Search NASASearch

SEARCH · Search NASA

Results for “International Space Station”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

653 records · Page 2

Investigation of Lunar-Inspired Geopolymer Concrete Formulations Mixed and Cured in Microgravity on the International Space Station (ISS)

The research outlined in this presentation investigates the use of various lunar regolith simulants in geopolymer lunar concrete mixes mixed and cured on the International Space Station (ISS). The motivation for this work is to study the effects of gravity on the microstructure of alkali-activated materials cured with heat, and to develop materials for the construction of long-term infrastructure on the lunar surface with in-situ resource utilization (ISRU). ISRU for construction materials reduces the cost and mass of payloads related to lunar construction. The advantage of geopolymer concrete as opposed to traditional portland cement concrete is that water acts as a medium for the polymerization reaction and leaves the system throughout the process, reducing its demand. Twelve samples of lunar regolith simulant and a solution composed of sodium hydroxide and sodium silicate were sent to the ISS. The three simulants were OPRH2N, OPRL2N, and JSC-1AF, using only particles less than 53 µm in diameter to increase reactivity of the simulant. Simulant to solution ratios were determined by workability while mixing. The simulant and solution were sealed Burst Pouches® along with 2 other sealed bags to prevent material from leaking. Crew member F-14 conducted testing on the ISS by introducing the solution to the simulant in the Burst Pouch®, mixing the sample with a spatula, and then clamping the specimen in the fresh state to prevent flow inside the Burst Pouch®. These specimens were then put in a thermos heated to 80C via sealed drinking water bags to cure for 24 hours with a temperature logger. The cured specimens remained in microgravity for at least 28 days and were returned from the ISS in February 2025. The specimens were then brought to the NASA Marshall Space Flight Center (MSFC) to analyze. Material characterization consisted of conducting Micro-CT tests of entire samples in their sealed apparatus to a resolution of 25µm. 2D image slices were saved in each orthogonal direction of each specimen at a 0.03 mm step size from the 3D model to conduct analytical porosity calculations. Representative samples from each specimen were sampled to perform helium gas pycnometery and were then mounted in resin for SEM imaging, EDS, and nanoindentation. Porosity was analyzed analytically using micromechanics modelling with the assistance of the NASA Multiscale Analysis Tool (NASMAT), as well as the NASA Advanced Supercomputing (NAS) servers (V. Saseendran & N. Yamamoto, 2024). Density was measured using helium gas pycnometery and was then compared to the theoretical density for experimental porosity calculation. Due to the samples’ non-uniform shape being cured in a pouch, traditional compression and tensile strength testing could not be performed. Nanoindentation was conducted at Clarkson University to determine the microhardness and reduced modulus of elasticity. Results from flight samples can be compared to ground samples currently in DLR’s possession to determine the effect on microstructure from being mixed and cured in microgravity. This study gives further insight and understanding of geopolymer lunar concrete and its viability as a lunar construction material with ISRU.

Adam Johnson

Ares I-X Ground Diagnostic Prototype

The automation of pre-launch diagnostics for launch vehicles offers three potential benefits: improving safety, reducing cost, and reducing launch delays. The Ares I-X Ground Diagnostic Prototype demonstrated anomaly detection, fault detection, fault isolation, and diagnostics for the Ares I-X first-stage Thrust Vector Control and for the associated ground hydraulics while the vehicle was in the Vehicle Assembly Building at Kennedy Space Center (KSC) and while it was on the launch pad. The prototype combines three existing tools. The first tool, TEAMS (Testability Engineering and Maintenance System), is a model-based tool from Qualtech Systems Inc. for fault isolation and diagnostics. The second tool, SHINE (Spacecraft Health Inference Engine), is a rule-based expert system that was developed at the NASA Jet Propulsion Laboratory. We developed SHINE rules for fault detection and mode identification, and used the outputs of SHINE as inputs to TEAMS. The third tool, IMS (Inductive Monitoring System), is an anomaly detection tool that was developed at NASA Ames Research Center. The three tools were integrated and deployed to KSC, where they were interfaced with live data. This paper describes how the prototype performed during the period of time before the launch, including accuracy and computer resource usage. The paper concludes with some of the lessons that we learned from the experience of developing and deploying the prototype.

