Search NASA⌕ Search

SEARCH · Search NASA

Results for “Early flight risk”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 37 records · Page 2

SEMMS - Understanding the solar electric multimission concept.

The feasibility of developing a solar electric multimission spacecraft (SEMMS) is examined with emphasis on understanding the effect of solar electric propulsion elements on a spacecraft system design. The applicability of Mariner, Viking, and thermoelectric outer planet spacecraft (TOPS) technologies to postulated mission/science objectives is investigated. A Mariner/Viking-based, modular spacecraft evolves which, with minimum modifications, is capable of performing a variety of interplanetary missions, including comet and asteroid rendezvous and orbit of Mercury, Jupiter, and Saturn. An early technology-evaluation flight is recommended to minimize the risk in subsequent missions.

Irace, W. R.↗

Nutrition and renal stone disease in space

There is a growing body of evidence from the National Aeronautics and Space Administration and the Russian space program showing that humans exposed to the microgravity environment of space have a greater risk for developing renal stones. Increased bone resorption and the attendant hypercalciuria and hyperphosphaturia contribute significantly to raising the urinary state of saturation with respect to the calcium salts, namely calcium oxalate and calcium phosphate. In addition, other environmental and dietary factors may adversely affect urine composition and increase stone formation risk during space flight. For example, reductions in urinary volume, pH, and citrate contribute to raising stone formation risk. In addition to raising the risk for calcium stone formation, this metabolic profile is conducive to the formation of uric acid stones. Although observations to date have suggested that there may actually be a reduced food intake during the early phase of flight, crew members on longer-duration flights may increase food intake and be at increased risk for stone formation. Taken together, these findings support the use of nutritional recommendations for crew members that would serve to reduce the stone-forming propensity of the urinary environment. Pharmacologic intervention should be directed at raising urinary volumes, diminishing bone losses, and preventing reductions in urinary pH and citrate. Success in reducing the risk for stone formation in astronauts would also be of potential major benefit to the estimated 20 million Americans with nephrolithiasis.

Review↗

Technology Applications that Support Space Exploration

Several enabling technologies have been identified that would provide significant benefits for future space exploration. In-Space demonstrations should be chosen so that these technologies will have a timely opportunity to improve efficiencies and reduce risks for future spaceflight. An early window exists to conduct ground and flight demonstrations that make use of existing assets that were developed for the Space Shuttle and the Constellation programs. The work could be mostly performed using residual program civil servants, existing facilities and current commercial launch capabilities. Partnering these abilities with the emerging commercial sector, along with other government agencies, academia and with international partners would provide an affordable and timely approach to get the launch costs down for these payloads, while increasing the derived benefits to a larger community. There is a wide scope of varied technologies that are being considered to help future space exploration. However, the cost and schedule would be prohibitive to demonstrate all these in the near term. Determining which technologies would yield the best return in meeting our future space needs is critical to building an achievable Space Architecture that allows exploration beyond Low Earth Orbit. The best mix of technologies is clearly to be based on our future needs, but also must take into account the availability of existing assets and supporting partners. Selecting those technologies that have complimentary applications will provide the most knowledge, with reasonable cost, for future use The plan is to develop those applications that not only mature the technology but actually perform a useful task or mission. These might include such functions as satellite servicing, a propulsion stage, processing lunar regolith, generating and transmitting solar power, cryogenic fluid transfer and storage and artificial gravity. Applications have been selected for assessment for future consideration and are addressed in this paper. These applications have been made available to the various NASA study groups that are determining the next steps the Agency must take to secure a sound foundation for future space exploration The paper also addresses how follow-on demonstrations, as launch performance grows, can build on the earlier applications to provide increased benefits for both the commercial and scientific communities. The architecture of incrementally building upon previous successes and insights dramatically lowers the overall associated risk for developing and maturing the key enabling technologies. The goal is to establish a potential business case that encourages commercial activity, thereby reducing the cost for the demonstration while using the technology maturation in developing readiness for future space exploration with overall less risk.

