Search NASA⌕ Search

SEARCH · Search NASA

Results for “Disassembly”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 37 records · Page 2

Automation for Electric Vehicle Battery Pack Disassembly

Battery‐electric vehicles (EVs) are growing exponentially. The demand for these batteries is expected to increase sevenfold by 2035. The EV batteries reach their end of life when the capacity fades to 70%–80% of new, with some being removed from the primary applications with even lower levels of degradation. These batteries can be used in less demanding applications. The disassembly process is currently manual, slow, unsafe, and expensive. Automation is needed to increase the throughput. EV battery packs feature various continually changing designs and form factors, which limit the usefulness of deterministically programmed robotic solutions. The conceptual robotic disassembly of EV batteries has attracted the attention of researchers. However, while many approaches have been proposed, practical implementations are lacking. Here, we review proposed concepts for EV battery disassembly and describe the selected approach, with elements of partial solutions validated in a laboratory setting, including the selection of commercial solutions, the development of custom end effectors, and methodologies for detection, localization, and classification of fasteners. The computer vision tasks employed an overhead 2D camera to detect the type of battery pack and approximate localization of fasteners, and a 3D camera mounted on the robotic arm for precise localization (position and tilt) and classification.

Islam, Abu [Rochester Inst. of Technology, Rochest↗

Phosphorylation of p37 is important for Golgi disassembly at mitosis

Research highlights: {yields} p37 is phosphorylated on Serine-56 and Threonine-59 by Cdc2 at mitosis. {yields} Phosphorylated p37 does not bind to Golgi membranes. {yields} p37 phosphorylation inhibits p97/p37-mediated Golgi membrane fusion. -- Abstract: In mammals, the Golgi apparatus is disassembled at early mitosis and reassembled at the end of mitosis. For Golgi disassembly, membrane fusion needs to be blocked. Golgi biogenesis requires two distinct p97ATPase-mediated membrane fusion, the p97/p47 and p97/p37 pathways. We previously reported that p47 phosphorylation on Serine-140 by Cdc2 results in mitotic inhibition of the p97/p47 pathway . In this study, we demonstrate that p37 is phosphorylated on Serine-56 and Threonine-59 by Cdc2 at mitosis, and this phosphorylated p37 does not bind to Golgi membranes. Using an in vitro Golgi reassembly assay, we show that mutated p37(S56D, T59D), which mimics mitotic phosphorylation, does not cause any cisternal regrowth, indicating that p37 phosphorylation inhibits the p97/p37 pathway. Our results demonstrate that p37 phosphorylation on Serine-56 and Threonine-59 is important for Golgi disassembly at mitosis.

60 APPLIED LIFE SCIENCES↗

ASSESSMENT OF THE POTENTIAL FOR HYDROGEN GENERATION DURING GROUTING OPERATIONS IN C-REACTOR DISASSEMBLY BASIN

C-reactor disassembly basin is being prepared for deactivation and decommissioning (D and D). D and D activities will consist primarily of immobilizing contaminated scrap components and structures in a grout-like formulation. The disassembly basin will be the first area of the C-reactor building that will be immobilized. The scrap components contain aluminum alloy materials. Any aluminum will corrode very rapidly when it comes in contact with the very alkaline grout (pH > 13), and as a result would produce hydrogen gas. To address this potential deflagration/explosion hazard, Savannah River National Laboratory (SRNL) reviewed and evaluated existing experimental and analytical studies of this issue to determine if any process constraints are necessary. The risk of accumulation of a flammable mixture of hydrogen above the surface of the water during the injection of grout into the C-reactor disassembly area is low if the assessment of the aluminum surface area is reliable. Conservative calculations estimate that there is insufficient aluminum present in the basin areas to result in significant hydrogen accumulation in this local region. The minimum safety margin (or factor) on a 60% LFL criterion for a local region of the basin (i.e., Horizontal Tube Storage) was greater than 3. Calculations also demonstrated that a flammable situation in the vapor space above the basin is unlikely. Although these calculations are conservative, there are some measures that may be taken to further minimize the risk of developing a flammable condition during grouting operations.

