Search NASA⌕ Search

SEARCH · Search NASA

Results for “Integration and Testing of DERs”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 37 records · Page 2

Performance Evaluation of Distributed Energy Resource Management Systems Using Software- and Hardware-in-the-Loop

Distributed energy resource management systems (DERMS) are an important emerging technology for coordinating distributed energy resources (DERs) integrated in power distribution networks. These solutions implement a software platform to monitor, control, and coordinate DERs in real time to provide aggregate grid services to the electric utility or distribution system operator. To move DERMS technology forward, research and performance validation in a laboratory environment are needed to ensure proper function of DERMS prior to field deployment. This presentation presents a generic hardware-in-the-loop (HIL) platform to evaluate performance of DERMS using software-in-the-loop (SIL) and power HIL. The platform provides realistic testing in a laboratory environment, including accurate modeling of full-scale distribution systems, DERMS software controllers, and at-power distributed energy resources (DERs), such as solar and battery inverters. Two case studies are presented to demonstrate how the platform can be used independently as an integrated development and validation approach for different projects. Laboratory testing results are included to showcase the voltage regulation performance of each study and the benefits of implementing such a platform for DERMS evaluation.

DERMS↗

Integration of a DER Management System in Riverside. Final report

The tasks in this project covered various aspects, including algorithm development, algorithm integration into a commercial Active Network Management (ANM) platform, hardware-in-the-loop (HIL) testing in an industry-standard testing platform, pilot demonstration in Riverside, California, and also cost and benefit analysis. The DERMS platform in this project can host different algorithms developed on different platforms (e.g., MATLAB and Python) and it can interact with different hardware devices (e.g., different PV inverters, battery inverters, and different sensors). The DER control solution are based on an advanced model-free, layered, and clustered DER control paradigm. At the core of the DER control algorithms was the concept of Extremum Seeking (ES), which is a model-free probing-based control technique. The ES-based control algorithms were tested on major real-world inverters; both individually and in a cluster. It was shown that even legacy equipment (or when paired with a few additional advanced equipment) can support such advanced control. The monitoring algorithms utilize a heterogeneous set of legacy and advanced sensor measurements, such as behind-the-meter DER sensors, distribution-level Phase Measurement Units, distribution-substation Supervisory Control and Data Acquisition (SCADA), and line current sensors, with their limited availability; in order to infer practical network conditions. Sensor data are utilized to achieve resource forecasting, phase identification, and distribution system state estimation. The technology that was developed and demonstrated in this project could be transformational to utilities, including the smaller municipal utilities such as in Riverside, which may not have the resources to deploy advanced distribution system and DERMS solutions in order to support high penetration of solar power integration. This project created a real-world prototype to provide utilities with an assessment of smart grid monitoring and control technologies.

24 POWER TRANSMISSION AND DISTRIBUTION↗

IEEE 1547 Standards Advancing Grid Modernization

Technology advances including development of advanced distributed energy resources (DER) and grid-integrated operations and controls functionalities have surpassed the requirements in current standards and codes for DER interconnection with the distribution grid. The full revision of IEEE Standards 1547 (requirements for DER-grid interconnection and interoperability) and 1547.1 (test procedures for conformance to 1547) are establishing requirements and best practices for state-of-the-art DER including variable renewable energy sources. The revised standards will also address challenges associated with interoperability and transmission-level effects, in addition to strictly addressing the distribution grid needs. This paper provides the status and future direction of the ongoing development focus for the 1547 standards.

1547↗

AGGREGATE: dAta-driven modelinG preservinG contRollable dEr for outaGe mAnagemenT and rEsiliency (Report for Task 14: Model Verification/Validation Test Plan (Deliverable D10))

This report summarizes the technical progress and validation plan for each of AGGREGATE project modules, and integrated modules. The overall validation plan can be divided into two major parts. Firstly, it provides offline validation results of each module using the IEEE-123 node distribution system with certain modifications to support individual module results verification. The offline validation plan tentatively validated the usability and practicability of developed AGGREGATE tools. Secondly, the realworld test system - Seattle City Light (SCL) test feeder for verifying each module and the integrated modules using GE advanced distribution management system (ADMS) software.

