Search NASA⌕ Search

SEARCH · Search NASA

Results for “Installation”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 37 records · Page 2

Categorizing distributed wind energy installations in the United States to inform research and stakeholder priorities

Abstract Background Distributed wind energy adoption in the United States can contribute to the diverse portfolio of energy technologies needed to achieve ambitious decarbonization goals. However, with limited deployment to date, the current distributed wind market must be better understood; these efforts will support the range of stakeholders who will drive successful deployment. This article first distinguishes three categories of distributed wind from existing literature: (1) behind the meter, (2) intended for explicit local load, and (3) physically distributed. A novel methodology to classify individual wind installations into each of these categories is then presented and applied to two data sets of wind installations in the United States to categorize and illuminate distinct segments in the distributed wind market. Results Physically distributed installations, constituted by small to moderately sized projects serving local loads on distribution systems solely because of their proximity to them, account for the highest amount of capacity but the lowest number of installations out of the three categories. The inverse is true for behind-the-meter installations, which are used to serve on-site loads. Installations intended for explicit local load, which are interconnected on the utility side of the distribution system and intentionally built to provide energy to loads on the same distribution system, rank in the middle for both installed capacity and number of installations. Conclusions Distributed wind energy deployment in the United States is geographically widespread, but the extent to which a single category is developed in each state varies. Policies, wind resources, and broad energy technology trends contribute to these deployment patterns. By identifying the extent to which each category of installations exists, decision-makers are empowered with data necessary to tailor research and development programs and address stakeholder priorities through policy and other means, ultimately supporting future deployment.

17 WIND ENERGY↗

U.S. Industrial and Commercial Motor System Market Assessment Report Volume 1: Characteristics of the Installed Base

