Search NASA⌕ Search

SEARCH · Search NASA

Results for “Mixed-integer linear optimization”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 37 records · Page 2

PDPTW-DB: MILP-Based Offline Route Planning for PDPTW with Driver Breaks

The Pickup and Delivery Problem with Time Windows (PDPTW) involves optimizing routes for vehicles to meet pickup and delivery requests within specific time constraints, a challenge commonly faced in logistics and transportation. Microtransit, a flexible and demand-responsive service using smaller vehicles within defined zones, can be effectively modeled as a PDPTW. Yet, the need for driver breaks—a key human constraint—is frequently overlooked in PDPTW solutions, despite being necessary for regulatory compliance. This study presents a novel mixed-integer linear programming formulation for the Pickup and Delivery Problem with Time Windows and Driver Breaks (PDPTW-DB). To the best of our knowledge this formulation is the first to consider mandatory periodic driver breaks within optimized Microtransit routes. The proposed model incorporates regulatory compliant break scheduling directly within the vehicle routing optimization framework. By considering driver break requirements as an integral component of the optimization process, rather than as a post-processing step, the model enables the generation of routes that respect hours of service regulations while minimizing operational costs. This integrated approach facilitates the generation of schedules that are operationally efficient and prioritize driver welfare through driver breaks. We work with a public transit agency from the southern USA, and highlight the specific nuances of driver break optimization, and present a Pickup and Delivery Problem with Time Windows formulation for optimizing Microtransit operations and scheduling driver breaks. We validate our approach using real-world data from the transit agency. Our results validate our formulation in producing cost-effective, and regulation-compliant solutions.

Applied Computing, Transportation↗

McCormick envelopes in mixed-integer PDE-constrained optimization

McCormick envelopes are a standard tool for deriving convex relaxations of optimization problems that involve polynomial terms. Such McCormick relaxations provide lower bounds, for example, in branch-and-bound procedures for mixed-integer nonlinear programs but have not gained much attention in PDE-constrained optimization so far. This lack of attention may be due to the distributed nature of such problems, which on the one hand leads to infinitely many linear constraints (generally state constraints that may be difficult to handle) in addition to the state equation for a pointwise formulation of the McCormick envelopes and renders bound-tightening procedures that successively improve the resulting convex relaxations computationally intractable. We analyze McCormick envelopes for a model problem class that is governed by a semilinear PDE involving a bilinearity and integrality constraints. We approximate the nonlinearity and in turn the McCormick envelopes by averaging the involved terms over the cells of a partition of the computational domain on which the PDE is defined. This yields convex relaxations that underestimate the original problem up to an a priori error estimate that depends on the mesh size of the discretization. These approximate McCormick relaxations can be improved by means of an optimization-based bound-tightening procedure. We show that their minimizers converge to minimizers to a limit problem with a pointwise formulation of the McCormick envelopes when driving the mesh size to zero. We provide a computational example, for which we certify all of our imposed assumptions. The results point to both the potential of the methodology and the gaps in the research that need to be closed. Our methodology provides a framework first for obtaining pointwise underestimators for nonconvexities and second for approximating them with finitely many linear inequalities in an infinite-dimensional setting.

Approximations and Expansions↗

Optimal Operation of Residential High Performance Water Heater for Reduction of Electricity Cost and Peak Demand Through Field Validation

Water heating accounts for about 18% of a typical US home’s energy use. Modern water heaters have enabled control options through APIs, offering customers the opportunity to reduce their energy cost and peak demand by dynamically adjusting settings. A water heater’s capacity to store energy using its storage tank makes it an asset for peak demand reduction and energy cost savings. For this reason, a mixed-integer linear programming model is proposed to minimize the energy cost of a high-performance water heater while also reducing the peak demand of the residential household under a time-of-use utility rate by dynamically changing the water heater’s running mode. Specifically, a multi-objective optimization model is formulated to determine the mode settings of the water heater considering hot water use, time-of-use rate, and peak demand limit of the residential household. The mode settings are associated with different dead bands of water temperature for triggering on/off action of the heat pump and heating element. A 66-gal hybrid electric high performance water heater was used for numerical simulation and practical experiments. The simulation results were well aligned with measurements of practical experiments, validating the soundness of the thermodynamic model. In addition, reductions of energy cost, enabling affordability, and reducing peak demand are demonstrated. The research team also developed a software framework with dashboards to automatically and continuously monitor and manage devices.