Machine Learning

Fifth International Microgravity Combustion Workshop

On behalf of the NASA Headquarters Microgravity Research Division and the Microgravity Combustion Science Discipline Working Group, we are pleased to present these proceedings of the Fifth International Microgravity Combustion Workshop. At the time we go to press we expect to welcome to the workshop over 250 presenters and participants from U.S. academia, industry, and government; and from at least 8 international partner countries. We come together for this workshop at the beginning of the International Space Station era, where the future of microgravity combustion science programs will unfold over the next few years. As we accelerate our preparations for the ISS, this book and the growing literature base cited herein provide a summary of the accomplishments of approximately forty space-flight experiment-missions (plus nearly countless drop tests and aircraft parabolas) and a valuable resource for the new experiment ideas of the future.

Kurt R Sacksteder

Radiation-Resistant Ti/BN Coatings: Insights From 171 Days Exposure to Space Radiation and Atomic Oxygen in Low Orbit

Atmospheric Plasma Spray (APS) and Vacuum Plasma Spray (VPS) techniques were used to develop Ti/2 vol.% hBN coatings, for extreme space environments and tested aboard the International Space Station as part of the MISSE-17 (Materials International Space Station Experiments) program. The coatings were exposed to atomic oxygen, space radiation, and low-orbit thermal cycling. VPS coatings showed a 56% increase in microhardness, a 26% rise in elastic modulus, minimal porosity and crack density changes compared to APS coatings. The change in mechanical properties is attributed to the formation of TiO, TiO₂ and TiN from nitrogen retention, alongside radiation-induced dislocations, which enhanced surface hardening. The oxidation of titanium led to the formation of TiO and TiO₂, while boron nitride was retained and underwent transmutation in VPS coatings. XPS and EDS analyses confirmed the enhanced space-environment resistance of VPS coatings, making them ideal for long-term spacecraft protection in lunar and Martian conditions.

Abhijith Kunneparambil Sukumaran

General Purpose Data-Driven Monitoring for Space Operations

As modern space propulsion and exploration systems improve in capability and efficiency, their designs are becoming increasingly sophisticated and complex. Determining the health state of these systems, using traditional parameter limit checking, model-based, or rule-based methods, is becoming more difficult as the number of sensors and component interactions grow. Data-driven monitoring techniques have been developed to address these issues by analyzing system operations data to automatically characterize normal system behavior. System health can be monitored by comparing real-time operating data with these nominal characterizations, providing detection of anomalous data signatures indicative of system faults or failures. Data-driven techniques have a number of advantages over other methods for monitoring complex space vehicles. Unlike model-based systems, the developer does not need to understand or encode the internal operation of the system. The knowledge required to monitor the system is automatically derived from archived data from system operation. Unlike rule-based systems, data-driven systems do not require system analysts to define nominal relationships among sensors. Analysts can and often do determine these relationships for a system with few sensors; it is more difficult to analytically determine the nominal relationship among a large number of sensors. Data-driven techniques are not limited to low-dimensional spaces and work as effectively with dozens of parameters as they do with a few. Knowledge bases formed by data-driven techniques are also easy to update. As the operating envelope of the monitored system is expanded, data-driven techniques can be quickly retrained to incorporate the new behavior into the knowledge base. The expertise and time-consuming process of updating a model or rule base to maintain consistency with the new operation is not required. The Inductive Monitoring System (IMS) is a data-driven system health monitoring software tool that has been successfully applied to several aerospace applications. IMS uses a data mining technique called clustering to analyze archived system data and characterize normal interactions between parameters. This characterization, or model, of nominal operation is stored in a knowledge base that can be used for real-time system monitoring or analysis of archived events. System data is compared with the nominal IMS model to produce a measure of how well current system behavior matches the normal behavior defined by the training data. Significant deviations from the nominal system model can provide alerts to system malfunctions or precursors of significant failures. The scope of IMS based data-driven monitoring applications continues to expand with current development activities. Successful IMS deployment in the International Space Station (ISS) flight control room to monitor ISS attitude control systems has led to applications in other ISS flight control disciplines, such as thermal control. It has also generated interest in data-driven monitoring capability for Constellation, NASA's program to replace the Space Shuttle with new launch vehicles and spacecraft capable of returning astronauts to the moon, and then on to Mars. Several projects are currently underway to evaluate and mature the IMS technology and complementary tools for use in the Constellation program. These include an experiment on board the Air Force TacSat-3 satellite, and ground systems monitoring for NASA's Ares I-X and Ares I launch vehicles. The TacSat-3 Vehicle System Management (TVSM) project is a software experiment to integrate fault and anomaly detection algorithms and diagnosis tools with executive and adaptive planning functions contained in the flight software on-board the Air Force Research Laboratory TacSat-3 satellite. The TVSM software package will be uploaded after launch to monitor spacecraft subsystems such as power and guidance, navigation, and control (GN&C). It will analyze data in real-time to demonstrate detection of faults and unusual conditions, diagnose problems, and react to threats to spacecraft health and mission goals. The experiment will demonstrate the feasibility and effectiveness of integrated system health management (ISHM) technologies with both ground and on-board experiments. Initially, the TVSM software will run open loop, providing system health information and recommendations to ground operators, without automatically performing fault-mitigating corrective actions. After the end of the satellite's mission, closed loop tests combining TVSM monitoring and diagnosis with reactive capabilities by the flight software will be performed. In addition to monitoring for long periods of actual operation, the experiment will include fault injection into TacSat-3 data as well as commanded operations to test and evaluate automatic ISHM monitoring and recovery under controlled conditions.