Motor systems are an integral part of our industrial and commercial facilities. They provide the motive force behind the fans, pumps, compressors, chillers, and conveyors in these facilities. Given their centrality to any facility’s operations, they are a critical energy end use to understand, particularly when developing technologies and policies to meet sustainability goals, improve productivity, and enhance resilience. In the late 1990s, the U.S. Department of Energy (DOE) conducted two seminal studies to better understand the installed stock and energy savings opportunities of industrial and commercial motor systems. In the industrial sector, The United States Industrial Electric Motor Systems Market Opportunities Assessment used primary data collected through onsite assessments and led to a greater understanding of the installed base of motor systems, their characteristics, and the opportunities for energy savings (U.S. Department of Energy, 2002). Notable findings included the following: Industrial motor systems consumed 679 billion kilowatt-hours (kWh) in 1994, representing 23 percent of U.S. electricity consumption. Cost-effective energy efficiency measures could result in 62-104 billion kWh of energy savings annually. Sixty-two percent of the energy savings potential was from fan, pump, and compressor end use equipment. Nearly half of motor system electricity consumption was attributable to approximately 3,500 facilities, or 1.5 percent of U.S. manufacturing facilities. Opportunities for Energy Savings in the Residential and Commercial Sectors with High Efficiency Electric Motors provided an evaluation of the installed stock of motor driven equipment in U.S. commercial and residential buildings and opportunities for utilization of high efficiency motors and variable speed technologies (Arthur D. Little, 1999). Notable findings included the following: Commercial motor systems consumed 343 billion kWh in 1995, with refrigeration and space conditioning constituting 93 percent of the total. Cost-effective energy efficiency measures could result in 51 billion kWh of energy savings annually. Due in no small part to these seminal studies, motor system technologies and usage characteristics have changed drastically since the late 1990s. Greater awareness of cost-effective strategies for reducing motor system electricity consumption have been developed and deployed. This includes several software tools, literature, and utility and government programs promoting energy efficiency improvements in motor driven systems. Additionally, several rounds of energy efficiency standards have been enacted, resulting in improved installed motor efficiency. The cost of variable speed drives has dropped substantially, and combined with utility rebate programs, has led to their greater adoption. Further, since these results were published, the U.S. manufacturing sector has undergone a massive transformation. Due to global competition, some sectors have relocated operations overseas. Others have brought operations onshore to avail low cost and abundant natural gas. Additionally, automation and robotics have pervaded the entire sector. Consequently, these two reports likely do not represent the current state of motor driven systems in U.S. industrial and commercial facilities. As cited in recent studies, the lack of current information on motor system electricity consumption and use characteristics limits the ability to conduct analysis on energy savings potential, develop technologies to address energy and productivity gaps, and develop programs to promote energy efficiency practices and technologies for motor systems (International Energy Agency, 2007; UNIDO, 2010; McKane and Hasanbeigi, 2011; Waide and Brunner, 2011). Specifically, the lack of information affects a range of stakeholders: Governments must rely on outdated information when setting research agendas, developing policies, and designing energy efficiency programs and offerings. Utilities and energy efficiency programs cannot identify the current market needs or potential impact when designing rebate and energy efficiency programs. Electric grid planners cannot identify motor system usage characteristics when developing plans to support the resilience of the electric grid. Manufacturers of motors, motor driven equipment, and drives are hampered when developing technologies to meet the needs of their market. Motor system end users are limited in their ability to identify energy saving opportunities within their own facilities because they do not have reliable benchmark information. In response to the lack of current information and analysis on industrial and commercial motor systems, the DOE initiated an update to these two studies. Launched in 2016 and led by Lawrence Berkeley National Laboratory (LBNL), the Motor System Market Assessment (MSMA) provides an updated, more comprehensive assessment of the installed stock of motor systems in both the industrial and commercial sectors, a review of the supply chains supporting motor and drives in the U.S., and the performance improvement opportunity available from using best available technologies and maintenance and operation practices. The outcomes of the MSMA are documented in three U.S. Industrial and Commercial Motor System Market Assessment reports, with this report being the first listed: 1. Volume 1: Characteristics of the Installed Base (this report) documents the findings on the installed base of motor systems in the U.S. industrial and commercial sectors. Quantification of energy savings potential is not documented in this report but in Volume 3. 2. Volume 2: Motors and Drives Supply Chain Review reviews the state of supply chains for motors and drives installed in U.S. industrial and commercial facilities, focusing on advanced motor and drive technologies and their constituent materials. 3. Volume 3: Energy Savings Opportunity analyzes the energy performance improvement opportunity for the installed base of U.S. industrial and commercial motor systems. This report has been prepared as a reference for motor system stakeholders. It provides factual information as could be best determined by the assessment results and avoids speculating on any findings.

29 ENERGY PLANNING, POLICY, AND ECONOMY↗

Reducing Propulsion Airframe Aeroacoustic Interactions with Uniquely Tailored Chevrons: Installed Nozzles - 2

Propulsion airframe aeroacoustic (PAA) interactions arise due to the manner in which an engine is installed on the airframe and lead to an asymmetry in the flow/acoustic environment, for example, for under-the-wing installations due to the pylon, the wing and the high-lift devices. In this work we study how we can affect these PAA interactions to reduce the overall jet-related installed noise by tailoring the chevron shapes on fan and core nozzles in a unique fashion to take advantage of this asymmetry. In part 1 of this trio of papers we introduced the concept of azimuthally varying chevrons (AVC) and showed how some types of AVCs can be more beneficial than the conventional chevrons when tested on "isolated" scaled nozzles inclusive of the pylon effect. In this paper, we continue to study the effect of installing these AVC nozzles under a typical scaled modern wing with high-lift devices placed in a free jet. The noise benefits of these installed nozzles, as well as their installation effects are systematically studied for several fan/core AVC combinations at typical take-off conditions with high bypass ratio. We show, for example, that the top-enhanced mixing T-fan AVC nozzle (with enhanced mixing near the pylon and less mixing away from it) when combined with conventional chevrons on the core nozzle is quieter than conventional chevrons on both nozzles, and hardly produces any high-frequency lift, just as in the isolated case; however, its installed nozzle benefit is less than its isolated nozzle benefit. This suppression of take-off noise benefit under installed conditions, compared to its isolated nozzle benefit, is seen for all other chevron nozzles. We show how these relative noise benefits are related to the relative installation effects of AVCs and baseline nozzles.