42 ENGINEERING↗

Harnessing Virtual Power Plants Reliably: Enabling tools for increased observability, controllability, operation, and aggregation of distributed energy resources

Harnessing virtual power plants enhances the integration of distributed energy resources into utility grids for a sustainable energy future. Virtual power plants (VPPs) aggregate DERs to enhance resource adequacy and reduce emissions. U.S. utilities are exploring various technologies to manage DERs effectively. FERC Order 2222 allows DERs to participate in both wholesale and retail markets. Enhancing observability and controllability of behind-the-meter (BTM) DERs is essential for reliable grid operations. A hierarchical control architecture can improve coordination among residential energy resources. Field tests showed nearly 20% energy savings and 30% peak power reduction during grid events. Effective management of DERs requires enhanced situational awareness to prevent grid congestion. Integrating DER management systems (DERMS) with existing planning tools can improve operational security. Near-real-time grid models can validate optimal resource set points against resource uncertainty. Traditional uninterruptible power supplies (UPS) can be upgraded to support grid services and become part of VPPs. Upgrading UPS systems can reduce costs by 75% and unlock significant battery capacity. New battery management systems and grid-aware controllers are essential for optimizing UPS performance. Continued research and development are necessary to address challenges in integrating DERs into utility grids. Encouraging customer participation in pilot programs is vital for the evolution of VPPs. Here, the shift towards price-responsive DERs and VPPs is expected to enhance energy distribution efficiency.

24 POWER TRANSMISSION AND DISTRIBUTION↗

A Blockchain Based Co-Simulation Framework for Integrating DERs to Wholesale Electricity Markets

As the number of distributed energy resources (DERs) continue to increase across energy-delivery systems, there remains a need for integrating their capabilities into traditional grid operations. In this paper, a blockchain-based solution is proposed to facilitate FERC's Order No. 2222 implementations. The presented use-case enables small-scale DERs to participate in wholesale market operations through DER aggregators, while also enabling local distribution system operators to enforce distribution system constraints in a secure and traceable manner. The presented use case is built around the Unified Testing Platform (UTP) being developed as a part of the Blockchain for Optimized Security and Energy Management (BLOSEM) project. This is a multi-lab effort intended to simplify the deployment of blockchain-powered grid solutions by enabling the integration of simulation tools, and blockchain technologies through the use of system-agnostic interfaces that provide a modular, interoperable, and reusable connectivity layer.

blockchain interoperability↗

TrustDER: Trusted, Private and Scalable Coordination of Distributed Energy Resources

In this project, the Stanford and SLAC Teams have developed a Trusted, Private and Scalable platform for coordinating Coordination of Distributed Energy Resources (TrustDER). This is a layered system that ensures private, trusted and scalable coordination and monitoring of DERs. It accommodates a variety of resources, such as solar generation, gensets and loads, with a particular focus on battery systems-based resources, as they are a transformational technology experiencing fast growth in adoption by large critical facilities. The platform can be used as standalone or added to existing aggregation systems to enable trust, privacy and resilience. TrustDER consists of layers that address each of the shortcomings of the existing state of the art. Each layer in the platform can operate independently but provides information to the layers above it to enable a novel form of overall coordination architecture. The project consists of several tasks, with each task dedicated to the design of each layer. Task 2 Resource Virtualization defined a software abstraction layer for distributed energy resources (DERs). The goal of this abstraction was to simplify the implementation of algorithms utilizing cooperation of DERs resources in a variety of use cases. Task 3 is on Secure ID for Asset Authentication. Identity Management Systems (IDMS) are a foundational infrastructure for interactions between entities (organizations, users, devices, and services). Secure ID is blockchain-based a distributed identity management system allowing (1) identity provisioning, (2) authentication, (3) authorization, and (4) identity data sharing for IoT-enabled assets on the electricity grid. In this project, the SLAC team focused on designing and testing Keymaker, a protocol for authenticating device identity managed by Secure ID. Task 5 Private and Safe Integration is focused on the design and evaluation of a DER cooperation scheme which allows for the aggregation of DERs without impacting network reliability. The approach is designed based on realistic assumptions regarding data availability, communication infrastructure limitations, and privacy. Task 6 Scalable Distributed Privacy for Information explored how virtualized batteries could be managed privately. Specifically, it examined the case in which a principal provides a partitioned battery to multiple clients. Task 7 Use Cases was to ensure that this technology was applied in relevant situations and scenarios. Primarily, this means that virtualization needed to be employed in a manner that either improved flexibility, bolstered security or privacy, or decreased costs.

