Search NASA⌕ Search

SEARCH · Search NASA

Results for “Draft Requirements”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 37 records · Page 2

Draft Geologic Disposal Requirements Basis for STAD Specification

This document provides supporting technical rationale in draft form as input for: STAD Performance Specification Requirements Rationale (planned to be issued as FCRD-NFST-2015- 000106). The supporting rationale addresses those parts of the storage, transportation and disposal (STAD) canister performance specification that pertain to geologic disposal. These parts include service lifetime, repository thermal performance, postclosure criticality, and materials selection. Each draft performance specification is presented, and those pertaining to geologic disposal are elaborated with brief sections labeled Rationale. More detail is provided in appendices that address: long-term performance of borated stainless steel, use of borated stainless steel in existing designs, recommendations for additional corrosion studies, stress corrosion cracking of canister shell materials, and a generic postclosure safety case for STAD canisters.

11 NUCLEAR FUEL CYCLE AND FUEL MATERIALS↗

Requirements and Waivers

Good requirements are the first step for good communications, and good communications are central to insure an understanding between the customer and contractor. Failure to generate good requirements is unfortunately commonplace and repeated. Waivers to requirements are discussed from a risk based point of view. The assumption that every requirement will eventually be waived is used to establish a critical review of a draft safety requirement. Validation methods of requirements are addressed. Value added that safety requirements contribute to the Project is estimated to further our critical review of draft requirements.

Goodin, James Ronald↗

Draft Geologic Disposal Requirements Basis for STAD Specification

This document provides the basis for requirements in the current version of Performance Specification for Standardized Transportation, Aging, and Disposal Canister Systems, (FCRD-NFST-2014-0000579) that are driven by storage and geologic disposal considerations. Performance requirements for the Standardized Transportation, Aging, and Disposal (STAD) canister are given in Section 3.1 of that report. Here, the requirements are reviewed and the rationale for each provided. Note that, while FCRD-NFST-2014-0000579 provides performance specifications for other components of the STAD storage system (e.g. storage overpack, transfer and transportation casks, and others), these have no impact on the canister performance during disposal, and are not discussed here.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Space Station Power System

The strategies, reasoning, and planning guidelines used in the development of the United States Space Station Program are outlined. The power required to support Space Station missions and housekeeping loads is a key driver in overall Space Station design. conversely, Space Station requirements drive the power technology. Various power system technology options are discussed. The mission analysis studies resulting in the required Space Station capabilities are also discussed. An example of Space Station functions and a concept to provide them is presented. The weight, area, payload and altitude requirements on draft and mass requirements are described with a summary and status of key power systems technology requirements and issues.

Baraona, C. R.↗

Particle Engulfment and Pushing by Solidifying Interfaces (PEPSI)

The preliminary definition phase included the following actions: producing a science requiring document (draft), producing a science requirements document (preliminary), updating the flight program proposal, project review at NASA Marshall Space Flight Center, and research work as defined in the statement of work. The first three items of this plan have been delivered by the University of Alabama to NASA according to schedule. A project review meeting was held at MSFC on June 29, 1993. Consequently, this part of the report will address the results of the research work performed in the Solidification Laboratory at the University of Alabama during the first six months of the project.

Stefanescu, Doru Michael↗

One Methodology for Proving Compliance to the Commercial Crew Program (CCP) Abort Capability Requirement

As of Draft 4.0 of the CCT-REQ-1130 requirements document for CCP, ISS Crew Transportation and Services Requirements Document, specific language for the verification of the abort capability requirement, 3.3.1.4, was added. The abort capability requirement ensures that the CTS under dispersed conditions is always capable of aborting from a failed LV. The Integrated Aborts IPT was asked to author a memo for how this verification might be completed. The following memo dictates one way that this requirement and its verification could be met, but this is the not the only method.

