Search NASA⌕ Search

SEARCH · Search NASA

Results for “GETEM”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 19 records

2022 GETEM Geothermal Drilling Cost Curve Update: Preprint

The Geothermal Electricity Technology Evaluation Model (GETEM) is an essential tool for the Department of Energy's (DOE) Geothermal Technology Office (GTO) to understand the performance and cost of technologies it is seeking to improve. This detailed model is used for supply curve analyses, assessing the current economic feasibility and Levelized Cost of Energy (LCOE) of hydrothermal geothermal systems and EGS, and evaluating the potential impact of advanced geothermal technologies. GETEM can be used to estimate the performance and costs of currently available U.S. geothermal power systems. It is also used to estimate the costs of technologies 5 to 20 years in the future, given the direction of potential research, development, and demonstration (RD&D) projects. The model is intended to help GTO determine which proposed RD&D programs and projects might offer the most efficient improvement when using taxpayer funding. The model requires annual updates as well as revisions to reflect the current state of the art. Drilling costs are a significant portion of total geothermal development costs. The current GETEM drilling cost inputs rely on drilling data from 2009 and require an updated analysis of more recent data to ensure they remain representative of current technologies. An updated, more accurate understanding of costs could help the geothermal industry secure project development financing and investment funding and better allow the oil and gas (O&G) industry (both operators and service companies) weigh potential geothermal market participation and customization. This report details recent drilling improvements from the Utah Frontier Observatory for Research in Geothermal Energy (FORGE) and O&G, comparing drilling performance and costs with values in GETEM, particularly the baseline drilling cost curves. Though drilling performance at FORGE has improved significantly, we did not find associated cost decreases that would justify lowering the GETEM baseline cost curves as of now.

API↗

2022 GETEM Geothermal Drilling Cost Curve Update

The Geothermal Electricity Technology Evaluation Model (GETEM) is an essential tool for the U.S. Department of Energy's (DOE) Geothermal Technologies Office (GTO) to understand the performance and cost of technologies it is seeking to improve. This detailed model is used for supply curve analyses, assessing the current economic feasibility and levelized cost of energy (LCOE) of hydrothermal geothermal systems and enhanced geothermal systems (EGS), and evaluating the potential impact of advanced geothermal technologies. GETEM can be used to estimate the performance and costs of currently available U.S. geothermal power systems. It is also used to estimate the costs of technologies 5 to 20 years in the future, given the direction of potential research, development, and demonstration (RD&D) projects. The model is intended to help GTO determine which proposed RD&D programs and projects might offer the most efficient improvement when using taxpayer funding. The model requires annual updates as well as revisions to reflect the current state of the art. Drilling costs are a significant portion of total geothermal development costs. The current GETEM drilling cost inputs rely on drilling data from 2009 and require an updated analysis of more recent data to ensure they remain representative of current technologies. An updated, more accurate understanding of costs could help the geothermal industry secure project development financing and investment funding and better allow the oil and gas (O&G) industry (both operators and service companies) to weigh potential geothermal market participation and customization. This report details recent drilling improvements from the Utah Frontier Observatory for Research in Geothermal Energy (FORGE) and the O&G sector, comparing drilling performance and costs with values in GETEM, particularly the baseline drilling cost curves. Although drilling performance at FORGE has improved significantly, we did not find associated cost decreases that would justify lowering the GETEM baseline cost curves at this time.

