Search NASA⌕ Search

SEARCH · Search NASA

Results for “OGA”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 37 records · Page 2

Oxygen Generation Assembly Design for Exploration Missions

Future Exploration missions will require an Oxygen Generation Assembly (OGA) to electrolyze water to supply oxygen for crew metabolic consumption. The system design will be based on the International Space Station (ISS) OGA but with added improvements based on lessons learned during ISS operations. These improvements will reduce system weight, crew maintenance time and resupply mass from Earth while increasing reliability. Currently, the design team is investigating the feasibility of the upgrades by performing ground tests and analyses. Upgrades being considered include: redesign of the electrolysis cell stack, deletion of the hydrogen dome, replacement of the hydrogen sensors, deletion of the wastewater interface, redesign of the recirculation loop deionizing bed and redesign of the cell stack Power Supply Module. The upgrades will be first demonstrated on the ISS OGA.

Takada, Kevin↗

Ground-based Design of a Test System to Evaluate Static Vapor Feed Electrolysis for Oxygen Generation

NASA designed a test facility to evaluate the performance of a Static Vapor Feed Electrolysis (SVFE) cell stack to determine its viability as an alternative technology to the state-of-the-art Oxygen Generation Assembly (OGA) to generate oxygen for habitable spacecraft environments. Static Vapor Feed Electrolysis differs from the liquid cathode-feed process utilized by the OGA in that the electrolysis process occurs entirely in the gas phase, operates at a higher pressure than OGA, and potentially requires a simpler balance-of-plant system. Pressurized liquid water is statically-fed, i.e. dead-headed, through a vapor-permeable membrane into the electrolysis chamber of the cell stack. The water vapor is then electrolyzed into hydrogen and oxygen in the cathode and anode chambers, respectively, all the while maintaining above-ambient pressures to eliminate water condensation in the oxygen and hydrogen product streams. This paper presents the design of the test facility and accompanying required balance-of-plant that will be used to test the SVFE cell stack.

Zeeshan Khawar↗

International Space Station United States Oxygen Generator Development Testing

A life test of a liquid anode feed oxygen generator assembly (OGA) using SPE(R) (United Technologies Corporation, Hamilton Sundstrand Division) membrane technology was terminated in June of 1999. In the total 15,658 hours of operation at MSFC since delivery in 1995, the OGA has produced 2,103 kilograms (kg) (4,632 pounds mass (lbm)) of oxygen, and 263 kg (579 lbm) of hydrogen. Evaluation of cell stack characteristics and oxygen and hydrogen hydrophilic/hydrophobic membrane separators will be discussed.

Erickson, Robert J.↗

International Space Station Water Balance Operations

In November 2008, the Water Regenerative System racks were launched aboard Space Shuttle flight, STS-126 (ULF2) and installed and activated on the International Space Station (ISS). These racks, consisting of the Water Processor Assembly (WPA) and Urine Processor Assembly (UPA), completed the installation of the Regenerative (Regen) Environmental Control and Life Support Systems (ECLSS), which includes the Oxygen Generation Assembly (OGA) that was launched 2 years prior. With the onset of active water management on the US segment of the ISS, a new operational concept was required, that of water balance . In November of 2010, the Sabatier system, which converts H2 and CO2 into water and methane, was brought on line. The Regen ECLSS systems accept condensation from the atmosphere, urine from crew, and processes that fluid via various means into potable water, which is used for crew drinking, building up skip-cycle water inventory, and water for electrolysis to produce oxygen. Specification (spec) rates of crew urine output, condensate output, O2 requirements, toilet flush water, and drinking needs are well documented and used as the best guess planning rates when Regen ECLSS came online. Spec rates are useful in long term planning, however, daily or weekly rates are dependent upon a number of variables. The constantly changing rates created a new challenge for the ECLSS flight controllers, who are responsible for operating the ECLSS systems onboard ISS from Mission Control in Houston. This paper reviews the various inputs to water planning, rate changes, and dynamic events, including but not limited to: crew personnel makeup, Regen ECLSS system operability, vehicle traffic, water storage availability, and Carbon Dioxide Removal Assembly (CDRA), Sabatier, and OGA capability. Along with the inputs that change the various rates, the paper will review the different systems, their constraints, and finally the operational challenges and means by which flight controllers manage this new concept of "water balance."