Mengle, Vinod G.↗

GHEP WIBT (Guidelines for Home Energy Professionals Weatherization Installer Badges Toolkit) [SWR-20-69]

The National Renewable Energy Laboratory (NREL) and the U.S. Department of Energy's (DOE) Weatherization Assistance Program (WAP) are collaborating with the home energy retrofit industry to support the development of skilled workers. The Installer Badges Toolkit provides a flexible, customizable, and voluntary approach to training and skills recognition for WAP implementers, utility programs, private-sector workers, and contractors. In Fiscal Year 2018, DOE, along with the Crew Leader scheme committee, determined the Retrofit Installer Technician (RIT) Job Task Analysis (JTA) could be eliminated and its tasks inserted in the Crew Leader JTA. The RIT tasks became the basis of the Installer Badges. The Badges Toolkit was updated in 2020 to add licensing and copyright agreements. Users must cite the copyright information when using or distributing copies of the Badges Toolkit in any way. The technical content has remained unchanged from previous versions of the Badges Toolkit. The Toolkit for home retrofits consists of 25 Badges, each representing different energy efficiency tasks that an installer could perform on a home. Each Badge defines the desired outcome, criteria to verify, applicable material requirements, and references to Standard Work Specifications (SWS) or other relevant standards. The Badges provide a consistent approach to training by ensuring that installers in different regions are learning the same skills nationwide. Organizations can also customize the Toolkit by choosing only those Badges that are relevant to their program. The Badges Toolkit includes five pieces: "How to Use the Badges Toolkit" provides a brief overview of how a Grantee, Subgrantee, or training provider may approach using the toolkit. The "Badges Toolkit: Worksheet" includes what to consider when determining whether and how to best incorporate the Badges into a weatherization assistance program. The "Crew Leader Job Task Analysis Spreadsheet" indicates how the Badges align with specific areas of the JTA. The "Installer Badges Passport" features separate pages for each Badge, which include places for the installer and the supervisor/trainer to record the number of times a task has been successfully completed. The "Installer Badges Verification Criteria" includes sample inspection checklists for each Badge. These can be modified as needed based on approved variance requests or more stringent requirements. They also provide a basis for consistent inspections and awarding of Badges. Note: All elements of the Badges Toolkit are designed for use by potential program implementers. They are not off-the-shelf products intended for immediate deployment. Program implementers must review and modify as needed, revise verification criteria to match local requirements, complete worksheets, and otherwise define the parameters of their own badging program.

Desai, Jal↗

U.S. Offshore Wind Energy Noise Reduction Associated with Installation of Fixed-Bottom Foundations: Workshop Report

