentioned earlier, I worked on two projects during my summer at Sandia. The first project focused on a lightweight embedded controller in an advanced FPGA System-on-Chip for radar signal processing applications. The term “controller” refers to a hardware device that directs the flow of data between two entities. An FPGA is a reprogrammable integrated circuit (as opposed to an integrated circuit with one purpose). An FPGA was used on this project so in order to protype various ideas for our System-on-Chip. My role on the project was to implement designs on the fabric of the FPGA and design a state machine (written in C) for the processor. My second project was also heavily involved with embedded systems but had a different application. It focused on using a Newton-Raphson control algorithm to stabilize an inverted pendulum using a novel microcontroller. The pendulum dynamics were derived, and it was successfully simulated in MATLAB. I worked on integrating the microcontroller with the inverted pendulum machinery, and converting the Newton-Raphson control algorithm from MATLAB into C. The inverted pendulum was successfully stabilized using a simple PID controller and industry-standard microcontroller. The project is still ongoing, and the team is gearing up for more tests using the novel Newton-Raphson control algorithm and novel microcontroller

42 ENGINEERING↗

FFTF Acceptance and Startup Testing for GAIN

The Fast Flux Test Facility (FFTF) is the most recent liquid metal reactor (LMR) to be designed, constructed, and operated by the U.S. Department of Energy (DOE). The 400-MWt sodium-cooled, fast-neutron flux reactor plant was designed for irradiation testing of nuclear reactor fuels and materials for liquid metal fast breeder reactors. Following the demise of the breeder reactor program in the United States, FFTF continued to play a key role in providing a test bed for demonstrating performance of advanced fuel designs and demonstrating operation, maintenance, and safety of advanced liquid metal reactors. FFTF operations ceased in April 1992 after a determination by DOE that no combination of proposed missions was financially feasible over a ten-year period. The reactor is currently deactivated and in a long-term surveillance and maintenance (S&M) mode. This report provides information on the extensive and rigorous process that was used to conduct turnover from construction followed by acceptance and startup testing of the FFTF. This paper is in support of the Gateway for Accelerated Innovation in Nuclear (GAIN), which provides the nuclear energy community with access to the technical, regulatory, and financial support necessary to move new or advanced nuclear reactor designs toward commercialization while ensuring the continued safe, reliable, and economic operation of the existing nuclear fleet. The information obtained from the design, startup, and operation of the FFTF provides valuable insight for follow-on reactor projects, such as the Versatile Test Reactor (VTR), in the areas of plant system and component design, component fabrication, fuel design and performance, prototype testing, site construction, reactor startup and operations, and reactor deactivation and decommissioning (D&D). The focus of this report is on the process used to startup the FFTF and to ensure that operations could be conducted efficiently and safely. A reference section is provided of documents detailing the successful turnover and testing process implemented for startup of the reactor and its supporting systems. The documents listed can be retrieved upon request and are believed useful for future reactor startup endeavors.

21 SPECIFIC NUCLEAR REACTORS AND ASSOCIATED PLANTS↗