Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 37 records · Page 2

Case Study: Field Evaluation of a Low-Cost Circuit-Level Electrical Submetering System

Circuit-level metering technologies provide the ability to monitor individual circuits within an electrical panel in a building, providing detailed power and energy consumption data at a much more granular level than was previously achievable in a cost-effective manner. While the fundamental hardware components of circuit-level—split-core current transformers (CTs) and power monitoring meters—have existed for some time, the new offerings in the market have tightly integrated these components, lower costs, and have streamlined data organization, transport, and access via software solutions accessible through web and application programming interfaces (API). NREL evaluated Meazon’s single-circuit metering system. The evaluation of the equipment under test (EUT) focused on three aspects: (1) accuracy of the data provided by the system, (2) ease of installation of this technology and ease of data integration into existing U.S. General Services Administration (GSA) analytics platforms, and (3) total cost of ownership and cost-effectiveness of the technology. The metering technology was tested in a field deployment where it was installed in low and high-voltage commercial electrical panels in the César E. Chávez Memorial Building in Denver, Colorado. The goals were to assess the metering accuracy, the ease of installation and data retrieval, and the total cost of ownership and cost-effectiveness. This technology proved easy to install by a certified electrician who completed the install of 6 meters in 2 separate panels (120/208 V and 277/480 V) and 2 circuit disconnects (along with associated commissioning) at the César E. Chávez Memorial Building in less than one day. The technology was installed in high- and low-voltage panels and with limited space in the electrical room, demonstrating the applicability of this technology to almost all commercial buildings in the GSA portfolio. Primary considerations for this technology include appropriate sizing of CTs for each circuit, selection of loads/circuits/panels that are of high value for detailed submetering (e.g., tailored for high-load devices), and how GSA would like to integrate these data with its existing energy management infrastructure. Through the field evaluation, we demonstrated data integration from the vendor system into the primary software component on the GSA enterprise-level energy management and information system, GSA Link. Data from the circuit-level metering were integrated into this platform and used to perform FDD. This demonstrated the ability of the EUT to augment existing energy management and information systems in buildings where GSA Link is deployed and provides a pathway for delivering FDD at other buildings throughout the portfolio.

29 ENERGY PLANNING, POLICY, AND ECONOMY↗

Enhancing Performance Contracts with Monitoring-Based Commissioning (MBCx)

Integrating monitoring-based commissioning (MBCx) software tools into performance contracts is a timely topic given recent developments in MBCx software offerings and the growing number of MBCx deployments nationwide. Many commercial building owners have started to install MBCx software tools that tie in advanced metering infrastructure, building automation systems, and local weather data to enable ongoing commissioning and identify energy conservation measures. To support federal and commercial building owners in understanding, procuring, and implementing MBCx software tools, this report provides an overview of their capabilities, the MBCx process, and how MBCx can be integrated into - and benefit - each phase of a performance contract. This report is intended to spur increased use of MBCx in performance contracts, whether an agency has previously installed or is considering adding MBCx at the time of their project. Additionally, case studies illustrate successful experiences using MBCx within performance contracts at a university campus and across a large number of buildings managed by the General Services Administration.

32 ENERGY CONSERVATION, CONSUMPTION, AND UTILIZATI↗

Enhancing Performance Contracts with Monitoring-Based Commissioning (MBCx)

To support federal and commercial building owners in understanding, procuring, and implementing monitoring-based commissioning (MBCx) software tools, this report provides an overview of their capabilities, the MBCx process, and how MBCx can be integrated into—and benefit—each phase of a performance contract. This report is intended to spur increased use of MBCx in performance contracts, whether an agency has previously installed or is considering adding MBCx at the time of their project. Additionally, case studies illustrate successful experiences using MBCx within performance contracts at a university campus and across a large number of buildings managed by the General Services Administration.