As offshore wind energy development grows in the United States, solutions are needed to reduce the underwater noise and substrate vibration generated during fixed-bottom turbine installation to help protect marine life. Monopiles are currently the main turbine foundation type installed globally and impact pile driving, the primary installation method, can be a major source of noise and vibration generation during wind farm construction. Opportunities exist to reduce the amount of noise and vibration produced during future offshore wind farm development. The use of alternative foundation types and installation methods, as well as innovative noise abatement technologies, would help reduce the potential detrimental effects on sensitive marine species. To explore these opportunities, the Department of Energy’s Wind Energy Technologies Office, in collaboration with the Bureau of Ocean Energy Management and the National Oceanic and Atmospheric Administration, funded the National Renewable Energy Laboratory and the Pacific Northwest National Laboratory to organize, host, and facilitate a virtual workshop in December 2022. The goal of the workshop was to gather input from the offshore wind energy community on noise reduction strategies for the installation of fixed-bottom offshore wind turbines in U.S. waters across multiple regions, including the U.S. Atlantic Coast, Gulf of Mexico, and Great Lakes to inform recommendations on future research. The joint lab team convened industry representatives, subject matter experts, and regulators to discuss potential pathways to reduce noise and vibration associated with fixed-bottom turbine installation, including the practicality of using alternative foundations and installation methods, the effectiveness of noise abatement technologies, as well as research and monitoring needs. In preparation for the workshop, the team invited experts to be part of a steering committee and worked with its members to help focus activities to meet the workshop goals. Additional pre-workshop activities included developing the invitee list and workshop agenda, reviewing existing Construction and Operations Plans (COP) for proposed offshore wind projects, distributing a brief questionnaire to industry representatives, and drafting the workshop discussion questions and Mural boards. In total, 128 workshop participants provided over 600 comments in response to the 17 group discussion questions used over two workshop sessions. Overarching recommendations highlighted across themes included future investments to provide data sharing, consistency, transparency, and opportunities for sharing best available science, knowledge, and expertise. The joint lab team synthesized the comments and identified four key research and development themes that could help advance the successful implementation of noise and vibration reduction strategies (see report). This report provides an overview of the workshop goals and scope, reviews the pre-workshop activities, presents brief summaries of participant feedback, and concludes with detailed research themes and recommendations for future investments. Appendix A includes the group discussion questions, Appendix B includes the results of the COP review, and Appendix C includes the results of the industry questionnaire. Overall, there was a high level of interest and engagement in the workshop. The sessions provided an opportunity for significant exchange of information between workshop participants from across sectors. Participants identified a variety of opportunities for next steps towards the noise reduction of offshore wind turbine installation in U.S. waters, including recommendations for future investments to provide certainty in the use of new technologies associated with alternative foundation types, noise abatement systems, and efficacy monitoring.

17 WIND ENERGY↗

Installation aerodynamics of wing-mounted, single-rotation propfans

The installation of advanced (M = 0.8) turboprop propulsion systems on transport aircraft represents a challenging task to design engineers. The installation aerodynamics of wing-mounted, single-rotation, tractor turboprop systems have been extensively investigated by NASA Ames using a large powered semispan wind tunnel model. Two configurations have been studied: a straight under-the-wing (UTW) nacelle and a contoured over-the-wing (OTW) configuration. The installation characteristics of these two configurations are presented in terms of installed drag, wing pressure distributions, and surface oil flows. Through the use of wing leading-edge modifications, the installed drag of the UTW nacelle was reduced to less than isolated nacelle drag at the cruise condition of M = 0.8 with a wing C(L) of 0.5. At this condition, the favorable interference is attributed to the recovery of a portion of the swirl in the slipstream generated by the single rotation propeller. The OTW installation represented a much more difficult task. For the configuration tested, the installed drag was unacceptably high and demonstrated the sensitive nature of installing a nacelle/slipstream combination in the transonic flow regime.

Bencze, Daniel P.↗

Thiokol/Wasatch installation evaluation of the redesigned field joint protection system (concepts 1 and 3)

The procedures, performance, and results obtained from the Thiokol Corporation/Wasatch Redesigned Field Joint Protection System (FJPS) Installation Evaluation are documented. The purpose of the evaluation was to demonstrate and develop the procedures required to install two different concepts (referred to as Concepts 1 and 3) of the redesigned FJPS. The processing capability of each configuration was then evaluated and compared. The FJPS is installed on redesigned solid rocket motors (RSRM) to protect the field joints from rain intrusion and to maintain the joint temperature sensor measurement between 85 and 122 F while the boosters are on the launch pad. The FJPS is being redesigned to reduce installation timelines at KSC and to simplify or eliminate installation processing problems related to the present design of an EPDM moisture seal/extruded cork combination. Several installation techniques were evaluated, and a preferred method of application was developed for each concept. The installations were performed with the test article in the vertical (flight) position. Comparative timelines between the two concepts were also developed. An additional evaluation of the Concept 3 configuration was performed with the test article in the horizontal position, to simulate an overhead installation on a technical evaluation motor (TEM).

