Search NASA⌕ Search

SEARCH · Search NASA

Results for “Multipaction”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 37 records · Page 2

COMMISSIONING RESULTS OF THIRD C75 CRYOMODULE FOR CEBAF

The program to upgrade CEBAF cryomodules has been implemented to enhance the energy gain of refur-bished cryomodules up to 75 MeV. This strategy in-volves reusing the waveguide end-groups from original CEBAF cavities produced in the 1990s, and existing five elliptical cell cavities are replaced with a new optimized cell shape cavity constructed from large-grain, ingot Nb material. Following fabrication, each cavity undergoes centrifugal barrel polishing and electropolishing and is tested at 2.07 K. Eight cavities are then assembled into "cavity pairs" and tested at 2.07 K before integration into the cryomodule. This paper pre-sents the outcomes of the cavity qualification for the third C75 module, providing a detailed account of the assessment in both a vertical cryostat and the acceptance test results of the cryomodule. Furthermore, efforts have been made to address performance limitations arising from field emission and multipacting

Senevirathne, I.↗

DEVELOPMENT OF PLASMA SIMULATION TOOL FOR THE ACCEL-ERATING CAVITIES

Plasma processing of superconducting radio frequency (SRF) cavities has shown an improvement in accelerating gradient by reducing the radiation due to field emission and multipacting. Plasma processing is a common tech-nique where the free oxygen produced by the plasma breaks down and removes hydrocarbons from surfaces. This increases the work function and reduces the second-ary emission coefficient. The hydrocarbon fragments of H2, CO, CO2, and H2O are removed from the system with the process gas which is flowing through the system. Here, we present COMSOL for the first time to simulate the plasma processing of an SRF cavity. In this work, we use Jefferson Lab's C75 SRF cavities design as our case study. Using simulation, we predict the condition of plasma ignition inside the SRF cavity. The simulation provides information about the optimal rf coupling to the cavity, mode for plasma ignition, choice of gas concen-tration, power, and pressure.

Senevirathne, I.↗

Cavity Production and Testing of the First C75 Cryomodule for CEBAF

The CEBAF cryomodule rework program was updated over the last few years to increase the energy gain of refurbished cryomodules to 75 MeV. The concept recycles the waveguide end-groups from original CEBAF cavities fabricated in the 1990s and replaces the five elliptical cells in each with a new optimized cell shape fabricated from large-grain, ingot Nb material. Eight cavities were fabricated at Research Instruments, Germany, and two cavities were built at Jefferson Lab. Each cavity was processed by electropolishing and tested at 2.07 K. The best eight cavities were assembled into ’cavity pairs’ and re-tested at 2.07 K, before assembly into the cryomodule. All but one cavity in the cryomodule were within 10% of the target accelerating gradient of 19 MV/m with a quality factor of 8·10⁹. The performance limitations were field emission and multipacting.

Ciovati, G.↗

LCLS-II-HE Vertical Acceptance Testing Plans

LCLS-II-HE has performance requirements similar to but generally more demanding than those of LCLS-II, with an operating gradient of 21 MV/m (up from 16 MV/m in LCLS-II) and tighter restrictions on field emission and multipacting. In this paper, we outline the requirements for the 1.3 GHz cavities and the plans for qualification of these cavities by vertical test. We discuss lessons learned from LCLS-II and highlight the changes implemented in the vertical test procedure for the new project.

43 PARTICLE ACCELERATORS↗

Simulation of the dynamics of gas mixtures during plasma processing in the C75 Cavity

Plasma processing using a mixture of noble gas and oxygen is a technique that is currently being used to reduce field emission and multipacting in accelerating cavities. Plasma is created inside the cavity when the gas mixture is exposed to an electromagnetic field that is generated by applying RF power through the fundamental power or higher-order mode couplers. Oxygen ions and atomic oxygen are created in the plasma which breaks down the hydrocarbons on the surface of the cavity and the residuals from this process are removed as part of the process gas flow. Removal of hydrocarbons from the surface increases the work function and reduces the secondary emission coefficient. This work describes the initial results of plasma simulation, which provides insight into the ignition process, distribution of different species, and interactions of free oxygen and oxygen ions with the cavity surfaces. The simulations have been done with an Ar/?2 plasma using COMSOL® multiphysics. These simulations help in understanding the dynamics and control of plasma inside the cavity and the exploration of different gas mixtures.

