Search NASA⌕ Search

SEARCH · Search NASA

Results for “Factory assembly & integration”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

23 records · Page 2

Solar Steam on Demand

INTRODUCTION: This Report summarizes the research and development project performed by Sunvapor and the subrecipient National Renewable Energy Laboratory (NREL) during the period of 10/01/2018-9/30/2021. The work was aimed at the economic integration of solar steam with an industrial process, and in particular, the advantages that a novel type of thermal energy storage and collector design could bring to the system. The completed work includes experimental research on the storage material, design of the collector, engineering of a complete solar steam plant, and economic analysis. The plant was, in the end, not constructed, due to COVID-19 impacts to the project host. PURPOSE: The purpose of the project was to test the hypothesis that a levelized cost of heat (LCOH) of 2¢/kWh delivered to a steam-consuming process, including energy discharged from storage, could be feasibly achieved. PROJECT OBJECTIVES: For Budget Period 1 our objectives were to engineer a prototype industrial solar steam generation system, and design and test a Latent Heat Energy Storage (LHES) lab-scale system. For Budget Period 2 our objectives were to construct and test the solar steam prototype plant, and to build and factory-test a full LHES module. For Budget Period 3 our objective was to integrate the storage module with the solar steam generator, show successful long duration energy tests of the combined system, and use the results to project the LCOH of delivered steam to a second-generation plant. PROJECT OUTCOMES: Various phase change materials (PCMs) for the LHES were tested for compatibility with industrial steam uses as measured by phase change temperature, stability of latent heat of fusion, and their corrosive effects on steel (the heat exchanger material). Two of these materials (sodium formate and sodium/ potassium) showed potential to meet the technical criteria. The estimated cost of a complete LHES module with these materials did not meet economic targets. The developmental collector design builds from previous work to exploit the potential cost advantages of a spaceframe of lumber construction. Design improvements were achieved in assembly efficiency and structural performance. A complete engineering package was completed for the solar steam system without storage that included the developmental as well as commercial arrays. The plant was permitted for construction. The storage CAPEX for a reference plant was estimate to be greater than $\$ 57$/kWh. The LCOH of the system without storage and with developmental collectors of lumber construction was projected to be 2¢/kWh, assuming a FCR of 8.2% over thirty years. PROJECT MILESTONES: The Milestones fully achieved in the first Budget Period includes obtaining a Letter of Intent from an industrial steam-consuming project host, issuance of a construction permit, and corrosion resistance. The Milestone that was partly achieved was the degradation in the latent heat of fusion. Milestones associated with Budget Periods 2 and 3, related to the construction and operation of the plant were not achieved as a result of the host shutting down the plant due to COVID-19 impacts. CONCLUSIONS: Sunvapor was able to secure an agreement with a host to build a fully engineered and permitted solar steam plant that met the host’s economic goals. As a basis for comparison, the solar field design was comprised of eight commercial collector arrays and one developmental Green Parabolic Trough Collector (GPTC) array. The projected LCOH with a solar field entirely populated with a second generation GPTC met the goal of 2¢/kWh. The experimental program concerning the PCM indicated the feasibility of meeting their technical requirements for industrial steam uses. The cost of the complete LHES exceeded its $\$ 14$/kWh target, and therefore the inclusion of LHES could not be economically justified. Due to COVID-19 impacts on the host, the solar steam plant was not constructed.

14 SOLAR ENERGY↗

Bottleneck Detection in Modular Construction Factories Using Computer Vision

The construction industry is increasingly adopting off-site and modular construction methods due to the advantages offered in terms of safety, quality, and productivity for construction projects. Despite the advantages promised by this method of construction, modular construction factories still rely on manually-intensive work, which can lead to highly variable cycle times. As a result, these factories experience bottlenecks in production that can reduce productivity and cause delays to modular integrated construction projects. To remedy this effect, computer vision-based methods have been proposed to monitor the progress of work in modular construction factories. However, these methods fail to account for changes in the appearance of the modular units during production, they are difficult to adapt to other stations and factories, and they require a significant amount of annotation effort. Due to these drawbacks, this paper proposes a computer vision-based progress monitoring method that is easy to adapt to different stations and factories and relies only on two image annotations per station. In doing so, the Scale-invariant feature transform (SIFT) method is used to identify the presence of modular units at workstations, and the Mask R-CNN deep learning-based method is used to identify active workstations. This information was synthesized using a near real-time data-driven bottleneck identification method suited for assembly lines in modular construction factories. This framework was successfully validated using 420 h of surveillance videos of a production line in a modular construction factory in the U.S., providing 96% accuracy in identifying the occupancy of the workstations and an F-1 Score of 89% in identifying the state of each station on the production line. The extracted active and inactive durations were successfully used via a data-driven bottleneck detection method to detect bottleneck stations inside a modular construction factory. The implementation of this method in factories can lead to continuous and comprehensive monitoring of the production line and prevent delays by timely identification of bottlenecks.

