Search NASA⌕ Search

SEARCH · Search NASA

Results for “Hydropower Components”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 37 records · Page 2

Development of external and neutrally buoyant acoustic transmitters for turbine passage evaluation

Recent studies show transmitters surgically implanted into juvenile salmonids, for the purposes of estimating survival of fish passing through turbines, increases the risk of injury and mortality due to the presence of the tag and exposure to rapid turbine pressure changes. Neutrally buoyant external tags may instead be used to eliminate this bias. However, the externally tagged fish could be affected by other factors such as shear and turbulence which may also bias survival estimates. Studies have been conducted to examine the influence of shear and turbulence on non-tagged juvenile salmonids, however, tests have never been conducted in the laboratory or field to determine the influence of shear and turbulence on retention and injury related to attachment of external transmitters. We designed and manufactured two different configurations of neutrally buoyant (nearly zero g weight in water) external transmitters: Type A and Type B. The Type A transmitters weigh approximately 0.60 g in air and are attached to fish using two sutures anterior to the dorsal fin. The Type B transmitters weigh approximately 0.83 g in air and consist of battery part and transducer part with both parts neutrally buoyant. They are attached to both sides of the dorsal fin using two enamel coated 25 gauge magnet wires. This study provides a broad approach using evaluation measures such as holding, swimming performance, shear, turbulence, rapid decompression exposures, and predation to determine the efficacy of using neutrally buoyant external transmitters to estimate survival of juvenile salmonids passing through turbines. Preliminary results show the Type A design is a viable design for turbine passage evaluation and is being planned for field deployment in the near future.

Advanced turbine↗

A Component-Level Bottom-Up Cost Model for Pumped Storage Hydropower

Pumped Storage Hydropower (PSH) is currently the largest source of utility-scale electricity storage in the U.S. and worldwide. As the accelerating deployment of variable renewable technologies creates opportunity and value for energy storage, it has become increasingly important to characterize PSH costs to understand how it competes. Site-specific considerations and limited cost data in the public domain make it difficult to estimate capital costs for potential new PSH sites. This report documents a spreadsheet-based tool that addresses this challenge and creates a component-level bottom-up cost model for PSH that can be made publicly available for widespread use. It uses detailed site-level physical characteristics and design specifications to calculate key performance and cost parameters for individual components and the project as a whole. The model was developed in consultation with HDR, Inc. and Small Hydro Consulting to ensure it aligns with industry expectations. It enables PSH cost exploration across a wide range of system assumptions and could be customized or extended for the needs of a variety of users.

cost model↗

A heuristic tool to assess regional impacts of renewable energy infrastructure on conservation areas

Wind and hydropower are important renewable components of national energy portfolios, but their infrastructure negatively affects biodiversity. Regional development requires identification of scenarios that minimize the cumulative impacts of multiple facilities. We introduce the cumulative impact plot (CIP) to quantify cumulative impacts of renewable energy development within a region. Summed impacts of facilities are plotted as a function of the number of facilities, with facilities ranked by increasing (the best-case scenario) or decreasing (worst-case scenario) individual impact. These curves represent lower and upper bounds to which alternative development scenarios (e.g., facilities ranked by generating capacity) can be compared. We used CIPs to assess overlap of potential wind and hydropower facilities with two types of conservation area in the United States: (1) federally protected lands and (2) critical habitats of federally threatened and endangered species. Here, we evaluated two alternative scenarios: facilities ranked by (A) decreasing generating capacity and (B) increasing distance from urban centers. Differences between the best-case and worst-case scenarios were large, thus revealing opportunities to develop facilities with limited impact on conservation areas. Alternative scenarios maximizing energy density generally resulted in conservation area overlap intermediate to best-case and worst-case scenarios. CIPs can also identify the proportion of wind versus hydropower favored under alternative scenarios. Build-out scenarios aimed at minimizing conservation area overlap favor hydropower, whereas alternative scenarios favor wind power. We conclude that CIPs can (1) complement—but should not replace—project-level environmental impact assessment, (2) integrate strategic, cumulative, and scenario-based assessments, and (3) harness rapidly growing geospatial data.