08 HYDROGEN↗

AGR-3/4 Irradiation Test Train Disassembly and Component Metrology First Look Report

The AGR-3/4 experiment was designed to study fission product transport within graphitic matrix material and nuclear-grade graphite. To this end, this experiment consisted of 12 capsules, each fueled with 4 compacts containing UCO TRISO particles as driver fuel and 20 UCO designed-to-fail (DTF) fuel particles in each compact. The DTF fuel was fabricated with a thin pyrocarbon layer which was intended to fail during irradiation and provide a source of fission products. These fission products could then migrate through the compact and into the surrounding concentric rings of graphitic matrix material and/or nuclear graphite. Through post-irradiation examination (PIE) of the rings (including physical sampling and gamma scanning) fission product concentration profiles within the rings can be determined. These data can be used to elucidate fission product transport parameters (e.g. diffusion coefficients within the test materials) which will be used to inform and refine models of fission product transport. After irradiation in the Advanced Test Reactor (ATR) had been completed in April 2014, the AGR-3/4 experiment was shipped to the Hot Fuel Examination Facility (HFEF) at the Materials and Fuels Complex (MFC) for inspection, disassembly, and metrology. The AGR-3/4 test train was received at MFC in two separate shipments between February and April 2015. Visual examinations of the test train exterior did not indicate dimensional distortion, and only two small discolored areas were observed at the bottom of Capsules 8 and 9. No corresponding discoloration was found on the inside of these capsules, however. Prior to disassembly, the two test train sections were subject to analysis via the Precision Gamma Scanner (PGS), which did not indicate that any gross fuel relocation had occurred. A series of specialized tools (including clamps, cutters, and drills) had been designed and fabricated in order to carry out test train disassembly and recovery of capsule components (graphite rings and fuel compacts). This equipment performed well for separating each capsule in the test train and extracting the capsule components. Only a few problems were encountered. In one case, the outermost ring (the sink ring) was cracked during removal of the capsule through tubes. Although the sink ring will be analyzed in order to obtain a mass balance of fission products in the experiment, these cracks do not pose a major concern because the sink ring will not be analyzed in detail to obtain the spatial distribution of fission products. In Capsules 4 and 5, the compacts could not be removed from the inner rings. Strategies for removing the compacts are being evaluated. Sampling the inner rings with the compacts in-place is also an option. Dimensional measurements were made on the compacts, inner rings, outer rings, and sink rings. The diameters of all compacts decreased by 0.5 to 2.0 %. Generally, the extent of diametric shrinkage increased linearly with increasing neutron fluence. Most compact lengths also decreased. Compact lengths decreased with increasing fluence, reaching maximum shrinkage of about 0.9 % at a fast fluence of 4.0x10 25 n/m 2 E > 0.18 MeV. Above this fluence, the extent of length shrinkage appeared to decrease with fluence, and two compacts from Capsule 7 were found to have slightly increased in length (< 0.1 %) after a fluence of 5.2x10 25 n/m 2 .

21 SPECIFIC NUCLEAR REACTORS AND ASSOCIATED PLANTS↗

AGR-3/4 Irradiation Test Train Disassembly and Component Metrology First Look Report