25 ENERGY STORAGE↗

Security Enhancements for Distributed Energy Resource Systems Interconnected with Distribution Networks: Final Technical Report

The revised IEEE 1547 Standard defines new complex communication-adjustable voltage and frequency regulation and ride-through characteristics, while maintaining the general antiislanding requirement for unintentional islanding situations. Unintentional islanding is prohibited while intentional islanding is specifically allowed, thus effectively enabling microgrid operation mode. Further, IEEE 1547-2018 Standard introduces new requirements in terms of interoperability so that the DER plant/circuit segments may be seamlessly integrated with the utility networks but at the same time become vulnerable to a cyber-attack. Traditional cybersecurity measures including encryption, authentication and role-based access control may not be fully implementable to all communication protocols specified in the IEEE 1547 Standard. Therefore, in this project we have identified, researched, implemented and tested several cyberphysical approaches that rely mostly on the behavior of the DER circuit and may help with validating the incoming command and control action potentially coming through an insecure communications channel. Additionally, we have built semantic models and communications profiles for DER facilities and have implemented lightweight IEC 61850 based publisher-subscriber GOOSE messaging mechanism, with security extensions in terms of authentication and encryption. The project proposed information models for integration into UCA OpenFMB 2.0 profiles focusing on grid code compliance.

24 POWER TRANSMISSION AND DISTRIBUTION↗

New York State Energy Research and Development Authority Exterior Building Solutions To Insulation

TO4 8.2.2: Space Cond. for Deep Energy Retrofits The purpose of this project for the New York State Energy Research and Development Authority (NYSERDA) is to find new or improved strategies for exterior building solutions in regard to insulation that will provide extensive energy-savings benefits for homeowners. Deep energy retrofits (DER) is one of the solutions. In the past, DERs have been expensive and hard for the average homeowner to budget. The DER solutions that IBACOS and GreenHomes America (GHA) are proposing will be market friendly, affordable, and easily repeatable. The insulation strategies that will be used on nine test homes include the following: - Rigid foam insulation - Four homes will have approximate center-of-wall R-values of R-28, including furring strips for siding, with additional systems approach work to supply the complete integrated DER solution. - Spray foam insulation - Four homes will have approximate center-of-wall R-values of R-30, with additional systems approach work to supply the complete integrated DER solution. - HPwES upgrade - One home will include criteria from the Home Performance with ENERGY STAR (HPwES) program, including dense pack walls and window upgrades for this retrofit strategy. In addition to the insulation, the strategies will include treatment where needed in the attic, mechanical systems, ventilation and basement band joist, walls, and floors.

acca manual rs↗

MPC4CLR (Model-Predictive-Control-for-Critical-Load-Restoration-in-Power-Distribution-Systems) [SWR-22-24]

Model predictive control (MPC) is a system or process control technique for making decisions under uncertainty via rolling look-ahead optimizations at each control step where only the current step decisions are applied, and the rest are discarded. In this work, we developed an MPC for a critical load restoration (CLR) in power distribution systems to recover system service (electricity delivery) following an extreme event-triggered substation outage. The method considers the problem of controlling distributed energy resources (DERs) of the distribution system with the objective of achieving maximum load pick up while satisfying distribution network flow and voltage constraints. A linearized optimal power flow (OPF) model is employed to represent the physics of the network. The problem formulation is augmented with a ramping (up) reserve product for the DERs to ensure improved and upward monotonic load restoration as time evolves. Simulation analysis and performance tests are performed using a modified IEEE 13-bus test feeder integrated with wind, solar, microturbine, and energy storage battery. The software is developed using various software packages in Julia and Python. The MPC model is implemented using the JuMP optimization language in Julia while the data analytics including renewable generation and load demand forecasts, running the MPC simulation and visualizations is performed in Python.

Eseye, Abinet Tesfaye↗

Risk-informed Hierarchical Control of Behind-the-Meter DERs with AMI Data Integration (Final Technical Report)

This project addresses several key barriers to implement the next generation demand response applications and provides a clear understanding of implementing hierarchical and standalone control using AMI data. Through this program, Eaton has developed and tested a meter-as-a-controller prototype with the help of other partners--- National Renewable Energy Laboratory (NREL), Electric Power Research Institute (EPRI), Pecan St Inc. (PSI), and Delaware Electric Cooperative (DEC). The controller can utilize residential controllable loads such as heating, ventilation, and air conditioner (HVAC), electric water heater and distributed energy resources like solar PV and battery energy storage systems for off-setting the demand that is required from the grid, thus providing reliable grid-services for demand reduction or peak shaving. The controller is also capable of coordinating the resources of the premises for better management and energy efficiency while meeting the comfort bound of the premises owner as quality-of-service. The development has been demonstrated in a three virtual-home setup at system performance lab of NREL with real appliances (HVAC, electric water heater, solar PV, and battery). The technology has also been proved through laboratory and field demonstration with successful interconnectivity (e.g., end-to-end communication and data exchange) between the residential appliances and utility through the RF network at Delaware Electric Co-op (DEC) in Delaware.