Proud, Ryan↗

Validation of Minimum Display Requirements for a UAS Detect and Avoid System

The full integration of Unmanned Aircraft Systems (UAS) into the National Airspace System (NAS), a prerequisite for enabling a broad range of public and commercial UAS operations, presents several technical challenges to UAS developers, operators and regulators. A primary barrier is the inability for UAS pilots (situated at a ground control station, or GCS) to comply with Title 14 Code of Federal Regulations sections 91.111 and 91.113, which require pilots to “see and avoid” other aircraft in order to maintain well clear. UAS pilots’ removal from the flight deck of the aircraft necessitates the development of a UAS-specific system for detecting nearby traffic and displaying traffic information to the pilot to support their ability to maintain an objectively defined “DAA well clear” threshold from other aircraft. This new UAS-specific function of remaining DAA well clear is called traffic avoidance. The resulting Detect and Avoid (DAA) system, however, will be subject to a collection of requirements that manufacturers will be obligated to meet in order to certify their equipment. RTCA Special Committee 228 (SC-228), a consortium of representatives from government, industry and academia, is responsible for developing and documenting the Minimum Operational Performance Standards (MOPS) for UAS DAA systems. The present study is the final in a series of human-in-the-loop (HITL) experiments designed to explore and test the various display and alerting requirements being incorporated into the DAA MOPS. Whereas the prior DAA HITLs examined a wide variety of DAA display features and concepts, the current experiment aims to validate the latest minimum display requirements for Phase 1 of the DAA MOPS. Rather than test different display concepts, this study tests two configurations of a MOPS-compatible DAA display: a version that is integrated into the primary navigation and control display of the GCS and a version that is physically separated from the primary display. This manipulation tests the draft minimum requirement that allows the DAA traffic display to be a separate, or standalone, configuration. This type of configuration is a more achievable near-term technology solution since it does not stipulate additional certification or integration requirements on UAS manufacturers. However, a standalone display configuration has the potential to result in pilot performance issues resulting from the cognitive costs of switching between the primary DAA display and the primary navigation and control display. This configuration is also particularly susceptible to errors if the displays are in different orientations (e.g., north-up versus track-up). Both the integrated and standalone display configurations were presented to 16 active UAS pilots in a medium-fidelity simulation, which included confederate air traffic controllers and pseudo pilots operating simulated manned traffic. Pilots were tasked with navigating two different mission routes while maintaining DAA well clear with scripted conflicts. Pilot response times (i.e., measured response) and ability to remain DAA well clear are reported. Primary results indicate that both display configurations resulted in favorable response times and well clear rates. While there were clear trends of pilots objectively performing better in the integrated display condition, with several measured response metrics reaching statistical significance, the differences between the two displays were typically moderate. While the primary variable of DAA display location did not have an especially large impact on pilot performance on its own, when examined alongside the type of DAA threat the pilot was facing (a caution-level versus a warning-level alert), the response time benefits associated with the integrated display were amplified. The implications of these American Institute of Aeronautics and Astronautics 2 results on the Phase 1 DAA MOPS and the connection of this data to previous studies is also discussed.

detect and avoid↗

Science Requirements for a Space Flight Experiment Entitled Critical Viscosity of Xenon

We propose to measure in low gravity the viscosity of xenon close to its critical point. The accuracy will be sufficient to eliminate uncertainties currently associated with the analysis of l-g experiments. The measurements will provide the first direct observation of the predicted power-law divergence of viscosity in a pure fluid. The measurements will also strengthen Zeno's test of mode coupling theory by greatly increasing the reliability of the extrapolation of viscosity to low reduced temperatures. Our scientific objectives are described in more detail in one of the attached reports. The low-gravity experiment will be the final stage of a program whose completed ground-based stages are: (1) theoretical studies by one of the principal investigators (MRM) and coworkers, (2) critical viscosity measurements of binary liquid mixtures, (3) critical viscosity measurements of pure fluids in l-g, and development of a suitable vibration-insensitive viscometer. Our technical approach is described in the draft Science Requirements Document. One of us (MRM) has reviewed opportunities for critical phenomena research in low gravity. Both of us were co-principal investigators in the Thermal Equilibration Experiment in the Critical Point Facility, flown on IML-1 in 1992. From this experience, and from the technical maturity of our ground-based work, we believe our critical point viscometer is ready for development as a flight experiment.

Berg, Robert F.↗

Precision Local Positioning System

The primary goal of the project is to lay the groundwork for a new system design, meaning that at the end of this project’s effort, a traditional LLNL project could begin. For this goal to be met, the overarching needs of potential sponsors and stakeholders must be analyzed and understood, and a clear statement of work should be able to be drafted from the finding in this report. More specifically, the results from this project should immediately feed into the drafting of requirements, an implementation plan, and a budget plan for a future project. In order to accomplish this goal, the team set a broad framework for work to be completed. First, conduct current market research and select reference technologies to decompose. From the decompositions, analyze shortcomings, possible pain-points and form metrics and architectural decisions. Next, analyze the potential market area by interviewing/researching stakeholders and understanding their needs. As an additional project goal, attempt to capture as large a market area and scope as reasonably possible by incorporating more than the traditional LLNL sponsors. From the information gathered, study stakeholder salience and understand the relationships between stakeholders, mission areas, mission critical functions, and system metrics. Further analyze the relationships to focus on critical system aspects and to group stakeholders and mission together in order to reduce system complexity while maintaining wide marketability. Finally, begin brainstorming concepts from the established architectural decision and use the found metrics to create tradespaces to down select the most viable architectures. This document presents the team’s findings as it progressed through the project’s strategy.