API↗

GETEM in the System Advisor Model (SAM)

This presentation on GETEM in the System Advisor Model (SAM) was part of a webinar to internal and external geothermal on January 19th, 2023. The presentation includes an overview of SAM and discussion of the GETEM model implementation in SAM.

geothermal↗

Geothermal Power Systems Analysis: Outcome of Industry Stakeholders Workshop: Preprint

Geothermal cost and performance evaluation implemented via technoeconomic assessment (TEA) modeling is critical for the Department of Energy (DOE) and other geothermal industry stakeholders in assessing the current state of geothermal technologies and to identify existing hurdles to commercially viable geothermal development. The Geothermal Electricity Technology Evaluation Model (GETEM) is a major TEA tool used in estimating the economic feasibility and levelized cost of energy (LCOE) of conventional hydrothermal systems and enhanced geothermal systems (EGS). Since 2021, GETEM has been transitioning from an intricate spreadsheet model to a user-friendly tool within the System Advisor Model (SAM) developed by the National Renewable Energy Laboratory (NREL). Apart from enabling an expanded visibility of the geothermal model among other renewable resources, having GETEM in SAM has the advantage of simulation automation, better usability, updates tracking, active user inputs/feedback, and extended financial modeling. GETEM is used in developing supply curves for the Annual Technology Baseline (ATB). The ATB data are inputs to the Renewable Energy Potential (reV) and the Regional Energy Deployment System (ReEDS) models. The geothermal module in NREL’s reV model assesses the geothermal energy potential in the conterminous United States by defining the geospatial intersection of geothermal resources with existing grid infrastructure within the constraint of land use characteristics. The ReEDS model is a capacity expansion model used for simulating the long-term build-out and operation of the US generation and transmission system based on current energy costs and policies. To ensure enhanced representation of current industry trends in our model transitions and development, we organized a two-day virtual workshop to elicit geothermal industry stakeholder input and recommendations on our current approaches and assumptions on technoeconomic, resource assessment, and deployment scenarios modeling of geothermal technologies. Participants included developers, operators, investors, regulatory agencies, system modelers, national laboratory researchers, consultants, and other stakeholders. In this workshop, we gained stakeholder insights on current geothermal plant performance (i.e., capacity factors), updated drilling costs and learning curves, and next generation technologies such as closed loop and superhot rock geothermal. Other outcomes from this workshop and its impact on future geothermal development feasibility, resource availability, and capacity expansion studies are compiled and discussed.

Annual Technology Baseline↗

Geothermal Power Systems Analysis: Outcome of Industry Stakeholders Workshop

Geothermal cost and performance evaluation implemented via techno-economic assessment (TEA) modeling is critical for the U.S. Department of Energy (DOE) and other geothermal industry stakeholders in assessing the current state of geothermal technologies and to identify existing hurdles to commercially viable geothermal development. The Geothermal Electricity Technology Evaluation Model (GETEM) is a major TEA tool used in estimating the economic feasibility and levelized cost of energy (LCOE) of conventional hydrothermal systems and enhanced geothermal systems (EGS). Since 2021, GETEM has been transitioning from an intricate spreadsheet model to a user-friendly tool within the System Advisor Model (SAM) developed by the National Renewable Energy Laboratory (NREL). Apart from enabling an expanded visibility of the geothermal model among other renewable resources, having GETEM in SAM has the advantage of simulation automation, better usability, updates tracking, active user inputs/feedback, and extended financial modeling. GETEM is used in developing supply curves for NREL's Annual Technology Baseline (ATB), which provides inputs to the Renewable Energy Potential (reV) and the Regional Energy Deployment System (ReEDS) models. The geothermal module in NREL's reV model assesses the geothermal energy potential in the conterminous United States by defining the geospatial intersection of geothermal resources with existing grid infrastructure within the constraint of land use characteristics. The ReEDS model is a capacity expansion model used for simulating the long-term build-out and operation of the U.S. generation and transmission system based on current energy costs and policies. To ensure enhanced representation of current industry trends in our model transitions and development, we organized a two-day virtual workshop to elicit geothermal industry stakeholder input and recommendations on our current approaches and assumptions on techno-economic, resource assessment, and deployment scenarios modeling of geothermal technologies. Participants included developers, operators, investors, regulatory agencies, system modelers, national laboratory researchers, consultants, and other stakeholders. In this workshop, we gained stakeholder insights on current geothermal plant performance (i.e., capacity factors), updated drilling costs and learning curves, and next-generation technologies such as closed-loop and superhot rock geothermal. Other outcomes from this workshop and its impact on future geothermal development feasibility, resource availability, and capacity expansion studies are compiled and discussed.