Tobias, Barry↗

Assessment of Service Life for Regenerative ECLSS Resin Beds

The International Space Station (ISS) Water Processor Assembly (WPA) and Oxygen Generation Assembly (OGA) manage and process water at various levels of cleanliness for multiple purposes. The effluent of theWPA and the influent of the OGA require water at very high levels of purity. The bulk of the water purification that occurs in both systems is performed by consumable activated carbon and ion exchange resin beds. Replacement beds must be available on orbit in order to continue the ISS critical processes of water purification and oxygen generation. Various hurdles exist in order to ensure viable spare resin beds. These include the characteristics of resin beds such as: storage environment, shelf life requirements, microbial growth, and variations in the levels and species of contaminants the beds are required to remove. Careful consideration has been given to match water models, bed capacities and spares traffic models to ensure that spares are always viable. The results of these studies and considerations, in particular, how shelf life requirements affect resin bed life management, are documented in this paper.

Cloud, Dale L.↗

Advancing the Oxygen Generation Assembly Design to Increase Reliability and Reduce Costs for a Future Long Duration Mission

The state-of-the-art Oxygen Generation Assembly (OGA) has been reliably producing breathing oxygen for the crew aboard the International Space Station (ISS) for over eight years. Lessons learned from operating the ISS OGA have led to proposing incremental improvements to advance the baseline design for use in a future long duration mission. These improvements are intended to reduce system weight, crew maintenance time and resupply mass from Earth while increasing reliability. The proposed improvements include replacing the cell stack membrane material, deleting the nitrogen purge equipment, replacing the hydrogen sensors, deleting the wastewater interface, replacing the hydrogen dome and redesigning the cell stack power supply. The development work to date will be discussed and forward work will be outlined. Additionally, a redesigned system architecture will be proposed.

Takada, Kevin C.↗

Advanced Oxygen Recovery via Series-Bosch Technology

Oxygen recovery from metabolically-produced carbon dioxide (CO2) is of critical importance for long-duration manned space missions beyond low Earth orbit. On the International Space Station (ISS), oxygen is provided to the crew through electrolysis of water in the Oxygen Generation Assembly (OGA). Prior to 2011, this water was entirely resupplied from Earth. A CO2 Reduction Assembly based on the Sabatier reaction (1) was developed by Hamilton Sundstrand and delivered to ISS in 2010. The unit recovers oxygen by reducing metabolic CO2 with diatomic hydrogen (H2) to produce methane and product water. The water is cleaned by the Water Purification Assembly and recycled to the OGA for continued oxygen production. The methane product is vented overboard.

Abney, Morgan B.↗

Space Technology Mission Directorate Game Changing Development Program FY2015 Annual Program Review: Advanced Manufacturing Technology

The Advance Manufacturing Technology (AMT) Project supports multiple activities within the Administration's National Manufacturing Initiative. A key component of the Initiative is the Advanced Manufacturing National Program Office (AMNPO), which includes participation from all federal agencies involved in U.S. manufacturing. In support of the AMNPO the AMT Project supports building and Growing the National Network for Manufacturing Innovation through a public-private partnership designed to help the industrial community accelerate manufacturing innovation. Integration with other projects/programs and partnerships: STMD (Space Technology Mission Directorate), HEOMD, other Centers; Industry, Academia; OGA's (e.g., DOD, DOE, DOC, USDA, NASA, NSF); Office of Science and Technology Policy, NIST Advanced Manufacturing Program Office; Generate insight within NASA and cross-agency for technology development priorities and investments. Technology Infusion Plan: PC; Potential customer infusion (TDM, HEOMD, SMD, OGA, Industry); Leverage; Collaborate with other Agencies, Industry and Academia; NASA roadmap. Initiatives include: Advanced Near Net Shape Technology Integrally Stiffened Cylinder Process Development (launch vehicles, sounding rockets); Materials Genome; Low Cost Upper Stage-Class Propulsion; Additive Construction with Mobile Emplacement (ACME); National Center for Advanced Manufacturing.