32 ENERGY CONSERVATION, CONSUMPTION, AND UTILIZATI↗

Field Validation of a Building Operating System Platform

The U.S General Services Administration's (GSA's) Green Proving Ground program, in partnership with the National Renewable Energy Laboratory. completed a large pilot study of an Energy Management Information Systems (EMIS) with Automated System Optimization (ASO). Four test bed facilities, each with different building characteristics and systems, were chosen for the implementation of cloud-based EMIS with ASO. Depending on functionality, this tool can be extremely effective in energy management and energy optimization in buildings. The capabilities evaluated in the pilot ranged from energy savings and energy consumption predictions to evaluations of user acceptance, operability, and ease of installation. This report presents the methodology, lessons learned and best practices, and deployment recommendations for the GSA's portfolio of commercial office space, comprising more than 8,500 properties.

32 ENERGY CONSERVATION, CONSUMPTION, AND UTILIZATI↗

Demonstration and Evaluation of a Non-Invasive, Low-Cost, Strap-On Sensor for Natural Gas Meters

The U.S. General Services Administration (GSA) is interested in installing internet-connected, gas submeters to better understand gas consumption in its portfolio of buildings. The GSA in partnership with the National Renewable Energy Laboratory conducted a demonstration to assess a specific submeter technology. This technology was implemented at two GSA separate facilities located in Dallas, Texas. This demonstration evaluated hardware and software installations and integrations, data integrity and accuracy, and included an economic analysis. This demonstration evaluated a gas submeter technology provided by the vendor Vata Verks, who produces a non-invasive strap-on submeter. The company was founded with a mission to conserve water (and eventually gas) cheaply and simply, as explained on its website. The product intends to streamline submeter deployments for gas and water by eliminating most hardware costs while allowing for easy integration of submetered data into other systems such as the Building Automation System and removing tenant and building disruption This demonstration evaluated the product features when used on a gas utility meter.

03 NATURAL GAS↗

Toward Solar Photovoltaic Storm Resilience: Learning from Hurricane Loss and Rebuilding Better

The General Service Administration (GSA) suffered extensive damage to its solar arrays located throughout the Caribbean from Hurricanes Irma and Maria in 2017. While the damage that occurred was unfortunate, there are excellent lessons learned that can be gained and utilized on new systems. A site on St. Croix provides a particularly high-value opportunity for lessons learned due to the innovative rebuilding process utilized by GSA managers and the in-depth analysis performed by the project engineers. This case study focuses on the rebuild of a 469-kW ground array located at the Almeric L. Christian Federal Building in Christiansted, St. Croix in the U.S. Virgin Islands. This array was destroyed by Hurricane Maria. The entire process of planning and subsequent rebuilding that the GSA managers undertook was highly successful. Notably, GSA managers conducting the rebuild effort obtained an independent assessment of failure modes from U.S. Department of Energy (DOE) national labs and then retained a consulting engineering firm to develop design and construction guidance for the rebuild effort. This design and construction guidance was then provided to the engineering, procurement, and constructing firm to implement while rebuilding the site.

14 SOLAR ENERGY↗

Toward Solar Photovoltaic Storm Resilience: Learning from Hurricane Loss and Rebuilding Better

This case study report focuses on the rebuild of a 469 kW ground array located at the Almeric L. Christian Federal Building in Christiansted, St. Croix, in the U.S. Virgin Islands. The General Service Administration (GSA) suffered extensive damage to its solar arrays located throughout the Caribbean from Hurricanes Irma and Maria in 2017. While the damage that occurred was unfortunate, there are excellent lessons learned that can be gained and utilized on new systems. The St. Croix site provides a particularly high-value opportunity for lessons learned due to the innovative rebuilding process utilized by GSA managers and the in-depth analysis performed by the project engineers.