Satellites

Power and Propulsion Element Steerable High Gain Antenna Lunar Transit Thermal Analysis Tracking Methodology

The Power and Propulsion Element (PPE) is an ion thruster propulsion spacecraft developed as an element of Space Reactor (SR-1) Freedom to provide propulsion, communications and power for the spacecraft. PPE was originally being developed for the use with the lunar orbiting space station Gateway as one of the first two planned elements. PPE was to be launched with the Habitation and Logistics Outpost (HALO) element in a configuration called the Co-Manifested Vehicle (CMV) that would arrive at a Near-Rectilinear Halo Orbit (NRHO) around the Moon via a lunar transit spiral trajectory phase. The PPE communication system is equipped with two Steerable High Gain Antennas (SHGA) each steered by a two-axis gimbal (TAG) mechanism. A thermal analysis was conducted during the near-Earth spiral phase of the mission using Thermal Desktop (TD). This analysis utilized multiple axis Earth tracking articulators in combination with SINDA system internal environmental heating symbols to produce accurate Earth ground station tracking communication system temperatures. This presentation provides an overview of the communication system thermal model and the analysis methodology.

Thermal Analysis

ISS Radiator Face Sheet Anomaly Investigation and Return to Function

Maintaining sufficient heat rejection on the International Space Station (ISS) is critical to the function of the Low-Earth Orbit station. The External Active Thermal Control System (EATCS) rejects the excess heat generated by the US On-Orbit Segment (USOS) modules. The system uses single-phase liquid ammonia to collect the heat and reject it to six radiators (three on the Starboard side, three on the Port side). Each radiator is made up of eight panels. In September 2008, imagery of the Starboard radiators was conducted and showed one of the panels’ face sheets had peeled up from the internal honeycomb core structure. Out of an abundance of caution, the radiator was isolated from the rest of the EATCS and the ammonia was vented to space. Since the radiator was vented, periodic imagery of all radiator panels was taken to monitor any changes in the face sheet and inspect for other radiator anomalies. In January 2025, after years of trending and inspections, the radiator was reintegrated into the system to increase heat rejection capabilities. This paper will document the multi-year investigation that took place to determine root cause and mitigations implemented to reduce risk to the system. A summary of the data since the investigation will show rationale for reintegrating the radiator even with the damaged panel. The goal of the paper is to document the investigation for historical purposes and provide future programs with findings discovered during the investigation.