annual technology baseline↗

Techno-Economic Analysis and Market Potential of Geological Thermal Energy Storage (GeoTES) Charged With Solar Thermal and Heat Pumps

In this project, we developed a techno-economic analysis (TEA) model that can be used to evaluate the viability of a proposed Geological Thermal Energy Storage (GeoTES) design. This MATLAB-based model integrates distinct subsystem models for the reservoir, wells, power cycle, and solar field to capture their distinct characteristics. It applies this approach in simulating GeoTES storage and dispatch operations for durations ranging from hourly to seasonal. Using cases studies based on GeoTES designs provided by industry partners - Premier Resource Management (PRM) and EarthBridge Energy - we validated the TEA model estimations of system performance and costs (such as thermal and electrical power/energy inflow and outflow, capital costs, and levelized costs of energy and storage) for both concentrating solar thermal (CST) and Carnot Battery (CB) pairings with GeoTES (CST-GeoTES and CB-GeoTES). For the CST-GeoTES case, the model was validated against the proposed system designed by PRM. It showed good agreement with PRM's estimations when well and pump costs derived from PRM's estimations were used. When GETEM-based costs were used, there was a slight overprediction due to GETEM's project/site agnostic assumption of these costs. From a sensitivity analysis perspective, the levelized cost of electricity (LCOE) of the CST-GeoTES case was most sensitive to well flow rate and the charging temperature. An optimal design scenario resulted in an LCOE of 0.11 $\$$/kWhe. CST-GeoTES can also provide a source of heat to meet seasonal demands. With 12-hour and 24-hour levelized cost of heat (LCOH) of 0.018 $\$$/kWhth and 0.022 $\$$/kWhth, respectively, CST-GeoTES could be competitive in the California market with an average industrial price of natural gas in California between 0.041-0.047 $\$$/kWhth. The levelized cost of storage (LCOS) for CST-GeoTES depends on the energy storage duration. Although the LCOS is relatively higher for shorter durations (e.g., ~0.50 $\$$/kWhe for 1 hour of storage), it is an order of magnitude lower (0.06 $\$$/kWhe) for longer storage durations and competitive with lithium-ion batteries (beyond 12 hours of storage) and molten-salt thermal energy storage (beyond 32 hours). Energy. Three options were explored and applied to the EarthBridge case study: (1) A Carnot Battery design using R125 working fluid with both hot and cold storage; (2) A Carnot Battery design using R125 working fluid with only hot storage; (3) A Carnot Battery using a commercially available heat pump with carbon dioxide (CO2) working fluid and hot storage only. The CB-GeoTES with cold storage only had a slight (round-trip) efficiency advantage over the system without (43.4% vs. 42.8%). This is because the cold storage is limited by the freezing point of water, so the cold storage is not much colder than the environment. The system using commercially available technologies was the least efficient - partly because different cycles were used in the heat pump (CO2) and heat engine (binary cycle) which leads to some inefficiencies. Using the commercially available design, the levelized cost of energy (LCOS) from the model (0.10 $\$$/kWhe) was higher than that estimated by EarthBridge (0.068 $\$$/kWhe). This is because of the low round-trip (38.7%) efficiency of the commercially available design. Sensitivity analysis reveals that the model is most sensitive to electricity price. Including electricity price in the TEA for CB-GeoTES leads to an increase in LCOS from the base value to 0.25 $\$$/kWhe. To determine storage sites suitable for GeoTES, we gathered and analyzed geological, petrophysical, and geophysical data of oil and gas reservoir and aquifers in California and Texas. We down-selected possible sites based on cut-off values for site characteristics (e.g., reservoir temperature, formation thickness, permeability, porosity, depth, and brine salinity) and preliminary costs. Using this approach, the Carrizo-Wilcox, Yegua-Jackson, and Dockum brackish aquifers in Texas were identified as having the highest suitability. Similarly, in the central California region, the White Wolf, Belridge South Tulare, and Belridge South Reef Ridge were the most suitable. Going further, we assessed the storage potential in the selected sites. To do this we developed distributions of reservoir characteristic data and applied a Monte Carlo-based analysis to account for intrinsic uncertainty in the acquired data. The analysis revealed that the Carrizo-Wilcox aquifer had the highest storage potential with a mean capacity of 554 TWhth (i.e., 63 TWhe). The estimated capacity serves as an upper limit of storage potential given that not all fields in the basin will be developed. We participated in multiple outreach activities including conference presentations, panel session discussions, and the facilitation of a GeoTES workshop at the NREL Golden campus.

