Search NASA⌕ Search

SEARCH · Search NASA

Results for “In-Orbit Assembly”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 19 records

Automatic in-orbit assembly of large space structures

The automated assembly of a large number of components required for the on-orbit erection of large tetrahedral space platforms is described. The assembly machine is a huge jig in which a multitude of mechanisms must operated continuously in the thermo vacuum environment of space and under the control of computers programmed to command every step of each motion. The concepts are presented to determine the most reliable solution. Continuous operation of mechanisms in space presents many unresolved problems, with regard to lubrication of unprotected devices, such as chain drives, which must maintain reasonable positioning tolerances.

Jacquemin, G. G.↗

A modular docking mechanism for in-orbit assembly and spacecraft servicing

A Docking Mechanism concept is described which is suitable for use with autonomous docking systems. The central feature of using simple cylindrical handles on one side and a type of prism seating on the other is offered as a practical method of achieving a standardized structural interface without freezing continued development of the latches, either technically or commercially. The main emphasis in docking mechanism concepts is in two directions: (1) a very simple docking mechanism, involving mainly the latch mechanism to achieve a structural link; and (2) a sophisticated Docking Mechanism, where the latch mechanism is designed for nonrigid spacecraft and the achievement of very low dynamic interactions between spacecraft during the docking process.

Gampe, F.↗

Manned Mars mission Earth-To-Orbit (ETO) delivery and orbit assembly of the manned Mars vehicle

The contents of this section contain the initial concepts developed for the In-orbit assembly of a Manned Mars Vehicle and for the Earth-to-Orbit (ETO) delivery of the required hardware and propellant. Two (2) Mars vehicle concepts (all-propulsive and all-aerobrake) and two (2) ET0 Vehicle concepts were investigated. Both Mars Vehicle concepts are described in Reference 1, and both ETO Vehicle concepts are described in Reference 2. The all-aerobrake configuration reduces the number of launches and time required to deliver the necessary hardware/propellent to orbit. Use of the larger of the 2 ETO Vehicles (HLLV) further reduces the number of launches and delivery time; however, this option requires a completely new vehicle and supporting facilities.

B Barisa↗

Satellite power system LEO vs GEO assembly issues

A strawman crystal-silicon 5-GW Satellite Power System (SPS) concept formed the basis of a study of construction concepts for building a complete SPS in low earth orbit (LEO) or geosynchronous orbit (GEO). Construction scenarios were evolved, including factory-in-space concepts and operations. Design implications imposed on the SPS satellite as a consequence of in-orbit assembly operations, and related attitude control requirements during assembly in LEO or GEO environments, were also evaluated. Results are presented indicating that complete assembly of an operational SPS in LEO, followed by transport to GEO, does not appear technically desirable. The best mix, however, of LEO versus GEO construction activity remains to be resolved.

Mockovciak, J., Jr.↗

Astrophysics space systems critical technology needs

This paper addresses an independent assessment of space system technology needs for future astrophysics flight programs contained within the NASA Space Systems Technology Model. The critical examination of the system needs for the approximately 30 flight programs in the model are compared to independent technology forecasts and possible technology deficits are discussed. These deficits impact the developments needed for spacecraft propulsion, power, materials, structures, navigation, guidance and control, sensors, communications and data processing. There are also associated impacts upon in-orbit assembly technology and space transportation systems. A number of under-utilized technologies are highlighted which could be exploited to reduce cost and enhance scientific return.

Gartrell, C. F.↗

NASA astrophysics - Optical systems to explore the universe

Major and minor NASA astrophysical research efforts in the near-term are outlined, together with projections of direction for future projects. The Space Telescope is being readied for a 1986 launch and will feature an f/24, 2.4 m aperture, an MgF2 mirror with better than 1/60 wavelength accuracy and will be diffraction-limited in the UV. Pointing accuracy is designed to be 0.007 arcsec for 24 hr. Optical, spectrometric, and photometric equipment will be included. Around 1990, Shuttle-based missions will include an IR telescope and a subarcsec solar surface imaging device. A free-flying X-ray observatory (AXAF) is planned and will include a sensitivity that exceeds that of the HEAO-2 spacecraft by two orders of magnitude. Instruments are under development for higher resolution UV, gamma-ray, and IR studies. In-orbit interferometry is being studied and will depend on in-orbit assembly and servicing of stable structures with segmented optics.

Pellerin, C. J., Jr.↗

Space research in the era of the space station

The historical development of U.S. space technology is examined as a basis for future programs planned in the field of astrophysics, meteorological and land sciences, and planetary exploration. The background of the NASA space station project is described, as well as other current programs: Voyager II for Uranus and Neptune exploration, Galileo mission for sending probes into the Jovian atmosphere, Venus Radar Mapper, Mars Geochemistry and Climatology Orbiter, and the International Solar Polar mission. Recent advances in in-orbit assembly, refurbishment and repairs are discussed through the example of the Solar Maximum mission spacecraft repair in 1984 and the use of the RMS tool. The U.S. space observatory project with a 20-meter reflector telescope, currently in the early definition stage, is also discussed. Finally, the Soviet Salyut and Soyuz missions, together with the Soviet Union's study of long term flight conditions are mentioned as possible comparison with the NASA work.

