Search NASA⌕ Search

SEARCH · Search NASA

Results for “In-Orbit Assembly”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

34 records · Page 2

Initial contamination control considerations for the Next Generation Space Telescope (NGST)

The NASA's Next Generation Space Telescope (NGST), a 6 m to 8 m diameter device, is described. The NGST will be radiatively cooled to 30 K to 60 K in order to carry out extremely deep exposures at near infrared wavelengths, for 5 years to 10 years lifetime. Initial contamination control design options include strict materials selection and baking out of both hardware down to the component level, minimizing or eliminating the exposure to the optical telescope assembly to sunlight or earth albedo during deployment and early in-orbit operations.

Wooldridge, Eve M.↗

STS-71 Shuttle/Mir mission report

The performance measurements of the space shuttle on-orbit flight control system from the STS-71 mission is presented in this post-flight analysis report. This system is crucial to the stabilization of large space structures and will be needed during the assembly of the International Space Station A mission overview is presented, including the in-orbit flight tests (pre-docking with Mir) and the systems analysis during the docking and undocking operations. Systems errors and lessons learned are discussed, with possible corrective procedures presented for the upcoming Mir flight tests.

Zimpfer, Douglas J.↗

Charter and activities of the SIRTF in-orbit checkout focus integrated products team and optical performance of the CTA

We describe a strategy to determine the initial mirror spacing by quantitatively evaluating the shapes of the images formed by the telescope using the Infrared Array Camera and other science instruments. We show that this information can be used to predict the direction and magnitude of the secondary mirror move that will result in the telescope best focus. The tools used to evaluate focus position and optical quality of the in orbit CTA have been qualified during the BRUTUS test are here described.

Integrated↗

Brassboard Astrometric Beam Combiner (ABC) Development for the Space Interferometry Mission (SIM)

The Astrometric Beam Combiner (ABC) is a critical element of the Space Interferometry Mission (SIM) that performs three key functions: coherently combine starlight from two siderostats; individually detect starlight for angle tracking; and disperse and detect the interferometric fringes. In addition, the ABC contains: a stimulus, cornercubes and shutters for in-orbit calibration; several tip/tilt mirror mechanisms for in-orbit alignment; and internal metrology beam launcher for pathlength monitoring. The detailed design of the brassboard ABC (which has the form, fit and function of the flight unit) is complete, procurement of long-lead items is underway, and assembly and testing is expected to be completed in Spring 2009. In this paper, we present the key requirements for the ABC, details of the completed optical and mechanical design as well as plans for assembly and alignment.

PlanetQuest↗

Application of adaptive control to space stations

The space station will be deployed and assembled in low earth orbit with multiple Shuttle trips. Several construction phases will be required involving both ground and in-orbit operations. In this paper, the construction process of a four-panel space station and its control problems are discussed. The applicability of a direct model reference adaptive control technique with plant augmentation is investigated. Control during several key assembly operation periods has been simulated. These include Shuttle docking with initial-phase station, habitat module mating, and Shuttle docking with operational station. High rate of convergence and robust performance have been observed for all the simulated cases even with 40 percent model parameter errors and model truncations and more than 100 percent instant mass property variations. Controller with severe gain saturations is also discussed and results show only slight performance deterioration.

Ih, C.-H. C.↗

Low cost, high concentration ratio solar cell array for space applications

A miniaturized Cassegrainian-type concentrator solar array concept for space applications is described. In-orbit cell operating temperatures near 80 C are achieved with purely passive cell cooling and a net concentration ratio of 100. A multiplicity of miniaturized, rigid solar cell concentrator subassemblies are electrically interconnected in conventional fashion and mounted into rigid frames to form concentrator solar panel assemblies approximately 14-mm thick. A plurality of such interconnected panels forms a stowable and deployable solar cell blanket. It is projected that for 20% efficient silicon cells an array of 500 kW beginning-of-life output capability, including orbiter cradle structures, can be transported by a single shuttle orbiter flight into low earth orbit. In-orbit array specific performance is calculated to be approximately 100 W/sq m and 20 W/kg, including all stowage, deployment and array figure control equipment designed for a 30-year orbital life. Higher efficiency gallium arsenide and multiple band gap solar cells will improve these performance factors correspondingly.

