Search NASA⌕ Search

SEARCH · Search NASA

Results for “GETEM”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

27 records · Page 2

Performance, Cost, and Financial Parameters of Geothermal District Heating Systems for Market Penetration Modeling under Various Scenarios

Geothermal district heating (GDH) systems have limited penetration in the U.S., with an estimated installed capacity of only 100 MWth for a total of 21 sites. We see higher deployment in other regions, for example, in Europe with an installed capacity of more than 4,700 MWth for 257 GDH sites. The U.S. Department of Energy Geothermal Vision (GeoVision) Study is currently looking at the potential to increase the deployment in the U.S. and to understand the impact of this increased deployment. This paper reviews 31 performance, cost, and financial parameters as input for numerical simulations describing GDH system deployment in support of the GeoVision effort. The focus is on GDH systems using hydrothermal and Enhanced Geothermal System resources in the U.S.; ground-source heat pumps and heat-to-electricity conversion technology were excluded. Parameters investigated include 1) capital and operation and maintenance costs for both subsurface and surface equipment; 2) performance factors such as resource recovery factors, well flow rates, and system efficiencies; and 3) financial parameters such as inflation, interest, and tax rates. Current values as well as potential future improved values under various scenarios are presented. Sources of data considered include academic and popular literature, software tools such as GETEM and GEOPHIRES, industry interviews, and analysis conducted by other task forces for the GeoVision Study, e.g., on the drilling costs and reservoir performance.

15 GEOTHERMAL ENERGY↗

Potential economic values of minerals in brines of identified hydrothermal systems in the US

Geothermal resources have been used as a clean and sustainable baseload power for a long time. However, the upfront deployment costs of geothermal technologies are high. Various approaches are considered to make geothermal energy more economically attractive for developers. One potential approach is to have an additional revenue stream through recovery minerals from the large volume of brine that is used to generate power at geothermal sites. Geothermal brines interact with rocks for a long time at high temperature and pick up minute levels of various minerals, such as SiO2, Li, Mn, Cs, etc. In this paper, we assess the mineral contents in brines of several identified hydrothermal resource areas in the US. The compositions of geothermal brines were assembled from various sources whereas the brine mass flow rates of the potential power plants in those hydrothermal areas were obtained from GETEM simulations. Our study shows that several value-adding minerals could be available for recovery from the geothermal brines in the US. Specially, potential revenues from recovery of Au, Cs, Rb, Li, and SiO2 look very promising for several hydrothermal systems. However, several outstanding technological, financial, and market challenges as well as site-specific challenges (e.g., chemistry, sustainability, etc.) need to be evaluated for economic recovery of targeted minerals.

15 GEOTHERMAL ENERGY↗

Crossing the Barriers: An Analysis of Permitting Barriers to Geothermal Development and Potential Improvement Scenarios

Developers have identified many non-technical barriers to geothermal power development, including permitting. Activities required for permitting, such as the associated environmental reviews, can take a considerable amount of time and delay project development. This paper discusses the impacts to geothermal development timelines due to the permitting challenges, including the regulatory framework, environmental review process, and ancillary permits. We identified barriers that have the potential to prevent geothermal development or delay timelines and defined improvement scenarios that could assist in expediting geothermal development and permitting timelines and lead to the deployment of additional geothermal resources by 2030 and 2050: (1) the creation of a centralized federal geothermal permitting office and utilization of state permit coordination offices as well as (2) an expansion of existing categorical exclusions applicable to geothermal development on Bureau of Land Management public lands to include the oil and gas categorical exclusions passed as part of the Energy Policy Act of 2005. We utilized the Regional Energy Deployment System (ReEDS) and the Geothermal Electricity Technology Evaluation Model (GETEM) to forecast baseline geothermal deployment based on previous analysis of geothermal project development and permitting timelines. The model results forecast that reductions in geothermal project timelines can have a significant impact on geothermal deployment. For example, using the ReEDS model, we estimated that reducing timelines by two years, perhaps due to the creation of a centralized federal geothermal permitting office and utilization of state permit coordination offices, could result in deployment of an additional 204 MW by 2030 and 768 MW by 2050 - a 13% improvement when compared to the business as usual scenario. The model results forecast that a timeline improvement of four years - for example with an expansion of existing categorical exclusions coupled with the creation of a centralized federal geothermal permitting office and utilization of state permit coordination offices - could result in deployment of an additional 2,529 MW of geothermal capacity by 2030 and 6,917 MW of geothermal capacity by 2050 - an improvement of 116% when compared to the business as usual scenario. These results suggest that reducing development timelines could be a large driver in the deployment of geothermal resources.