Liu, Guodong [ORNL] (ORCID:0000000213498608)↗

Mixed-Integer Linear Programming Formulation with Embedded Machine Learning Surrogates for the Design of Chemical Process Families

In previous work, we introduced process family design. The main idea is to design a platform of common elements, and, allowing us to capture additional cost savings, simultaneously design a family of processes, and reducing both engineering and deployment timelines. We formulate this as an optimization problem, specifically a nonlinear generalized disjunctive program (GDP). We have proposed two approaches for reformulating and solving this problem: one based on full-discretization of the design space and one that uses Machine Learning (ML) surrogates to replace the nonlinear process models. Using ML surrogates to predict required system costs and performance indicators allows us to reformulate the nonlinearities in the GDP generate an efficient MILP formulation. In this work, we apply the ML surrogate approach to two case studies. One case study involves designing a family of carbon capture systems to cover a set of different flue gas flow rates and inlet CO 2 concentrations, where we consider the absorber and stripper as common unit module types. The second case study focuses on a water-desalination process, where we design a family of these processes for a variety of salt concentrations and flow rates. In both of these case studies, we demonstrate a scalable optimization approach that enables the design of multiple processes simultaneously, reducing the time-to-market and overall costs by maximizing the cost savings due to both economies of scale and economies of numbers.

37 INORGANIC, ORGANIC, PHYSICAL, AND ANALYTICAL CH↗

A Vehicle-to-Grid planning framework incorporating electric vehicle user equilibrium and distribution network flexibility enhancement

The rapid surge in electric vehicle (EV) adoption, coupled with advancements in charging technologies, emphasizes the critical necessity for expanding EV recharging infrastructure. Simultaneously, the Distribution Network (DN) encounters escalating challenges in meeting charging demand during peak traffic periods. Consequently, there is a mounting demand for the deployment of innovative Vehicle-to-Grid (V2G) technologies to augment the DN’s flexibility in power dispatch and alleviate travel costs for EV users. Hence, this paper proposes an EV-user-equilibrium-(UE)-constrained V2G planning framework that enhances flexibility in the DN. The framework aims to ascertain the optimal placement and capacity of EV charging stations (EVCSs) and V2G charging piles within the Transportation Network (TN). It takes into account the equilibrium condition stemming from competitive EV charging and routing behaviors alongside the optimal expansion of DN energy resources to accommodate the electricity supplied by the V2G piles. This study commences by analyzing EV drivers’ travel decisions, considering the influence of charging and V2G pile locations and sizes. Subsequently, we tackle the Traffic Assignment Problem with User Equilibrium (TAP-UE) model to characterize the steady-state traffic flow distribution of EVs. Following this, we formulate the optimization model for the Coordinated Power and Transportation Network (CPTN), which encompasses the optimal expansion of DN facilities and traffic flow regulation under UE conditions. To mitigate the computational complexity associated with the V2G planning model, we introduce a series of linearization methods to obtain a manageable Mixed-Integer Linear Programming (MILP) solution. Finally, to validate the efficacy of our proposed planning framework, we apply it to two test systems, including a real-world case study. Through these case studies, we explore the necessity and potential benefits of V2G technologies.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Decomposing a renewable energy design and dispatch model

We address a mixed-integer linear programming model which selects a cost-minimizing set of available technologies with which to design a renewable energy system and prescribe their associated dispatch decisions. Realistically sized instances of such models pose computational challenges. To this end, we develop a Lagrangian heuristic based on a decomposition methodology which partitions the model into blocks and optimizes these more manageable, smaller subproblems. It also provides a lower bound to assess solution quality. In conclusion, we apply this methodology to the National Renewable Energy Laboratory's Renewable Energy Integration and Optimization (REopt TM ) model to generate near-optimal solutions to realistic instances containing, on average, approximately 300,000 variables and at least as many constraints, with a mean 30% optimality gap improvement using a five-minute solution time limit, compared to directly solving the original monolith.

97 MATHEMATICS AND COMPUTING↗

Heuristic solutions to the single depot electric vehicle scheduling problem with next day operability constraints

This study focuses on the single depot electric vehicle scheduling problem (SDEVSP) within the broader context of the vehicle scheduling problem (VSP). By developing an effective scheduling model using mixed-integer linear programming, we generate bus blocks that accommodate electric vehicles (EVs), ensuring successful completion of each block while considering recharging requirements between blocks and during off-hours. Next day operability constraints are also incorporated, allowing for seamless repetition of blocks on subsequent days. The SDEVSP is known to be computationally complex, deriving optimal solutions unattainable for large-scale problems within reasonable timeframes. To address this, we propose a two-step solution approach: first solving the single depot VSP, and then addressing the block chaining problem (BCP) using the blocks generated in the first step. The BCP focuses on optimizing block combinations to facilitate recharging between consecutive blocks, considering operational constraints. Further, a case study conducted reveals that nearly 100% electrification for Chicago, IL and Austin, TX transit buses is viable yet requires 1.6 EVs at 150-mile range per diesel vehicle.

