Search NASA⌕ Search

SEARCH · Search NASA

Results for “NUCLEAR POWER”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 37 records · Page 2

Addressing Function Allocation for the Digital Transformation of Existing Nuclear Power Plants

The existing nuclear power plants in the United States (U.S.) have a vital role in providing carbon-free electricity. For the existing nuclear power plant fleet to remain economically viable, a significant digital transformation that fundamentally changes the way in which these plants are operated, maintained, and supported ought to be seriously considered. Safe and reliable automation is needed. This work describes important considerations and challenges that come with function allocation for the adoption of new automation at existing nuclear power plants. Specifically, this work reviews the state-of-the-art in function allocation guidance and highlights how it can be used within the U.S. nuclear industry. An objective of this work is to present the current challenges and proposed approaches to the human factors community to support future research and development that ultimately supports the effective use of function allocation in the digital transformation of existing nuclear power plants.

99 GENERAL AND MISCELLANEOUS↗

United States Nuclear Power Reactor Used Nuclear Fuel Database and Applications

The Unified Database (UDB) within STANDARDS serves as the foundational data infrastructure for managing the United States' spent nuclear fuel inventory of 315,111 discharged assemblies totaling 91,036 metric tons of heavy metal. The database organizes this complex inventory through over 200 interconnected tables structured into eight primary attribute categories, supporting integrated analyses across storage, transportation, and disposal domains. Data enters the UDB through the GC-859 Nuclear Fuel Data Survey, which transitioned to web-based collection in 2023, improving data quality through real-time validation. The UDB enables automated generation of input files for nuclear safety analyses, reducing preparation time from weeks to hours while maintaining traceability. Applications include national inventory reporting, Certificate of Compliance assessments, and facility optimization. The three-tier distribution model balances accessibility with security requirements for federal agencies, national laboratories, and research organizations. The UDB provides essential data infrastructure as spent fuel management transitions from site-specific to integrated national campaigns.

Stefanovic, Peter↗

The Floating Chameleon: Floating Nuclear Power Plants and the Nexus of Maritime and Nuclear Security Law

During the 63rd regular session of the International Atomic Energy Agency (IAEA) General Conference, as part of Norway's statement to the General Conference, Mr. Auden Halvorsen, State Secretary for Norway, made the following statement about transportable nuclear power plants (TNPPs): "Deployment of transportable nuclear power plants—TNPPs—demands our attention. The Agency must intensify its conversations of all aspects of the safety and security of such facilities. . . . The scope and applicability of existing requirements and instruments need to be clarified and developed including dialogue with the International Maritime Organization [IMO]." Ensuring the security of TNPPs is essential for their deployment and implementation. TNPPs may be floating nuclear power plants (FNPPs), which bring together elements of nuclear security related to the nuclear power plant with elements of maritime security. Insofar as an FNPP weds the principles of nuclear and maritime security, it also weds the two domains, the ancient traditions and contemporary practices of maritime law with the contemporary practices of nuclear law. Fundamentally, this raises the question, what are the legal requirements for the security of a FNPP? Although both maritime law and nuclear law have established regimes for security through various legal instruments, does an FNPP expose gaps between the current international legal instruments? The previous question of whether international legal regimes define requirements for the security of FNPPs, but a threshold question remains: what is an FNPP? For purposes of nuclear and maritime security, is an FNPP a facility, is an FNPP a vessel and therefore a transport, or does an FNPP change its status based upon temporal and spatial considerations such as when it is docked at a port generating power or in transit to its destination? This set of questions, and others addressed later in this article, highlights that the issue is not merely a question about security but intersects elements of safety whether an FNPP is in uncharted waters of the international regime for both nuclear and maritime law. Here, this paper addresses many of the questions posed above related to the security regulations for an FNPP.