The AGR-3/4 experiment was designed to study fission product transport within graphitic matrix material and nuclear-grade graphite. To this end, this experiment consisted of 12 capsules, each fueled with 4 compacts containing UCO TRISO particles as driver fuel and 20 UCO designed-to-fail (DTF) fuel particles in each compact. The DTF fuel was fabricated with a thin pyrocarbon layer which was intended to fail during irradiation and provide a source of fission products. These fission products could then migrate through the compact and into the surrounding concentric rings of graphitic matrix material and/or nuclear graphite. Through post-irradiation examination (PIE) of the rings (including physical sampling and gamma scanning) fission product concentration profiles within the rings can be determined. These data can be used to elucidate fission product transport parameters (e.g. diffusion coefficients within the test materials) which will be used to inform and refine models of fission product transport. After irradiation in the Advanced Test Reactor (ATR) had been completed in April 2014, the AGR-3/4 experiment was shipped to the Hot Fuel Examination Facility (HFEF) at the Materials and Fuels Complex (MFC) for inspection, disassembly, and metrology. The AGR-3/4 test train was received at MFC in two separate shipments between February and April 2015. Visual examinations of the test train exterior did not indicate dimensional distortion, and only two small discolored areas were observed at the bottom of Capsules 8 and 9. No corresponding discoloration was found on the inside of these capsules, however. Prior to disassembly, the two test train sections were subject to analysis via the Precision Gamma Scanner (PGS), which did not indicate that any gross fuel relocation had occurred. A series of specialized tools (including clamps, cutters, and drills) had been designed and fabricated in order to carry out test train disassembly and recovery of capsule components (graphite rings and fuel compacts). This equipment performed well for separating each capsule in the test train and extracting the capsule components. Only a few problems were encountered. In one case, the outermost ring (the sink ring) was cracked during removal of the capsule through tubes. Although the sink ring will be analyzed in order to obtain a mass balance of fission products in the experiment, these cracks do not pose a major concern because the sink ring will not be analyzed in detail to obtain the spatial distribution of fission products. In Capsules 4 and 5, the compacts could not be removed from the inner rings. Strategies for removing the compacts are being evaluated. Sampling the inner rings with the compacts in-place is also an option. Dimensional measurements were made on the compacts, inner rings, outer rings, and sink rings. The diameters of all compacts decreased by 0.5 to 2.0 %. Generally, the extent of diametric shrinkage increased linearly with increasing neutron fluence. Most compact lengths also decreased. Compact lengths decreased with increasing fluence, reaching maximum shrinkage of about 0.9 % at a fast fluence of 4.0x1025 n/m2 E > 0.18 MeV. Above this fluence, the extent of length shrinkage appeared to decrease with fluence, and two compacts from Capsule 7 were found to have slightly increased in length (< 0.1 %) after a fluence of 5.2x1025 n/m2.

21 SPECIFIC NUCLEAR REACTORS AND ASSOCIATED PLANTS↗

Photographic Mitigation Documentation Related to the Engine Assembly and Disassembly Facility, Area 25, Nevada National Security Site, Nye County, Nevada

This letter report provides documentation in partial fulfillment of the mitigation of adverse effects to the Engine Maintenance Assembly and Disassembly (E-MAD) facility, a major component of the Nuclear Rocket Development Station (NRDS) Historic District located in Area 25 of the Nevada National Security Site (NNSS). Construction of the E-MAD facility began in 1962 for the purpose of disassembling and maintaining nuclear-powered rocket engines. Once the building was complete in 1967, the E-MAD facility remained in continuous operation until the nuclear rocket program was terminated in 1973. The mothballed facility was repurposed in 1977 for spent nuclear fuel handling and packaging activities. By the mid-1980s, all activities at the E-MAD facility had ceased (Reno et al. 2019). This submission is intended to comply with Stipulation III.D.1 of the Memorandum of Agreement DE-GM58-20NA25534 between the U.S. Department of Energy and the Nevada State Historic Preservation Officer Regarding Corrective Action Activities and Demolition of the Engine Maintenance Assembly and Disassembly Facility and the Test Cell C Historic District, Major Components of the Nuclear Rocket Development Station Historic District Located in Area 25 at the Nevada National Security Site Nye County (hereafter referred to as the MOA). Stipulation III.D.1 states the U.S. Department of Energy (DOE) will submit the existing supplementary collection of the large-format, black-and-white photographic prints taken during the 1996 Historic American Engineering Record (HAER) documentation of the E-MAD facility to the Nuclear Testing Archive (NTA), located on the second floor of the Rogers Building at Desert Research Institute (DRI) in Las Vegas, Nevada.