Aaron Rodriguez

ISS Radiator Face Sheet Anomaly Investigation and Return to Function

Maintaining sufficient heat rejection on the International Space Station (ISS) is critical to the function of the Low-Earth Orbit station. The External Active Thermal Control System (EATCS) rejects the excess heat generated by the US On-Orbit Segment (USOS) modules. The system uses single-phase liquid ammonia to collect the heat and reject it to six radiators (three on the Starboard side, three on the Port side). Each radiator is made up of eight panels. In September 2008, imagery of the Starboard radiators was conducted and showed one of the panels’ face sheets had peeled up from the internal honeycomb core structure. Out of an abundance of caution, the radiator was isolated from the rest of the EATCS and the ammonia was vented to space. Since the radiator was vented, periodic imagery of all radiator panels was taken to monitor any changes in the face sheet and inspect for other radiator anomalies. In January 2025, after years of trending and inspections, the radiator was reintegrated into the system to increase heat rejection capabilities. This paper will document the multi-year investigation that took place to determine root cause and mitigations implemented to reduce risk to the system. A summary of the data since the investigation will show rationale for reintegrating the radiator even with the damaged panel. The goal of the paper is to document the investigation for historical purposes and provide future programs with findings discovered during the investigation.

Aaron Rodriguez

Transitional Flow in Thin Tubes for Space Station Freedom Radiator

A two dimensional finite volume method is used to predict the film coefficients in the transitional flow region (laminar or turbulent) for the radiator panel tubes. The code used to perform this analysis is CAST (Computer Aided Simulation of Turbulent Flows). The information gathered from this code is then used to augment a Sinda85 model that predicts overall performance of the radiator. A final comparison is drawn between the results generated with a Sinda85 model using the Sinda85 provided transition region heat transfer correlations and the Sinda85 model using the CAST generated data.

Patrick Loney

Space Station battery system design and development

The Space Station Electric Power System will rely on nickel-hydrogen batteries in its photovoltaic power subsystem for energy storage to support eclipse and contingency operations. These 81-Ah batteries will be designed for a 5-year life capability and are configured as orbital replaceable units (ORUs), permitting replacement of worn-out batteries over the anticipated 30-year Station life. This paper describes the baseline design and the development plans for the battery assemblies, the battery ORUs and the battery system. Key elements reviewed are the cells, mechanical and thermal design of the assembly, the ORU approach and interfaces, and the electrical design of the battery system. The anticipated operational approach is discussed, covering expected performance as well as the processor-controlled charge management and discharge load allocation techniques. Development plans cover verification of materials, cells, assemblies and ORUs, as well as system-level test and analyses.

Haas, R. J.

Mechanical Properties of Carbon Fiber Reinforced Composites Exposed to Cryogenic Conditions and Space Radiation via Simulation and Testing

As NASA missions extend beyond low Earth orbit, increasing reliance is placed on carbon fiber reinforced polymer (CFRP) composites for spacecraft structures where mass efficiency, durability, and long-term reliability are critical. In service, these materials are subjected to a combination of ultraviolet radiation, vacuum, ionizing radiation, atomic oxygen, and extreme thermal excursions under sustained mechanical loading. Flight systems such as the Boeing Starliner and SpaceX Dragon employ external composite structures that will experience these environments for extended durations. Although prior spaceflight and ground studies have reported limited changes in bulk mechanical properties, the synergistic effects of these environments on composite microstructure, particularly at the fiber matrix interphase, remain insufficiently characterized and represent a potential qualification and reliability risk. This study investigates the effects of short-term cryogenic exposure on a radiation shielding carbon epoxy composite, SC2020, as a ground-based analog for space relevant thermal extremes. The SC2020 material system has previously flown on the International Space Station under the Materials International Space Station Experiment (MISSE) program. Composite specimens were exposed to liquid nitrogen for 6 and 24 hours and evaluated using a multiscale characterization framework that combined ASTM D3039 tensile testing, Atomic Force Microscopy (AFM) based interphase analysis, and helium gas permeability measurements. Tensile testing showed no statistically significant or permanent degradation in global strength or modulus following cryogenic exposure. In contrast, AFM measurements revealed reductions in interphase modulus, weakened adhesion, and increased nanoscale heterogeneity, indicating localized degradation mechanisms not captured by conventional bulk testing. Gas permeability measurements showed a progressive increase in helium diffusion with exposure duration, consistent with micro-void formation or partial interfacial debonding. The results indicate that cryogenic exposure initiates degradation at the fiber matrix interphase while leaving global mechanical properties largely unchanged over short durations. These findings underscore the importance of multiscale diagnostics for identifying early-stage damage mechanisms that may influence long term performance and qualification margins for spaceflight composite structures. The data presented establish a cryogenic baseline for comparison with forthcoming MISSE flight exposure results and support ongoing NASA Established Program to Stimulate Competitive Research (EPSCoR) efforts aimed at improving composite qualification methodologies, risk assessment, and reliability prediction for space environments.