32 ENERGY CONSERVATION, CONSUMPTION, AND UTILIZATI↗

The International Orion Spacecraft Is off Towards the Stars

Following a very successful year of manufacturing, assembly and testing in factories located around the globe, NASA and ESA are preparing to deliver the major Exploration Mission-1 (EM-1) Orion flight elements, including the Crew Module, ESA Service Module and Launch Abort System. This international effort to design and develop a deep space exploration capable human spacecraft is rapidly transitioning from the design, development and test phase to the early test flight and production phase. Two major flight tests, an Ascent Abort test and EM-1, Orion's first flight onboard NASA's new heavy lift Space Launch System, are planned for the near future. Further, Orion will play a crucial role in the ambitious new Deep Space Gateway human exploration Program. This paper gives a short overview of the system and subsystem configuration of the Orion spacecraft, including NASA and ESA contributions, a status of EM-1, AA-2 and EM-2 spacecraft production, and a look at Orion's role in the construction and operation of the Deep Space Gateway. The paper will also address the innovative international cooperation methods being employed to conduct Orion and Service Module integration.

Kirasich, Mark↗

Simple, Scalable, Script-Based Science Processor (S4P)

The development and deployment of data processing systems to process Earth Observing System (EOS) data has proven to be costly and prone to technical and schedule risk. Integration of science algorithms into a robust operational system has been difficult. The core processing system, based on commercial tools, has demonstrated limitations at the rates needed to produce the several terabytes per day for EOS, primarily due to job management overhead. This has motivated an evolution in the EOS Data Information System toward a more distributed one incorporating Science Investigator-led Processing Systems (SIPS). As part of this evolution, the Goddard Earth Sciences Distributed Active Archive Center (GES DAAC) has developed a simplified processing system to accommodate the increased load expected with the advent of reprocessing and launch of a second satellite. This system, the Simple, Scalable, Script-based Science Processor (S42) may also serve as a resource for future SIPS. The current EOSDIS Core System was designed to be general, resulting in a large, complex mix of commercial and custom software. In contrast, many simpler systems, such as the EROS Data Center AVHRR IKM system, rely on a simple directory structure to drive processing, with directories representing different stages of production. The system passes input data to a directory, and the output data is placed in a "downstream" directory. The GES DAAC's Simple Scalable Script-based Science Processing System is based on the latter concept, but with modifications to allow varied science algorithms and improve portability. It uses a factory assembly-line paradigm: when work orders arrive at a station, an executable is run, and output work orders are sent to downstream stations. The stations are implemented as UNIX directories, while work orders are simple ASCII files. The core S4P infrastructure consists of a Perl program called stationmaster, which detects newly arrived work orders and forks a job to run the appropriate executable (registered in a configuration file for that station). Although S4P is written in Perl, the executables associated with a station can be any program that can be run from the command line, i.e., non-interactively. An S4P instance is typically monitored using a simple Graphical User Interface. However, the reliance of S4P on UNIX files and directories also allows visibility into the state of stations and jobs using standard operating system commands, permitting remote monitor/control over low-bandwidth connections. S4P is being used as the foundation for several small- to medium-size systems for data mining, on-demand subsetting, processing of direct broadcast Moderate Resolution Imaging Spectroradiometer (MODIS) data, and Quick-Response MODIS processing. It has also been used to implement a large-scale system to process MODIS Level 1 and Level 2 Standard Products, which will ultimately process close to 2 TB/day.

Lynnes, Christopher↗

Cost analysis of alternative large-scale high-temperature solid oxide electrolysis hydrogen production facilities

We extend our past cost analysis of gigawatt-scale solid oxide electrolysis (SOE) facilities that produce high purity hydrogen gas from water by estimating construction and operating costs for three new alternative design cases: (1) offsite feed steam generation; (2) near-atmospheric pressure (NAP) stack; and (3) onsite electric boiler feed steam generation. Pressure effects on hydrogen electrode-(cathode-)supported SOE cell (SOEC) stack performance are estimated for the same assumed cell and stack construction and used to determine facility-wide stack capital costs for achieving a fixed H2 production at different pressures. Modular balance of plant (BOP) process equipment capital costs are estimated for each new alternative design case using our past equipment sizing, design, and cost data and scaling relationships. Furthermore, we update BOP equipment sizing and design for the NAP case using Aspen®. Vendor quotes for electric boilers are used to estimate costs for the electric boiler design case. Factory and onsite assembly and installation costs for SOEC stacks and BOP equipment are calculated using our past simplified first-principles approach. First-of-a-kind (FOAK) and N th -of-a-kind (NOAK) production maturity cost estimates are included for all results. The case with NAP stacks offers the lowest facility total capital cost (TCC, ~23% lower than base) while use of small electric boilers requires the highest TCC (~3% higher than base). H 2 production prices decrease from the base of ~$\$2.17$ /kgH 2 to ~$\$1.92$/kgH 2 for 1 GW e DC SIP facilities utilizing NAP stacks supplied by offsites steam situated in large modules and blocks for $\$0.030$/kWh e and $0.009/kWh t prices for electricity and thermal energy, respectively. We report all costs in 2021 US dollars.

Balance of plant (BOP) process equipment↗