14 SOLAR ENERGY↗

Federal Workplace Charging Program Guide

The 2015 Fixing America's Surface Transportation (FAST) Act authorizes the installation, operation, and maintenance of electric vehicle supply equipment (EVSE) for the purpose of recharging employees' privately owned vehicles (POVs) under the custody or control of the General Services Administration (GSA) or a Federal agency. It requires the collection of fees to recover the costs of installing, operating, and maintaining this equipment and imposes reporting requirements. This program guide reviews those requirements, excerpts the relevant language in Appendix A, and describes when and how fees may be required to cover costs of electricity, network costs, EVSE units, and installations in various scenarios. This program guide is designed to support Federal agencies developing and refining workplace charging programs for employee POVs. While it provides guidance and best practices, it does not replace agencywide policies or agency-specific legal counsel. It contains a roadmap for agency workplace charging programs and defines roles and responsibilities. This guide explains how to determine the number of POVs likely to charge at a given site and contains a sample employee survey in Appendix B. It reviews EVSE planning, including unit selection and acquisition, charger location(s), accounting for available power capacity, using existing infrastructure, and funding an incentive program. It also discusses the costs associated with EVSE acquisition, installation, and network management. These costs inform the subsequently provided information, which describes how to amortize costs to determine appropriate fees for each charging session. The final two sections of this guide address aspects of ongoing program management that the facility coordinator should consider and the reporting requirements associated with the FAST Act. The insights in this guide are applicable to all agency-owned and GSA-leased buildings or facilities offering the use of EVSE or a 120-volt receptacle for the purpose of recharging an employee's POV. However, the FAST Act requirements typically do not apply to any building or facility operated and maintained by a third-party vendor offering the use of EVSE as part of a commercial building lease unless the agency is managing the station and/or energy on behalf of the building and collecting POV fees.

29 ENERGY PLANNING, POLICY, AND ECONOMY↗

Window Retrofits: Ultralight Window Insulating Panels

This technical report includes the results of a 2-year field evaluation of ultralight window insulating panels at a U.S. General Services Administration Building, Eau Clair Federal Courthouse. The panels produced 2% - 7% building energy savings depending on the baseline window configuration and climate zone.

32 ENERGY CONSERVATION, CONSUMPTION, AND UTILIZATI↗

EVI-LOCATE User Manual

One of the longest stages in the deployment of electric vehicle supply equipment (EVSE) is the initial planning of the infrastructure itself. Engineers and fleet experts from the National Renewable Energy Laboratory (NREL) have supported dozens of charging infrastructure site plans over the past couple decades, including the generation of site schematics, determinations of electric capacity, and estimates for likely costs. As the market for electric vehicles (EVs) has matured, this approach should no longer require a time and personnel intensive process. In order to shorten the time taken to develop site plans and cost estimates, NREL developed a tool that fleet managers, facility managers, electricians, EVSE installers, and members of the public can use to develop initial schematics and ballpark pricing for charging station installations. The Electric Vehicle Infrastructure - Locally Optimized Charger Assessment Tool and Estimator (EVI-LOCATE) provides a structured and consistent way for users to enter information about their planned EVSE project in a relatively simple web-based format. EVI-LOCATE then calculates electrical equipment capacity, wiring runs, and project costs. It produces a site diagram optimized around surface characteristics with differential trenching costs for softscape such as grass compared to hardscape such as asphalt that can be adjusted by users in the tool. It also stores the resulting site plans and costs in a dashboard for access at a later date, including plan revisions if necessary. This document guides users through the EVI-LOCATE screens and associated questions. It contains tip text boxes throughout on how best to interface with the tool and find additional information or context. The appendices contain the assumptions and calculations underpinning the tool. Much of the information for EVI-LOCATE was gathered through industry engagements with EVSE installers, invoices from completed EVSE installations, Gordian's RS Means construction data, and the General Services Administration blanket purchase agreement for EVSE. For a visual tutorial of the tool, users can watch EVI-LOCATE Step-by-Step Video. The tool itself is available at https://evi-locate.nrel.gov.