15 GEOTHERMAL ENERGY↗

Summary of Historical Production for Nevada Binary Facilities

The analysis described was initiated to validate inputs used in the US Department of Energy’s (DOE) economic modeling tool GETEM (Geothermal Electricity Technology Evaluation Model) by using publically available data to identify production trends at operating geothermal binary facilities in the state of Nevada. Data required for this analysis was obtained from the Nevada Bureau of Mines and Geology (NBMG), whom received the original operator reports from the Nevada Division of Minerals (NDOM). The data from the NBMG was inputted into Excel files that have been uploaded to the DOE’s National Geothermal Data System (NGDS). Once data was available in an Excel format, production trends for individual wells and facilities could be established for the periods data was available (thru 2009). Additionally, this analysis identified relationships existing between production (temperature and flow rates), power production and plant conversion efficiencies. The data trends showed that temperature declines have a significant impact on power production, and that in some instances operators increased production flow rate to offset power declines. The production trends with time that were identified are being used to update GETEM’s default inputs.

15 GEOTHERMAL ENERGY↗

Cost Contributors to Geothermal Power Production

The US Department of Energy Geothermal Technologies Office (DOE-GTO) has developed the tool Geothermal Electricity Technologies Evaluation Model (GETEM) to assess the levelized cost of electricity (LCOE) of power produced from geothermal resources. Recently modifications to GETEM allow the DOE-GTO to better assess how different factors impact the generation costs, including initial project risk, time required to complete a development, and development size. The model characterizes the costs associated with project risk by including the costs to evaluate and drill those sites that are considered but not developed for commercial power generation, as well as to assign higher costs to finance those activities having more risk. This paper discusses how the important parameters impact the magnitude project costs for different project scenarios. The cost distributions presented include capital cost recovery for the exploration, confirmation, well field completion and power plant construction, as well as the operation and maintenance (O&M) costs. The paper will present these cost distributions for both EGS and hydrothermal resources.

15 GEOTHERMAL ENERGY↗

Report on the U.S. DOE Geothermal Technologies Program's 2009 Risk Analysis

NREL conducted an annual program risk analysis on behalf of the U.S. Department of Energy Geothermal Technologies Program (GTP). NREL implemented a probabilistic risk analysis of GTP-sponsored research, development, and demonstration (RD&D) work, primarily for enhanced geothermal systems (EGS). The analysis examined estimates of improvement potential derived from program RD&D work for two types of technology performance metric (TPM): EGS-enabling technologies potential and EGS cost improvement potential. Four risk teams (exploration, wells/pumps/tools, reservoir engineering, and power conversion) comprised of industry experts, DOE laboratory researchers, academic researchers, and laboratory subcontractors estimated the RD&D impacts and TPM-improvement probability distributions. The assessment employed a risk analysis spreadsheet add-in that uses Monte Carlo simulation to drive the Geothermal Electric Technology Evaluation Model (GETEM). The GETEM-based risk analysis used baseline data from the experts' discussion of multiple reports and data sources. Risk results are expressed in terms of each metric's units and/or the program's top-level metric: levelized costs of electricity (LCOE). Results--both qualitative comments and quantitative improvement potential--are thorough and cohesive in three of the four expert groups. This conference paper summarizes the industry's current thinking on various metrics and potential for research improvement in geothermal technologies.