54 ENVIRONMENTAL SCIENCES↗

Closure Report for Corrective Action Unit 117: Area 26 Pluto Disassembly Facility, Nevada Test Site, Nevada, Revision 0

This Closure Report (CR) presents information supporting the closure of Corrective Action Unit (CAU) 117: Area 26 Pluto Disassembly Facility, Nevada Test Site, Nevada. This CR complies with the requirements of the Federal Facility Agreement and Consent Order that was agreed to by the State of Nevada; U.S. Department of Energy (DOE), Environmental Management; U.S. Department of Defense; and DOE, Legacy Management. Corrective Action Unit 117 comprises Corrective Action Site (CAS) 26-41-01, Pluto Disassembly Facility, located in Area 26 of the Nevada Test Site. The purpose of this CR is to provide documentation supporting the completed corrective actions and provide data confirming that the closure objectives for CAU 117 were met. To achieve this, the following actions were performed: • Review the current site conditions, including the concentration and extent of contamination. • Implement any corrective actions necessary to protect human health and the environment. • Properly dispose of corrective action and investigation wastes. • Document Notice of Completion and closure of CAU 117 issued by the Nevada Division of Environmental Protection. From May 2008 through February 2009, closure activities were performed as set forth in the Streamlined Approach for Environmental Restoration Plan for Corrective Action Unit 117, Area 26 Pluto Disassembly Facility, Nevada Test Site, Nevada. The purpose of the activities as defined during the data quality objectives process were: • Determine whether contaminants of concern (COCs) are present. • If COCs are present, determine their nature and extent, implement appropriate corrective actions, and properly dispose of wastes. Analytes detected during the closure activities were evaluated against final action levels to determine COCs for CAU 117. Assessment of the data generated from closure activities indicated that the final action levels were exceeded for polychlorinated biphenyls (PCBs) reported as total Aroclor and radium-226. A corrective action was implemented to remove approximately 50 cubic yards of PCB-contaminated soil, approximately 1 cubic foot of radium-226 contaminated soil (and scabbled asphalt), and a high-efficiency particulate air filter that was determined to meet the criteria of a potential source material (PSM). Electrical and lighting components (i.e., PCB-containing ballasts and capacitors) and other materials (e.g., mercury-containing thermostats and switches, lead plugs and bricks) assumed to be PSM were also removed from Building 2201, as practical, without the need for sampling. Because the COC contamination and PSMs have been removed, clean closure of CAS 26-41-01 is recommended, and no use restrictions are required to be placed on this CAU. No further action is necessary because no other contaminants of potential concern were found above preliminary action levels. The physical end state for Building 2201 is expected to be eventual demolition to slab. The DOE, National Nuclear Security Administration Nevada Site Office provides the following recommendations: • Clean closure is the recommended corrective action for CAS 26-41-01 in CAU 117. • A Notice of Completion to the DOE, National Nuclear Security Administration Nevada Site Office is requested from the Nevada Division of Environmental Protection for closure of CAU 117. • Corrective Action Unit 117 should be moved from Appendix III to Appendix IV of the Federal Facility Agreement and Consent Order.