Henderson, Edward M.↗

The Impact of Apollo-Era Microbiology on Human Space Flight

The microbiota of crewmembers and the spacecraft environment contributes significant risk to crew health during space flight missions. NASA reduces microbial risk with various mitigation methods that originated during the Apollo Program and continued to evolve through subsequent programs: Skylab, Shuttle, and International Space Station (ISS). A quarantine of the crew and lunar surface samples, within the Lunar Receiving Laboratory following return from the Moon, was used to prevent contamination with unknown extraterrestrial organisms. The quarantine durations for the crew and lunar samples were 21 days and 50 days, respectively. A series of infections among Apollo crewmembers resulted in a quarantine before launch to limit exposure to infectious organisms. This Health Stabilization Program isolated the crew for 21 days before flight and was effective in reducing crew illness. After the program developed water recovery hardware for Apollo spacecraft, the 1967 National Academy of Science Space Science Board recommended the monitoring of potable water. NASA implemented acceptability limits of 10 colony forming units (CFU) per mL and the absence of viable E. coli, anaerobes, yeasts, and molds in three separate 150 mL aliquots. Microbiological investigations of the crew and spacecraft environment were conducted during the Apollo program, including the Apollo-Soyuz Test Project and Skylab. Subsequent space programs implemented microbial screening of the crew for pathogens and acceptability limits on spacecraft surfaces and air. Microbiology risk mitigation methods have evolved since the Apollo program. NASA cancelled the quarantine of the crew after return from the lunar surface, reduced the duration of the Health Stabilization Program; and implemented acceptability limits for spacecraft surfaces and air. While microbial risks were not a main focus of the early Mercury and Gemini programs, the extended duration of Apollo flights resulted in the increased scrutiny of impact of the space flight environment on crew health. The lessons learned during that era of space flight continue to impact microbiology risk mitigation in space programs today.

Elliott, T. F↗

Flight and Integrated Vehicle Testing: Laying the Groundwork for the Next Generation of Space Exploration Launch Vehicles

Integrated vehicle testing will be critical to ensuring proper vehicle integration of the Ares I crew launch vehicle and Ares V cargo launch vehicle. The Ares Projects, based at Marshall Space Flight Center in Alabama, created the Flight and Integrated Test Office (FITO) as a separate team to ensure that testing is an integral part of the vehicle development process. As its name indicates, FITO is responsible for managing flight testing for the Ares vehicles. FITO personnel are well on the way toward assembling and flying the first flight test vehicle of Ares I, th Ares I-X. This suborbital development flight will evaluate the performance of Ares I from liftoff to first stage separation, testing flight control algorithms, vehicle roll control, separation and recovery systems, and ground operations. Ares I-X is now scheduled to fly in summer 2009. The follow-on flight, Ares I-Y, will test a full five-segment first stage booster and will include cryogenic propellants in the upper stage, an upper stage engine simulator, and an active launch abort system. The following flight, Orion 1, will be the first flight of an active upper stage and upper stage engine, as well as the first uncrewed flight of an Orion spacecraft into orbit. The Ares Projects are using an incremental buildup of flight capabilities prior to the first operational crewed flight of Ares I and the Orion crew exploration vehicle in 2015. In addition to flight testing, the FITO team will be responsible for conducting hardware, software, and ground vibration tests of the integrated launch vehicle. These efforts will include verifying hardware, software, and grou handling interfaces. Through flight and integrated testing, the Ares Projects will identify and mitigate risks early the United States prepares to take its next giant leaps to the Moon and beyond.