54 ENVIRONMENTAL SCIENCES↗

Creating a Digital Twin for a Hydropower System through 3D Object Modeling: Alder Dam FY23

Hydropower stands as the world's leading source of renewable electricity, with hydropower plants spanning the globe. A typical hydropower plant comprises essential components including the governor, excitation system, generator, thrust bearing, hydraulic turbine, transformer, main lead, metering and control devices, tailwater depression system, and dissolved oxygen monitoring. Each of these components undergoes various measures and monitoring procedures. These measurements are collected through a diverse array of systems, encompassing standalone sensors, programmable logic controllers (PLCs), Supervisory Control and Data Acquisition (SCADA) systems, Internet of Things (IoT) devices, and data acquisition and integration platforms like OSI/PI.

13 HYDRO ENERGY↗

Large Format Composite Additive Manufacturing for Low-Head Hydropower

Hydropower with a small elevation change from inlet to outlet, known as “low-head” hydropower, is a relatively untapped resource for reliable green power generation. One major barrier to entry is the cost of the components needed to generate the power. Each installation site is unique, with various head levels, flow rates, and other unique site characteristics that drive up the cost of development and installation. As a result, custom-made components are necessary because the sites are intrinsically inefficient. However, customized parts are generally more expensive to manufacture than ready-made parts. Often times, the cost of custom-made components is so high that the low-head hydropower installation becomes non-viable. Additive manufacturing offers the ability to make custom components, ideal for one-off applications, at low costs that are well suited for the needs of low-head hydropower. Indirect additive manufacturing, such as making tools or dies rather than end use components, can also be used to make low-cost composite tooling as needed for these custom applications. This paper explores the use of additive manufacturing, both directly and indirectly, to produce the components of a turbine system for a low-head hydropower site. The parts were designed to form a unique modular system, which saves time for future designs and iterations. The system has operated for more than three years without failure at a test site in Wisconsin, USA. This work serves as a basis for future application of AM to low-head systems, in which the modular components can be customized for each unique hydropower installation.

36 MATERIALS SCIENCE↗

Near Net Shape Workshop Report

In 2021, President Biden issued Executive Order (EO) 14017, spurring the federal government to build more secure and diverse U.S. supply chains, including energy supply chains, to ensure economic prosperity and national security (White House 2021). In response to EO 14017, the U.S. Department of Energy (DOE) published America’s Strategy to Secure the Supply Chain for a Robust Clean Energy Transition (Igogo 2022) to outline the challenges and opportunities facing the energy supply chain along with key strategies to secure America’s position as a clean energy superpower in the years and decades to come. The expansion of domestic manufacturing capabilities is identified as one of the common risks and vulnerabilities for which DOE should develop comprehensive strategies to secure supply chains for the clean energy transition. The report states that “examples of manufacturing capabilities of concern include … large iron and steel castings for wind turbines, hydropower turbines, and nuclear reactor components.”

32 ENERGY CONSERVATION, CONSUMPTION, AND UTILIZATI↗

Analysis of Supply Chains and Advanced Manufacturing of Small Hydropower Systems

Clean energy manufacturing is a sector of increasing importance both in the United States and worldwide. In the United States, it has been presented as an engine for job creation in a sector of the U.S. economy that was hit hard by the 2008-2009 recession. The Clean Energy Manufacturing Analysis Center (CEMAC), sponsored by the U.S. Department of Energy (DOE), conducts credible, objective, industry-relevant, recurring, and consistent analyses of clean energy technologies. In this project, the National Renewable Energy Laboratory (NREL) and the Oak Ridge National Laboratory (ORNL) collaborated in a hydropower manufacturing and supply chain analysis primarily for U.S. small hydropower (SHP) market to provide insights on supply chain constraints, manufacturing cost, location factors, and opportunities for hydropower using advanced manufacturing technologies. The goal of the project is to improve understanding of the manufacturing opportunities in the U.S. hydropower supply chain, specific competitive advantages, and factors for manufacturing location decisions for SHP. These insights could be used to inform investment and research strategies, policy, and other decisions that could promote economic growth and strengthen U.S. manufacturing capabilities. The project scope included a design for manufacturing and assembly (DFMA) costs analysis and a levelized cost of electricity (LCOE) sensitivity analysis of modular, representative SHP turbines. A representative SHP system was chosen to be made up of two 5 megawatt (MW) turbines, as these Kaplan style turbines could be useable for many non-powered dams (NPDs) across the U.S. The sensitivity analysis used the Integrated Design and Assessment (IDEA) tool, which has helped highlight the impact of the turbine equipment cost on the potential capital expenditure (CAPEX) and LCOE of the installed, representative system. In addition, the project team analyzed international tradeflows (e.g., export and import of hydropower turbines and the parts used in hydropower systems). As part of this project, hydropower stakeholder interviews were undertaken to help identify insights related to hydropower manufacturing opportunities for U.S. players in SHP, the country-specific manufacturing advantages in the United States and threats, and key factors behind manufacturing location decisions made by the SHP industry. Key opportunities for the US SHP market and industry include: Foreign export markets such as Chile, China, Columbia, India and Japan, have an estimated 71,795 MW of technical potential that could be serviced with SHP installations. Utilization of existing manufacturing capacity and expertise, along with economies of scale benefits, could result in increased global competitiveness through lower investment requirements and component costs, which could lead to increased U.S. strength in the export of SHP systems and components. Technology advances such as modular turbine designs, standardized units for conduit systems, precast systems, and improved powertrain technologies could help reduce costs, particularly for manufacturing a small number of units. The DOE is also exploring modular hydropower designs, which would integrate standard independently-produced components, validated to meet multiple specifications. Using modules in product design simplifies manufacturing activities such as inspection, testing, assembly, and purchasing, may increase economies of scale to lower total system cost. There are significant opportunities for the use of composites and Additive Manufacturing (AM) for hydropower components, when design changes are made to hydropower systems. By taking advantage of the corrosion resistance, light-weighting and structural benefits, composites and AM could help significantly alter hydropower structures and installations.