Frost, K. J.↗

Thermal design of the ACCESS erectable space truss

Thermal design requirements for the erectable truss beam to be assembled in-orbit during extra-vehicular activity as part of the ACCESS experiment to take place in 1985-1986 are formulated and assessed. The coatings, insulation, and materials chosen for the structural elements of the beam are detailed. A combined radiation and conduction thermal model reveals that worst-case thermal gradients within the ACCESS structure over plane-to-sun angles of 0 to 80 deg will be less than 29 F, which is within the allowable limit of 50 F. The individual strut insulation concept using aluminized Kapton is shown to offer significant advantages over white paint or a chromic acid anodized surface for controlling the thermal response.

Bradley, O. H., Jr.↗

Advanced-technology space station study: Summary of systems and pacing technologies

The principal system features defined for the Advanced Technology Space Station are summarized and the 21 pacing technologies identified during the course of the study are described. The descriptions of system configurations were extracted from four previous study reports. The technological areas focus on those systems particular to all large spacecraft which generate artificial gravity by rotation. The summary includes a listing of the functions, crew requirements and electrical power demand that led to the studied configuration. The pacing technologies include the benefits of advanced materials, in-orbit assembly requirements, stationkeeping, evaluations of electrical power generation alternates, and life support systems. The descriptions of systems show the potential for synergies and identifies the beneficial interactions that can result from technological advances.

Butterfield, A. J.↗

Active adhesion concepts for in-orbit structural construction

The in-orbit assembly of structural elements is presently addressed by means of a continuum-based theory of active-adhesion contact/impact which assumes the manufacturability of active adhesion elements by piezoelectric (and similarly behaving) materials. Block bonding characteristics can furnish an effective alternative to optimal control-based, impact surge force-mitigation strategies, especially in the numerous nonsmooth control problems that are difficult to synthesize and implement. Attention is given to design concepts employing combined serial/parallel-bonded active adhesion elements composed of cascaded piezoelectric devices.

Park, K. C.↗

Joint Japan/U.S. Conference on Adaptive Structures, 2nd, Nagoya, Japan, Nov. 12-14, 1991, Collection of Papers

The present conference discusses the development status of adaptive structures in Europe and in Japan, the 'Cosmo-Lab' structures/robotics cooperation concept, active-adhesion concepts for in-orbit structural assembly, adaptively controlled truss structures, object-oriented modeling in structural analysis, the control effectiveness and energy efficiency of an active mass damper, a space truss with experimental tendon control, and piezoelectric actuator-based space trusses. Also discussed is the control of resonant frequencies in adaptive structures through prestressing, active control of vortex-excited vibrations of flexible cylindrical structures, shape adjustment of a flexible space antenna reflector, the SDIO Adaptive Structures Program, optimal trajectories of iterative manipulation for space robots, a docking device as an adaptive structure, shape-memory polymers and their hybrid composites, and fuzzy control methods for structural dynamics.

Matsuzaki, Yuji↗

Activities of the Center for Space Construction

The Center for Space Construction (CSC) at the University of Colorado at Boulder is one of eight University Space Engineering Research Centers established by NASA in 1988. The mission of the center is to conduct research into space technology and to directly contribute to space engineering education. The center reports to the Department of Aerospace Engineering Sciences and resides in the College of Engineering and Applied Science. The college has a long and successful track record of cultivating multi-disciplinary research and education programs. The Center for Space Construction is prominent evidence of this record. At the inception of CSC, the center was primarily founded on the need for research on in-space construction of large space systems like space stations and interplanetary space vehicles. The scope of CSC's research has now evolved to include the design and construction of all spacecraft, large and small. Within this broadened scope, our research projects seek to impact the underlying technological basis for such spacecraft as remote sensing satellites, communication satellites, and other special purpose spacecraft, as well as the technological basis for large space platforms. The center's research focuses on three areas: spacecraft structures, spacecraft operations and control, and regolith and surface systems. In the area of spacecraft structures, our current emphasis is on concepts and modeling of deployable structures, analysis of inflatable structures, structural damage detection algorithms, and composite materials for lightweight structures. In the area of spacecraft operations and control, we are continuing our previous efforts in process control of in-orbit structural assembly. In addition, we have begun two new efforts in formal approach to spacecraft flight software systems design and adaptive attitude control systems. In the area of regolith and surface systems, we are continuing the work of characterizing the physical properties of lunar regolith, and we are at work on a project on path planning for planetary surface rovers.

Source record↗

Application of adaptive control to space stations

The space station will be deployed and assembled in low earth orbit with multiple Shuttle trips. Several construction phases will be required involving both ground and in-orbit operations. In this paper, the construction process of a four-panel space station and its control problems are discussed. The applicability of a direct model reference adaptive control technique with plant augmentation is investigated. Control during several key assembly operation periods has been simulated. These include Shuttle docking with initial-phase station, habitat module mating, and Shuttle docking with operational station. High rate of convergence and robust performance have been observed for all the simulated cases even with 40 percent model parameter errors and model truncations and more than 100 percent instant mass property variations. Controller with severe gain saturations is also discussed and results show only slight performance deterioration.