Dhakal, Pashupati↗

Prevention of Dual-Mode Excitation in 9-Cell Cavities for LCLSII-HE

Dual-Mode Excitation, also referred to as mode-mixing, is a superposition of two fundamental pi modes in an SRF cavity. In 9-cell TESLA cavities used for the LCLSII-HE project, the two modes that are commonly excited are the pi mode (1300.2 MHz), and the 7/9 pi mode (1297.8 MHz). During vertical cavity qualification testing, only the pi mode is driven by the RF system. However, at high gradients, emitted power at the frequency of the 7/9 pi mode grows despite the RF system only powering the pi mode. When this happens, the RF power measurement system is unable to differentiate between the superimposed modes, and any data taken is invalid. The previous method of dealing with mode-mixing was to turn off power to the cavity, let both modes decay fully, then restore power. Because of the time-sensitive nature of this testing, this leads to underestimates of Q0 or any radiant field emission present in the cavity. The novel RF control solution prevents the 7/9 pi mode from being excited while not interfering with measurements of the fundamental pi mode. A second RF control system is connected to the cavity which drives the 7/9 pi mode. The loop phase for driving the 7/9 pi mode in self excited loop mode is determined then shifted by 180 degrees, thus providing a negative feedback to the undesired mode. Because this off-resonance power can be very small, on the order of milliwatts, it does not interfere with the high-power measurements of the fundamental pi mode. At Jefferson Lab, we are now able to test a cavity for the LCLSII-HE project with no problems from mode-mixing, which allows for CW processing of high-gradient multipacting and field emission.

Owen, Peter↗

Multipactor in Coaxial Line Induced by DC Bias

High DC voltage applied between outer and inner electrodes of coaxial transmission lines is considered and actually is an effective remedy against multipactor in these lines. However, the high voltage bias being below certain level itself initiates multipacting. In this technical note the experimental manifestation and numerical simulations of the phenomenon are presented.

43 PARTICLE ACCELERATORS↗

Cavity Production and Testing of the First C75 Cryomodule for CEBAF

The CEBAF cryomodule rework program was updated over the last few years to increase the energy gain of refurbished cryomodules to 75 MeV. The concept recycles the waveguide end-groups from original CEBAF cavities fabricated in the 1990s and replaces the five elliptical cells in each with a new optimized cell shape fabricated from large-grain, ingot Nb material. Eight cavities were fabricated at Research Instruments, Germany, and two cavities were built at Jefferson Lab. Each cavity was processed by electropolishing and tested at 2.07 K. The best eight cavities were assembled into ’cavity pairs’ and re-tested at 2.07 K, before assembly into the cryomodule. All but one cavity in the cryomodule were within 10% of the target accelerating gradient of 19 MV/m with a quality factor of 8·10⁹. The performance limitations were field emission and multipacting.

Ciovati, G.↗

Low RF loss conductive ceramic for high power input coupler windows for SRF cavities

High power RF couplers connect transmission lines to cavities, providing power used to accelerate particle beam • Coupler also provides vacuum barrier for beam vacuum via RF windows • RF windows experience breakdown at much lower voltages than comparable insulators in DC fields • For large voltages, electron emission from “triple junction” and multipacting lead to window failure due to arching and/or thermal runaway.

43 PARTICLE ACCELERATORS↗

591 MHz SRF Cavity Design for the EIC ESR

The Electron-Ion Collider (EIC) is a next generation particle accelerator to be built at Brookhaven National Laboratory, in partnership with Thomas Jefferson National Accelerator Facility. The Electron Storage Ring (ESR) of RIC requires a 10 MW RF storage system to restore beam power lost by a 2.5 A electron beam. The RF system will use 18 single-cell 591 MHz Superconducting RF (SRF) cavities. Effective damping of higher-order-modes (HOMs) is critical to ensure beam stability. This paper presents the design of the single-cell 591 MHz cavity, including cavity geometry optimization, multipacting evaluation, and HOM damping analysis.

43 PARTICLE ACCELERATORS↗

Spacecraft radio

Spacecraft radio studies on multipacting between coaxial electrodes, S-band ranging, radar beam guidance, and rectangular cup radiator for high impact antenna

RADIO EQUIPMENT↗

Planning for large construction projects in space

The paper discusses briefly some broad plans for developing the technology needed for large construction projects in space ranging from orbiting solar power stations to large communications antennas. Space construction classes include assembly of modules, deployment of compacted structures, assembly of passive preformed pieces, and fabrication of structures from sheet stock. Technological areas related to structural concepts include (1) analyses for prediction of structural behavior, structural/control interaction, electromagnetic and control performance, and integrated design development; (2) electronics for signal conditioning and data acquisition, power distribution, and signal channel interference and multipaction; (3) concepts for shape control, attitude/pointing control, and orbital transfer and station keeping; and (4) materials and techniques for 30-year dimensional stable composites, thermal control, thin-lightweight structural alloys, and material joining in space. The concept of a power module for the construction operations is discussed along with a concept for a habitability module.