Taylor, Jim↗

Flight and Integrated Vehicle Testing: Laying the Groundwork for the Next Generation of Space Exploration Launch Vehicles

Integrated vehicle testing will be critical to ensuring proper vehicle integration of the Ares I crew launch vehicle and Ares V cargo launch vehicle. The Ares Projects, based at Marshall Space Flight Center in Alabama, created the Flight and Integrated Test Office (FITO) as a separate team to ensure that testing is an integral part of the vehicle development process. As its name indicates, FITO is responsible for managing flight testing for the Ares vehicles. FITO personnel are well on the way toward assembling and flying the first flight test vehicle of Ares I, the Ares I-X. This suborbital development flight will evaluate the performance of Ares I from liftoff to first stage separation, testing flight control algorithms, vehicle roll control, separation and recovery systems, and ground operations. Ares I-X is now scheduled to fly in summer 2009. The follow-on flight, Ares I-Y, will test a full five-segment first stage booster and will include cryogenic propellants in the upper stage, an upper stage engine simulator, and an active launch abort system. The following flight, Orion 1, will be the first flight of an active upper stage and upper stage engine, as well as the first uncrewed flight of an Orion spacecraft into orbit. The Ares Projects are using an incremental buildup of flight capabilities prior to the first operational crewed flight of Ares I and the Orion crew exploration vehicle in 2015. In addition to flight testing, the FITO team will be responsible for conducting hardware, software, and ground vibration tests of the integrated launch vehicle. These efforts will include verifying hardware, software, and ground handling interfaces. Through flight and integrated testing, the Ares Projects will identify and mitigate risks early as the United States prepares to take its next giant leaps to the Moon and beyond.

Taylor, J. L.↗

Early Oscillation Detection for DC/DC Converter Fault Diagnosis

The electrical power system of a spacecraft plays a very critical role for space mission success. Such a modern power system may contain numerous hybrid DC/DC converters both inside the power system electronics (PSE) units and onboard most of the flight electronics modules. One of the faulty conditions for DC/DC converter that poses serious threats to mission safety is the random occurrence of oscillation related to inherent instability characteristics of the DC/DC converters and design deficiency of the power systems. To ensure the highest reliability of the power system, oscillations in any form shall be promptly detected during part level testing, system integration tests, flight health monitoring, and on-board fault diagnosis. The popular gain/phase margin analysis method is capable of predicting stability levels of DC/DC converters, but it is limited only to verification of designs and to part-level testing on some of the models. This method has to inject noise signals into the control loop circuitry as required, thus, interrupts the DC/DC converter's normal operation and increases risks of degrading and damaging the flight unit. A novel technique to detect oscillations at early stage for flight hybrid DC/DC converters was developed.

Wang, Bright L.↗

Advanced Supersonic Parachute Inflation Research and Experiment-2 (ASPIRE2) Flight Mechanics Modeling and Simulation

Introduction: The Advanced Supersonic Para-chute Inflation Research Experiment-2 (ASPIRE2) program is a sounding rocket flight test to be conducted at Wallops Island, VA in early 2025. This program is a risk mitigation exercise for the Mars Sample Retrieval Lander (MSRL) program and builds upon the success of the 2017 & 2018 ASPIRE program, [1,2]. While the ASPIRE program certified the strengthened 21.5 m diameter disk-gap-band (DGB) deployed at Mach 1.7, ASPIRE2 will certify a 24 m diameter DGB deployed at Mach 2.1. The need to certify this increased parachute performance is driven the increased lander mass for MSRL; over 50% increase in comparison to M2020. Modeling: Like its predecessor, ASPIRE2 is developing a multi-body flight dynamics simulation to predict parachute dynamics and aide in designing the flight test that will target Mars-relevant flight conditions, as shown in Figure 1. This work de-scribes the parachute modeling, flight mechanics simulations (from payload separation to splash-down), and design trades used to prepare for the 2025 ASPIRE2 flight. Discussed herein are comparisons between ASPIRE and ASPIRE2, noting key differences in the parachute modeling and vehicle configuration. A study on the attitude control system performance impacts with respect to payload section design will also be presented. This work will quantify the pre-flight parachute performance in the presence of uncertainties, such as those associated with the separation from the sounding rocket, atmosphere, the parachute system, and vehicle mass. The pre-flight predictions will include Monte Carlo analyses, powered by the flight mechanics simulations to show the ASPIRE2 vehicle performance in meeting program requirements on parachute deployment conditions (Mach & dynamic pressure), parachute loads, vehicle attitude at key milestones, and the vehicle splashdown conditions.