Vickers, John↗

2015 Annual Report for the Flight Opportunities Program

Welcome to this third edition of the Flight Opportunities program annual report. In this edition, we continue our story of pathfinding NASA's role in the partnership with the U.S. commercial space and space technology R&D communities to advance national space interests and develop technologies critical to NASA's future missions. 2015 was the year in which a planned change to our payload solicitation strategy saw its first tangible result. As you might remember from our 2014 annual report, in 2015 we set out to facilitate a more direct interaction between flight providers and technology developers by providing fixed funding awards to researchers to directly purchase the flight service(s) that best meet their needs. The selection and award of the first six REDDI-F1 flight grants to non-U.S. government researchers was an important milestone in this regard. From now on, using the REDDI-F1 solicitation appendix, the program will enable non-U.S. government researchers to directly purchase flight services on the emerging suborbital market. The same (or similar) commercial flight services will be available to NASA and other U.S. government agencies (OGA) through commercial contracts that NASA has established through our program. For the latter, our program is available to provide campaign management services, similar to the role we play(ed) for technology payloads remaining in our pool from earlier selections. The full impact of this broader strategic change will likely become more visible in the years ahead as our legacy pool gets depleted and we have implemented a new NASA- and OGA-specific call for proposals. One observation that can already be made after two rounds of REDDI-F1 solicitations is that through this change, the list of commercial flight service providers of interest to non-U.S. government researchers has grown from five in 2014 to nine in 2015. On the industry development front, our Announcement of Collaborative Opportunities (ACO) solicitation was promoted to an STMD-wide solicitation and released in 2015 in combination with the Tipping Point solicitation. A total of 22 awards was announced in November 2015, 12 of which are ACO awards, and six of these are funded by Flight Opportunities. Through these ACO awards, the program funds NASA technical expertise and NASA test facilities to aid industry partners in maturing key space technologies, in our case focusing on small launch vehicle technology development. Flight test activity in 2015 saw a steady 13 campaigns with 31 payload-flights (29 unique payloads). Thirteen new payloads were selected into the program in FY2015, and 14 payloads completed flight testing, bringing the total number of completed technology demonstration payloads to 69. Overall, we are pleased with the evolution and growth of the Flight Opportunities program and look forward to continued success in our partnership with the technology R&D community and the commercial space sector.

Flight Testing↗

Axiomatic Design Based Analysis and Equivalent Mass Comparison of Alternate Air Revitalization Systems

A proposed Photocatalytic Air Processor (PAP) would combine two atmosphere revitalization functions for a crewed spacecraft, carbon dioxide removal and oxygen provision. The axiomatic design method is used to develop the general requirements and alternate system designs that combine these two atmosphere revitalization functions. There are two current atmosphere revitalization approaches. Short missions such as the space shuttle use lithium hydroxide (LiOH) to remove carbon dioxide and tanks to provide oxygen. The ISS (International Space Station) uses the CDRA (Carbon Dioxide Removal Assembly) to remove carbon dioxide and a Sabatier reactor and OGA (Oxygen Generation Assembly) to provide oxygen. The PAP could replace either of these combined systems, LiOH and oxygen tanks or the CDRA, Sabatier, and OGA. Axiomatic design is used to investigate these alternate high level system designs for atmosphere revitalization. The axiomatic design approach develops the requirements and design together from higher to lower system level, using a back-and-forth and top-down process. One objective is to reduce the coupling between design elements, which is a measure of system complexity. The equivalent system mass of the alternate systems is compared.

Jones, Harry W.↗

Electrochemical Solutions for Advanced Life Support

The Oxygen Generating Assembly (OGA) on-board the International Space Station (ISS) employs a polymer electrolyte membrane (PEM) water electrolysis cell stack to electrochemically dissociate water into its two components – oxygen and hydrogen. Oxygen is provided to the cabin atmosphere for crew respiration while the hydrogen is delivered to a carbon dioxide reduction system to recover oxygen as water. The design of the OGA evolved over a number of years to arrive at the system solution that is currently operational on ISS. Future manned missions to space will require advanced technologies that eliminate the need for resupply from earth and feature in-situ resource utilization to sustain crew life and to provide useful materials to the crew. The architects planning such missions should consider all potential solutions at their disposal to arrive at an optimal vehicle solution that minimizes crew maintenance time, launch weight, installed volume and energy consumption demands. Skyre is developing new technologies through funding from NASA, the Department of Energy, and internal investment based on PEM technology that could become an integral part of these new vehicle solutions. At varying stages of Technology Readiness Level (TRL) are: an oxygen concentrator and compressor that can separate oxygen from an air stream and provide an enriched oxygen resource for crew medical use and space suit recharge without any moving parts in the pure oxygen stream; a regenerative carbon dioxide removal system featuring a PEM-based sorbent regenerator; a carbon dioxide reduction system that electrochemically produces organic compounds that could serve as fuels or as a useful intermediary to more beneficial compounds; and an electrochemical hydrogen separator and compressor for hydrogen recycle. The technical maturity of these projects is presented along with pertinent performance test data that could be beneficial in future study efforts.