29 ENERGY PLANNING, POLICY, AND ECONOMY↗

Performance contracting centers of expertise: a framework for federal implementation

This report examines the establishment and operation of Energy Performance Contracting (EPC) Centers of Expertise (COEs) within the federal government. EPCs, including Energy Savings Performance Contracts (ESPCs) and Utility Energy Service Contracts (UESCs), are critical mechanisms for advancing energy efficiency, resilience, and infrastructure modernization without the need for significant upfront appropriations. However, EPCs require specialized knowledge in project development, contracting, financing, legal parameters and technical project oversight. Currently federal agencies have varying levels of expertise and institutionalized policy to effectively and consistently use congressionally authorized EPCs which have decades of proven and impactful use. To address these challenges, several federal agencies have created COEs to centralize expertise, standardize practices, and streamline implementation. This report reviews statutory and policy drivers, highlights the benefits and challenges and presents case studies from the General Services Administration (GSA), the Department of Veterans Affairs (VA) and the U.S. Army Engineering and Support Center Huntsville (HNC). Recommendations are also provided for agencies considering the establishment of EPC COEs, which will bring much needed structure, consistency and lead to implementation of these energy and infrastructure building projects to save costs for U.S. taxpayers.

32 ENERGY CONSERVATION, CONSUMPTION, AND UTILIZATI↗

Field Validation of a Grid-Interactive Efficient Building Software Solution

The U.S. General Services Administration's (GSA's) Green Proving Ground (GPG) program, in partnership with the National Laboratory of the Rockies (NLR), completed a field study of a Grid-Interactive Efficient Buildings (GEB) software solution. The study focused on a single testbed facility to test the GEB functionality of the software solution, along with other features. The testbed facility - a courthouse - is a common building type in GSA's vast building portfolio, offering potentially impactful findings on a scalable level. The study evaluated Prescriptive Data's technology, Nantum OS, a connected building operating system ("GEB Solution") which aggregates multiple sources of previously siloed building data and combines that data with external sources, such as weather information or utility signals, into a single integrated platform. A GEB Solution is a type of Energy Management Information System (EMIS). EMIS is defined as a system of devices, data services, and software applications that communicates with any building system or third-party data source to aggregate and transform data into new capabilities to aid in the optimization of energy use at the building, campus, or agency level. This specific GEB Solution is an EMIS with ASO, automated system optimization, offering supervisory control of certain aspects of the Building Automation System (BAS). Multiple features were evaluated including, but not limited to, Continuous Demand Management to avoid setting new monthly kilowatt (kW) peaks, energy efficiency for reduction of kilowatt hours (kWh) and natural gas consumption, and automated demand response (ADR) for purposes of lowering demand during a utility called Demand Response (DR) event. The testbed facility was the Foley Federal Building and US Courthouse ("Foley Federal Building") located in Las Vegas, NV. This is a 209,496 sq. ft. building constructed in the 1960s with major renovations in 2004. The facility was a good candidate due to the large prevalence of office and courthouse spaces in the GSA portfolio of buildings. It also has many features which allow integration into and control of the building and a strong facilities team to assist with the study. Quantitative and qualitative performance objectives were developed using GSA's GPG GEB project template along with input from the vendor and building facility staff; these are outlined in Table 1. The quantitative performance objectives focused on continuous demand management, energy efficiency, and automated demand response. The qualitative performance objectives focused on the ease of installation and commissioning as well as the operability of the GEB solution. Other performance metrics that are reported on include carbon reduction, cost effectiveness, and occupant acceptance.