composite reliability

NASA Systems Autonomy Demonstration Project: Advanced Automation Demonstration of Space Station Freedom Thermal Control System

The NASA Systems Autonomy Demonstration Project (SADP) was initiated in response to Congressional interest in Space station automation technology demonstration. The SADP is a joint cooperative effort between Ames Research Center (ARC) and Johnson Space Center (JSC) to demonstrate advanced automation technology feasibility using the Space Station Freedom Thermal Control System (TCS) test bed. A model-based expert system and its operator interface were developed by knowledge engineers, AI researchers, and human factors researchers at ARC working with the domain experts and system integration engineers at JSC. Its target application is a prototype heat acquisition and transport subsystem of a space station TCS. The demonstration is scheduled to be conducted at JSC in August, 1989. The demonstration will consist of a detailed test of the ability of the Thermal Expert System to conduct real time normal operations (start-up, set point changes, shut-down) and to conduct fault detection, isolation, and recovery (FDIR) on the test article. The FDIR will be conducted by injecting ten component level failures that will manifest themselves as seven different system level faults. Here, the SADP goals, are described as well as the Thermal Control Expert System that has been developed for demonstration.

Jeffrey Dominick

Interactions Between the Space Station and the Environment: A Preliminary Assessment of EMI

A review of the interactions between proposed Space Station systems/payloads and the environment that contribute to electromagnetic interference was performed. Seven prime sources of interference have been identified. These are: The Space Station power system; active experiments such as beam injection; ASTROMAG; ram and wake density gradients; pick up ions produced by vented or offgassed clouds; waves produced by current loops that include the plasma and structure; arcing from high voltage solar arrays (or possible ESD in polar orbit). This review indicates that: minimizing leakage current from the 20 kHz power system to the structure; keeping the surfaces of the Space Station structure, arrays, and radiators nonconducting; minimizing venting of payloads or systems to non-operational periods; careful placement of payloads sensitive to magnetic field perturbations or wake noise; and designing an operational timeline compatible with experiment requirement are the most effective means of minimizing the effects of this interference. High degrees of uncertainty exist in the estimates of magnitudes of gas emission induced EMI, radiation of 20 kHz and harmonics, ASTROMAG induced interference, and arc threshold/frequency of the solar array. These processes demand further attention so that mitigation efforts are properly calibrated.

G B Murphy

NASA Talks: Earth to Mars in 3 Giant Leaps

“Earth to Mars in 3 Giant Leaps” will explain why, despite landing astronauts on the Moon more than 40 years ago, humanity has not yet sent people to Mars. Astronaut Dr. Stan Love will demonstrate that the challenge is not simply building bigger rockets, it is overcoming the immense engineering, logistical, and human obstacles required for a safe round-trip mission to the Red Planet. The first giant leap focuses on Low Earth Orbit, where the International Space Station serves as humanity's laboratory for living and working in space; the second giant leap revisits the Apollo missions to the Moon, illustrating the extraordinary amount of energy required to travel beyond Earth orbit; and the third and greatest leap explores human exploration of Mars.