Disher, J. H.↗

Preliminary Cryogenic Cold Test Results of the First 9-Cell LSF Shape Cavity

Following successful prototyping and testing of single- & 5-cell LSF shape cavities *, **, the first 9-cell LSF shape cavity LSF9-1 was successfully constructed using an innovative process at JLab with the in-house facilities. The cavity was then shipped to KEK for post-fabrication mechanical adjustment and ILC TDR style treatment and surface processing. Cold testing was carried out at the JLab VTA facility, instrumented with a suite of Kyoto instruments. Favorable values for the bath pressure detuning sensitivity and Lorentz force detuning coefficient were experimentally measured, validating the design improvement in cell stiffeners. Pass-band measurements indicate 4 out of 9 cells reaching gradient capability of > 45 MV/m, including 2 cells reaching 51 MV/m. Cornell OST detectors identified the cell and location responsible for the current hard quench limit. Multipacting-like barriers observed in end cells are investigated both analytically and numerically. The cavity was shipped to FNAL and received a light EP at the joint ANL/FNAL facility for further cold testing at Jlab. Two new 9-cell LSF cavities are being constructed including one made of large-grain niobium material.

Geng, Rong-Li↗

Design Enhancements for the SNS RFQ Coaxial Coupler

The H⁻ ion linear accelerator at the Spallation Neutron Source (SNS) at Oak Ridge National Laboratory operates with reliability that routinely surpasses 90% during scheduled beam operation. With the ambitious goal of eventually achieving at least 95% availability, several upgrade and improvement projects are ongoing. One such project is the modification of the coaxial couplers that transfer radio frequency (RF) power to the accelerator’s Radio Frequency Quadrupole (RFQ). The proposed modification utilizes stub sections and capacitive coupling to construct a physically separable assembly with DC isolation. With a separated coupler assembly, the section that includes the magnetic coupling loop can be permanently mounted to the RFQ which would eliminate the need to re-adjust the couplers after maintenance activities, upgrades, and repairs. Additionally, the modified design would provide increased multipaction suppression with DC biasing and potentially lower thermal gradients across the device. This paper presents the design and simulation results of the project.

Toby, George↗

Logistic function as a characteristic of multipactor development

Simulations of multipacting with or without space charge effect bring out a different behavior of particle number growth, namely, the exponential growth of particle number in the simulations without space charge effect and the saturation of particle number (or collision and emission currents) when space charge is considered. That creates a certain confusion in evaluation and comparison of overall danger of multipactor between the approaches. On the other hand, both growth rate and total multipactor current loading at saturation are important for multipactor barriers evaluation. It was noticed and then verified that the logistic function, widely used in chemistry, biology, and ecosystem study, reproduces the particle number growth curves remarkably well. The function contains the parameters, which can be interpreted as particle number growth rate and multipactor current saturation level, so both become correlated and obtained simultaneously in one run. In this work it is shown how the logistic function can be used for characterization of the multipactor barriers and how it can be used for possible reduction of simulation time in the simulations with space charge effect.

Romanov, Gennady↗

Cryogenic RF characterization of the MAGO cavity for high-frequency gravitational-wave detection

Superconducting radio-frequency (SRF) cavities are promising resonant sensors for gravitational-wave detection in the kHz-MHz frequency range. We report the cryogenic RF characterization of a prototype superconducting niobium cavity with an unconventional geometry designed for narrow electromagnetic mode separation. Following an adapted surface preparation procedure, cryogenic tests were performed at Fermilab and DESY at temperatures down to 2 K. Mechanical tuning at room temperature achieved a mode splitting of approximately 11 kHz at cryogenic temperature. High electromagnetic quality factors consistent with previous prototype cavities were measured. The measurements further revealed phase transfer characteristics relevant for stable low-level RF control as well as indications of mode coupling potentially caused by one-point multipacting. In addition, first cryogenic measurements of the mechanical eigenmodes yielded mechanical quality factors significantly below commonly assumed theoretical values. These results demonstrate the successful application of established SRF preparation and characterization techniques to a non-standard resonator geometry and provide important experimental input for the development of future SRF-based gravitational-wave detectors.

Dokuyucu, Can [DESY]↗

Certification testing of production superconducting quarter-wave and half-wave resonators for $\mathrm{FRIB}$

We report the Facility for Rare Isotope Beams (FRIB) is designed to accelerate ion beams to 200 MeV per nucleon with 46 superconducting radio-frequency cryomodules. The FRIB driver linac uses quarter-wave resonators and half-wave resonators; with a total of 324 resonators, the linac is currently the largest heavy ion accelerator in the world. Production of jacketed resonators began in January 2014 and was completed in December 2019. Dewar certification testing of all the cavities was done before they were installed into cryomodules. The experience and lessons from more than 5 years of FRIB resonator production and certification testing are analyzed and summarized in this paper.

46 INSTRUMENTATION RELATED TO NUCLEAR SCIENCE AND ↗