Ih, C.-H. C.↗

Low cost, high concentration ratio solar cell array for space applications

A miniaturized Cassegrainian-type concentrator solar array concept for space applications is described. In-orbit cell operating temperatures near 80 C are achieved with purely passive cell cooling and a net concentration ratio of 100. A multiplicity of miniaturized, rigid solar cell concentrator subassemblies are electrically interconnected in conventional fashion and mounted into rigid frames to form concentrator solar panel assemblies approximately 14-mm thick. A plurality of such interconnected panels forms a stowable and deployable solar cell blanket. It is projected that for 20% efficient silicon cells an array of 500 kW beginning-of-life output capability, including orbiter cradle structures, can be transported by a single shuttle orbiter flight into low earth orbit. In-orbit array specific performance is calculated to be approximately 100 W/sq m and 20 W/kg, including all stowage, deployment and array figure control equipment designed for a 30-year orbital life. Higher efficiency gallium arsenide and multiple band gap solar cells will improve these performance factors correspondingly.

Patterson, R. E.↗

Attitude sensor package

This paper describes the design, construction, testing, and successful flight of the Attitude Sensor Package. The payload was assembled on a standard HITCHHIKER experiment mounting plate, and made extensive use of the carrier's power and data handling capabilities. The side mounted HITCHHIKER version was chosen, since this configuration provided the best viewing conditions for the instruments. The combustion was successfully flown on board Space Shuttle Columbia (STS-52), in October 1992. The payload was one of the 14 experiments of the In-Orbit Technology Demonstration Program (Phase 1) of the European Space Agency.

Aceti, R.↗

Robotics program at the NASA Goddard Space Flight Center

The NASA Goddard telerobotic program is structured to increase the scope and efficiency of what man can accomplish in space through the use of robotics. The main focus is to service Space Station Freedom and its payloads, but robotic assembly of Space Station Freedom and platforms is also anticipated. The approach being taken to achieve this by telerobotics, where manipulators can be controlled by human operators or computer programs. The Goddard Space Flight Center (GSFC) has the responsability to develop the Flight Telerobotic Servicer (FTS) for Space Station Freedom. The current plan at GSFC in support of telerobotics for Space Station Freedom and the in-orbit servicing of platforms are reviewed. Plans for ground demonstrations involving the use of an engineering test bed and an operational facility are discussed.

Ollendorf, Stanford↗

Apollo 14 Mission to Fra Mauro

The 1971 Apollo 14 Mission to Fra Mauro, a lunar highland area, is highlighted in this video. The mission's primary goal was the collection of lunar rocks and soil samples and lunar exploration. The soil and rock sampling was for the geochronological determination of the Moon's evolution and its comparison with that of Earth. A remote data collection station was assembled on the Moon and left for continuous data collection and surface monitoring experiments. The Apollo 14 astronauts were Alan B. Shepard, Edgar D. Mitchell, and Stuart A. Rossa. Astronauts Shepard and Mitchell landed on the Moon (February 5, 1971) and performed the sampling, the EVA, and deployment of the lunar experiments. There is film-footage of the lunar surface, of the command module's approach to both the Moon and the Earth, Moon and Earth spacecraft launching and landing, in-orbit command- and lunar-module docking, and of Mission Control.

Beasley, Brian D.↗

X-Ray Imaging and Spectroscopy Mission

The X-Ray Imaging and Spectroscopy Mission (XRISM) is a joint mission between the Japan Aerospace Exploration Agency (JAXA) and the National Aeronautics and Space Administration (NASA) in collaboration with the European Space Agency (ESA). In addition to the three space agencies, universities and research institutes from Japan, North America, and Europe have joined to contribute to developing satellite and onboard instruments, data-processing software, and the scientific observation program. XRISM is the successor to the ASTRO-H (Hitomi) mission, which ended prematurely in 2016. Its primary science goal is to examine astrophysical problems with precise, high-resolution X-ray spectroscopy. XRISM promises to discover new horizons in X-ray astronomy. It carries a 6 × 6 pixelized X-ray microcalorimeter on the focal plane of an X-ray mirror assembly (Resolve) and a co-aligned X-ray CCD camera (Xtend) that covers the same energy band over a large field of view. XRISM utilizes the Hitomi heritage, but all designs were reviewed. The attitude and orbit control system was improved in hardware and software. The spacecraft was launched from the JAXA Tanegashima Space Center on 2023 September 6 (UTC). During the in-orbit commissioning phase, the onboard components were activated. Although the gate valve protecting the Resolve sensor with a thin beryllium X-ray entrance window was not yet opened, scientific observation started in 2024 February with the planned performance verification observation program. The nominal observation program commenced with the following guest observation program beginning in 2024 September.

Astronomy and AstroPhysics↗