Entry Descent and Landing↗

NASA Propulsion Concept Studies and Risk Reduction Activities for Resource Prospector Lander

The trade study has led to the selection of propulsion concept with the lowest cost and net lowest risk -Government-owned, flight qualified components -Meet mission requirements although the configuration is not optimized. Risk reduction activities have provided an opportunity -Implement design improvements while development with the early-test approach. -Gain knowledge on the operation and identify operation limit -Data to anchor analytical models for future flight designs; The propulsion system cold flow tests series have provided valuable data for future design. -The pressure surge from the system priming and waterhammer within component operation limits. -Enable to optimize the ullage volume to reduce the propellant tank mass; RS-34 hot fire tests have successfully demonstrated of using the engines for the RP mission -No degradation of performance due to extended storage life of the hardware. -Enable to operate the engine for RP flight mission scenarios, outside of the qualification regime. -Provide extended data for the thermal and GNC designs. Significant progress has been made on NASA propulsion concept design and risk reductions for Resource Prospector lander.

Trinh, Huu P.↗

Early Results and Spaceflight Implications of the SWAB Flight Experiment

Microbial monitoring of spacecraft environments provides key information in the assessment of infectious disease risk to the crew. Monitoring aboard the Mir space station and International Space Station (ISS) has provided a tremendous informational baseline to aid in determining the types and concentrations of microorganisms during a mission. Still, current microbial monitoring hardware utilizes culture-based methodology which may not detect many medically significant organisms, such as Legionella pneumophila. We hypothesize that evaluation of the ISS environment using non-culture-based technologies would reveal microorganisms not previously reported in spacecraft, allowing for a more complete health assessment. To achieve this goal, a spaceflight experiment, operationally designated as SWAB, was designed to evaluate the DNA from environmental samples collected from ISS and vehicles destined for ISS. Results from initial samples indicate that the sample collection and return procedures were successful. Analysis of these samples using denaturing gradient gel electrophoresis and targeted PCR primers for fungal contaminants is underway. The current results of SWAB and their implication for in-flight molecular analysis of environmental samples will be discussed.

Ott, C. Mark↗

NASA CARA Prelaunch Analysis and Process

NASA implemented an official Procedural Requirement (NPR) 8079.1 in June 2023, establishing the minimum collision avoidance requirements and associated operational protocols for NASA space flight programs, projects, and spacecraft to protect the space environment by reducing the risk of collision to an acceptable level. Part of the requirement employs a two-fold approach to analyze the satellite design process with conjunction assessment and risk mitigation in mind, during the pre-launch process, led by the Conjunction Assessment Risk Analysis (CARA) Program for non-Human Space Flight (HSF) Missions. This presentation outlines CARA coordination with missions, informed by the NPR, that spans early mission development to operations. CARA is an Agency-level resource that provides support to all NASA non-HSF missions. CARA protects the orbital environment from collision between NASA non-HSF missions and other tracked on-orbit objects. During the pre-formulation and formulation phases, NASA missions undergo a series of conjunction assessment analyses captured in the Orbital Collision Avoidance Plan (OCAP) prior to transitioning to the implementation phase (typically at the Preliminary Design Review (PDR) or equivalent). The OCAP analyses consist of a thorough review of the spacecraft(s) orbit selection and placement, deployment, cataloguing performance, trackability, ephemeris generation, conjunction mitigation options, autonomous maneuvering, and risk assessment parameters which are performed by a dedicated CARA Analysis Team. The results of these analyses, CARA’s formal recommendations, and the mission’s methods for implementing them, are documented in the OCAP. The intent of engaging in this process so early in the mission design phase, is to ensure that conjunction assessment is considered from the outset, thus mitigating costly design changes and operational risks down the road. NASA missions are also required to coordinate their operational processes and conjunction mitigation procedures with CARA in a Conjunction Assessment Operations Implementation Agreement (CAOIA). The aim of this process is to document the conjunction assessment screening process, conjunction risk assessment parameters, conjunction mitigation steps, flight dynamics operations concepts and maneuvers, and the communication and coordination process between the mission’s project manager and CARA. The intent of the CAOIA document is for it to be completed iteratively, and as missions update these elements, corresponding changes are made in the CAOIA. With this process in place, the engagement and coordination between the missions and CARA from early in the design process into mission operations, helps to ensure that missions not only have a robust conjunction assessment concept of operations to reduce conjunction risk for space sustainability, but are also able to achieve their science goals and have a successful mission.