42 ENGINEERING↗

Development of an Interactive Valuation Model for Distributed Energy Resource Value

The Oklahoma Secretary of Commerce & Tourism (OSCT) seeks to address perceived challenges and barriers to the deployment of distributed energy generation resources (DERs), including solar and other technologies, in the state of Oklahoma. The Scope of Work (SOW) outlines follow-on tasks related to the previous CRADA # CRD-18-762. The first task will finalize the Interactive Valuation Model Requirements Document, the final draft of which was provided in June 2018. The second task includes the building, validation, and finalization of the interactive valuation model for expressing distributed energy resource value based on user inputs to be completed by June 30, 2019. Training for how to prepare the data inputs and use the model will also be provided. To address perceived challenges and barriers to the deployment of distributed energy generation resources (DERs), including solar and other technologies, in the state of Oklahoma, the work under this CRADA will: 1) finalize the draft Interactive Valuation Model Requirements Document delivered in June 2018; 2) finish building and validating the interactive valuation model for expressing DER value based on user inputs, and 3) provide training for use of this model.

14 SOLAR ENERGY↗

Modeling approach for very high efficiency dedicated outdoor air systems in new construction and major renovation

Based on a draft program requirement for very high efficiency dedicated outdoor air systems (VHE DOAS) provided by NEEA, a more detailed report (Hart, Lerond, Goel, & Rosenberg, 2020) proposed sequences of operation and modeling strategies for such equipment. Simulations were carried out to estimate savings potential of these sequences of operation.

32 ENERGY CONSERVATION, CONSUMPTION, AND UTILIZATI↗

A Reliable Earth Return System for Safe Recovery of Mars Samples

The objective of a Mars sample return mission is to bring selected Mars surface materials to Earth. Numerous approaches for the Earth-return segment have been analyzed including propulsive or aerocapture return to low-Earth orbit followed by Space Shuttle rendezvous and direct entry. Of these approaches, ballistic entry of a small capsule terminating in a ground landing has been shown to be the lowest risk strategy. Over the past two years, significant work has been performed towards development of a robust direct entry vehicle for Mars sample return. In June 1999, the NASA Planetary Protection Officer provided initial guidance to the former Mars Sample Return Project. The sample return phase of the mission was assigned a restricted Earth return planetary protection classification. The draft mission requirement states that the total mean probability of release of unsterilized Mars material into the Earth;s biosphere must be less than 1.0E-06 (1 in a million). This strict requirement drives the approach and design of the Earth return system. To meet this requirement, selection of the Earth return strategy and development of the Earth return system must be guided by risk, not performance, based decisions. An initial Probabilistic Risk Assessment (PRA) was performed to address the direct entry Earth return system containment assurance reliability and to identify high-risk elements of this system. The results of this PRA identified risk elements that include thermal protection system performance during entry, spin-eject orientation and aerodynamic stability during entry, structural integrity under atmospheric deceleration and impact loads, and tracking/recovery of this system. This initial probabilistic risk quantification demonstrates that, with the proper development program, a prototypical direct entry design can satisfy the containment assurance reliability requirement. Through the current Mars Sample Return Advanced Technology Development effort, an extensive design, analysis, and test program is presently proceeding with the aim of reducing the containment assurance risk of this system. This technology development effort, guided by a continuing PRA, focuses on key risk areas of a direct entry Earth return system including: the thermal protection system, impact dynamics, structural performance, aerodynamic stability, and ground recovery. This development program will culminate in a system validation flight test, 1-2 years prior to launch of the flight system. This flight test would include the launch, entry, and recovery of a full-scale Earth return system, as a scientific validation of the key risk elements to verify nominal design performance. The results of the initial PRA suggested several dominant failure sequences that can be validated in a flight test. These include: demonstrating the thermal protection system reliability and performance during entry, demonstrating the spin-eject orientation and aero-dynamic stability during entry, demonstrating the structural integrity under atmospheric deceleration and impact loads, and demonstrating tracking and recovery of the Earth return system. This single test will directly address over 50% of the total containment assurance risk elements. This presentation will begin by presenting the relative risk of various Earth return strategies. The results of the initial probabilistic risk assessment will be presented followed by a discussion of the development accomplishments and plans for demonstration of a highly reliable direct entry Earth return system.