13 HYDRO ENERGY↗

Climate Change Impacts to Hydropower Generation in Pacific Northwest River Basins (Final Report)

This is the final technical report describing the research findings for the project, “Climate change impacts to hydropower generation in Pacific Northwest river basins”. The overall objective of the research was to develop a new approach to assess which types of climate changes would adversely affect hydropower production. This research had three major components. First, we conducted a geospatial analysis of the region to identify potential focus basins. We compiled geospatial data on hydropower dam locations, contributing areas to hydropower dams, and climate characteristics in contributing areas. For the potential focus basins identified, we classified these basins by hydrologic regime as snow-dominated, rain-dominated, or mixed. Rain-dominated basins were primarily found in Oregon, with some in western Washington. Most of the basins draining west out of the Cascades in Washington were mixed, whereas most of the potential focus basins in Idaho were snowmelt-dominated. Next, we developed a stochastic conceptual modeling approach in which we stochastically generate a wide range of climate scenarios and use these scenarios to generate time series of reservoir inflows. We developed and applied this modeling approach to the North Fork of the Clearwater River in Idaho. Results showed that increases in temperature in the basin led to decreases in streamflow, even in cases where precipitation increased. Finally, we used the reservoir inflow scenarios from the stochastic conceptual model to force a reservoir operations model for Dworshak reservoir. The wide range of climate scenarios generated by the hydrologic model allowed us to test the sensitivity of reservoir operations objectives to shifts in both temperature and precipitation. Results showed that scenarios with lower inflow had less hydropower generation, but changes in hydropower generation were not always proportional to changes in inflow. Current reservoir operations were better suited to maximize hydropower generation under climate change scenarios with no shift in inflow timing but did not optimize power generation under warming scenarios with earlier snowmelt runoff.

13 HYDRO ENERGY↗

EMTA’s Evaluation of the Elastic Properties for Fiber Polymer Composites Potentially Used in Hydropower Systems

Fiber-reinforced polymer composites can offer important advantages over metals where lightweight, cost-effective manufacturing and high mechanical performance can be achieved. To date, these materials have not been used in hydropower systems. In view of the possibility to tailor their mechanical properties to specific applications, they now have become a subject of research for potential use in hydropower systems. The first step in any structural design that uses composite materials consists of evaluating the basic composite mechanical properties as a function of the as-formed composite microstructure. These basic properties are the elastic stiffness, stress-strain response, and strength. This report describes the evaluation of the elastic stiffness for a series of common discontinuous fiber polymer composites processed by injection molding and compression molding in order to preliminarily estimate whether these composites could be used in hydropower systems for load-carrying components such as turbine blades. To this end, the EMTA (Copyright © Battelle 2010) predictive modeling tool developed at the Pacific Northwest National Laboratory (PNNL) has been applied to predict the elastic properties of these composites as a function of three key microstructural parameters: fiber volume fraction, fiber orientation distribution, and fiber length distribution. These parameters strongly control the composite mechanical performance and can be tailored to achieve property enhancement. EMTA uses the standard and enhanced Mori-Tanaka type models combined with the Eshelby equivalent inclusion method to predict the thermoelastic properties of the composite based on its microstructure.