Cook, M.↗

Installation caused flow distortion and its effect on noise from a fan designed for turbofan engines

A ground test stand was used to obtain acoustic data on a full scale prototype fan designed for quiet subsonic aircraft engines. The fan was installed in three different ways in the test stand. In two of the installations the fan was driven by a shaft in the inlet; in the third installation the fan was driven from the rear. These three installations, and the structures associated with them, resulted in various amounts of inlet flow distortion to the fan. The rear drive installation had less inlet flow distortion than the two front drive installations. Some measurements of inlet flow distortion were made and used in a blade passage noise generation theory to predict the effects of distortion on noise. Good agreement was obtained when the predicted and measured power level differences between the front drive and rear drive installations were compared.

Povinelli, F. P.↗

Installation caused flow distortion and its effect on noise from a fan designed for turbofan engines.

Use of a ground test stand to obtain acoustic data on a full-scale prototype fan designed for quiet subsonic-aircraft engines. The fan was installed in three different ways in the test stand. In two of the installations the fan was driven by a shaft in the inlet; in the third installation the fan was driven from the rear. These three installations, and the structures associated with them, resulted in various amounts of inlet flow distortion to the fan. The rear-drive installation had less inlet flow distortion than the two front drive installations. Differences in blade passage sound pressure levels of more than 10 dB were measured between the rear-drive and front-drive versions, with the rear-drive installation producing less noise. Perceived noise levels were computed and the influence of the distortion on these levels was determined.

Povinelli, F. P.↗

The Effect of Various Wing-Gun Installations on the Aerodynamic Characteristics of an Airplane Model Equipped with an NACA Low-Drag Wing, Special Report

An investigation was made in the NACA 19-foot pressure wind tunnel to determine the effect of various win-gun installation on the aerodynamic characteristics of a model with an NACA low-drag wing. Measurements were made of lift and drag over an angle-of-attack range and for several values of dynamic pressure on a four-tenths scale model of a high-speed airplane equipped with the low-drag wing and with various wing-gun installations. Two installations were tested: one in which the blast tube and part of the gun barrel protrude ahead of the wing and another in which the guns is mounted wholly within the wing. Two types of openings for the latter installation were tested. For each installation three simulated guns were mounted in each wing. The results are given in the form of nondimensional coefficients. The installations tested appear to have little effect on the maximum-lift coefficient of the model. However, the drag coefficient shows a definite change. The least adverse effect was obtained with the completely internal mounting and small nose entrance. The results indicate that a properly designed wing-gun installation will have very little adverse effect on the aerodynamic characteristics of the low-drag wing.

Muse, Thomas C.↗

The Effect of Several Armament Installations on the Drag of 1/8-Scale Model of the B-32 Airplane

The effect of several armament installations on the drag of a 1/8 scale model of the B-32 airplane was determined. Turrets in the following positions were tested: nose, tail, upper forward, upper aft, and lower. The nose and tail turrets were each equipped with two.50-caliber guns. Upper turrets were of three types: two.50-caliber guns, four.50-caliber guns, and 20-millimeter cannon. Lower turrets were of two types: two.50-caliber guns and four.50-caliber guns. The effect of streamlining the upper two- and four-gun turrets and of extending the lower two-gun turret was determined. The tests were conducted in the Langley 19-foot. pressure tunnel at a Reynolds number of approximately 2,960,000 and a Mach number of 0.13. Large increases in drag coefficient were caused by the complete armament installations. At a lift coefficient of 0. 4 the installations with nonstreamlined upper turrets and the lower turret retracted increased the drag coefficient by 0.0022 and 0.0027 for the two-gun and four-gun turret installations, respectively. Streamlining the upper turrets reduced the drag of these installations by approximately 40 percent with the upper turrets streamlined, the drag increase was about the same for either the two- or four-gun turret installation. The streamlined two-cannon upper turrets increased the drag about the same amount as the two-gun upper turrets that were not streamlined. Extension of the lower turret. increased the drag slightly more than the whole streamlined gun-turret installation.