Patterson, R. E.↗

Attitude sensor package

This paper describes the design, construction, testing, and successful flight of the Attitude Sensor Package. The payload was assembled on a standard HITCHHIKER experiment mounting plate, and made extensive use of the carrier's power and data handling capabilities. The side mounted HITCHHIKER version was chosen, since this configuration provided the best viewing conditions for the instruments. The combustion was successfully flown on board Space Shuttle Columbia (STS-52), in October 1992. The payload was one of the 14 experiments of the In-Orbit Technology Demonstration Program (Phase 1) of the European Space Agency.

Aceti, R.↗

Robotics program at the NASA Goddard Space Flight Center

The NASA Goddard telerobotic program is structured to increase the scope and efficiency of what man can accomplish in space through the use of robotics. The main focus is to service Space Station Freedom and its payloads, but robotic assembly of Space Station Freedom and platforms is also anticipated. The approach being taken to achieve this by telerobotics, where manipulators can be controlled by human operators or computer programs. The Goddard Space Flight Center (GSFC) has the responsability to develop the Flight Telerobotic Servicer (FTS) for Space Station Freedom. The current plan at GSFC in support of telerobotics for Space Station Freedom and the in-orbit servicing of platforms are reviewed. Plans for ground demonstrations involving the use of an engineering test bed and an operational facility are discussed.

Ollendorf, Stanford↗

Apollo 14 Mission to Fra Mauro

The 1971 Apollo 14 Mission to Fra Mauro, a lunar highland area, is highlighted in this video. The mission's primary goal was the collection of lunar rocks and soil samples and lunar exploration. The soil and rock sampling was for the geochronological determination of the Moon's evolution and its comparison with that of Earth. A remote data collection station was assembled on the Moon and left for continuous data collection and surface monitoring experiments. The Apollo 14 astronauts were Alan B. Shepard, Edgar D. Mitchell, and Stuart A. Rossa. Astronauts Shepard and Mitchell landed on the Moon (February 5, 1971) and performed the sampling, the EVA, and deployment of the lunar experiments. There is film-footage of the lunar surface, of the command module's approach to both the Moon and the Earth, Moon and Earth spacecraft launching and landing, in-orbit command- and lunar-module docking, and of Mission Control.

Beasley, Brian D.↗

Initial flight results of the TRMM Kalman filter

The Tropical Rainfall Measuring Mission (TRMM) spacecraft is a nadir pointing spacecraft that nominally controls attitude based on the Earth Sensor Assembly (ESA) output. After a potential single point failure in the ESA was identified, the contingency attitude determination method chosen to backup the ESA-based system was a sixth-order extended Kalman filter that uses magnetometer and digital sun sensor measurements. A brief description of the TRMM Kalman filter will be given, including some implementation issues and algorithm heritage. Operational aspects of the Kalman filter and some failure detection and correction will be described. The Kalman filter was tested in a sun pointing attitude and in a nadir pointing attitude during the in-orbit checkout period, and results from those tests will be presented. This paper will describe some lessons learned from the experience of the TRMM team.

Andrews, Stephen F.↗

Initial Flight Results of the TRMM Kalman Filter

The Tropical Rainfall Measuring Mission (TRMM) spacecraft is a nadir pointing spacecraft that nominally controls attitude based on the Earth Sensor Assembly (ESA) output. After a potential single point failure in the ESA was identified, the contingency attitude determination method chosen to backup the ESA-based system was a sixth-order extended Kalman filter that uses magnetometer and digital sun sensor measurements. A brief description of the TRMM Kalman filter will be given, including some implementation issues and algorithm heritage. Operational aspects of the Kalman filter and some failure detection and correction will be described. The Kalman filter was tested in a sun pointing attitude and in a nadir pointing attitude during the in-orbit checkout period, and results from those tests will be presented. This paper will describe some lessons learned from the experience of the TRMM team.

Andrews, Stephen F.↗

The Focal Plane Assembly for the Athena X-Ray Integral Field Unit Instrument

This paper summarizes a preliminary design concept for the focal plane assembly of the X-ray Integral Field Unit on the Athena spacecraft, an imaging microcalorimeter that will enable high spectral resolution imaging and point-source spectroscopy. The instrument's sensor array will be a 3840-pixel transition edge sensor (TES) microcalorimeter array, with a frequency domain multiplexed SQUID readout system allowing this large-format sensor array to be operated within the thermal constraints of the instrument's cryogenic system. A second TES detector will be operated in close proximity to the sensor array to detect cosmic rays and secondary particles passing through the sensor array for off-line coincidence detection to identify and reject events caused by the in-orbit high-energy particle background. The detectors, operating at 55 mK, or less, will be thermally isolated from the instrument cryostat's 2 K stage, while shielding and filtering within the FPA will allow the instrument's sensitive sensor array to be operated in the expected environment during both on-ground testing and in-flight operation, including stray light from the cryostat environment, low-energy photons entering through the X-ray aperture, low-frequency magnetic fields, and high-frequency electric fields.