36 MATERIALS SCIENCE↗

Hydropower Geotechnical Foundations: Current Practice and Innovation Opportunities for Low-Head Applications

Hydropower is a renewable energy resource that produces electricity from flowing water under pressure. Engineered hydropower structures, such as dams, are used to create a hydraulic head, enabling a turbinegenerator unit to convert pressurized flow into electricity. While hydropower has been a source of renewable energy since antiquity, new development in the United States has slowed in recent decades. Based on recent resource assessments, the largest opportunity to expand hydropower in the United States is from new stream-reach development (i.e., new hydropower development along stream-reaches that do not currently have hydroelectric facilities or other forms of infrastructure, such as dams). Roughly 75% of identified new stream-reach development potential is from low-head sites (less than 30 ft of head), which typically suffer from smaller power densities and higher normalized costs, given economies of scale. Hydropower developers and other stakeholders are thus interested in strategies to reduce initial capital costs while practicing sustainable development to maximize environmental compatibility with minimal disruption to natural aquatic life, sediment, and water flows. Historically, civil works have represented a significant cost driver for new hydropower development, with the foundation system representing a major cost component and source of uncertainty. The foundation system is the collection of engineered structural features (e.g. cutoff trenches, walls, grouting, anchors) constructed at or below the preconstruction ground surface that interfaces between the overlying structures (superstructures) and the bed material below (subsurface). Development of a hydropower foundation system must consider the various characteristics of the surrounding stream environment and subsurface while adhering to the engineering requirements of the superstructure that it supports. The care of water, excavation, and other construction activities are important features of foundation design and construction. The design and construction cost of the foundation system is largely dependent on the site geology and riverbed composition and is influenced by the level of geotechnical assessment required and conducted. Thus, a hydropower facility’s geotechnical foundation is often highly site-specific, with proper site selection and assessment being important to project success. The foundation system is designed to provide structural stability (of the foundation and dam), limit seepage, ensure public safety, and maintain functionality for the project life, during both construction and facility operations. Inadequate foundation or dam design can result in dam failure and the uncontrolled release of significant volumes of water, which could cause a high number of casualties and extensive property damage downstream of the failure. According to the Association of State Dam Safety Officials, approximately 30% of all historical dam failures in the United States are attributed to foundation or abutment defects, and another 20% are attributed to piping or seepage through the embankment, foundation, or abutment. To ameliorate these safety considerations, foundations often require massive amounts of construction material (e.g., grout, concrete, engineered dam fill) and long construction times. Foundation design also requires significant analysis prior to construction because the initial in-stream and abutment subsurface conditions are site-specific, and sufficient data for them often are lacking. Current practice requires on-site assessment, using expensive drilling and invasive and non-invasive investigation methods, to determine the expected cost of foundation material and treatment. Additionally, foundation construction often requires site dewatering (and other care of water activities), which involves constructing temporary diversion structures upstream and often downstream, called cofferdams, and water diversion systems that route water around the construction site. Cofferdams and water diversion systems can drastically increase construction costs and contribute to environmental disruption, including modification of flow patterns and benthic habitats. Given the technical, economic, and environmental challenges associated with hydropower foundations, opportunities exist to improve the current state of practice and to develop new and innovative solutions to Hydropower is a renewable energy resource that produces electricity from flowing water under pressure. Engineered hydropower structures, such as dams, are used to create a hydraulic head, enabling a turbinegenerator unit to convert pressurized flow into electricity. While hydropower has been a source of renewable energy since antiquity, new development in the United States has slowed in recent decades. Based on recent resource assessments, the largest opportunity to expand hydropower in the United States is from new stream-reach development (i.e., new hydropower development along stream-reaches that do not currently have hydroelectric facilities or other forms of infrastructure, such as dams). Roughly 75% of identified new stream-reach development potential is from low-head sites (less than 30 ft of head), which typically suffer from smaller power densities and higher normalized costs, given economies of scale. Hydropower developers and other stakeholders are thus interested in strategies to reduce initial capital costs while practicing sustainable development to maximize environmental compatibility with minimal disruption to natural aquatic life, sediment, and water flows. Historically, civil works have represented a significant cost driver for new hydropower development, with the foundation system representing a