Fairbanks, R. W.↗

Protection and Restoration Solutions to Reliable and Resilient Integration of Grid-connected PV Installations and Distributed Energy Resources: Design, Testbed, Proof of Work and Impact Studies (Final Report)

To gain a better understanding of the complex transients in a utility grid with a large number of solar PV installations coupled by PWM inverters during the protection and restoration period of the power grid, in this project a kW-level experimental system with dominating inverter-based resources and a hardware-in-loop simulation system with transmission and distribution models, as well as several SEL protective relays have been built and used. The major research findings of the project are summarized below in two perspectives: Experimental research: A self-organized ultra-high frequency solitary waveform is discovered and demonstrated in the hardware experimental system. Despite the familiarities, such a solitary waveform is distinct from any harmonics, transient, or resonance waves in that, it is 1) non-dispersive over time and space, 2) not associated with any active source or the linear superposition of sources, 3) half-cycle asymmetric, 4) not responding to filters or change of system characteristic resonance frequency, 5) ubiquitous as it occurs simultaneously everywhere in the system from DC supply, power lines, and the utility grid, and 6) explosive through tripping the protection or damaging susceptible devices or circuits. Analytical study: The nature of such a new waveform and an analytical explanation of its formation are studied based on related physics and non-linear science principles, with the following highlights: 1) such a new waveform follows the solutions to the Non-linear Schrödinger equation, so the classic linear perturbation theory is unable to explain or predict such a unique waveform as confirmed with the research team of RTDS; 2) the critical condition of occurrence of such a waveform is derived, which indicates that the breakings of solitary wave is a system synchronous issue between the utility grid in the 60Hz phasor domain and duty-ratio modulation of DC sources in the inverter switching frequency domain; 3) such a waveform carries energy mass so it could be detrimental; 4) such a waveform is deceiving as it is not readily detectable in the energy propagation direction by the primary protection equipment, while it is detrimental in the perpendicular direction of energy propagation, i.e. voltage direction. Thus, it has more likely challenges to the second primary equipment and devices, particularly at the weakest link and point such as aging insulation and inappropriate setting of susceptible devices. Therefore, such a waveform can be easily ignored in the aftermath investigation. The intellectual merits: The experimental discovery reveals certain unfamiliar transient phenomena that could challenge the integration of large-scale grid-connected solar PV installation during the group ride-through period of solar PV installations, commissioning of large-solar farms, or dramatic change of solar radiation conditions. Particularly, the research findings suggest that the occurrence of the unfamiliar transient phenomena is uniquely associated with the inverter-based solar PV installation, which is less likely to happen for rotary energy systems. The physics and non-linear science-based research work laid down an analytical path to the challenging transient stability problems including those that have been observed currently and future calls. Both experimental and analytical research results explain the limitation of many current research effects including some DoE research undertakings as well as possible solutions. The broader impacts: The research outcome of the project advances the understanding of the possible transient problems for the integration of inverter-based solar PV installation. It also highlights the theoretical and technical barriers for applying the conventional theory and technology to design and implement countermeasures against their adverse impacts of the large-scale solar PV installation and operation on grid reliability and security. More broadly, the research outcomes have shed some light on the open, fundamental challenges in the integration of large-scale solar photovoltaic energy into current and next-generation power grids across the country, and worldwide. The advanced physics and non-linear science-based analysis open up a path to harmonization of the renewables for societal energy needs via building a resilient and sustainable electric power infrastructure.

14 SOLAR ENERGY↗

Installation of Lysimeters Near Engineered Trench 3, Slit Trench 8, and Slit Trench 9

Nine new lysimeter stations were installed at the E-Area Low Level Waste Facility (ELLWF). Six lysimeter stations were installed near Engineered Trench 3 (ET3), one installed near Slit Trench 8 (ST8), and two installed near Slit Trench 9 (ST9) as shown in Figure ES-1. Two lysimeters were installed at each station at the depths shown in Table ES-1. Lysimeter placements were based on borehole lithology and were comparable to existing nearby lysimeter stations. The deepest lysimeter at each of the new lysimeter stations was designated as the action-level lysimeter. Following installation, the lysimeters were purged and placed under vacuum for sampling. Sampling occurred in April 2023. Analytical results from the sampling will be provided in the Spring 2023 Lysimeter Tritium Data technical memo and the 2023 Annual Summary Report. With the addition of the new lysimeters at ET3, ST8, and ST9, the vadose zone monitoring system is now comprised of 327 active lysimeters at 111 lysimeter stations. There are 102 action-level lysimeters at 111 stations.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