54 ENVIRONMENTAL SCIENCES↗

GROUT TEMPERATURE MEASUREMENTS IN 105-R DISASSEMBLY BASIN D AND E CANAL

The 105-R Reactor Disassembly Basin Grout Placement Strategy Report (SRNL-TR-2009-00157) identifies various portions of the facility that will undergo an in-situ decommissioning process. The estimated residual radioactive contamination in the 105-R facility is shown in Figure 1. Cementitious grout formulations developed by SRNL are being used to immobilize and isolate the radioactive contamination in existing below grade portions of the 105-R building as shown by the gray-hatched area in Figure 2. A Zero Bleed flowable fill was formulated for both dry placement and for underwater placement. The first major area in the 105-R Disassembly Basin to undergo the grouting process was the D&E Canal and an underlying void space known as the Chase. Grout temperature data was needed to ensure that the grout mix design was on the correct grout curing trajectory to meet the material compressive strength requirement of 50 pounds per square inch. Initial grout temperature measurements were needed to confirm and optimize grout mix design fresh property characteristics; i.e. material strength, and set time. Grout curing temperature is an integrating fresh property characteristic that is used to estimate cementitious material strength in accordance with the Standard Practice for Estimating Concrete Strength by the Maturity Method, ASTM C 1074. The Maturity Method is used in the construction industry to estimate in-place strength of concrete to allow the start of critical construction activities; e.g. formwork removal, removal of cold weather protection, opening of roadways to traffic, etc. Applying this methodology provides an expeditious means to estimate in-place grout strength based on compressive strength laboratory results. The Maturity Method results define the relationship between strength-time and age-time that may be utilized in the field for estimating strength after a given time of placement. Maturation curves were developed under the 105-R Reactor Disassembly Basin Cementitious Materials Laboratory Test Plan (SRNL-TR-2009-00175) to establish grout mix maturation indices for this relationship. Temperature data collected from the D&E grout placement will be evaluated against these maturation indices in a subsequent analysis. Grout temperature data outside the maturation indices highlight the opportunity to adjust the grout mix design for future placements. The pre-existing grout placement will not be removed since this material will comply with strength requirements under the normal curing duration. SRNL designed a standalone measurement system to collect grout mass placement temperature data in the D&E Canal. Four vertical poles instrumented with thermocouples were positioned in the canal prior to grout placement. The thermocouples were connected to stand-alone, battery-powered data recorders mounted nearby that were configured to take temperature recordings every 10 minutes for up to 100 days. Unfortunately, after just 2 weeks, data collection was terminated because the thermocouple wires connecting the data loggers to the thermocouple poles were severed during construction activities. This report will highlight the unique challenges in designing a data collection system for the D&E canal, describe the temperature measurement system and its installation, and present calculated as well as measured temperature values.

11 NUCLEAR FUEL CYCLE AND FUEL MATERIALS↗

Alignment Pins for Assembling and Disassembling Structures

Simple, easy-to-use, highly effective tooling has been devised for maintaining alignment of bolt holes in mating structures during assembly and disassembly of the structures. The tooling was originally used during removal of a body flap from the space shuttle Atlantis, in which misalignments during removal of the last few bolts could cause the bolts to bind in their holes. By suitably modifying the dimensions of the tooling components, the basic design of the tooling can readily be adapted to other structures that must be maintained in alignment. The tooling includes tapered, internally threaded alignment pins designed to fit in the bolt holes in one of the mating structures, plus a draw bolt and a cup that are used to install or remove each alignment pin. In preparation for disassembly of two mating structures, external supports are provided to prevent unintended movement of the structures. During disassembly of the structures, as each bolt that joins the structures is removed, an alignment pin is installed in its place. Once all the bolts have been removed and replaced with pins, the pins maintain alignment as the structures are gently pushed or pulled apart on the supports. In assembling the two structures, one reverses the procedure described above: pins are installed in the bolt holes, the structures are pulled or pushed together on the supports, then the pins are removed and replaced with bolts. The figure depicts the tooling and its use. To install an alignment pin in a bolt hole in a structural panel, the tapered end of the pin is inserted from one side of the panel, the cup is placed over the pin on the opposite side of the panel, the draw bolt is inserted through the cup and threaded into the pin, the draw bolt is tightened to pull the pin until the pin is seated firmly in the hole, then the draw bolt and cup are removed, leaving the pin in place. To remove an alignment pin, the cup is placed over the pin on the first-mentioned side of the panel, the draw bolt is inserted through the cup and threaded into the pin, then the draw bolt is tightened to pull the pin out of the hole.