15 GEOTHERMAL ENERGY↗

Report on the U.S. DOE Geothermal Technologies Program's 2009 Risk Analysis

NREL conducted an annual program risk analysis on behalf of the U.S. Department of Energy Geothermal Technologies Program (GTP). NREL implemented a probabilistic risk analysis of GTP-sponsored research, development, and demonstration (RD&D) work, primarily for enhanced geothermal systems (EGS). The analysis examined estimates of improvement potential derived from program RD&D work for two types of technology performance metric (TPM): EGS-enabling technologies potential and EGS cost improvement potential. Four risk teams (exploration, wells/pumps/tools, reservoir engineering, and power conversion) comprised of industry experts, DOE laboratory researchers, academic researchers, and laboratory subcontractors estimated the RD&D impacts and TPM-improvement probability distributions. The assessment employed a risk analysis spreadsheet add-in that uses Monte Carlo simulation to drive the Geothermal Electric Technology Evaluation Model (GETEM). The GETEM-based risk analysis used baseline data from the experts' discussion of multiple reports and data sources. Risk results are expressed in terms of each metric's units and/or the program's top-level metric: levelized costs of electricity (LCOE). Results--both qualitative comments and quantitative improvement potential--are thorough and cohesive in three of the four expert groups. This conference paper summarizes the industry's current thinking on various metrics and potential for research improvement in geothermal technologies.

15 GEOTHERMAL ENERGY↗

Alternative Geothermal Power Production Scenarios

The information given in this file pertains to Argonne life-cycle analyses (LCAs) of the plant cycle stage for a set of ten new geothermal scenario pairs, each comprised of a reference and improved case. These analyses were conducted to compare environmental performances among the scenarios and cases. The types of plants evaluated are hydrothermal binary and flash and Enhanced Geothermal Systems (EGS) binary and flash plants. Each scenario pair was developed by the levelized cost of energy (LCOE) group using the Geothermal Electricity Evaluation Model (GETEM) as a way to identify plant operational and resource combinations that could reduce geothermal power plant LCOE values. Based on the specified plant and well field characteristics (plant type, capacity, capacity factor and lifetime, and well numbers and depths) for each case of each pair, Argonne generated a corresponding set of material to power ratios (MPRs) and greenhouse gas and fossil energy ratios.

15 GEOTHERMAL ENERGY↗

Energy Return On Investment of Engineered Geothermal Systems Data

The project provides an updated Energy Return on Investment (EROI) for Enhanced Geothermal Systems (EGS). Results incorporate Argonne National Laboratory's Life Cycle Assessment and base case assumptions consistent with other projects in the Analysis subprogram. EROI is a ratio of the energy delivered to the consumer to the energy consumed to build, operate, and decommission the facility. EROI is important in assessing the viability of energy alternatives. Currently EROI analyses of geothermal energy are either out-of-date, of uncertain methodology, or presented online with little supporting documentation. This data set is a collection of files documenting data used to calculate the Energy Return On Investment (EROI) of Engineered Geothermal Systems (EGS) and erratum to publications prior to the final report. Final report is available below, or from the OSTI web site (http://www.osti.gov/geothermal/). Data in this collections includes the well designs used, input parameters for GETEM, a discussion of the energy needed to haul materials to the drill site, the baseline mud program, and a summary of the energy needed to drill each of the well designs. EROI is the ratio of the energy delivered to the customer to the energy consumed to construct, operate, and decommission the facility. Whereas efficiency is the ratio of the energy delivered to the customer to the energy extracted from the reservoir.