33 ADVANCED PROPULSION SYSTEMS↗

Solving the Grid Optimization Competition Challenge 3 Problem

The Grid Optimization Competition Challenge 3 Problem posed a multiperiod security-constrained unit commitment problem with base-case AC power flow. The problem formulation includes binary unit commitment decisions, nonlinear AC power flow and balance, dispatchable loads, and linearized contingency real power flow, among other features. This talk will present a modified consensus ADMM algorithm, which splits the problem into mixed-integer linear and nonlinear components, as a heuristic solution method for this large-scale mixed integer nonlinear program. We will present some computational results from the competition for our implementation and reflect on the challenges of participating the grid optimization competition.

AC power flow↗

Multi-parametric analysis for mixed integer linear programming: An application to transmission upgrade and congestion management

Upgrading the capacity of existing transmission lines is essential for meeting the growing energy demands, facilitating the integration of renewable energy, and ensuring the security of the transmission system. This study focuses on the selection of lines whose capacities and by how much should be expanded from the perspective of the Independent System Operators (ISOs) to minimize the total system cost. We employ advanced multi-parametric programming and an enhanced branch-and-bound algorithm to address complex mixed-integer linear programming (MILP) problems, considering multi-period time constraints and physical limitations of generators and transmission lines. To characterize the various decisions in transmission expansion, we model the increased capacity of existing lines as parameters within a specified range. This study first relaxes the binary variables to continuous variables and applies the Lagrange method and Karush-Kuhn-Tucker (KKT) conditions to obtain optimal solutions and identify critical regions associated with active and inactive constraints. Moreover, we extend the traditional branch-and-bound (B&B) method by determining the problem’s upper and lower bounds at each node of the B&B decision tree, helping to manage computational challenges in large-scale MILP problems. Here, we compare the difference between the upper and lower bounds to obtain an approximate optimal solution within the decision-makers’ tolerable error range. In addition, the first derivative of the objective function on the parameters of each line is used to inform the selection of lines for easing congestion and maximizing social welfare. Finally, the capacity upgrades are selected by weighing the reductions in system costs against the expense of upgrading line capacities. The findings are supported by numerical simulations and provide transmission-line planners with decision-making guidance.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Cooperative Transmission Expansion Planning Experiment Data and Results

GO WEST is an open-source power grid modeling framework for U.S. Western Interconnection, which allows users to tailor the model depending on their research study and science questions. It covers 28 balancing authorities (BA) and 12 states in U.S. Western Interconnection. GO WEST allows users to select different number of nodes and come up with a simplified network by utilizing 10,000 nodal topology of U.S. Western Interconnection created by Texas A&M University. Users can try and select different number of nodes, mathematical formulations (linear programming vs. mixed-integer linear programming), transmission line limit scaling factors, and hurdle rate scaling factors. GO WEST offers a unit commitment and economic dispatch (UC/ED) module to simulate grid operations on an hourly scale. In this sense, users can calibrate and validate their model versions by comparing model outputs to historical datasets. TEP is an open-source transmission capacity expansion model, built on GO WEST framework. It utilizes linear programming to optimize transmission capacity addition investment on existing lines within GO WEST framework. In this sense, TEP model only increases the thermal capacity of existing transmission lines and does not add new lines to the system, which leaves the topology preserved. TEP minimizes the total cost of the system which comprises the operational cost of satisfying electricity demand (i.e., generation cost), cost of loss of load (i.e., unserved energy), cost of power flow, and cost of new transmission capacity additions (i.e., investment cost). In order to use TEP model, users need to create scenarios with GO WEST framework. In this analysis, outputs from several models are used to create future inputs to GO WEST and TEP models, including GCAM-USA, TELL, CERF and reV. This dataset includes experiment inputs and outputs from three different transmission expansion scenarios (cooperative, intermediate, and individual) for 2019 and 2059. For 2019, a base scenario to illustrate the default (i.e., historical) power grid operations is also included. This study utilizes rcp45hotter_ssp3 scenario from a previous version of GCAM-USA simulations. Sources of the shapefiles in supplementary data are HIFLD Open and U.S. Energy Atlas. Please see the README file for a detailed description of the main and supplementary data.