Campbell, Oliver C.↗

Joining, Disassembly, and Reconfiguration of Thermoplastic Composites for Space Applications

Thermoplastic composites are increasingly being investigated for aerospace applications because of their relatively short processing time, good chemical and radiation resistance, and potential for reforming and reuse via melting. The manufacturing, reforming, and reuse of thermoplastic composites can be leveraged to advance joining, disassembly, and reassembly of structures for space exploration activities. Potential applications include, but are not limited to, habitats and on-orbit assembly and reassembly of large-scale truss structures. This work focuses on demonstrating the feasibility of joining, disassembly, and reassembly of a thermoplastic bond using heat and pressure. Polyether ether ketone (PEEK) composite adherends were joined using low-melt polyaryl ether ketone (LM-PAEK) thermoplastic films at the bonding interface. The single lap shear specimens with LM-PAEK film were tested and had a maximum shear strength between 5 and 8 MPa and consistently failed adhesively at the bondline. Reassembly of disassembled specimens was successfully demonstrated using additional thermoplastic interlayers. Thus, the reassembly of thermoplastic composite joints was found to be feasible. However, additional work is required to reduce film flowout and optimize consolidation parameters for an in space environment.

thermoplastic composites↗

Assignment of structural transitions during mechanical unwrapping of nucleosomes and their disassembly products

Nucleosome DNA unwrapping and its disassembly into hexasomes and tetrasomes is necessary for genomic access and plays an important role in transcription regulation. Previous single-molecule mechanical nucleosome unwrapping revealed a low- and a high-force transitions, and force-FRET pulling experiments showed that DNA unwrapping is asymmetric, occurring always first from one side before the other. However, the assignment of DNA segments involved in these transitions remains controversial. Here, using high-resolution optical tweezers with simultaneous single-molecule FRET detection, we show that the low-force transition corresponds to the undoing of the outer wrap of one side of the nucleosome (∼27 bp), a process that can occur either cooperatively or noncooperatively, whereas the high-force transition corresponds to the simultaneous unwrapping of ∼76 bp from both sides. This process may give rise stochastically to the disassembly of nucleosomes into hexasomes and tetrasomes whose unwrapping/rewrapping trajectories we establish. In contrast, nucleosome rewrapping does not exhibit asymmetry. To rationalize all previous nucleosome unwrapping experiments, it is necessary to invoke that mechanical unwrapping involves two nucleosome reorientations: one that contributes to the change in extension at the low-force transition and another that coincides but does not contribute to the high-force transition.

59 BASIC BIOLOGICAL SCIENCES↗

AGC-2 Disassembly Report

The Next Generation Nuclear Plant (NGNP) Graphite Research and Development (R&D) Program is currently measuring irradiated material properties for predicting the behavior and operating performance of new nuclear graphite grades available for use within the cores of new very high temperature reactor designs. The Advanced Graphite Creep (AGC) experiment, consisting of six irradiation capsules, will generate irradiated graphite performance data for NGNP reactor operating conditions. The AGC experiment is designed to determine the changes to specific material properties such as thermal diffusivity, thermal expansion, elastic modulus, mechanical strength, irradiation induced dimensional change rate, and irradiation creep for a wide variety of nuclear grade graphite types over a range of high temperature, and moderate doses. A series of six capsules containing graphite test specimens will be used to expose graphite test samples to a dose range from 1 to 7 dpa at three different temperatures (600, 900, and 1200°C) as described in the Graphite Technology Development Plan. Since irradiation induced creep within graphite components is considered critical to determining the operational life of the graphite core, some of the samples will also be exposed to an applied load to determine the creep rate for each graphite type under both temperature and neutron flux. All six AGC capsules in the experiment will be irradiated in the Advanced Test Reactor (ATR). AGC-1 and AGC-2 will be irradiated in the south flux trap and AGC-3–AGC-6 will be irradiated in the east flux trap. The change in flux traps is due to NGNP irradiation priorities requiring the AGC experiment to be moved to accommodate Fuel irradiation experiments. After irradiation, all six AGC capsules will be cooled in the ATR Canal, sized for shipment, and shipped to the Materials and Fuels Complex (MFC) where the capsule will be disassembled in the Hot Fuel Examination Facility (HFEF). During disassembly, the metallic capsule will be machined open and the individual samples removed from the interior graphite body containing the samples. Samples removed from the capsule will be loaded in a shipping drum and shipped to the Idaho National Laboratory (INL) Research Center (IRC) for initial post-irradiation examination (PIE) and storage for any future testing at the newly completed Carbon Characterization Laboratory (CCL). All work was performed under an ASME NQA-1-2008;1a-2009 compliant quality assurance program.

