Driving on the Surface of Mars Using the Rover Control Workstation
On July 4, 1997 the Mars Pathfinder Spacecraft and Sojourner Microrover safely landed on the surface of Mars and began an ambibitious mission of exploration.
SEARCH · Search NASA
Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.
Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.
On July 4, 1997 the Mars Pathfinder Spacecraft and Sojourner Microrover safely landed on the surface of Mars and began an ambibitious mission of exploration.
A series of metals was examined for suitability for the Wheel Abrasion Experiment, one of ten microrover experiments of the Mars Pathfinder Mission. The seven candidate metals were: Ag, Al, Au, Cu, Ni, Pt, and W. Thin films of candidate metals from 0.1 to 1.0 micrometer thick were deposited on black anodized aluminum coupons by e-beam and resistive evaporation and chemical vapor deposition. Optical, corrosion, abrasion, and adhesion criteria were used to select Al, Ni, and Pt. A description is given of the deposition and testing of thin films, followed by a presentation of experimental data and a brief discussion of follow-on testing and flight qualification.
This paper presents a staus report on the MESUR Pathfinder Microrover Experiment.
With NASA's spectacular return to Mars on July 4th 1997, the Mars Pathfinder Lander and its Sojourner Microrover have set a new standard for Faster, Better, Cheaper space exploration missions.
An exciting scientific component of the Pathfinder mission is the rover, which will act as a mini-field geologist by providing us with access to samples for chemical analyses and close-up images of the Martian surface, performing active experiments to modify the surface and study the results, and exploring the landing site area.
In this paper, the rover navigation performance is analyzed on the basis of received rover telemetry, rover uplink commands and stereo images captured by the lander cameras.
This paper summarizes the activites and results of the effort to conduct a low-cost, yet meaningful risk management program for the MFEX, which was originally designated as a high risk payload.
With the success of Mars Pathfinder's Sojourner rover, a new era of planetary exploration has opened, with demand for highly capable mobile robots.
On 4 July 1997, the Mars Pathfinder landed on the surface of Mars carrying the first planetary rover, known as the Sojourner. Formally known as the Microrover Flight Experiment (MFEX), the Sojourner was a low cost, high-risk technology demonstration, in which new risk management techniques were tried. This paper summarizes the activities and results of the effort to conduct a low-cost, yet meaningful risk management program for the MFEX. The specific activities focused on cost, performance, schedule, and operations risks. Just as the systems engineering process was iterative and produced successive refinements of requirements, designs, etc., so was the risk management process. Qualitative risk assessments were performed first to gain some insights for refining the microrover design and operations concept. These then evolved into more quantitative analyses. Risk management lessons from the manager's perspective is presented for other low-cost, high-risk space missions.
Explore the source record for details and available documents.
The MESUR (Mars Environmental Survey) Pathfinder mission is the first Discovery mission planned for launch in 1996. MESUR Pathfinder is designed as an engineering demonstration of the entry, descent and landing approach to be employed by the follow-on MESUR Network mission, which will land of order 10 small stations on the surface of Mars to investigate interior, atmospheric and surface properties. Pathfinder is a small Mars lander, equipped with a microrover to deploy instruments and explore the local landing site. Instruments selected for Pathfinder include a surface imager on a 1 m pop-up mast (stereo with spectral filters), an atmospheric structure instrument/surface meteorology package, and an alpha proton x-ray spectrometer. The microrover will carry the alpha proton x-ray spectrometer to a number of different rocks and surface materials and provide close-up imaging...
Mars Pathfinder, one of the Discovery class missions (quick. low-cost projects with focused science objectives), will land a single spacecraft with a microrover and several instruments on the surface of Mars in 1997. Pathfinder will be the first mission to use a rover, carrying a chemical analysis instrument, to characterize the rocks and soils in a landing area over hundreds of square meters on Mars, which will provide a calibration point or ground truth for orbital remote sensing observations.
Mars Pathfinder, one of the first Discovery-class missions (quick, low-cost projects with focused science objectives), will land a single spacecraft with a microrover and several instruments on the surface of Mars in 1997. Pathfinder will be the first mission to use a rover, carrying a chemical analysis instrument, to characterize the rocks and soils in a landing area over hundreds of square meters on Mars, which will provide a calibration point or "ground truth" for orbital remote sensing observations. In addition to the rover, which also performs a number of technology experiments, Pathfinder carries three science instruments: a stereoscopic imager with spectral filters on an extendable mast, an alpha proton X ray spectrometer, and an atmospheric structure instrument/meteorology package. The instruments, the rover technology experiments, and the telemetry system will allow investigations of the surface morphology and geology at submeter to a hundred meters scale, the petrology and geochemistry of rocks and soils, the magnetic properties of dust, soil mechanics and properties, a variety of atmospheric investigations, and the rotational and orbital dynamics of Mars. Landing downstream from the mouth of a giant catastrophic outflow channel, Ares Vallis at 19.5 deg N, 32.8 deg W, offers the potential of identifying and analyzing a wide variety of crustal materials, from the ancient heavily cratered terrain, intermediate-aged ridged plains, and reworked channel deposits, thus allowing first-order scientific investigations of the early differentiation and evolution of the crust, the development of weathering products, and tile early environments and conditions on Mars.
Explore the source record for details and available documents.
This paper describes MFEX and the four factors that contribute to the feasibility of small rovers.
In 1996, NASA will launch the Mars Pathfinder spacecraft, which will carry an 11 kg rover to.
The sinkage and slippage detection methodologies employed by a MESUR Pathfinder microrover, Rocky 3.2, are discussed. Results from a simulation are presented.
The Mars Pathfinder Project plans a December 1996 launch of a single spacecraft. After jettisoning a cruise stage, an entry body containing a lander and microrover will directly enter the Mars atmosphere and parachute to a hard landing near the sub-solar latitude of 15 degrees North in July 1997. Primary surface operations last for 30 days. Cost estimates for Pathfinder ground systems development and operations are not only lower in absolute dollars, but also are a lower percentage of total project costs than in past planetary missions. Operations teams will be smaller and fewer than typical flight projects. Operations scenarios have been developed early in the project and are being used to guide operations implementation and flight system design. Recovery of key engineering data from entry, descent, and landing is a top mission priority. These data will be recorded for playback after landing. Real-time tracking of a modified carrier signal through this phase can provide important insight into the spacecraft performance during entry, descent, and landing in the event recorded data is never recovered. Surface scenarios are dominated by microrover activity and lander imaging during 7 hours of the Mars day from 0700 to 1400 local solar time. Efficient uplink and downlink processes have been designed to command the lander and microrover each Mars day.