Capacity Expansion Model↗

IM3 Projected U.S. Western Interconnection Grid Stress Dataset

This dataset provides projected grid stress and reliability results (including all model inputs and outputs from GO WEST and TEP) for Integrated Multisector, Multiscale Modeling (IM3) Phase 2 simulations across eight different scenarios for the U.S. Western Interconnection through 2055. The scenarios include combinations of two Shared Socioeconomic Pathways (SSP3 and SSP5) with four high-resolution climate projections specific to the United States from a set of Thermodynamic Global Warming (TGW) simulations. These climate projections include "hotter" and "cooler" variants for two Representative Concentration Pathways (RCP4.5 and RCP8.5). The resulting eight simulations are: rcp45cooler_ssp3 rcp45cooler_ssp5 rcp45hotter_ssp3 rcp45hotter_ssp5 rcp85cooler_ssp3 rcp85cooler_ssp5 rcp85hotter_ssp3 rcp85hotter_ssp5 GO WEST is an open-source power grid modeling framework for the U.S. Western Interconnection, which allows users to tailor the model depending on their research study and science questions. It covers 28 balancing authorities (BAs) and 12 states in U.S. Western Interconnection. GO WEST allows users to select different number of nodes and come up with a simplified network by utilizing 10,000 nodal topology of the U.S. Western Interconnection (ACTIVSg10k). Users can select different number of nodes, mathematical formulations (linear programming vs. mixed-integer linear programming), transmission line limit scaling factors, and hurdle rate scaling factors. GO WEST offers a unit commitment and economic dispatch (UC/ED) module to simulate grid operations on an hourly scale. In this sense, users can calibrate and validate their model versions by comparing model outputs to historical datasets. TEP is an open-source transmission capacity expansion model, built on the GO WEST framework. It utilizes linear programming to optimize transmission capacity addition investment on existing lines within the GO WEST framework. The TEP model only increases the thermal capacity of existing transmission lines and does not add new lines to the system, which leaves the topology preserved. In order to use TEP model, users need to create scenarios with the GO WEST framework. Please refer to README file for a detailed description of the dataset including individual files and references.

Capacity Expansion Model↗

Optimal Economic Dispatch and Load-Following Strategies for Nuclear Integrated Energy Systems

The need for distributed and adaptable energy resources that can handle the growing unpredictability in both supply and demand is rising as the power system continues to modernize. In order to satisfy those needs and maintain grid resilience, nuclear power plants can dynamically control their output, despite typically being used as baseload generators. By incorporating energy storage and renewable energy sources, nuclear integrated energy systems are designed to satisfy the electrical and thermal demands of different end-user applications while ensuring flexible power operation. These systems generate revenue by participating in both wholesale and ancillary services electricity markets, as well as commodity markets for various byproducts generated from coupled industrial processes. This study addresses the economic dispatch efficiency of a tightly coupled nuclear integrated energy system comprising a gigawatt-scale light water reactor, commercialized in the U.S., a high-temperature steam electrolysis unit, a district heating network, and specified electrical loads. To demonstrate the nuclear power plant’s flexibility within the day-ahead unit commitment and economic dispatch framework, while maintaining equilibrium even during periods of refueling outages, this paper develops a mixed-integer linear programming framework that models the subsystems and components of its nuclear steam supply system. A systematic comparative analysis of flexible versus baseload nuclear power plant operation under varying levels of renewable energy integration indicates that flexible operation enhances system profitability by more than 18% while also increasing energy storage utilization, improving reactor responsiveness to load fluctuations, and allowing for greater participation across numerous electricity markets.

29 ENERGY PLANNING, POLICY, AND ECONOMY↗

Near-Optimal Solutions for Day-Ahead Unit Commitment

Given the difficulty and the time pressure of solving unit commitment problems, near -optimal solutions (those with 0.1 or 0.001% optimality gaps) are often used in practice. The choice in which of the near -optimal solutions is used, however, is random. We investigate the impact of solution choice on the revenues obtained by generator owners across a variety of pricing schemes and problem instances.