major cost component and source of uncertainty. The foundation system is the collection of engineered structural features (e.g. cutoff trenches, walls, grouting, anchors) constructed at or below the preconstruction ground surface that interfaces between the overlying structures (superstructures) and the bed material below (subsurface). Development of a hydropower foundation system must consider the various characteristics of the surrounding stream environment and subsurface while adhering to the engineering requirements of the superstructure that it supports. The care of water, excavation, and other construction activities are important features of foundation design and construction. The design and construction cost of the foundation system is largely dependent on the site geology and riverbed composition and is influenced by the level of geotechnical assessment required and conducted. Thus, a hydropower facility’s geotechnical foundation is often highly site-specific, with proper site selection and assessment being important to project success. The foundation system is designed to provide structural stability (of the foundation and dam), limit seepage, ensure public safety, and maintain functionality for the project life, during both construction and facility operations. Inadequate foundation or dam design can result in dam failure and the uncontrolled release of significant volumes of water, which could cause a high number of casualties and extensive property damage downstream of the failure. According to the Association of State Dam Safety Officials, approximately 30% of all historical dam failures in the United States are attributed to foundation or abutment defects, and another 20% are attributed to piping or seepage through the embankment, foundation, or abutment. To ameliorate these safety considerations, foundations often require massive amounts of construction material (e.g., grout, concrete, engineered dam fill) and long construction times. Foundation design also requires significant analysis prior to construction because the initial in-stream and abutment subsurface conditions are site-specific, and sufficient data for them often are lacking. Current practice requires on-site assessment, using expensive drilling and invasive and non-invasive investigation methods, to determine the expected cost of foundation material and treatment. Additionally, foundation construction often requires site dewatering (and other care of water activities), which involves constructing temporary diversion structures upstream and often downstream, called cofferdams, and water diversion systems that route water around the construction site. Cofferdams and water diversion systems can drastically increase construction costs and contribute to environmental disruption, including modification of flow patterns and benthic habitats. Given the technical, economic, and environmental challenges associated with hydropower foundations, opportunities exist to improve the current state of practice and to develop new and innovative solutions to challenges frequently encountered with traditional approaches. With this understanding, it is critically important to understand and document the current state of practice for hydropower geotechnical foundations, identify key challenges, and define opportunities for innovative solutions. To this end, this report documents the current state of practice across the three main phases of geotechnical foundation development: (1) geotechnical site assessment, (2) design, and (3) construction for hydropower systems. It also describes the major challenges with conventional approaches and identifies opportunities for innovation to reduce hydropower foundations costs, timelines, and risks. Key takeaways from this report include the following: Approximately 80% of available low-head sites are expected to have foundations on soil beds rather than rock beds, suggesting that rockfill and earthfill dams may be the most cost-effective conventional dam type for new projects.; Geotechnical and geologic investigation activities are time-consuming and expensive but are essential to define the parameters and criteria needed for foundation design.; Certain riverbed soil and bedrock types present significant technical challenges or require expensive foundation construction, which can prove financially prohibitive for low-head project development.; Modular hydropower design and prefabricated modular foundations represent a promising but unproven paradigm for new hydropower development. Design and construction approaches using optimized and highly repeatable, reliable components would benefit project cost, time, and risk but require additional research and development.; Temporary construction features for foundations, including cofferdams, water diversion, and water control systems, can prove costly and have inherent construction risk.; For economically viable development, hydropower geotechnical foundations should be limited to 4 to 15% of the project’s total initial capital costs. Many proposed projects have experienced cost overruns attributable to foundation difficulties or surprises during construction. These overruns may have been due to inadequate investigations, lack of adequate engineering effort to tailor the structures to site geology and topography, and/or contractual terms, among other considerations.; Challenges for hydropower foundations and opportunities for innovative technology solutions are identified in the following areas (consistent with the three main phases of foundation development): Geotechnical site assessment, Foundation design and materials, Construction methods and technology. Ultimately, this report aims to provide information about geotechnical foundations for low-head hydropower and to motivate transformative technologies to support hydropower growth.