conjunction assessment↗

NASA CARA Prelaunch Analysis and Process

NASA implemented an official Procedural Requirement (NPR) 8079.1 in June 2023, establishing the minimum collision avoidance requirements and associated operational protocols for NASA space flight programs, projects, and spacecraft to protect the space environment by reducing the risk of collision to an acceptable level. Part of the requirement employs a two-fold approach to analyze the satellite design process with conjunction assessment and risk mitigation in mind, during the pre-launch process, led by the Conjunction Assessment Risk Analysis (CARA) Program for non-Human Space Flight (HSF) Missions. This presentation outlines CARA coordination with missions, informed by the NPR, that spans early mission development to operations. CARA is an Agency-level resource that provides support to all NASA non-HSF missions. CARA protects the orbital environment from collision between NASA non-HSF missions and other tracked on-orbit objects. During the pre-formulation and formulation phases, NASA missions undergo a series of conjunction assessment analyses captured in the Orbital Collision Avoidance Plan (OCAP) prior to transitioning to the implementation phase (typically at the Preliminary Design Review (PDR) or equivalent). The OCAP analyses consist of a thorough review of the spacecraft(s) orbit selection and placement, deployment, cataloguing performance, trackability, ephemeris generation, conjunction mitigation options, autonomous maneuvering, and risk assessment parameters which are performed by a dedicated CARA Analysis Team. The results of these analyses, CARA’s formal recommendations, and the mission’s methods for implementing them, are documented in the OCAP. The intent of engaging in this process so early in the mission design phase, is to ensure that conjunction assessment is considered from the outset, thus mitigating costly design changes and operational risks down the road. NASA missions are also required to coordinate their operational processes and conjunction mitigation procedures with CARA in a Conjunction Assessment Operations Implementation Agreement (CAOIA). The aim of this process is to document the conjunction assessment screening process, conjunction risk assessment parameters, conjunction mitigation steps, flight dynamics operations concepts and maneuvers, and the communication and coordination process between the mission’s project manager and CARA. The intent of the CAOIA document is for it to be completed iteratively, and as missions update these elements, corresponding changes are made in the CAOIA. With this process in place, the engagement and coordination between the missions and CARA from early in the design process into mission operations, helps to ensure that missions not only have a robust conjunction assessment concept of operations to reduce conjunction risk for space sustainability, but are also able to achieve their science goals and have a successful mission.

conjunction assessment↗

Ares I-X Roll Control System Development

Project Managers often face challenging technical, schedule and budget issues. This presentation will explore how the Ares I-X Roll Control System Integrated Product Team (IPT) mitigated challenges such as concurrent engineering requirements and environments and evolving program processes, while successfully managing an aggressive project schedule and tight budget. IPT challenges also included communications and negotiations among inter- and intra-government agencies, including the US Air Force, NASA/MSFC Propulsion Engineering, LaRC, GRC, KSC, WSTF, and the Constellation Program. In order to successfully meet these challenges it was essential that the IPT define those items that most affected the schedule critical path, define early mitigation strategies to reduce technical, schedule, and budget risks, and maintain the end-product focus of an "unmanned test flight" context for the flight hardware. The makeup of the IPT and how it would function were also important considerations. The IPT consisted of NASA/MSFC (project management, engineering, and safety/quality) and contractors (Teledyne Brown Engineering and Pratt and Whitney Rocketdyne, who supplied heritage hardware experience). The early decision to have a small focused IPT working "badgelessly" across functional lines to eliminate functional stove-piping allowed for many more tasks to be done by fewer people. It also enhanced a sense of ownership of the products, while still being able to revert back to traditional roles in order to provide the required technical independence in design reviews and verification closures. This presentation will highlight several prominent issues and discuss how they were mitigated and the resulting Lessons Learned that might benefit other projects.