98 NUCLEAR DISARMAMENT, SAFEGUARDS, AND PHYSICAL P↗

Experiences with Mobile Units for Liquid RAW Management in Slovak and Czech Nuclear Power Plants - 20089

In Nuclear Power Plants VVER 440, Russian type of reactor there was designed auxiliary building where according to basic design all operational liquid radioactive waste (RAW) should be stored in large capacity tanks during the whole operational period. That's why there are in the auxiliary building several types of large storage tanks with different internal volume from 110 m{sup 3}, 460 m{sup 3} to 550 m{sup 3}. Storage tanks are usually situated in rooms with limited access and minimal handling space. Operational waste was here transported by the system of pipes from the reactor building. There is possibility to handle with the waste and set the pipeline in to the chosen storage tanks. Nobody takes care about the quality of waste in the storage tanks and waste waits for the period of decommissioning when it should be treated. The storage capacity was designed for the whole lifetime of nuclear power plant. Currently the life time of Nuclear Power Plant's (NPP) is extended and there is necessity to retrieve and treat the RAW in advance. Another reason why the stakeholder, who operates the NPPs, decides to treat the operational RAW during the operational period of NPP, is that there are still new requirements from safety point of view which need to have free available space for example because of potential accident. So treating the operational RAW during the life time of NPP is present issue. Because in basic design nobody cares how the RAW will be retrieved and treated in the future, there is usually no technology for that in existing NPP. Some of the NPPs build an additional building with suitable technologies for treatment or hire the company which offer mobile technology for retrieving the waste from the storage tanks. Wood Nuclear Slovakia PLC provides all activities within liquid RAW management projects by its own staff including management, design, construction and deployment of equipment, engineering support, as well as all RAW retrieval and solidification activities. We offer RAW management as a service without any significant changes in existing NPP's buildings and technology. It is always a technical challenge to conduct successful retrieval, pumping and treatment of RAW. The complex RAW retrieval system can be designed as tailored solution for any RAW storage according to known boundary conditions and specific needs. These systems are based on years of experience with RAW manipulation, processing and treatment and the whole RAW management knowledge by Wood Nuclear Slovakia LTD. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Coupling of CTF and RELAP5-3D Within an Enhanced Fidelity Nuclear Power Plant Simulator

A robust and accurate multiphysics engineering simulator is being developed to model the core behavior and system response of pressurized water reactors. This simulator relies on the NESTLE and CTF computer codes to model the neutronics and thermal hydraulics (TH), respectively, inside the core on a nodal scale and on the Reactor Excursion and Leak Analysis Program—Three Dimensional (RELAP5-3D) to model the entire nuclear steam supply system. The RELAP5-3D model includes highly detailed nodalization and multidimensional flow modeling throughout the vessel. Previously, pin-resolved data generated via the Virtual Environment for Reactor Analysis core simulator were used to improve the accuracy of the NESTLE core predictions. The engineering simulator being developed as part of this work uses the 3KEYMASTER platform to couple the enhanced NESTLE model to a nodal-fidelity CTF model to balance run time with accuracy; NESTLE provides node-dependent powers to CTF, and CTF provides node-dependent coolant densities and fuel temperatures to NESTLE.An overlapping domain approach is used for the core TH in which RELAP5-3D provides core boundary conditions based on the system response and CTF provides a node-dependent coolant heating rate to the RELAP5-3D core solution. In the preliminary TH demonstration discussed in this paper, CTF and RELAP5-3D provided similar steady-state core predictions, indicating the hydraulic compatibility between the codes, as well as reasonable and expected behavior under hypothetical transient conditions. This provides an initial step in ongoing efforts toward a robust, multiscale TH/neutronics engineering simulator capability.

21 SPECIFIC NUCLEAR REACTORS AND ASSOCIATED PLANTS↗

Direct Air Capture (DAC) With Nuclear Power Sources

The presentation summarizes a recently published report, along with ANL and INL, on utilizing waste heat and power from nuclear power plants (NPP) for direct air capture (DAC) applications. Two DAC technologies are considered – solid sorbent (S-DAC) and liquid solvent (L-DAC). S-DAC uses both heat and power from NPPs, while L-DAC uses only power. The results show that using NPPs for DAC applications results in an economic benefit compared to using fossil fired power plants

Mantripragada, Hari↗

Nuclear Power Plant Infrastructure Evaluations for Removal of Spent Nuclear Fuel

This report provides evaluations of the NPP site infrastructure and near-site transportation infrastructure for removing SNF from 19 NPP sites and the Morris Independent Spent Fuel Storage Installation (ISFSI). The material to be removed from the NPP sites includes both the SNF and the greater-than-Class C low-level radioactive waste (GTCC waste)3 that is stored, or will be stored, at the sites. This report is an update of the report Nuclear Power Plant Infrastructure Evaluations for Removal of Spent Nuclear Fuel (Maheras et al. 2021) and includes expansion of the site evaluations to include operating nuclear power plant (NPP) sites and to incorporate updated site inventory data. Figures that include the number of spent nuclear fuel (SNF) assemblies and metric tons heavy metal (MTHM) in a single figure have also been added to the report.