Roy, Robert J.↗

Reliable and Efficient Electrochemical Recovery of O 2 from Metabolic CO 2 at the International Space Station (ISS)

Maximum O 2 recovery from metabolic carbon dioxide (CO 2 ) is desired for future long-duration missions beyond Low Earth Orbit (LEO). The O 2 recovery for the Environmental Control and Life Support System (ECLSS) at the International Space Station (ISS), presently limited to 50% (Sabatier), must be highly reliable and efficient and recover a minimum of 75% oxygen (O 2 ) from metabolic CO 2 . An alternative technology development effort currently underway at NASA Marshall Space Flight Center (MSFC) via a Microfluidic Electrochemical Reactor (MFECR) approach has the potential to increase O 2 recovery significantly and reduce the complexity of the ECLSS O 2 recovery at the ISS as it would replace three pieces, the CO 2 Reduction Assembly (CRA) (Sabatier reactor), the Oxygen Generation Assembly (OGA), and the Plasma Pyrolysis Assembly (PPA). The MFECR's electrochemical process generates ethylene (C 2 H 4 ) and carbon moxide (CO) instead of methane (CH 4 ) (Sabatier) as a byproduct, eliminating the need for further dehydrogenation through the PPA. As in the OGA, the MFECR's electrochemical process generates O 2 and hydrogen (H 2 ) from the water electrolysis process. MSFC and the University of Texas in Arlington (UTA) have jointly designed and fabricated an MFECR's single cell that operates at ambient conditions and utilizes a proprietary catalysis highly selective on reducing CO 2 to C 2 H 4 and CO at the cathode. This MFECR's single cell consists of gas diffusion layers at the cathode and anode for respective intake of CO 2 and output of O 2 from the catalytic layer. This approach is expected to substantially improve the ISS ECLSS sustainability and reduce power and weight requirements as the MFECR would replace three units currently installed in the ISS. In this paper, the authors discuss the outcome of preliminary tests, the current development, and the evaluation efforts on different alternatives for the cathode and the anode configurations, the setup of the MFECR at an engineering development unit (EDU) scale, and the O 2 recovery performance, and evaluation efforts on different alternatives on not only the configuration and setup of the MFECR at an Engineering Design Unit (EDU) scale but also the selection of component materials.

Jesus A Dominguez↗

Ground Test Stand Development for One-step Electrochemical Production of High-Pressure Oxygen

NASA designed a test rig, High-Pressure Oxygen Generation Assembly (HPOGA) to test a novel method of electrolysis as an alternative technology to the state-of-the-art Oxygen Generation Assembly (OGA) currently on the International Space Station (ISS). This approach involves utilizing a specialized electrolysis cell stack designed to both generate and compress high-pressure oxygen up to 3600 PSIG. The design eliminates the need for an external compressor and hydrogen separator, streamlining the oxygen generation process. HPOGA tests the viability of an electrolysis cell stack for extended life usage. Within the system, there are several key subsystems: nitrogen, high/low pressure oxygen, hydrogen, water recirculation, and water injection. The water injection subsystem supplies deionized (DI) water to a centralized reservoir for consumption. Subsequently, a water recirculation loop transfers the DI water across the cathode side of the electrolysis cell stack with constant flow rate. The result is a supply of hydrogen in the water loop and oxygen accumulation on the anode side of the cell stack. Hydrogen is evaporated out as part of the hydrogen sub-system which also measures hydrogen/oxygen concentration for safety. The oxygen subsystem is responsible for managing high pressure oxygen, O2 exhaust, and conducting hydrogen/oxygen concentration measurements. The nitrogen subsystem serves dual functions, purging the hydrogen/oxygen subsystems, and regulating pressure in both high/low-pressure O2 sections via pneumatic back pressure regulators. Various sensors monitor pressure, temperature, humidity, gas concentration and flow rate in each subsystem. This paper presents the design and testing of a comprehensive test stand, which serves to operate and functionally verify the performance of the electrolysis cell while offering valuable lessons learned.

electrolysis↗

Water Processor and Oxygen Generation Assembly

This report documents the results of the tasks which initiated efforts on design issues relating to the Water Processor (WP) and the Oxygen Generation Assembly (OGA) Flight Hardware for the International Space Station. This report fulfills the Statement of Work deliverables requirement for contract H-29387D. The following lists the tasks required by contract H-29387D: (1) HSSSI shall coordinate a detailed review of WP/OGA Flight Hardware program requirements with personnel from MSFC to identify requirements that can be eliminated without affecting the technical integrity of the WP/OGA Hardware; (2) HSSSI shall conduct the technical interchanges with personnel from MSFC to resolve design issues related to WP/OGA Flight Hardware; (3) HSSSI will initiate discussions with Zellwegger Analytics, Inc. to address design issues related to WP and PCWQM interfaces.