Unger, Ronald J.↗

Orion Heat Shield Manufacturing Producibility Improvements for the EM-1 Flight Test Program

This paper describes how the Orion program is incorporating improvements in the heat shield design and manufacturing processes reducing programmatic risk and ensuring crew safety in support of NASA’s Exploration Missions. The Orion program successfully completed the EFT-1 flight test in 2014 and is currently developing the EM-1 spacecraft to meet the test objectives of an orbital mission to the moon and return to earth in 2019. Lessons learned from the EFT-1 manufacturing and flight test experience are being incorporated into a wide variety of vehicle systems and manufacturing processes to reduce risk to the Orion missions and flight crew. A critical contributor to crew safety is the heat shield that protects the crew capsule during re-entry through the earth’s atmosphere for return from deep space. The first flight test vehicle, EFT-1, was manufactured and tested in the Neil Armstrong Operations and Checkout (O&C) facility at KSC to demonstrate early risk reduction including the functionality of the Thermal Protection Systems (TPS) for capsule safe return to earth. The approach for the EFT-1 heat shield utilized a low risk approach using Apollo heritage design and manufacturing processes using an Avcoat TPS ablator with a honeycomb substrate to provide a one piece heat shield to meet the mission re-entry heating environments. The manufacturing processes used honeycomb cell injection guns which were redeveloped from the Apollo Lunar Program processes to build the EFT-1 heat shield. The completed heat shield was transported across the country by aircraft to the O&C at KSC for installation onto the capsule. The EFT-1 heat shield successfully performed its mission and experienced ~80% of the re-entry velocity (50% heating rate) for a lunar return for an Exploration Mission. The second flight test vehicle is the EM-1 mission which will have additional flight systems installed to fly to the moon and return. Heat shield design and producibility improvements have been incorporated in the EM-1 vehicle to meet deep space mission and programmatic requirements. The design continues to use the Avcoat material, but in a “block” configuration to enable improvements in the application processes as well as additional improvements in the carrier structure design and manufacturing operations. Incorporating flight test results and producibility improvements from EFT-1 for the heat shield system design and processes have improved the thermal protection capability, improved the producibility, and cost for EM-1 flight test.

Producibility↗

Shuttle Risk Progression: Use of the Shuttle Probabilistic Risk Assessment (PRA) to Show Reliability Growth

It is important to the Space Shuttle Program (SSP), as well as future manned spaceflight programs, to understand the early mission risk and progression of risk as the program gains insights into the integrated vehicle through flight. The risk progression is important to the SSP as part of the documentation of lessons learned. The risk progression is important to future programs to understand reliability growth and the first flight risk. This analysis uses the knowledge gained from 30 years of operational flights and the current Shuttle PRA to calculate the risk of Loss of Crew and Vehicle (LOCV) at significant milestones beginning with the first flight. Key flights were evaluated based upon historical events and significant re-designs. The results indicated that the Shuttle risk tends to follow a step function as opposed to following a traditional reliability growth pattern where risk exponentially improves with each flight. In addition, it shows that risk can increase due to trading safety margin for increased performance or due to external events. Due to the risk drivers not being addressed, the risk did not improve appreciably during the first 25 flights. It was only after significant events occurred such as Challenger and Columbia, where the risk drivers were apparent, that risk was significantly improved. In addition, this paper will show that the SSP has reduced the risk of LOCV by almost an order of magnitude. It is easy to look back afte r 30 years and point to risks that are now obvious, however; the key is to use this knowledge to benefit other programs which are in their infancy stages. One lesson learned from the SSP is understanding risk drivers are essential in order to considerably reduce risk. This will enable the new program to focus time and resources on identifying and reducing the significant risks. A comprehensive PRA, similar to that of the Shuttle PRA, is an effective tool quantifying risk drivers if support from all of the stakeholders is given.