11 NUCLEAR FUEL CYCLE AND FUEL MATERIALS↗

Demonstrating the Value of 3D Models to Support Large-Scale Digital Modifications at Nuclear Power Plants

Many Nuclear Power Plants are currently in the process of extending their operating licenses for continued generation. The use of three-dimensional (3D) modeling in the early stages of large scale NPP modernization efforts is one lower cost method that can verify proposed design changes against established guidelines and allows for visual presentation of the 3D model to various stakeholders in the project. Guidance from Nuclear Regulatory Commission NUREG 0711 and 0700, and other sources on performing HF/E for control rooms and design modifications can be visually represented in 3D models. Distance and measurements, workstation design, anthropometric considerations, and early feedback of modifications are used in 3D models to identify potential human issues early in the design process. 3D modeling is a useful tool for early design and help to reduce costs and present visuals to stakeholders early in the design.

3D Models↗

Developing an AI-Powered Zero-Trust Cybersecurity Framework for Malware Prevention in Nuclear Power Plants

This study presents the development of an AI-powered Zero-Trust cybersecurity framework for malware prevention in nuclear power plants. The framework aims to enhance the security of critical systems within nuclear power plants by adopting the principles of Zero-Trust and leveraging artificial intelligence (AI) technologies. By assuming no implicit trust in any user or device and continuously authenticating and authorizing access, the framework ensures a robust defense against malware attacks. The integration of AI allows for the detection and prevention of malware through behavioral analytics, endpoint protection, network segmentation, and continuous monitoring. The paper discusses the key considerations, steps, and technologies involved in developing this framework, emphasizing the importance of regular updates, training, compliance, and auditing. The proposed framework serves as a comprehensive approach to safeguarding nuclear power plants from sophisticated malware threats and protecting the integrity and safety of critical infrastructure.

21 SPECIFIC NUCLEAR REACTORS AND ASSOCIATED PLANTS↗

A mechanistic model of a PWR-based nuclear power plant in response to external hazard-induced station blackout accidents

Natural hazard-induced nuclear accidents, such as the Fukushima Daiichi Accident that occurred in Japan in 2011, have significantly increased reactor safety studies in understanding nuclear power plant (NPP) responses to external hazard events such as earthquakes and floods. Natural hazards could cause the loss of offsite power in nuclear power plants, potentially leading to a Station Blackout (SBO) accident that significantly contributes to the overall risk of nuclear power plant accidents. Despite the fact that extensive research has been conducted on the station blackout accident for nuclear power plant, further understanding of these events is needed, particularly in the context of the dynamic nature of external hazards such as external flooding. This paper estimates the progression of station blackout events for a generic pressurized water reactor (PWR) in response to external flooding events. The original RELAP5-3D model of the Westinghouse four-loop design pressurized water reactor was adopted and modified to simulate the external flood-induced station blackout accident, including the short-term and long-term station blackout scenarios. A sensitivity analysis of long-term station blackout, examining reactor operation times and analyzing key parameters over time, was also conducted in this work. The results of the analyses, especially the critical timing parameters of key event sequences, provide useful insights about the time during the external flooding event, which is important for plant operators to make timely decisions to prevent potential core damage. This paper represents significant progress toward developing an integrated risk assessment framework for further identifying and assessing the effects of the critical sources of uncertainties of nuclear power plant under external hazard-induced events.