32 ENERGY CONSERVATION, CONSUMPTION, AND UTILIZATI↗

Building Specifications

The building in the top photo is the new home of the National Permanent Savings Bank in Washington, D.C., designed by Hartman-Cox Architects. Its construction was based on a money-saving method of preparing building specifications which derived from NASA technology developed to obtain quality construction while holding down cost of launch facilities, test centers and other structures. Written technical specifications spell out materials and components to be used on construction projects and identify the quality tests each item must pass. Specifications can have major impact on construction costs. Poorly formulated specifications can lead to unacceptable construction which must be replaced, unnecessarily high materials costs, safety hazards, disputes and often additional costs due to delays and litigation. NASA's Langley Research Center developed a novel approach to providing accurate, uniform, cost-effective specifications which can be readily updated to incorporate new building technologies. Called SPECSINTACT, it is a computerized - system accessible to all NASA centers involved in construction programs. The system contains a comprehensive catalog of master specifications applicable to many types of construction. It enables designers of any structure to call out relevant sections from computer storage and modify them to fit the needs of the project at hand. Architects and engineers can save time by concentrating their efforts on needed modifications rather than developing all specifications from scratch. Successful use of SPECSINTACT has led to a number of spinoff systems. One of the first was MASTERSPEC, developed from NASA's experience by Production Systems for Architects and Engineers, Inc., an organization established by the American Institute of Architects. MASTERSPEC, used in construction of the bank building pictured, follows the same basic format as SPECSINTACT and can be used in either automated or manual modes. The striking appearance of the bank building shows that, while MASTERSPEC saves time and money, its use involves no sacrfice in architectural design freedom. The Naval Engineering Facilities Command employs an automated specifications system based on SPECSINTACT. The Public Buildings Service of the General Services Administration used SPECSINTACT as a starting point in a plan to make its guideline specifications available to architects and engineers on a nationwide computer network. Public Technology, Inc., a NASA Technology Application Team, is working with Production Systems for Architects and Engineers, Inc., to promote widespread use of the system by state and local governments for cost benefits to taxpayers.

Source record↗

Shallow Soil Polychlorinated Biphenyl Site Assessment Report

This report presents a summary of the shallow soil polychlorinated biphenyl (PCB) site assessment activities that occurred from December 2020 through July 2022 at General Services Administration Reclamation Yard, Solid Waste Management Unit (SWMU) 010, located at the John F. Kennedy Space Center (KSC), Florida. The site is monitored under KSC’s Resource Conservation and Recovery Act Corrective Action Program, which also meets the requirements of Chapter 62-780, Florida Administrative Code. For the purposes of this report, three separate shallow soil plumes, known as the Northeast Shallow Soil PCB Plume, Southeast Shallow Soil PCB Plume, and West Shallow Soil PCB Plume, were identified for this site. The activities presented in this report include seven field events conducted between December 2020 and July 2022, which include shallow soil sample collection in the Northeast, Southeast, and West Shallow Soil PCB Plumes. AECOM Technical Services, Inc., personnel collected 330 soil samples from 118 boring locations. The samples were collected at 0.5-foot depth intervals to various depths based on analytical results and depth to groundwater. The soil samples were submitted to a fixed-based laboratory for analysis by United States Environmental Protection Agency Method 8082A for total PCBs. Several soil samples had PCB concentrations above the State of Florida Direct Exposure Residential and Industrial Soil Cleanup Target Levels (SCTLs), and two soil samples had PCB concentrations above the State of Florida Leachability for Groundwater. No soil borings were located beneath impervious surfaces, such as concrete or asphalt. The current Land Use Control Implementation Plan (LUCIP) covers PCBs in soils above the residential SCTL, which includes the paved areas.

PCBs↗

Houston, We Have a Problem-and a Solution: Solar Performance Initiative Helps Federal Building Boost Rooftop Production

In 2014, the Mickey Leland Federal Building in Houston, Texas installed a 192 kW PV system on top of its parking structure. To monitor and optimize its performance, the General Services Administration, which manages the site, responded to the Federal Energy Management Program’s request for federal agency participation in the Federal Energy Management Program Solar PV Performance Initiative.