Stan Love

Ares I-X Ground Diagnostic Prototype

Automating prelaunch diagnostics for launch vehicles offers three potential benefits. First, it potentially improves safety by detecting faults that might otherwise have been missed so that they can be corrected before launch. Second, it potentially reduces launch delays by more quickly diagnosing the cause of anomalies that occur during prelaunch processing. Reducing launch delays will be critical to the success of NASA's planned future missions that require in-orbit rendezvous. Third, it potentially reduces costs by reducing both launch delays and the number of people needed to monitor the prelaunch process. NASA is currently developing the Ares I launch vehicle to bring the Orion capsule and its crew of four astronauts to low-earth orbit on their way to the moon. Ares I-X will be the first unmanned test flight of Ares I. It is scheduled to launch on October 27, 2009. The Ares I-X Ground Diagnostic Prototype is a prototype ground diagnostic system that will provide anomaly detection, fault detection, fault isolation, and diagnostics for the Ares I-X first-stage thrust vector control (TVC) and for the associated ground hydraulics while it is in the Vehicle Assembly Building (VAB) at John F. Kennedy Space Center (KSC) and on the launch pad. It will serve as a prototype for a future operational ground diagnostic system for Ares I. The prototype combines three existing diagnostic tools. The first tool, TEAMS (Testability Engineering and Maintenance System), is a model-based tool that is commercially produced by Qualtech Systems, Inc. It uses a qualitative model of failure propagation to perform fault isolation and diagnostics. We adapted an existing TEAMS model of the TVC to use for diagnostics and developed a TEAMS model of the ground hydraulics. The second tool, Spacecraft Health Inference Engine (SHINE), is a rule-based expert system developed at the NASA Jet Propulsion Laboratory. We developed SHINE rules for fault detection and mode identification. The prototype uses the outputs of SHINE as inputs to TEAMS. The third tool, the Inductive Monitoring System (IMS), is an anomaly detection tool developed at NASA Ames Research Center and is currently used to monitor the International Space Station Control Moment Gyroscopes. IMS automatically "learns" a model of historical nominal data in the form of a set of clusters and signals an alarm when new data fails to match this model. IMS offers the potential to detect faults that have not been modeled. The three tools have been integrated and deployed to Hangar AE at KSC where they interface with live data from the Ares I-X vehicle and from the ground hydraulics. The outputs of the tools are displayed on a console in Hangar AE, one of the locations from which the Ares I-X launch will be monitored. In a previous publication, we discussed how we selected the three tools based primarily on their ability to be certified for human spaceflight and described our plans for the prototype. This abstract is due October 23, 2009, and the Ares I-X launch is currently scheduled for October 27, 2009. If this abstract is accepted, then the full paper will describe how the prototype performed before the launch. It will include an analysis of the prototype's accuracy, including false-positive rates, false-negative rates, and receiver operating characteristics (ROC) curves. It will also include a description of the prototype's computational requirements, including CPU usage, main memory usage, and disk usage. If the prototype detects any faults during the prelaunch period then the paper will include a description of those faults. Similarly, if the prototype has any false alarms then the paper will describe them and will attempt to explain their causes. Also, the paper will describe the three tools and how they are used in the prototype. It will include a description of the TEAMS models of the Ares I-X first-stage TVC and associated ground hydraulics and how we adapted the TVC model for use in real-time diagnostics. It will describe the SHINE rules used for fault detection and mode identification and the software architecture that interfaces the various pieces of existing software that are part of the prototype to one another. It will describe how we selected the sensor values and commands that were used to train the IMS model and how we optimized the number of clusters in the IMS model. It will include screen shots of the graphical display that we developed in Java to display the outputs of the three tools. Because Ares I-X data was not yet available to us while we were developing the prototype, we used historical data from the Space Shuttle's Solid Rocket Booster (SRB) TVCs and the associated ground hydraulics to train IMS and to test the entire prototype. Because most of the failure modes that we modeled have never occurred in the Shuttle we inserted simulated failures into the Shuttle data. The Ares I-X first-stage TVC is very similar to the SRB TVC and we expect the data will be very similar. After the launch, we will determine how similar the data actually is and report how any differences in the data affected the diagnostic accuracy of the prototype. Finally, although we did not get the prototype certified, we designed it in a way that it could be certified and wrote a preliminary certification plan. The paper will include a brief summary of how we considered the need for certification in the design of the prototype, how we tested the prototype before deploying it to Hangar AE, and how we would propose to get it certified if it were deployed as an operational system. The paper will conclude with a description of some of the challenges we faced and some of the lessons learned in developing and deploying the prototype.