An Updated Life Cycle Assessment of Utility-Scale Solar Photovoltaic Systems Installed in the United States

Given the high deployment targets for solar photovoltaics (PV) needed to meet U.S. decarbonization goals, and the limited carbon budget remaining to limit global temperature rise, accurate accounting of the energy-use and greenhouse-gas emissions over the life-cycle of PV systems is needed. In the United States, most PV systems are large utility-scale systems which use single-axis trackers and central inverters, which are not commonly examined in existing life-cycle assessment (LCA) literature. In this study, we present a cradle-to-grave LCA of a typical silicon U.S. utility PV (UPV) installation which is consistent with the utility system features documented in the annual NREL PV system cost benchmark reports. We analyze and present results for four main metrics: cumulative energy demand (CED), greenhouse gas (GHG) emissions, energy payback time (EPBT), and carbon payback time (CPBT). We consider six primary manufacturing options: three based on an imported PV module supply chain (comparing low-carbon imports, high-carbon imports, and average imports), and three based on a potential domestic PV module supply chain (comparing low-carbon U.S. regions, high-carbon U.S. regions, and average U.S. regions). These manufacturing options were then paired with installation locations to create six main cases: low-carbon options were installed in Phoenix (Arizona), high-carbon options were installed in Seattle (Washington), and average options were installed in Fredonia (Kansas). These locations were selected to represent a range of irradiance and grid mixes in the United States, in order to illustrate the likely range of EPBTs and CPBTs possible across the United States. For all six cases, a sensitivity analysis for end-of-life (EOL) handling was explored to capture current and future management options: landfilling, partial recycling, and high-quality recycling. For the purposes of this report, the benchmark system was defined to use an average imported supply chain with partial recycling, installed in Fredonia (Kansas). CED results show ratios at or below 0.1 MJ oil-eq /MJgenerated which demonstrates efficient use of primary energy resources (below a 1:1 ratio), and represents a slight improvement over previous results in literature. GHG emissions per kWh range from 10-36 g CO 2 e, which are consistent with or lower than previous results published by NREL and IEA-PVPS. We use a graphical approach for calculating EPBT and CPBT in this report, which improves upon methods typically used in literature by accounting for non-linearity and avoiding data quality issues associated with long-term projections. EPBT was determined to vary from 0.5 to 1.2 years, with a benchmark EPBT of 0.6 years; CPBT was shown to vary from 0.8 to 20 years, with benchmark CPBT of 2.1 years, which is lower than other estimates from recent literature (typically >2 years).

14 SOLAR ENERGY↗

Physical and Operational Status of the Photovoltaic Systems in the Municipality of Pinotepa de Don Luis, Oaxaca, One Year after Their Installation [Estado fisico y operativo de los sistemas fotovoltaicos en el municipio de Pinotepa de Don Luis, Oaxaca un ano despues de su instalacion]