11 NUCLEAR FUEL CYCLE AND FUEL MATERIALS↗

AGR 5/6/7 Disassembly and Metrology

AGR 5/6/7 Disassembly and Metrology background, disassembly obervations on graphite holders and fuel compacts, metrology fuel compacts and graphite holders, and summary.

11 NUCLEAR FUEL CYCLE AND FUEL MATERIALS↗

Characterization of the disassembly and reassembly of the HBV glycoprotein surface antigen, a pliable nanoparticle vaccine platform

While nanoparticle vaccine technology is gaining interest due to the success of vaccines like those for the human papillomavirus that is based on viral capsid nanoparticles, little information is available on the disassembly and reassembly of viral surface glycoprotein-based nanoparticles. One such particle is the hepatitis B virus surface antigen (sAg) that exists as nanoparticles. Here we show, using biochemical analysis coupled with electron microscopy, that sAg nanoparticle disassembly requires both reducing agent to disrupt intermolecular disulfide bonds, and detergent to disrupt hydrophobic interactions that stabilize the nanoparticle. Particles were otherwise resistant to salt and urea, suggesting the driving mechanism of particle formation involves hydrophobic interactions. We reassembled isolated sAg protein into nanoparticles by detergent removal and reassembly resulted in a wider distribution of particle diameters. Knowledge of these driving forces of nanoparticle assembly and stability should facilitate construction of epitope-displaying nanoparticles that can be used as immunogens in vaccines.

60 APPLIED LIFE SCIENCES↗

Hydrodynamic disassembly and expansion of electron-beam-heated warm dense copper

Cu foils, 200 μm in thickness, were heated in two stages by a ~100-ns-long monoenergetic electron bunch at 19.8 MeV and a current of 1.7 kA (8.5 × 10 14 e - ) in a 2-mm-spot to T e ~1 eV. After 45 ns of isochoric heating, the pressure in the foil builds up to >20 GPa (200 kbar), it begins to hydrodynamically disassemble, and a velocity spread is measured. Near the end of the electron pulse, the 1550 nm probe is cut off or absorbed. Photonic Doppler velocimetry measurements were made to quantify the expansion velocity, hydrodynamic disassembly time, and pressure of the foil prior to cutoff. Measurements indicate foil motion begins the instant electrons pass through the foil and continues until the particle velocity approaches the ambient sound velocity of Cu and the bulk density exceeds the critical density of the probe. Finally, once the density of the plasma drops below the critical threshold and begins reflecting again, an expansion velocity of the classical plasma is also measured, similar to the point-source solution.

70 PLASMA PHYSICS AND FUSION TECHNOLOGY↗

Disassembly of Capsules after Irradiation of Prototype Metal and Nanocomposite Specimens in the High Flux Isotope Reactor

This report summarizes the disassembly, thermometry (TM) analysis, and future post-irradiation examination of irradiation capsules that contain nanodispersion-strengthened materials for the improved neutron irradiation resistance of fuel cladding and reactor core materials. All six capsules were successfully disassembled, and all TM was shipped to the Low Activation Materials Development and Analysis Laboratory for further analysis. The results of this project will support the development of new radiation-resistant materials by helping researchers understand the mechanism of defect evolution at interfaces in nanodispersion-strengthened materials.