market-clearing↗

Assessing the Reliability Benefits of Energy Storage as a Transmission Asset

Utilizing energy storage solutions to reduce the need for traditional transmission investments has been recognized by system planners and supported by federal policies in recent years. This work demonstrates the need for detailed reliability assessment for quantitative comparison of the reliability benefits of energy storage and traditional transmission investments. First, a mixed-integer linear programming expansion planning model considering candidate transmission lines and storage technologies is solved to find the least-cost investment decisions. Next, operations under the resulting system configuration are simulated in a probabilistic reliability assessment which accounts for weather-dependent forced outages. The outcome of this work, when applied to TPPs, is to further equalize the consideration of energy storage compared to traditional transmission assets by capturing the value of storage for system reliability.

co-optimization↗

Extreme-scale EV charging infrastructure planning for last-mile delivery using high-performance parallel computing

Here, this paper addresses stochastic charger location and allocation problems under queue congestion for last-mile delivery using electric vehicles (EVs). The objective is to decide where to open charging stations and how many chargers of each type to install, subject to budgetary and waiting-time constraints. We formulate the problem as a mixed-integer non-linear program, where each station-charger pair is modeled as a multiserver queue with stochastic arrivals and service times to capture the notion of waiting in fleet operations. The model is extremely large, with billions of variables and constraints for a typical metropolitan area; even loading the model in solver memory is difficult, let alone solving it. To address this challenge, we develop a Lagrangian-based dual decomposition framework that decomposes the problem by station and leverages parallelization on high-performance computing systems, where the subproblems are solved by using a cutting plane method and their solutions are collected at the master level. We also develop a three-step rounding heuristic to transform the fractional subproblem solutions into feasible integral solutions. Computational experiments on data from the Chicago metropolitan area with hundreds of thousands of households and thousands of candidate stations show that our approach produces high-quality solutions in cases where existing exact methods cannot even load the model in memory. We also analyze various policy scenarios, demonstrating that combining existing depots with newly built stations under multiagency collaboration substantially reduces costs and congestion. These findings offer a scalable and efficient framework for developing sustainable large-scale EV charging networks.

Capacity allocation↗

A Decomposition-Based Learn-To-Optimize Approach with Feasibility Layer Assistance for Sub-Hourly Unit Commitment

Sub-hourly unit commitment (UC) with 15-min intervals is gaining significant attention as a way to respond rapidly to the fluctuations in electricity supply and demand introduced by renewable resources. However, the increased temporal resolution and complex inter-temporal dependencies pose substantial computational challenges for traditional optimization methods. To this end, this paper explores a decomposition-based learn-to-optimize approach. Building on recent advances in machine learning, our method revisits the long- overlooked Lagrangian relaxation framework, which is a classical decomposition technique that enables tractable subproblem solving. These smaller subproblems are inherently well-suited for machine learning, as their reduced dimensionality and structural regularity allow predictive models to efficiently learn and generalize solution patterns. We thus propose a generic predictive model, which embeds Gated Recurrent Units (GRUs) and Attention in the encoder-decoder structure, and integrate a rule-based feasibility layer to capture temporal dependencies, reduce training effort, and improve feasibility w.r.t. unit-level constraints. Our method has been validated on the IEEE 118-bus system, demonstrating promising performance in solving sub-hourly UC problems efficiently and feasibly.

97 MATHEMATICS AND COMPUTING↗

Relaxations of the steady optimal gas flow problem for a non-Ideal gas

Natural gas ranks second in U.S. primary energy consumption. Because most production sites are remote, gas must be transported through pipeline networks equipped with compressors, valves, and other components. For both economic efficiency and system reliability, it is desirable to operate these networks optimally. The governing physics across pipeline components entails nonlinear, non-convex equality and inequality constraints, and the most general steady-flow operations problem is a Mixed-Integer Nonlinear Program (MINLP).This work focuses on one such steady-flow problem-the Optimal Gas Flow (OGF) for a natural gas pipeline network-which minimizes production cost subject to the steady-flow physics. For day-to-day operations, the ability to quickly compute a globally optimal solution and a strong lower bound for varying demand profiles is crucial. A promising strategy is to build tight relaxations of the OGF’s nonlinear constraints. However, many nonlinearities arising from non-ideal equations of state either lack relaxations or have relaxations that do not scale to realistic network sizes. We address this gap by combining recent advances in polyhedral relaxations for univariate functions to construct tight, computationally efficient relaxations of the OGF with a non-ideal equation of state. These relaxations solve within seconds on a standard laptop. In conclusion, we demonstrate their quality through extensive numerical experiments on very large-scale test networks from the literature and find that the proposed approach proves optimality in 92% of tested instances.

03 NATURAL GAS↗