Hamlin, Teri L.↗

Evidence Report: Risk of Renal Stone Formation

The formation of renal stones poses an in-flight health risk of high severity, not only because of the impact of renal colic on human performance but also because of complications that could potentially lead to crew evacuation, such as hematuria, infection, hydronephrosis, and sepsis. Evidence for risk factors comes from urine analyses of crewmembers, documenting changes to the urinary environment that are conducive to increased saturation of stone-forming salts, which are the driving force for nucleation and growth of a stone nidus. Further, renal stones have been documented in astronauts after return to Earth and in one cosmonaut during flight. Biochemical analysis of urine specimens has provided indication of hypercalciuria and hyperuricemia, reduced urine volumes, and increased urine saturation of calcium oxalate and calcium phosphate. A major contributor to the risk for renal stone formation is bone atrophy with increased turnover of the bone minerals. Dietary and fluid intakes also play major roles in the risk because of the influence on urine pH (more acidic) and on volume (decreased). Historically, specific assessments on urine samples from some Skylab crewmembers indicated that calcium excretion increased early in flight, notable by day 10 of flight, and almost exceeded the upper threshold for normal excretion (300mg/day in males). Other crewmember data documented reduced intake of fluid and reduced intake of potassium, phosphorus, magnesium, and citrate (an inhibitor of calcium stone formation) in the diet. Hence, data from both short-duration and long-duration missions indicate that space travel induces risk factors for renal stone formation that continue to persist after flight; this risk has been documented by reported kidney stones in crewmembers.

Sibonga, Jean D.↗

Southern Impact Testing Alliance (SITA)

Efforts to form this Alliance began in 2008 to showcase the impact testing capabilities within the southern United States. Impact testing customers can utilize SITA partner capabilities to provide supporting data during all program phases-materials/component/ flight hardware design, development, and qualification. This approach would allow programs to reduce risk by providing low cost testing during early development to flush out possible problems before moving on to larger scale1 higher cost testing. Various SITA partners would participate in impact testing depending on program phase-materials characterization, component/subsystem characterization, full-scale system testing for qualification. SITA partners would collaborate with the customer to develop an integrated test approach during early program phases. Modeling and analysis validation can start with small-scale testing to ensure a level of confidence for the next step large or full-scale conclusive test shots. Impact Testing Facility (ITF) was established and began its research in spacecraft debris shielding in the early 1960's and played a malor role in the International Space Station debris shield development. As a result of return to flight testing after the loss of STS-107 (Columbia) MSFC ITF realized the need to expand their capabilities beyond meteoroid and space debris impact testing. MSFC partnered with the Department of Defense and academic institutions as collaborative efforts to gain and share knowledge that would benefit the Space Agency as well as the DoD. MSFC ITF current capabilities include: Hypervelocity impact testing, ballistic impact testing, and environmental impact testing.

Hubbs, Whitney↗

Advanced Engineering Environments for Space Transportation System Development

There are significant challenges facing today's launch vehicle industry. Global competition, more complex products, geographically-distributed design teams, demands for lower cost, higher reliability and safer vehicles, and the need to incorporate the latest technologies quicker, all face the developer of a space transportation system. Within NASA, multiple technology development and demonstration projects are underway toward the objectives of safe, reliable, and affordable access to space. New information technologies offer promising opportunities to develop advanced engineering environments to meet these challenges. Significant advances in the state-of-the-art of aerospace engineering practice are envisioned in the areas of engineering design and analytical tools, cost and risk tools, collaborative engineering, and high-fidelity simulations early in the development cycle. At the Marshall Space Flight Center, work has begun on development of an advanced engineering environment specifically to support the design, modeling, and analysis of space transportation systems. This paper will give an overview of the challenges of developing space transportation systems in today's environment and subsequently discuss the advanced engineering environment and its anticipated benefits.

Thomas, L. Dale↗