32 ENERGY CONSERVATION, CONSUMPTION, AND UTILIZATI↗

Integration of Fullerenes as Electron Acceptors in 3D Graphene Networks: Enhanced Charge Transfer and Stability through Molecular Design

Here, we report a concept that allows the integration of the characteristic properties of [60]fullerene in 3D graphene networks. In these systems, graphene provides high electrical conductivity and surface area while fullerenes add high electron affinity. We use molecular design to optimize the interaction between 3D graphene networks and fullerenes, specifically in the context of stability and charge transfer in an electrochemical environment. We demonstrated that the capacity of the 3D graphene network is critcally improved upon the addition of C 60 and C 60 monoadducts by providing additional acceptor states in the form of low-lying lowest unoccupied molecular orbitals of C 60 and its derivative. Guided by experimental results and first-principles calculations, we synthesized and tested a C 60 monoadduct with increased stability by strengthening the 3D graphene–C 60 van-der-Waals interactions. The synthesis approach and stabilization strategy presented here is expected to benefit the integration of graphene–C 60 hybrid materials in solar cell and charge storage applications.

25 ENERGY STORAGE↗

Beyond DERMS: Demonstration of Automated Grid Services, Mode Transition, and Resilience

This report describes the results of more advanced use cases including Ancillary Services, Black-sky-day operation, and Mode Switching from Phase 3 of the “Beyond DERMS” project aiming to build, deploy, and demonstrate a holistic platform that supports the integrated operation and planning of future power distribution networks with bi-directional power flows, many diverse distributed energy resources (DERs), and inverter-based resources. These test results demonstrated how a Beyond DERMS platform can fuse together AMI, SCADA, and DER data to provide a utility with deep insights into distribution network operations and planning, extending the value of DERMS and BTM DER resources.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Scheduler Modeling of Distributed Energy Resources for Providing Ancillary Services

Distribution energy resources (DERs) have been integral components of modern power systems, and their capability to provide grid services has been widely studied. To promote the deployment of these resources in providing grid services in real-world utility operations, this paper proposes a day-ahead scheduler model for a distribution system connected DER plant. A certain amount of generation capacity of this DER plant is reserved for frequency services, and some ancillary services for the distribution system-including peak load reduction, voltage regulation, and power factor control-are integrated into the model. The model is tested on a real-world distribution system. From the simulation results, the energy and reserve schedule of the solar photovoltaic (PV) unit and battery energy storage system (BESS) can be determined, and voltage and power factor are well maintained. Additionally, in order to demonstrate the specific characteristics of the co-located and hybrid operation modes for the PV and BESS, these two modes are analyzed both theoretically and through real-time simulation. Simulation results show that most of PV's variability is transferred to the net power in the co-located mode, whereas it is transferred to the BESS in the hybrid mode. This proposed scheduler model and the comparison of co-located and hybrid modes can provide practical guidance for the applications of DER plant in the real-world utility.

14 SOLAR ENERGY↗

Austin Sustainable and Holistic Integration of Energy Storage and Solar PV [Austin SHINES]. Final Report, Version 2