Liu, Tao↗

A Prospective Design Method for Nuclear Power: The Evaluation, Requirements, and Goals Outline for Nuclear (ERGON) Method

Human factors researchers at Idaho National Laboratory (INL) have worked on projects spanning control room modernization, operator support systems, visualization design, and novel system creation. These projects demonstrated the need for an explicit design method for nuclear power. Human factors teams found a high standard in the Human Factors Engineering Program Review Model (NUREG-0711) and needed a design methodology which could be successful in gaining approval. Previous work has been synthesized as the Evaluation, Requirements, and Goals Outline for Nuclear (ERGON) method here. Design tasks are broken into four phases: Context and Orientation, Human Factors Review, Prototyping and Evaluation, Iteration and Improvement. ERGON is intended as a flexible and direct design method for many applications in nuclear power. ERGON has been vetted through collaborative research and development with nuclear utilities and as such, the ERGON method can assist utilities to achieve approval from a NUREG-0711 summative evaluation for HSI implementations.

42 ENGINEERING↗

A full-scope, high-fidelity simulator-based hardware-in-the-loop testbed for comprehensive nuclear power plant cybersecurity research

Nuclear power plant (NPP) cybersecurity research often relies on hardware-in-the-loop (HIL) testbeds that integrate real hardware components into simulated environments. These testbeds allow researchers to identify vulnerabilities, evaluate attack impacts, and test security measures in a controlled setting. Furthermore, previous HIL testbeds lacked fidelity to accurately represent real nuclear systems, limiting the scope of cybersecurity analysis. This study presents the creation of a HIL testbed, devised upon a full-scope, high-fidelity NPP simulator, to facilitate realistic and comprehensive cybersecurity research. To demonstrate its capabilities, the control logic for the steam generator water level was migrated from the simulator to an external programmable logic controller. As a practical application of the developed testbed, supply chain attack scenarios were simulated by injecting malicious code into the controller logic, and the effects of manipulating sensor inputs and control commands were observed. While this HIL testbed provides more detailed simulations, enhanced realism, and wider applicability compared to other options utilizing a less complex simulator, it is also more intricate and costly. For this reason, we include a detailed comparison with some alternative architectures to aid fellow researchers and practitioners in the selection of a suitable HIL architecture based on specific research objectives.

47 OTHER INSTRUMENTATION↗

Research to Develop Flood Barrier Testing Strategies for Nuclear Power Plants

The U.S. Nuclear Regulatory Commission has developed regulations regarding the siting and design of nuclear power plants (NPPs) that are aimed at addressing various natural hazards, including flooding. Flood barriers are designed to prevent water from entering NPP areas containing structures, systems, and components (SSCs) important to safety. The barriers are used at NPPs along with drains, sumps, pumps, valves, plugs, and site grading as part of the plant flood protection features that protect SSCs from experiencing external or internal flooding and mitigate the effects of flooding on NPP operations. The performance of flood protection features, including flood barriers at NPPs, has been an ongoing concern. Domestic and international operational experience provides clear indications that flood barrier performance has significant safety implications, especially for aging NPPs. The observed deficiencies show that flood barriers should be designed and installed properly, then adequately tested, inspected, and maintained in order to ensure that they perform their intended functions during flooding events. Here, this paper reviews available information related to flood barriers employed at U.S. NPPs and provides an overview and categorization of NPP flood barriers. It identifies potential domestic and international flood barrier testing facilities, including operating and decommissioned U.S. NPPs. Finally, this paper presents the technical and logistical considerations that should be made when developing specific testing strategies and protocols for flood barriers, such as the selection of flood barriers, test locations, testing approach, performance criteria, and testing parameters.

21 SPECIFIC NUCLEAR REACTORS AND ASSOCIATED PLANTS↗

A Tool for Performing Link Analysis, Operational Sequence Analysis, and Workload Analysis to Support Nuclear Power Plant Control Room Modernization

Nuclear power continues to have an imperative role for the U.S.’s electricity generation. However, for these nuclear power plants (NPPs) to remain economically viable, new strategies for reducing operations and maintenance costs must be explored. The U.S. Department of Energy Light Water Reactor Sustainability Program is researching how to digitally transform existing analog and hybrid main control rooms into a fully integrated control room that addresses this challenge. The transformation will fundamentally change the conduct of operations for these U.S. NPPs. Human factors engineering has a vital role in this effort, where traditional task analysis methods are important in informing the design of advanced human-system interface displays. This work describes a preliminary tool to support task analysis for the development of these advanced displays. Details on the use of this tool, including the specific task analysis methods offered, are presented in this paper.

99 GENERAL AND MISCELLANEOUS↗