15 GEOTHERMAL ENERGY↗

Geothermal Desalination GeoVision Case Study Analysis: Multiple Effect Distillation

Multiple effect distillation (MED) was evaluated as the baseline technology for geothermal desalination. MED desalination plant mass & energy balances were modeled using a simplified method described in the open literature. GETEM was used to calculate hydrothermal and EGS resource costs in the Business-As-Usual and Exploration De-Risk GeoVision Study Scenarios. The levelized cost of water (LCOW) was evaluated for geothermal resources in the temperature range of 100°C to 200°C. The LCOH from geothermal resources in the scenarios evaluated is cost competitive with many of the heat sources examined for MED desalination applications discussed in the literature. In the Business-As-Usual Scenario a hydrothermal resource achieves the LCOW cost target of $1.50/m³ with resource temperatures of approximately 150°C and greater. A hydrothermal resource in the Exploration De-Risk Scenario achieves the LCOW cost target of $1.00/m³ at a resource temperature of 200°C. In all cases evaluated, higher temperature geothermal resources demonstrate increased ability to achieve the specified LCOW cost targets. The degree to which the geothermal resource, feed water source, cooling water, water market, and concentrate disposal site are co-located will have a significant impact on the viability of any geothermal desalination application. In practice, due to large variations in resource characteristics, site attributes, and application requirements, the economic and logistical feasibility of geothermal desalination is likely to be highly site- and application- dependent. Although EGS resources in the Exploration De-Risk Scenario do not achieve the LCOW cost target at the resource temperatures evaluated, EGS resources could be deployed at locations where hydrothermal resources do not exist, which would help to address co-location challenges.

15 GEOTHERMAL ENERGY↗

Geothermal Water Use: Life Cycle Water Consumption, Water Resource Assessment, and Water Policy Framework

This report examines life cycle water consumption for various geothermal technologies to better understand factors that affect water consumption across the life cycle (e.g., power plant cooling, belowground fluid losses) and to assess the potential water challenges that future geothermal power generation projects may face. Previous reports in this series quantified the life cycle freshwater requirements of geothermal power-generating systems, explored operational and environmental concerns related to the geochemical composition of geothermal fluids, and assessed future water demand by geothermal power plants according to growth projections for the industry. This report seeks to extend those analyses by including EGS flash, both as part of the life cycle analysis and water resource assessment. A regional water resource assessment based upon the life cycle results is also presented. Finally, the legal framework of water with respect to geothermal resources in the states with active geothermal development is also analyzed.

15 GEOTHERMAL ENERGY↗

Active Management of Integrated Geothermal-CO2 Storage Reservoirs in Sedimentary Formations: Data used in Geosphere Journal Article

This data submission is for Phase 2 of Active Management of Integrated Geothermal-CO2 Storage Reservoirs in Sedimentary Formations, which focuses on multi-fluid (CO2 and brine) geothermal energy production and diurnal bulk energy storage in geologic settings that are suitable for geologic CO2 storage. This data submission includes all data used in the Geosphere Journal article by Buscheck et al (2016). All assumptions are discussed in that article.

15 GEOTHERMAL ENERGY↗

Economics of Developing Hot Stratigraphic Reservoirs

Stratigraphic geothermal reservoirs at 3 – 4 km depth in high heat-flow basins are capable of sustaining 100 MW-scale power plants at about 10 c/kWh. This paper examines the impacts on the levelized cost of electricity (LCOE) of reservoir depth and temperature, reservoir productivity, and drillhole/casing options. For a reservoir at 3 km depth with a moderate productivity index by hydrothermal reservoir standards (about 50 L/s/MPa, 5.6 gpm/psi), an LCOE of 10c/kWh requires the reservoir to be at about 200°C. This is the upper temperature limit for pumps. The calculations assume standard hydrothermal drilling costs, with the production interval completed with a 7 inch liner in an 8.5 inch hole. If a reservoir at 4 km depth has excellent permeability characteristics with a productivity index of 100 L/s/MPa (11.3 gpm/psi), then the LCOE is about 11 c/kWh assuming the temperature decline rate with development is not excessive (< 1%/y, with first thermal breakthrough delayed by about 10 years). Completing wells with modest horizontal legs (e.g. several hundred meters) may be important for improving well productivity because of the naturally high, sub-horizontal permeability in this type of reservoir. Reducing the injector/producer well ratio may also be cost-effective if the injectors are drilled as larger holes.

15 GEOTHERMAL ENERGY↗

Preliminary Technical Risk Analysis for the Geothermal Technologies Program

This report explains the goals, methods, and results of a probabilistic analysis of technical risk for a portfolio of R&D projects in the DOE Geothermal Technologies Program (The Program). The analysis is a task by Princeton Energy Resources International, LLC, in support of the National Renewable Energy Laboratory on behalf of the Program. The main challenge in the analysis lies in translating R&D results to a quantitative reflection of technical risk for a key Program metric: levelized cost of energy (LCOE).

Geothermal Electric Technology Evaluation Model↗