15 GEOTHERMAL ENERGY↗

Life Cycle Analysis Data and Results for Geothermal and Other Electricity Generation Technologies

Life cycle analysis (LCA) is an environmental assessment method that quantifies the environmental performance of a product system over its entire lifetime, from cradle to grave. Based on a set of relevant metrics, the method is aptly suited for comparing the environmental performance of competing products systems. This file contains LCA data and results for electric power production including geothermal power. The LCA for electric power has been broken down into two life cycle stages, namely plant and fuel cycles. Relevant metrics include the energy ratio and greenhouse gas (GHG) ratios, where the former is the ratio of system input energy to total lifetime electrical energy out and the latter is the ratio of the sum of all incurred greenhouse gases (in CO2 equivalents) divided by the same energy output. Specific information included herein are material to power (MPR) ratios for a range of power technologies for conventional thermoelectric, renewables (including three geothermal power technologies), and coproduced natural gas/geothermal power. For the geothermal power scenarios, the MPRs include the casing, cement, diesel, and water requirements for drilling wells and topside piping. Also included herein are energy and GHG ratios for plant and fuel cycle stages for the range of considered electricity generating technologies. Some of this information are MPR data extracted directly from the literature or from models (eg. ICARUS - a subset of ASPEN models) and others (energy and GHG ratios) are results calculated using GREET models and MPR data. MPR data for wells included herein were based on the Argonne well materials model and GETEM well count results.

15 GEOTHERMAL ENERGY↗

Water use in the development and operation of geothermal power plants.

Geothermal energy is increasingly recognized for its potential to reduce carbon emissions and U.S. dependence on foreign oil. Energy and environmental analyses are critical to developing a robust set of geothermal energy technologies. This report summarizes what is currently known about the life cycle water requirements of geothermal electric power-generating systems and the water quality of geothermal waters. It is part of a larger effort to compare the life cycle impacts of large-scale geothermal electricity generation with other power generation technologies. The results of the life cycle analysis are summarized in a companion report, Life Cycle Analysis Results of Geothermal Systems in Comparison to Other Power Systems. This report is divided into six chapters. Chapter 1 gives the background of the project and its purpose, which is to inform power plant design and operations. Chapter 2 summarizes the geothermal electricity generation technologies evaluated in this study, which include conventional hydrothermal flash and binary systems, as well as enhanced geothermal systems (EGS) that rely on engineering a productive reservoir where heat exists but water availability or permeability may be limited. Chapter 3 describes the methods and approach to this work and identifies the four power plant scenarios evaluated: a 20-MW EGS plant, a 50-MW EGS plant, a 10-MW binary plant, and a 50-MW flash plant. The two EGS scenarios include hydraulic stimulation activities within the construction stage of the life cycle and assume binary power generation during operations. The EGS and binary scenarios are assumed to be air-cooled power plants, whereas the flash plant is assumed to rely on evaporative cooling. The well field and power plant design for the scenario were based on simulations using DOE's Geothermal Economic Technology Evaluation Model (GETEM). Chapter 4 presents the water requirements for the power plant life cycle for the scenarios evaluated. Geology, reservoir characteristics, and local climate have various effects on elements such as drilling rate, the number of production wells, and production flow rates. Over the life cycle of a geothermal power plant, from construction through 30 years of operation, plant operations is where the vast majority of water consumption occurs. Water consumption refers to the water that is withdrawn from a resource such as a river, lake, or non-geothermal aquifer that is not returned to that resource. For the EGS scenarios, plant operations consume between 0.29 and 0.72 gal/kWh. The binary plant experiences similar operational consumption, at 0.27 gal/kWh. Far less water, just 0.01 gal/kWh, is consumed during operations of the flash plant because geofluid is used for cooling and is not replaced. While the makeup water requirements are far less for a hydrothermal flash plant, the long-term sustainability of the reservoir is less certain due to estimated evaporative losses of 14.5-33% of produced geofluid at operating flash plants. For the hydrothermal flash scenario, the average loss of geofluid due to evaporation, drift, and blowdown is 2.7 gal/kWh. The construction stage requires considerably less water: 0.001 gal/kWh for both the binary and flash plant scenarios and 0.01 gal/kWh for the EGS scenarios. The additional water requirements for the EGS scenarios are caused by a combination of factors, including lower flow rates per well, which increases the total number of wells needed per plant, the assumed well depths, and the hydraulic stimulation required to engineer the reservoir. Water quality results are presented in Chapter 5. The chemical composition of geofluid has important implications for plant operations and the potential environmental impacts of geothermal energy production. An extensive dataset containing more than 53,000 geothermal geochemical data points was compiled and analyzed for general trends and statistics for typical geofluids. Geofluid composition was found to vary significantly both among and within geothermal fields. Seven main chemical constituents were found to account for 95-99% of the dissolved solids in typical geofluids. In order of abundance, they were chloride, sodium, bicarbonate, sulfate, silica, calcium, and potassium. The potential for water and soil contamination from accidents and spills was analyzed by comparing geofluid composition with U.S. drinking water standards. Geofluids were found to present a potential risk to drinking water, if released, due to high concentrations of antimony, arsenic, lead, and mercury. That risk could be mitigated through proper design and engineering controls. The concentration and impact of noncondensible gases (NCG) dissolved in the geofluid was evaluated. The majority of NCG was either nitrogen or carbon dioxide, but a small number of geofluids contain potentially recoverable concentrations of hydrogen or methane.