36 MATERIALS SCIENCE↗

Unwrapping Radiograph Target Disassembly Using Adaptive Machine Learning [Slides]

Advanced analysis methods were developed to determine the electron temperature and density evolution of targets disassembly by intense electron beams at DARHT based on shearing interferometer and shadowgraph measurements. New methods have been developed to spatially and temporally resolve electron velocity and temperature, expanding on recently published first results of Aluminum target disassembly. A surrogate model has been created for use in developing Adaptive Machine Learning analysis techniques. The results will also be used to guide the development of the system and experimental approach to future measurements on DARHT Axis-I and a new system to be deployed on DARHT Axis-II.

43 PARTICLE ACCELERATORS↗

Final Status Survey Report for Corrective Action Unit 117 - Pluto Disassembly Facility, Building 2201, Nevada National Security Site, Nevada

This document contains the process knowledge, radiological data and subsequent statistical methodology and analysis to support approval for the radiological release of Corrective Action Unit (CAU) 117 – Pluto Disassembly Facility, Building 2201 located in Area 26 of the Nevada National Security Site (NNSS). Preparations for release of the building began in 2009 and followed the methodology described in the Multi-Agency Radiation Survey and Site Investigation Manual (MARSSIM). MARSSIM is the DOE approved process for release of Real Property (buildings and landmasses) to a set of established criteria or authorized limits. The pre-approved authorized limits for surface contamination values and corresponding assumptions were established by DOE O 5400.5. The release criteria coincide with the acceptance criteria of the U10C landfill permit. The U10C landfill is the proposed location to dispose of the radiologically non-impacted, or “clean,” building rubble following demolition. However, other disposition options that include the building and/or waste remaining at the NNSS may be considered providing that the same release limits apply. The Final Status Survey was designed following MARSSIM guidance by reviewing historical documentation and radiological survey data. Following this review a formal radiological characterization survey was performed in two phases. The characterization revealed multiple areas of residual radioactivity above the release criteria. These locations were remediated (decontaminated) and then the surface activity was verified to be less than the release criteria. Once remediation efforts had been successfully completed, a Final Status Survey Plan (10-015, “Final Status Survey Plan for Corrective Action Unit 117 – Pluto Disassembly Facility, Building 2201”) was developed and implemented to complete the final step in the MARSSIM process, the Final Status Survey. The Final Status Survey Plan consisted of categorizing each individual room into one of three categories: Class 1, Class 2 or Class 3 (a fourth category is a “Non-Impacted Class” which in the case of Building 2201 only pertained to exterior surfaces of the building.) The majority of the rooms were determined to fall in the less restrictive Class 3 category, however, Rooms 102, 104, 106, and 107 were identified as containing Class 1 and 2 areas. Building 2201 was divided into “survey units” and surveyed following the requirements of the Final Status Survey Plan for each particular class. As each survey unit was completed and documented, the survey results were evaluated. Each sample (static measurement) with units of counts per minute (cpm) was corrected for the appropriate background and converted to a value with units of dpm/100 cm2. With a surface contamination value in the appropriate units, it was compared to the surface contamination limits, or in this case the derived concentration guideline level (DCGLw). The appropriate statistical test (sign test) was then performed. If the survey unit was statistically determined to be below the DCGLw, then the survey unit passed and the null hypothesis (that the survey unit is above limits) was rejected. If the survey unit was equal to or below the critical value in the sign test, the null hypothesis was not rejected. This process was performed for all survey units within Building 2201. A total of thirty-three “Class 1,” four “Class 2,” and one “Class 3” survey units were developed, surveyed, and evaluated. All survey units successfully passed the statistical test. Building 2201 meets the release criteria commensurate with the Waste Acceptance Criteria (for radiological purposes) of the U10C landfill permit residing within NNSS boundaries. Based on the thorough statistical sampling and scanning of the building’s interior, Building 2201 may be considered radiologically “clean,” or free of contamination.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