In November 1990, an inspection visit was made to the residential lighting photovoltaic systems that had been installed approximately one year before in the rural communities of the Municipality of Pinotepa de Don Luis, in the State of Oaxaca. The main purpose of the visit was to evaluate the physical and operational status of these systems. The systems typically consist of a photovoltaic module with a capacity of 30 or 35 Watts, an automotive type battery, an indicator of the status of charge of the battery, 3 fluorescent lamps and the corresponding installation, including cables, connection or outlet box and switches. It can be seen that the systems are in good physical condition and do not show any signs of intentionally caused damage. However, the incidence of failures is higher than what had been expected; therefore the operational status of these systems is considered to be below a level that could be accepted, with a tendency to getting worse. The main problem that has been detected is the lack of automatic charge controllers. This problem has caused other important failures. Serious deficiencies were appreciated in the installations, which show evidence of the poor workmanship of the installers. The lack of system standardization is evident, both regarding the components and the installation. As a consequence, there are technical factors which indicate that the installed systems will keep deteriorating at a rate faster than normal, and will stop operating in a short time unless urgent preventive and corrective measures are taken. The attitude of the users with respect to the systems is generally positive. However, there are elements that make the correct operation and maintenance of these systems a very difficult task. The users did not receive any training regarding the best way to operate and take care of their systems, nor any other information in relation to their technical limitations.

14 SOLAR ENERGY↗

Practical aspects of instrumentation system installation, volume 13

A review of factors influencing installation of aircraft flight test instrumentation is presented. Requirements, including such factors as environment, reliability, maintainability, and system safety are discussed. The assessment of the mission profile is followed by an overview of electrical and mechanical installation factors with emphasis on shock/vibration isolation systems and standardization of the electric wiring installation, two factors often overlooked by instrumentation engineers. A discussion of installation hardware reviews the performance capabilities of wiring, connectors, fuses and circuit breakers, and a guide to proper selections is provided. The discussion of the installation is primarily concerned with the electrical wire routing, shield terminations and grounding. Also inclued are some examples of installation mistakes that could affect system accuracy. System verification procedures and special considerations such as sneak circuits, pyrotechnics, aircraft antenna patterns, and lightning strikes are discussed.

Borek, R. W.↗

Meeting the challenges of installing a mobile robotic system

The challenges of integrating a mobile robotic system into an application environment are many. Most problems inherent to installing the mobile robotic system fall into one of three categories: (1) the physical environment - location(s) where, and conditions under which, the mobile robotic system will work; (2) the technological environment - external equipment with which the mobile robotic system will interact; and (3) the human environment - personnel who will operate and interact with the mobile robotic system. The successful integration of a mobile robotic system into these three types of application environment requires more than a good pair of pliers. The tools for this job include: careful planning, accurate measurement data (as-built drawings), complete technical data of systems to be interfaced, sufficient time and attention of key personnel for training on how to operate and program the robot, on-site access during installation, and a thorough understanding and appreciation - by all concerned - of the mobile robotic system's role in the security mission at the site, as well as the machine's capabilities and limitations. Patience, luck, and a sense of humor are also useful tools to keep handy during a mobile robotic system installation. This paper will discuss some specific examples of problems in each of three categories, and explore approaches to solving these problems. The discussion will draw from the author's experience with on-site installations of mobile robotic systems in various applications. Most of the information discussed in this paper has come directly from knowledge learned during installations of Cybermotion's SR2 security robots. A large part of the discussion will apply to any vehicle with a drive system, collision avoidance, and navigation sensors, which is, of course, what makes a vehicle autonomous. And it is with these sensors and a drive system that the installer must become familiar in order to foresee potential trouble areas in the physical, technical, and human environment.

Decorte, Celeste↗

Application-Program-Installer Builder

A computer program builds application programming interfaces (APIs) and related software components for installing and uninstalling application programs in any of a variety of computers and operating systems that support the Java programming language in its binary form. This program is partly similar in function to commercial (e.g., Install-Shield) software. This program is intended to enable satisfaction of a quasi-industry-standard set of requirements for a set of APIs that would enable such installation and uninstallation and that would avoid the pitfalls that are commonly encountered during installation of software. The requirements include the following: 1) Properly detecting prerequisites to an application program before performing the installation; 2) Properly registering component requirements; 3) Correctly measuring the required hard-disk space, including accounting for prerequisite components that have already been installed; and 4) Correctly uninstalling an application program. Correct uninstallation includes (1) detecting whether any component of the program to be removed is required by another program, (2) not removing that component, and (3) deleting references to requirements of the to-be-removed program for components of other programs so that those components can be properly removed at a later time.

Wolgast, Paul↗