The Austin SHINES project and solution is a software management platform, for an electric grid with a high penetration of dispersed photovoltaic (PV) solar generation sites, which maintains the traditional power quality and reliability associated with grid service. This project developed and deployed the platform as a Distributed Energy Resource Management System (DERMS), engaging multiple advanced controls, to evaluate operation and optimization of a fleet of diverse DER assets, installed at several locations among Austin Energy’s customers and distribution system. The project also produced a methodology to create a replicable DERMS template, adaptable to other regions and market structures. Last, Austin SHINES aimed to demonstrate the solution’s methodology would enable the DER grid ecosystem to serve load at a technical cost (System Levelized Cost of Electricity, or System LCOE) of less than the U.S. Department of Energy SHINES program metric of $0.14/kWh, in a defined boundary, while enabling a high penetration of distributed PV. Research was categorized in 6 reports (Final Deliverables = FD) listed below, with titles and descriptions indicating which area of understanding was investigated: FD-1: System Levelized Cost of Electricity (System LCOE) Methodology The creation and use of the System LCOE to Serve Load metric that encompasses the holistic, system-level costs and benefits of all resources, and enables them to be evaluated based on their ability to support an efficient and low-cost integrated grid ecosystem. FD-2: Software Platform Product Description The creation of new DER control methodologies deployable within a utility-grade software platform that enable DER's to maximize their benefit within a grid, that is capable of serving load enabling a high penetration of distributed PV generation. FD-3: Optimal Design Methodology Optimal design methodologies for individual DER installations that enable utilities to determine the optimal combinations and sizing for individual DER sites. FD-4: Austin SHINES Ownership and Operation Models for DER System Performance A comparison of multiple DER aggregation and ownership methodologies including direct utility control, third-party aggregator, and autonomous. FD-5: Economic Modeling & Optimization A comparison of multiple DER technology mixes and configurations within the distribution system, providing insight into an optimal blend of technologies that best enable the distribution system to serve load at the lowest cost at high penetrations of solar. FD-6: Fielded Assets Deployed DER assets within the Austin Energy SHINES circuits. Austin SHINES provided an opening for state-of-the-art technology products to be deployed, providing a rich opportunity for improving how each of the products perform as stand-alone products, and in concert with other complementary products. The Austin SHINES project comprised of two key metrics for System LCOE: SystemLCOE_SHINES<$0.14/kWh Modeled ΔSystemLCOE_SHINES/ΔSystemLCOE_Base≥20% at same solar penetration The System LCOE calculation uses the costs of the utility-owned infrastructure as it exists today, the cost of the DERs that exist in the system today, and the cost of the purchase of energy from ERCOT wholesale markets over the course of the calendar year. All costs are on an annualized basis. The capital and operating costs are derived from the rate case, which produces a yearly cost. The net cost of energy and services imported to the system is integrated over the test year, as is the load served and solar penetration. The first metric was easily achieved by every scenario considered. The goal was set when the Department of Energy’s SHINES Funding Opportunity Announcement was written in 2015 and was a more difficult target at the time. Due mostly to rapidly declining costs for DERs and the significant decrease in the Electric Reliability Council of Texas (ERCOT) energy market prices, which results in lower net cost of energy purchases, the System LCOE is well below this target for all scenarios considered. A fleet of DERs can assume different mixtures, each of which serves the load at a different LCOE. The optimal mixture of DERs serves load at the smallest System LCOE. The second metric (hereinafter %delta metric) asks that the holistic DERMS controls reduce the incremental cost above the baseline of going to a high solar penetration future by at least 20% as compared to the case of a DER deployment with no sophisticated controls (autonomous). Many comparison sets were created throughout this project. Physical technology was installed for informing utility engineering and testing several types of operational control schemes, through the DERMS. The types of operational control which were compared for valuation of the System LCOE Metric were: Holistic control = using the full suite of the DERMS platform to decide and optimize how/why the systems operate depending on weather, market, and reliability signal input. Autonomous control = a local mode at the asset site, wherein a schedule operates the asset, with visibility into performance only No control = the baseline for comparing value against the other two types of control The types of ownership control included: Direct Utility control = the utility dispatches a signal to each asset Third-Party Aggregator = a third party aggregates a fleet of assets and the utility dispatches one signal for all Autonomous = a local mode is set for operation at the asset site, wherein a schedule operates the asset, with visibility into performance only The types of control methodologies deployable within a utility-grade software platform included: Utility Peak Load Reduction = Lower transmission cost obligation Day-Ahead Energy Arbitrage = Realize economic value through price differential Real-Time Price Dispatch = Realize economic value from real-time price spikes Voltage support = Reduce losses and increase solar generation Distribution Congestion Management = Increase local grid reliability Demand Charge Reduction = Lower customer bills and realize system benefit The fielded assets deployed for the project were: Utility Scale Kingsbery Energy Storage System: 1.5 MW / 3 MWh Li-Ion battery storage Mueller Energy Storage System: 1.75 MW / 3.2 MWh Li-Ion battery storage, 7 Energy Storage Units (250 kW each) La Loma Community Solar: 2.6 MW Commercial Scale Aggregated storage installations at 3 sites, with existing solar (300+ kW): One 18 kW / 36 kWh Li-Ion battery storage Two 72 kW / 144 kWh Li-Ion battery storage Residential Scale Aggregated storage installations: -Six stationary battery storage systems (10 kWh each) at homes with existing solar -One Electric Vehicle installed as Vehicle-to-Grid (V2G) Utility-Controlled Solar via Smart Inverters at 12 homes Autonomously-Controlled Smart Inverters at 6 homes Over the course of the project, Austin SHINES undertook installing more than 3 MW of distributed battery energy storage, smart PV inverters, a DER control platform, and other enabling technologies utilizing customer and utility locations and aggregation models. All of these resources were to be integrated and optimized at the utility level. DER assets and control methodologies were designed to achieve a credible pathway to a System LCOE for energy delivered to load of $0.14//kWh or less by 2020, while maximizing distributed solar generation and maintaining acceptable standards of power quality. The project also established a template for other regions to follow, to maximize the adoption of distributed solar PV in support of an economic and efficient grid. In total, the Austin SHINES project added value to the DER subject area in each layer of integration. From utility, to commercial to residential scales, the sheer hierarchy of communication and coordination was a significant accomplishment in addition to learnings from what these communications revealed was unique to each. Economically, the most effective method demonstrated was the criticality of planning phases. Contingencies and multiple projection scenarios helped guide the project to deploy optimal design as close as feasible, in real world conditions. The project and reports will serve public benefit by outlining specific areas of DER strategy and installation where many stakeholders and needs can be addressed with improved efficiency. Overall, communities and utilities should use the results to guide the increasing options available for powering the grid with DER, renewables, and carbon considerate energy.