Braun, R.↗

Complex Decision-Making Applications for the NASA Space Launch System

The Space Shuttle program is ending and elements of the Constellation Program are either being cancelled or transitioned to new NASA exploration endeavors. The National Aeronautics and Space Administration (NASA) has worked diligently to select an optimum configuration for the Space Launch System (SLS), a heavy lift vehicle that will provide the foundation for future beyond low earth orbit (LEO) large-scale missions for the next several decades. Thus, multiple questions must be addressed: Which heavy lift vehicle will best allow the agency to achieve mission objectives in the most affordable and reliable manner? Which heavy lift vehicle will allow for a sufficiently flexible exploration campaign of the solar system? Which heavy lift vehicle configuration will allow for minimizing risk in design, test, build and operations? Which heavy lift vehicle configuration will be sustainable in changing political environments? Seeking to address these questions drove the development of an SLS decision-making framework. From Fall 2010 until Spring 2011, this framework was formulated, tested, fully documented, and applied to multiple SLS vehicle concepts at NASA from previous exploration architecture studies. This was a multistep process that involved performing figure of merit (FOM)-based assessments, creating Pass/Fail gates based on draft threshold requirements, performing a margin-based assessment with supporting statistical analyses, and performing sensitivity analysis on each. This paper discusses the various methods of this process that allowed for competing concepts to be compared across a variety of launch vehicle metrics. The end result was the identification of SLS launch vehicle candidates that could successfully meet the threshold requirements in support of the SLS Mission Concept Review (MCR) milestone.

Lyles, Garry↗

Complex Decision-Making Applications for the NASA Space Launch System

The Space Shuttle program is ending and elements of the Constellation Program are either being cancelled or transitioned to new NASA exploration endeavors. NASA is working diligently to select an optimum configuration for the Space Launch System (SLS), a heavy lift vehicle that will provide the foundation for future beyond LEO large ]scale missions for the next several decades. Thus, multiple questions must be addressed: Which heavy lift vehicle will best allow the agency to achieve mission objectives in the most affordable and reliable manner? Which heavy lift vehicle will allow for a sufficiently flexible exploration campaign of the solar system? Which heavy lift vehicle configuration will allow for minimizing risk in design, test, build and operations? Which heavy lift vehicle configuration will be sustainable in changing political environments? Seeking to address these questions drove the development of an SLS decisionmaking framework. From Fall 2010 until Spring 2011, this framework was formulated, tested, fully documented, and applied to multiple SLS vehicle concepts at NASA from previous exploration architecture studies. This was a multistep process that involved performing FOM-based assessments, creating Pass/Fail gates based on draft threshold requirements, performing a margin-based assessment with supporting statistical analyses, and performing sensitivity analysis on each. This paper discusses the various methods of this process that allowed for competing concepts to be compared across a variety of launch vehicle metrics. The end result was the identification of SLS launch vehicle candidates that could successfully meet the threshold requirements in support of the SLS Mission Concept Review (MCR) milestone.

Lyles, Garry↗

Space Launch System Complex Decision-Making Process

The Space Shuttle program has ended and elements of the Constellation Program have either been cancelled or transitioned to new NASA exploration endeavors. The National Aeronautics and Space Administration (NASA) has worked diligently to select an optimum configuration for the Space Launch System (SLS), a heavy lift vehicle that will provide the foundation for future beyond low earth orbit (LEO) large-scale missions for the next several decades. From Fall 2010 until Spring 2011, an SLS decision-making framework was formulated, tested, fully documented, and applied to multiple SLS vehicle concepts at NASA from previous exploration architecture studies. This was a multistep process that involved performing figure of merit (FOM)-based assessments, creating Pass/Fail gates based on draft threshold requirements, performing a margin-based assessment with supporting statistical analyses, and performing sensitivity analysis on each. This paper focuses on the various steps and methods of this process (rather than specific data) that allowed for competing concepts to be compared across a variety of launch vehicle metrics in support of the successful completion of the SLS Mission Concept Review (MCR) milestone.

Lyles, Garry↗