Bedard, John↗

Sabatier Engineering Development Unit

To facilitate life support system loop closure on board the International Space Station (ISS), the Node 3 Oxygen Generation System (OGS) rack contains a functional scar to accommodate a carbon dioxide reduction assembly (CRA). As part of the effort to better understand and define the functional scar, significant risk mitigation activities have been performed. To address integration risks, a CRA Engineering Development Unit (EDU) has been developed that is functionally equivalent to a flight CRA and is suitable for integrating with ground based carbon dioxide removal and oxygen generation systems. The CRA EDU has been designed to be functionally equivalent to the Sabatier Reactor Subsystem (SRS) portion of the CRA. The design of the CRA EDU and testing results in a stand alone configuration with simulated OGA and CDRA interfaces are reported. Carbon dioxide flow control is a major area requiring development since the size of the CO2 accumulator may result in periods of CRA starvation. The capability of the CO2 flow control algorithm to effectively manage integrated CRA operations is discussed.

Perry, Jay↗

Itegrated Test and Evaluation of a 4-Bed Molecular Sieve (4BMS) Carbon Dioxide Removtal System (CDRA), Mechanical Compressor Engineering Development Unit (EDU), and Sabitier Engineering Development Unit (EDU)

Currently on the International Space Station s (ISS) U.S. Segment, carbon dioxide (CO2) scrubbed from the cabin by a 4-Bed Molecular Sieve (4BMS) Carbon Dioxide Removal Assembly (CDRA) is vented overboard as a waste product. Likewise, the product hydrogen (H2) that will be generated by the Oxygen Generation Assembly (OGA) planned for installation will also be vented. A flight experiment has been proposed that will take the waste CO2 removed from the cabin, and via the catalytic Sabatier process, reduce it with waste H2 to generate water and methane. The water produced may provide cost and logistics savings for ISS by reducing the amount of water periodically re-supplied to orbit. To make this concept viable, a mechanical piston compressor and accumulator were developed for collecting and storing the CO2 from the CDRA. The compressor, accumulator and Sabatier system would be packaged together as one unit and referred to as the Carbon Dioxide Reduction Assembly (CRA). Testing was required to evaluate the performance of a 4BMS CDRA, compressor, accumulator, and Sabatier performance along with their operating rules when integrated together. This had been numerically modeled and simulated; however, testing was necessary to verify the results from the engineering analyses. Testing also allowed a better understanding of the practical inefficiencies and control issues involved in a fully integrated system versus the theoretical ideals in the model. This paper presents and discusses the results of an integrated engineering development unit test.

Knox, James C.↗

Rotary Drum Separator and Pump for the Sabatier Carbon Dioxide Reduction System

A trade study conducted in 2001 selected a rotary disk separator as the best candidate to meet the requirements for an International Space Station (ISS) Carbon Dioxide Reduction Assembly (CRA). The selected technology must provide micro-gravity gasfliquid separation and pump the liquid from 10 psia at the gasfliquid interface to 18 psia at the wastewater bus storage tank. The rotary disk concept, which has pedigree in other systems currently being built for installation on the ISS, failed to achieve the required pumping head within the allotted power. The separator discussed in this paper is a new design that was tested to determine compliance with performance requirements in the CRA. The drum separator and pump @SP) design is similar to the Oxygen Generator Assembly (OGA) Rotary Separator Accumulator (RSA) in that it has a rotating assembly inside a stationary housing driven by a integral internal motor. The innovation of the DSP is the drum shaped rotating assembly that acts as the accumulator and also pumps the liquid at much less power than its predecessors. In the CRA application, the separator will rotate at slow speed while accumulating water. Once full, the separator will increase speed to generate sufficient head to pump the water to the wastewater bus. A proof-of- concept (POC) separator has been designed, fabricated and tested to assess the separation efficiency and pumping head of the design. This proof-of-concept item was flown aboard the KC135 to evaluate the effectiveness of the separator in a microgravity environment. This separator design has exceeded all of the performance requirements. The next step in the separator development is to integrate it into the Sabatier Carbon Dioxide Reduction System. This will be done with the Sabatier Engineering Development Unit at the Johnson Space Center.

Holder, Don↗

On-Orbit Checkout and Activation of the ISS Oxygen Generation System

NASA has developed and; deployed an Oxygen Generation System (OGS) into the Destiny Module of the International Space Station (ISS). The major. assembly; included in this system is the Oxygen Generator Assembly. (OGA) which was developed under NASA contract by Hamilton Sundstrand Space Systems International (HSSSI), Inc. This paper summarizes the installation of the system into the Destiny Module, its initial checkout and periodic preventative maintenance activities, and its operational activation. Trade studies and analyses that were conducted with the goal of mitigating on-orbit operational risks are also discussed.

Bagdigian, Robert M.↗