14 SOLAR ENERGY↗

Microgrid Energy Management System Integration with Advanced Distribution Management System

The Integrated Distribution Management System (IDMS) project was initiated to demonstrate the interactive operation of microgrid systems and the distribution systems with which they interconnect. The key technologies for this are the microgrid management system and the utility distribution management system. The IDMS project successfully demonstrated that a utility’s advanced distribution management system/distributed energy resources management system (ADMS/DERMS) could effectively manage microgrids to provide visibility and control functionalities as well as use the microgrid as a dispatchable resource to support the utility grid. The DERMS accomplishes this by determining active and reactive power needs at the point of common coupling (PCC) using advanced applications like volt/VAR watt optimization (VVWO) and load relief (LR) with the underlying core applications state estimation (SE) and load flow (LF). The ADMS/DERMS can use the microgrid as a resource to resolve and prevent violations in the grid and to optimize the operational working state of the grid. The IDMS project demonstrated that a utility-operated ADMS with embedded DERMS functionality can flexibly manage a variety of microgrids and other aggregated distributed energy resources (DER) in concert with the wider distribution grid. Microgrids can provide grid services in any number of different ways to meet the operational needs of the distribution utility. The manner of aggregation — microgrid or virtual power plant — is not necessarily relevant to the utility as long as the grid services from the aggregated DER are available and can be managed by its ADMS/DERMS for the stability and reliability of the grid. The IDMS project demonstrated this integrated ADMS concept by combining hardware/software-in-the-loop testing with commercial products from different vendors and a utility’s network model. The project integrated the Schneider Electric EcoStruxure™ ADMS with DERMS with the Schweitzer Engineering Laboratories (SEL) POWERMAX ® Microgrid Control System, and the simulated resources with energy company PECO’s model of a utility-owned microgrid, establishing an operational relationship in which the utility manages the operational functionality of a microgrid at the PCC and that provides the utility with the capability to control the comprehensive power system, inclusive of the macrogrid and microgrid.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Cybersecurity Certification Requirements for Distributed Energy Resources: A Survey of SunSpec Alliance Standards

This survey paper explores the cybersecurity certification requirements defined by the SunSpec Alliance for Distributed Energy Resource (DER) devices, focusing on aspects such as software updates, device communications, authentication mechanisms, device security, logging, and test procedures. The SunSpec cybersecurity standards mandate support for remote and automated software updates, secure communication protocols, stringent authentication practices, and robust logging mechanisms to ensure operational integrity. Furthermore, the paper discusses the implementation of the SAE J3072 standard using the IEEE 2030.5 protocol, emphasizing the secure interactions between electric vehicle supply equipment (EVSE) and plug-in electric vehicles (PEVs) for functionalities like vehicle-to-grid (V2G) capabilities. This research also examines the SunSpec Modbus standard, which enhances the interoperability among DER system components, facilitating compliance with grid interconnection standards. This paper also analyzes the existing SunSpec Device Information Models, which standardize data exchange formats for DER systems across communication interfaces. Finally, this paper concludes with a detailed discussion of the energy storage cybersecurity specification and the blockchain cybersecurity requirements as proposed by SunSpec Alliance.

Tsikteris, Sean (ORCID:0009000524202250)↗