15 GEOTHERMAL ENERGY↗

GeoVision Analysis: Exploration Task Force Report

The GeoVision study effort included ground-breaking, detailed research on current and future market conditions and geothermal technologies in order to forecast and quantify the electric and non-electric deployment potentials under a range of scenarios, in addition to their impacts on the Nation’s jobs, economy and environment. Coordinated by the U.S. Department of Energy’s (DOE’s) Geothermal Technologies Office (GTO), the GeoVision study development relied on the collection, modeling, and analysis of robust datasets through seven national laboratory partners, which were organized into eight technical Task Force groups. The purpose of this report is to provide a central repository for the research conducted by the Exploration Task Force. The Exploration Task Force consists of four individuals representing three national laboratories: Patrick Dobson (task lead) and Christine Doughty of Lawrence Berkeley National Laboratory, Anna Wall of National Renewable Energy Laboratory, Travis McLing of Idaho National Laboratory, and Chester Weiss of Sandia National Laboratories. As part of the GeoVision analysis, our team conducted extensive scientific and financial analyses on a number of topics related to current and future geothermal exploration methods. The GeoVision Exploration Task Force complements the drilling and resource technology investigations conducted as part of the Reservoir Maintenance and Development Task Force. The Exploration Task Force however has focused primarily on early stage R&D technologies in exploration and confirmation drilling, along with an evaluation of geothermal financing challenges and assumptions, and innovative “blue-sky” technologies. This research was used to develop geothermal resource supply curves (through the use of GETEM) for use in the ReEDS capacity expansion modeling that determines geothermal technology deployment potential. It also catalogues and explores the large array of early-stage R&D technologies with the potential to dramatically reduce exploration and geothermal development costs, forming the basis of the GeoVision Technology Improvement (TI) scenario. These modeling topics are covered in detail in Potential to Penetration task force report. Most of the research contained herein has been published in peer-reviewed papers or conference proceedings and are cited and referenced accordingly. The sections that follow provide a central repository for all of the research findings of the Exploration and Confirmation Task Force. In summary, it provides a comprehensive discussion of Engineered Geothermal Systems (EGS) and associated technology challenges, the risks and costs of conducting geothermal exploration, a review of existing government efforts to date in advancing early-stage R&D in both exploration and EGS technologies, as well as a discussion of promising and innovative technologies and implementation of blue-sky concepts that could significantly reduce costs, lower risks, and shorten the time needed to explore and develop geothermal resources of all types.

15 GEOTHERMAL ENERGY↗