International Space Station

Augmentation of the Space Station Module Power Management and Distribution Breadboard

The space station module power management and distribution (SSM/PMAD) breadboard models power distribution and management, including scheduling, load prioritization, and a fault detection, identification, and recovery (FDIR) system within a Space Station Freedom habitation or laboratory module. This 120 VDC system is capable of distributing up to 30 kW of power among more than 25 loads. In addition to the power distribution hardware, the system includes computer control through a hierarchy of processes. The lowest level consists of fast, simple (from a computing standpoint) switchgear that is capable of quickly safing the system. At the next level are local load center processors, (LLP's) which execute load scheduling, perform redundant switching, and shed loads which use more than scheduled power. Above the LLP's are three cooperating artificial intelligence (AI) systems which manage load prioritizations, load scheduling, load shedding, and fault recovery and management. Recent upgrades to hardware and modifications to software at both the LLP and AI system levels promise a drastic increase in speed, a significant increase in functionality and reliability, and potential for further examination of advanced automation techniques. The background, SSM/PMAD, interface to the Lewis Research Center test bed, the large autonomous spacecraft electrical power system, and future plans are discussed.

Bryan Walls

An Intelligent Value-Driven Scheduling System for Space Station Freedom With Special Emphasis on the Electric Power System

This paper discusses the Electric Power Control System (EPCS) created by Decision-Science Applications, Inc. (DSA) for Lewis Research Center (LeRC). This system in its current form makes decisions on what to schedule and when to schedule it, including making choices among various options or ways of performing a task. The system is goal directed and seeks to shape resource usage in an optimal manner using a value-driven approach. The paper discusses the considerations governing what makes a "good" schedule; how to design a value function to find the best schedule; and how to design the algorithm which finds the schedule that maximizes this value function. Results are shown which demonstrate the usefulness of the techniques employed. The value-driven approach also allows for the system to be easily extended to an emergency response system, making decisions as to where to best cut power when warranted.

Joseph C Krupp

A Review of Pump Package Assembly Anomalies and Demonstration to Gain Motor Controller Replacement Capability

The International Space Station (ISS) generates heat within the US modules from systems used to operate the station, maintain crew health, and conduct science experiments in the orbiting laboratory. The Internal Thermal Control System (ITCS) collects this heat in water loops and transfers it to the external ammonia system for rejection to space. The ITCS uses six Pump Package Assemblies (PPA) as the motive force to circulate the water within the Lab, Node 2, and Node 3 (Node 1 is parasitic to the Lab and Node 3 ITCS loops). In the life of ISS, 3 PPAs have had to be replaced and 2 PPAs are currently showing signs of degradation. The first PPA to fail in 2003 was due to early coolant chemistry issues; the remaining pump failures and current pump degradations are determined to be related to the Pump/Fan Motor Controller (PFMC), with their individual signatures all being unique to this point. The PFMC of one of the failed PPAs was returned and testing confirmed its sub-components to be the root cause of the PPA failure. Due to the relative size and weight of the standalone PFMC in comparison to the integrated assembly, it is desired, from a launch and on-orbit stowage perspective, to replace the PFMC component of the degraded PPA instead of the entire PPA. The PPA was not designed for this capability, so on the ground demonstrations are planned using crew tools to show that the PFMC can be replaced on-orbit while maintaining full functionality. This paper will focus on the signatures of the two most recent PPA failures and the two PPAs showing signs of degradation, in addition to presenting the findings from the PFMC demonstration effort.

Aaron Rodriguez