13 HYDRO ENERGY↗

Hydropower Black Start: A Guidebook for Retrofitting Grid Dependent Hydropower

Not all United States (US) hydropower plants were designed to provide black start, but they are increasingly needed to uphold resilience in the evolving electric grid. This guidance is designed to help understand the minimal retrofits required for grid dependent hydropower (GDH) plants behind the point of interconnection (POI). For distribution connected hydropower plants or those with dedicated cranking paths, such upgrades can be sufficient for the plant to provide black start. For others, more coordination with the transmission system operator will be needed. This guidebook answers a number of questions relevant to retrofitting hydropower plants with black start capabilities. For example, the guidebook answers: • How flexible do the wicket gate controls need to be? • Who needs to do hydro governor model validation, why, and how? • How robust and flexible do the excitation and AVR controls need to be? • What protection settings need to be adjusted? • What relay(s) will need to be bypassed or overridden and at what risk? • What is the electrical energy demand of the station load or auxiliary power systems? • What should the strategy to energize transformer(s) along cranking path to address inrush currents be? • How should the critical load restoration be sequenced? In addition to outlining the specifications that hydropower plants need to meet for each component to be able to perform black start, this guidebook provides a set of case studies for specific upgrades needed at actual plants. Between the case studies of plants that have already performed black start retrofits and the examples of how this guidebook can be applied to scope future retrofits, five key themes have been identified for retrofit needs. 1. Protection needs “black start” mode: hydropower plants that are not designed with black start capabilities will have protections that prevent them from interconnecting to a “dead bus.” These protections will need to be overridden in every retrofit case and a separate black start mode should be established so that operators can safely switch between black start and grid connected modes, minimizing the risk to the plant. 2. Wicket gates need modern controls: digital governors accelerate the parameter tuning process and gate position sensors improve controllability, so plants with mechanical governors should be upgraded. Furthermore, a black start and islanding mode should be established for controls to maximize plant performance. 3. Robust excitation support: the DC system or excitation generator needs to be reliable enough to form and sustain the rotor electromagnetic field. These systems are typically undersized in plants that were not designed for black start, so they will need to be upgraded. 4. Turbine-governor model validation and operator training: validation of a standard hydro governor model is needed to characterize the dynamic response (i.e., inertial and primary frequency response) of the GDH. This is required for control development and old hydropower plants often have outdated or incorrect models. Operator training is also typically required to ensure the hardware retrofits are utilized correctly during the black start process. 5. Transformer and cranking path energization: any upgradation and control adjustment in front of the POI will depend upon the existing interconnection. Coordination with the transmission or distribution operator may be required.

13 HYDRO ENERGY↗

Hydropower Cyber-Physical Configurations

The U.S. Department of Energy’s Water Power Technologies Office funded Pacific Northwest National Laboratory, Argonne National Laboratory, and the National Renewable Energy Laboratory to develop a typology to characterize the variety and pervasiveness of cyber-physical configurations across the nation’s hydropower fleet. Outreach to owners and operators returned configurations for 275 hydropower plants or approximately 12% of the fleet. Components (OT and IT), systems, and connections among systems differed among plants according to function, age, position in the river cascade, and many other factors. Seven cyber-physical configuration types labeled A through I, included from 2 to dozens of plants. They were differentiated by how pervasive data and control connections were among cyber-physical components and how frequently control signals paired with data signals in a feedback loop. The flow of data and control within each type implies what cybersecurity vulnerabilities may exist, and what mitigation actions may be most effective. A self-assessment approach allows plant operators to identify the configuration type similar to their plant and link to the lessons learned and best practices information. The cyber-physical typology reinforces the idea that hydropower facilities vary widely, but it also identifies groups that highlight similarities in how their cyber-physical components interact. This helps address fleetwide cybersecurity needs by identifying a reasonable number of configuration types that share risks, vulnerabilities, and potential mitigations.

13 HYDRO ENERGY↗

In situ characterization of the biological performance of a Francis turbine retrofitted with a modular guide vane

There are two strategies to lower overall project costs to an extent that will make many potential sustainable hydropower sites economically viable: (1) design standardized/modular components; (2) use advanced tools to reduce environmental evaluation costs. In this study an autonomous sensor device (Sensor Fish) was used to study a Francis turbine retrofitted with a modular guide vane. The median nadir pressures measured were 74.7, 66.6, and 56.6 kPaA for 90-, 190-, and 380-kW operating conditions respectively. These nadir pressures were compared to other Francis turbines studied using Sensor Fish and were found to be within the same range. The proportion of Sensor Fish releases with severe acceleration events (acceleration = 95G) was also investigated. The proportion ranged from 73 to 80% (runner region), 50 to 64% (guide vane region), and 9 to 28% (draft tube region), which was within the range of the other turbines used for comparison. The Sensor Fish testing that was conducted at Hurley Dam demonstrates that the modular guide vane that was retrofitted to the existing Francis turbine is potentially a suitable replacement that can provide biological performance similar to the guide vane used with other existing Francis turbines, but with the benefit of reduced fabrication costs.