37 INORGANIC, ORGANIC, PHYSICAL, AND ANALYTICAL CH↗

Middlesex South FUSRAP Site: Collaboration Towards Beneficial Reuse - 20338

The US Department of Energy (DOE) Office of Legacy Management (LM) manages DoE's post-closure responsibilities and ensures the future protection of human health and the environment with respect to sites that have no continuing DOE mission after undergoing remediation. LM's beneficial reuse program promotes the LM strategic goal to sustainably manage and optimize use of public lands. The beneficial reuse program aims to repurpose former contaminated sites to restore the environment, protect the public health, revitalize communities, and spur economic growth. Benefits from the reuse of a site may increase the local tax base, facilitate job growth, utilize existing infrastructure, and enhance or protect natural resources. Beneficial reuse also promotes protectiveness by ensuring activities are compatible with long-term maintenance and protection of public health and the environment, as well as by retaining good stewardship of natural resources. LM actively participates in promoting the economic development vision of the surrounding communities by collaborating with local communities to promote regional or municipal initiatives. The Borough of Middlesex, New Jersey, has prepared the Lincoln Boulevard Redevelopment Plan, which will reinvent a once-viable downtown and enhance the quality of life for the community. The Middlesex South, New Jersey, Formerly Utilized Sites Remedial Action Program (FUSRAP) site lies within the boundaries of this redevelopment area. In support of this development plan, the Borough is interested in acquiring the site for its Department of Public Works and to increase street access in the future commercial district to be built near adjacent properties. The opportunity to put the FUSRAP site into productive use aligns with LM's mission and strategic goals. In support of beneficial reuse activities, DOE can dispose of excess real property using several mechanisms. The two disposal options applicable to the Middlesex south site include (1) utilizing the US General Services Administration (GSA) or (2) using the Title 10 Code of Federal Regulations Section 770, 'Transfer of Real Property at Defense Nuclear Facilities for Economic Development' (known as a '770 transfer') process. Using the 770 transfer requires economic development as the primary driver, and a specific redevelopment proposal must be submitted. If there is no interest in specific economic development, the GSA option becomes the default mechanism for disposal of the property. In the case of the Middlesex south site, the 770 transfer process is being utilized and the Borough has submitted its economic development proposal to LM. Although LM is encouraged by the opportunity to put the site into productive use, the Middlesex south site is currently on the US Environmental Protection Agency (EPA) National Priorities List and remediation is being performed by the US Army Corp of Engineers (USACE) under the Comprehensive Environmental Response, Compensation, and Liability Act (CERCLA). Consequently, any property transfer must meet the requirements under CERCLA Section 120(h), 'Property Transferred by Federal Agencies.' As the groundwater remedy will not be in place for several years, approval would be required from the US EPA administrator and the governor of the state of New Jersey to perform an early transfer of the site (before all response actions have been completed). The time frame for these approvals to occur under the normal process conflicts with the proposed redevelopment schedule; therefore, various options for expedited sale, transfer, or lease of portions of the site to the Borough were evaluated. The subsequent decision on a mutually beneficial path forward was the result of a collaborative effort between LM, USACE, the Borough and its redevelopment team, EPA, and the New Jersey Department of Environmental Protection. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

GSA Oklahoma City Federal Building: Smart Buildings Case Study

The purpose of this smart buildings case study is to showcase a leading example of a GEB renovation project in the federal buildings space and provide key information on the project roles, processes, costs, and benefits. The findings from this successful GEB project can be used to help pave the way for additional GEB-ready retrofits in the future. The General Services Administration’s (GSA’s) Oklahoma City (OKC) Federal Building, located in downtown Oklahoma City, Oklahoma, demonstrates that GEB-ready strategies and technologies can be realistically deployed today across buildings with minimal investment. The project team implemented nine energy conservation measures (ECMs) and/or smart building technologies, making it a leading example of a smart, sustainable, and efficient commercial building. The case study highlights the challenges and the lessons learned throughout the project design and execution in addition to some of the best practices and considerations when implementing GEB technologies.

Butrico, Mark↗

Utility Energy Service Contract Guide

This guide serves as a key resource for acquisition teams developing utility energy service contracts (UESC) with an emphasis on using a task order to acquire energy management services under a General Services Administration areawide contract. The guide features a compilation of templates to assist your efforts from acquisition planning through awarding a task order for design and installation.

Cali, Peter [National Renewable Energy Laboratory ↗