SQUID amplifier↗

X-Ray Imaging and Spectroscopy Mission

The X-Ray Imaging and Spectroscopy Mission (XRISM) is a joint mission between the Japan Aerospace Exploration Agency (JAXA) and the National Aeronautics and Space Administration (NASA) in collaboration with the European Space Agency (ESA). In addition to the three space agencies, universities and research institutes from Japan, North America, and Europe have joined to contribute to developing satellite and onboard instruments, data-processing software, and the scientific observation program. XRISM is the successor to the ASTRO-H (Hitomi) mission, which ended prematurely in 2016. Its primary science goal is to examine astrophysical problems with precise, high-resolution X-ray spectroscopy. XRISM promises to discover new horizons in X-ray astronomy. It carries a 6 × 6 pixelized X-ray microcalorimeter on the focal plane of an X-ray mirror assembly (Resolve) and a co-aligned X-ray CCD camera (Xtend) that covers the same energy band over a large field of view. XRISM utilizes the Hitomi heritage, but all designs were reviewed. The attitude and orbit control system was improved in hardware and software. The spacecraft was launched from the JAXA Tanegashima Space Center on 2023 September 6 (UTC). During the in-orbit commissioning phase, the onboard components were activated. Although the gate valve protecting the Resolve sensor with a thin beryllium X-ray entrance window was not yet opened, scientific observation started in 2024 February with the planned performance verification observation program. The nominal observation program commenced with the following guest observation program beginning in 2024 September.

Astronomy and AstroPhysics↗

Systems definition study for shuttle demonstration flights of large space structures, Volume 2: Technical Report

The development of large space structure (LSS) technology is discussed, with emphasis on space fabricated structures which are automatically manufactured in space from sheet-strip materials and assembled on-orbit. It is concluded that an LSS flight demonstration using an Automated Beam Builder and the orbiter as a construction base, could be performed in the 1983-1984 time period. The estimated cost is $24 million exclusive of shuttle launch costs. During the mission, a simple space platform could be constructed in-orbit to accommodate user requirements associated with earth viewing and materials exposure experiments needs.

Source record↗

NASA Tech Briefs, May 2011

Topics covered include: 1) Method to Estimate the Dissolved Air Content in Hydraulic Fluid; 2) Method for Measuring Collimator-Pointing Sensitivity to Temperature Changes; 3) High-Temperature Thermometer Using Cr-Doped GdAlO3 Broadband Luminescence; 4)Metrology Arrangement for Measuring the Positions of Mirrors of a Submillimeter Telescope; 5) On-Wafer S-Parameter Measurements in the 325-508-GHz Band; 6) Reconfigurable Microwave Phase Delay Element for Frequency Reference and Phase-Shifter Applications; 7) High-Speed Isolation Board for Flight Hardware Testing; 8) High-Throughput, Adaptive FFT Architecture for FPGA-Based Spaceborne Data Processors; 9) 3D Orbit Visualization for Earth-Observing Missions; 10) MaROS: Web Visualization of Mars Orbiting and Landed Assets; 11) RAPID: Collaborative Commanding and Monitoring of Lunar Assets; 12) Image Segmentation, Registration, Compression, and Matching; 13) Image Calibration; 14) Rapid ISS Power Availability Simulator; 15) A Method of Strengthening Composite/Metal Joints; 16) Pre-Finishing of SiC for Optical Applications; 17) Optimization of Indium Bump Morphology for Improved Flip Chip Devices; 18) Measuring Moisture Levels in Graphite Epoxy Composite Sandwich Structures; 19) Marshall Convergent Spray Formulation Improvement for High Temperatures; 20) Real-Time Deposition Monitor for Ultrathin Conductive Films; 21) Optimized Li-Ion Electrolytes Containing Triphenyl Phosphate as a Flame-Retardant Additive; 22) Radiation-Resistant Hybrid Lotus Effect for Achieving Photoelectrocatalytic Self-Cleaning Anticontamination Coatings; 23) Improved, Low-Stress Economical Submerged Pipeline; 24) Optical Fiber Array Assemblies for Space Flight on the Lunar Reconnaissance Orbiter; 25) Local Leak Detection and Health Monitoring of Pressurized Tanks; 26) Dielectric Covered Planar Antennas at Submillimeter Wavelengths for Terahertz Imaging; 27) Automated Cryocooler Monitor and Control System; 28) Broadband Achromatic Phase Shifter for a Nulling Interferometer; 29) Super Dwarf Wheat for Growth in Confined Spaces; 30) Fine Guidance Sensing for Coronagraphic Observatories; 31) Single-Antenna Temperature- and Humidity-Sounding Microwave Receiver; 32) Multi-Wavelength, Multi-Beam, and Polarization-Sensitive Laser Transmitter for Surface Mapping; 33) Optical Communications Link to Airborne Transceiver; 34) Ascent Heating Thermal Analysis on Spacecraft Adaptor Fairings; 35) Entanglement in Self-Supervised Dynamics; 36) Prioritized LT Codes; 37) Fast Image Texture Classification Using Decision Trees; 38) Constraint Embedding Technique for Multibody System Dynamics; 39) Improved Systematic Pointing Error Model for the DSN Antennas; 40) Observability and Estimation of Distributed Space Systems via Local Information-Exchange Networks; 41) More-Accurate Model of Flows in Rocket Injectors; 42) In-Orbit Instrument-Pointing Calibration Using the Moon as a Target; 43) Reliability of Ceramic Column Grid Array Interconnect Packages Under Extreme Temperatures; 44) Six Degrees-of-Freedom Ascent Control for Small-Body Touch and Go; and 45) Optical-Path-Difference Linear Mechanism for the Panchromatic Fourier Transform Spectrometer.