13 HYDRO ENERGY↗

A review of the potential impacts of climate change on bulk power system planning and operations in the United States

In this paper, climate change might impact various components of the bulk electric power system, including electricity demand; transmission; and thermal, hydropower, wind, and solar generators. Most research in this area quantifies impacts on one or a few components and does not link these impacts to effects on power system planning and operations. Here, we advance the understanding of how climate change might impact the bulk U.S. power system in three ways. First, we synthesize recent research to capture likely component-level impacts of climate change in the United States. Second, given the interconnected nature of the electric power system, we assess how aggregated component-level impacts might affect power system planning and operations. Third, we outline an agenda for future research on climate change impacts on power system planning and operations. Although component-level impacts vary in their magnitude, collectively they might significantly affect planning and operations. Most notably, increased demand plus reduced firm capacity across generation types might require systems to procure significant additional capacity to maintain planning reserve margins, and regional declines in renewable resources might need to be offset by increasing zero-carbon investment to meet decarbonization targets. Aggregated impacts might also affect operations, e.g., through shifts in dispatching and increased operational reserve requirements. Future research should aggregate component-level impacts at operational timescales, quantify impacts on wind and solar variability, and contextualize climate change impacts within ongoing shifts in the electric power system.

29 ENERGY PLANNING, POLICY, AND ECONOMY↗

Achieving American Leadership in the Hydropower Supply Chain

In 2020, hydropower accounted for 36.7% of U.S. renewable electricity generation and 7.3% of total electricity generation. While the existing U.S. supply chain effectively supports the nation’s hydropower fleet—the fourth-largest in the world, alongside the third-largest pumped storage hydropower (PSH) fleet—refurbishments, upgrades, and new development are required to modernize and expand the fleet and facilitate a clean, emissions-free U.S. electricity grid by 2035. To achieve these goals, researchers compiled a report examining the U.S. hydropower energy supply chain, including raw materials, processed materials, components, subcomponents, and recycling.

Source record↗

Hydropower representation in water and energy system models: a review of divergences and call for reconciliation

Abstract Reservoir-based hydropower systems represent key interactions between water and energy systems and are being transformed under policy initiatives driven by increasing water and energy demand, the desire to reduce environmental impacts, and interacting effects of climate change. Such policies are often guided by complex system models, whereby divergence in system representations can potentially translate to incompatible planning outcomes, thereby undermining any planning that may rely on them. We review different approaches and assumptions in hydropower representation in water and energy systems. While the models and issues are relevant globally, the review focuses on applications in California given its extensive development of energy and water models for policy planning, but discusses the extent to which these observations apply to other regions. Structurally, both water-driven and energy-driven management models are similar. However, in energy models, hydropower is often represented as a single-priority output. Water management models typically allocate water for competing priorities, which are generally uninformed by dynamic electricity load demand, and often result in a lower priority for hydropower. In water models, constraints are increasingly resolved for non-energy components (e.g. inflow hydrology and non-energy water demand); few analogues exist for energy models. These limitations may result in inadequate representations of each respective sector, and vastly different planning outcomes for the same facilities between the two different sectors. These divergent modeling approaches manifest themselves in California where poorly reconciled outcomes may affect decisions in hydropower licensing, electricity grid flexibility and decarbonization, and planning for environmental water. Fully integrated water-energy models are computationally intensive and specific to certain regions, but better representation of each domain in respective efforts would help reconcile divergences in planning and management efforts related to hydropower across energy and water systems.

Rheinheimer, David E. (ORCID:0000000315259069)↗

Water Energy Simulation Toolset

The Water-Energy Simulation Toolset (WEST) is an interactive simulation model that helps visualize impacts of different stakeholders on water quantity and quality of a watershed. The case study is applied for the Snake River Basin with the fictional name Cutthroat River Basin. There are four groups of stakeholders of interest: hydropower, agriculture, flood control, and environmental protection. Currently, the quality component depicts nitrogen-nitrate contaminant. Users can easily interact with the model by changing certain inputs (climate change, fertilizer inputs, etc.) to observe the change over the entire system. Users can also change certain parameters to test their management policy.

Nguyen, Thuy↗