Source record↗

Ares I-X Ground Diagnostic Prototype

Automating prelaunch diagnostics for launch vehicles offers three potential benefits. First, it potentially improves safety by detecting faults that might otherwise have been missed so that they can be corrected before launch. Second, it potentially reduces launch delays by more quickly diagnosing the cause of anomalies that occur during prelaunch processing. Reducing launch delays will be critical to the success of NASA's planned future missions that require in-orbit rendezvous. Third, it potentially reduces costs by reducing both launch delays and the number of people needed to monitor the prelaunch process. NASA is currently developing the Ares I launch vehicle to bring the Orion capsule and its crew of four astronauts to low-earth orbit on their way to the moon. Ares I-X will be the first unmanned test flight of Ares I. It is scheduled to launch on October 27, 2009. The Ares I-X Ground Diagnostic Prototype is a prototype ground diagnostic system that will provide anomaly detection, fault detection, fault isolation, and diagnostics for the Ares I-X first-stage thrust vector control (TVC) and for the associated ground hydraulics while it is in the Vehicle Assembly Building (VAB) at John F. Kennedy Space Center (KSC) and on the launch pad. It will serve as a prototype for a future operational ground diagnostic system for Ares I. The prototype combines three existing diagnostic tools. The first tool, TEAMS (Testability Engineering and Maintenance System), is a model-based tool that is commercially produced by Qualtech Systems, Inc. It uses a qualitative model of failure propagation to perform fault isolation and diagnostics. We adapted an existing TEAMS model of the TVC to use for diagnostics and developed a TEAMS model of the ground hydraulics. The second tool, Spacecraft Health Inference Engine (SHINE), is a rule-based expert system developed at the NASA Jet Propulsion Laboratory. We developed SHINE rules for fault detection and mode identification. The prototype uses the outputs of SHINE as inputs to TEAMS. The third tool, the Inductive Monitoring System (IMS), is an anomaly detection tool developed at NASA Ames Research Center and is currently used to monitor the International Space Station Control Moment Gyroscopes. IMS automatically "learns" a model of historical nominal data in the form of a set of clusters and signals an alarm when new data fails to match this model. IMS offers the potential to detect faults that have not been modeled. The three tools have been integrated and deployed to Hangar AE at KSC where they interface with live data from the Ares I-X vehicle and from the ground hydraulics. The outputs of the tools are displayed on a console in Hangar AE, one of the locations from which the Ares I-X launch will be monitored. The full paper will describe how the prototype performed before the launch. It will include an analysis of the prototype's accuracy, including false-positive rates, false-negative rates, and receiver operating characteristics (ROC) curves. It will also include a description of the prototype's computational requirements, including CPU usage, main memory usage, and disk usage. If the prototype detects any faults during the prelaunch period then the paper will include a description of those faults. Similarly, if the prototype has any false alarms then the paper will describe them and will attempt to explain their causes.

Schwabacher, Mark↗