Search NASASearch

SEARCH · Search NASA

Results for “Orbital Assembly”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

288 records · Page 2

Bipolar battery construction

A lightweight, bipolar battery construction for lead acid batteries in which a plurality of thin, rigid, biplates each comprise a graphite fiber thermoplastic composition in conductive relation to lead stripes plated on opposite flat surfaces of the plates, and wherein a plurality of nonconductive thermoplastic separator plates support resilient yieldable porous glass mats in which active material is carried, the biplates and separator plates with active material being contained and maintained in stacked assembly by axial compression of the stacked assembly. A method of assembling such a bipolar battery construction.

Rippel, Wally E.

Equivalent System Mass Comparison of ECLSS CO2 Removal Technologies

This project employs equivalent system mass (ESM) analyses to evaluate and compare state-of-the-art spacecraft CO2 removal systems. The ESM methodology converts sizing characteristics such as volume, power, and cooling requirements into a unified metric of mass, allowing for simple quantitative comparison of equipment impacts on a system level. Comparison of six high TRL technologies – the Carbon Dioxide Removal System (CDRS), Thermal Amine Scrubber (TAS), Carbon Dioxide Removal Assembly (CDRA), Four-Bed CO2 Scrubber (4BCO2), CO2 and Humidity Control Swing Bed (CHC), and the Carbon Dioxide Removal by Ionic Liquid Sorbent (CDRILS) – was achieved using an existing ESM spreadsheet tool that formerly ranked such technologies for consideration on Gateway. Fidelity of the tool was increased through revision with the most up-to-date sizing and performance data for each technology. ESM values were then estimated using NASA-supplied Lunar, Martian, and low-Earth orbit habitat infrastructure costs. This paper details the ESM approach used, lists major performance variables for each CO2 removal option, and summarizes conclusions of the technology comparison. The results are intended to act as a guide to assist programs in their selection of CO2 technologies best suited for a specific vehicle or mission.

Madeleine C Oliver

Equivalent System Mass Comparison of ECLSS CO 2 Removal Technologies

This project employs equivalent system mass (ESM) analyses to evaluate and compare state-of-the-art spacecraft CO 2 removal systems. The ESM methodology converts sizing characteristics such as volume, power, and cooling requirements into a unified metric of mass, allowing for simple quantitative comparison of equipment impacts on a system level. Comparison of six high TRL technologies – the Carbon Dioxide Removal System (CDRS), Thermal Amine Scrubber (TAS), Carbon Dioxide Removal Assembly (CDRA), Four-Bed CO 2 Scrubber (4BCO2), CO 2 and Humidity Control Swing Bed (CHC), and the Carbon Dioxide Removal by Ionic Liquid Sorbent (CDRILS) – was achieved using an existing ESM spreadsheet tool that formerly ranked such technologies for consideration on Gateway. Fidelity of the tool was increased through revision with the most up-to-date sizing and performance data for each technology. ESM values were then estimated using NASA-supplied Lunar, Martian, and low-Earth orbit habitat infrastructure costs. This paper details the ESM approach used, lists major performance variables for each CO 2 removal option, and summarizes conclusions of the technology comparison. The results are intended to act as a guide to assist programs in their selection of CO 2 technologies best suited for a specific vehicle or mission.

Madeleine Oliver

Battery testing device

A battery testing device is described for testing the cells of a multiple-cell battery, the battery having a cover plate with access holes to provide access to the connecting straps between cells. A panel of probe assembly receiving holes is located to correspond to the location of the access holes when the panel is positioned on top of the battery. A probe assembly is positioned within each probe assembly receiving hole, with a spring biased electrically conductive plunger to make electrical contact with the connecting strap through the corresponding access hole when the panel is pushed towards the top of the battery.

Boshers, W. A.

Spacecraft Conceptual Design for Returning Entire Near-Earth Asteroids

In situ resource utilization (ISRU) in general, and asteroid mining in particular are ideas that have been around for a long time, and for good reason. It is clear that ultimately human exploration beyond low-Earth orbit will have to utilize the material resources available in space. Historically, the lack of sufficiently capable in-space transportation has been one of the key impediments to the harvesting of near-Earth asteroid resources. With the advent of high-power (or order 40 kW) solar electric propulsion systems, that impediment is being removed. High-power solar electric propulsion (SEP) would be enabling for the exploitation of asteroid resources. The design of a 40-kW end-of-life SEP system is presented that could rendezvous with, capture, and subsequently transport a 1,000-metric-ton near-Earth asteroid back to cislunar space. The conceptual spacecraft design was developed by the Collaborative Modeling for Parametric Assessment of Space Systems (COMPASS) team at the Glenn Research Center in collaboration with the Keck Institute for Space Studies (KISS) team assembled to investigate the feasibility of an asteroid retrieval mission. Returning such an object to cislunar space would enable astronaut crews to inspect, sample, dissect, and ultimately determine how to extract the desired materials from the asteroid. This process could jump-start the entire ISRU industry.

solar electric propulsion

NASA’s SLS (Space Launch System) Rocket Ready for Artemis II Lunar Mission

In early 2026, NASA will launch the Artemis II mission, an approximately 10-day long lunar mission that will fly three NASA astronauts and one CSA (Canadian Space Agency) astronaut on a free-return trajectory around the Moon, following a one-day checkout of their Orion spacecraft in Earth orbit. The mission will be the first to launch astronauts aboard NASA’s Orion spacecraft and on top of the agency’s SLS (Space Launch System) rocket. The mission will also deploy four 12U CubeSats as secondary payloads from the Orion stage adapter, following Orion separation and departure. The payloads, developed by four of NASA’s international partners, will perform a variety of science and technology investigations. The SLS and Orion for the mission are currently stacked in the Vehicle Assembly Building (VAB) at NASA’s Kennedy Space Center in Florida and are undergoing final preparations to rollout to Launch Pad 39B for a tanking test before launch. In addition to preparations for the Artemis II mission, significant progress is being made on the SLS for the Artemis III mission, which is targeted to return astronauts to the lunar surface no later than 2029. Major components of the core stage and solid rocket boosters are already at NASA Kennedy undergoing build-up for the mission. Data from the Artemis II launch and mission, as well as progress to subsequent missions, as available, will be presented.

Bruce Askins

NASA’s SLS (Space Launch System) Rocket Ready for Artemis II Lunar Mission

In early 2026, NASA will launch the Artemis II mission, an approximately 10-day long lunar mission that will fly three NASA astronauts and one CSA (Canadian Space Agency) astronaut on a free-return trajectory around the Moon, following a one-day checkout of their Orion spacecraft in Earth orbit. The mission will be the first to launch astronauts aboard NASA’s Orion spacecraft and on top of the agency’s SLS (Space Launch System) rocket. The mission will also deploy four 12U CubeSats as secondary payloads from the Orion stage adapter, following Orion separation and departure. The payloads, developed by four of NASA’s international partners, will perform a variety of science and technology investigations. The SLS and Orion for the mission are currently stacked in the Vehicle Assembly Building (VAB) at NASA’s Kennedy Space Center in Florida and are undergoing final preparations to rollout to Launch Pad 39B for a tanking test before launch. In addition to preparations for the Artemis II mission, significant progress is being made on the SLS for the Artemis III mission, which is targeted to return astronauts to the lunar surface no later than 2029. Major components of the core stage and solid rocket boosters are already at NASA Kennedy undergoing build-up for the mission. Data from the Artemis II launch and mission, as well as progress to subsequent missions, as available, will be presented.

Bruce R Askins

SMM parallel battery operation in orbit

A parallel battery system for the SMM spacecraft is described. The battery system performance as a function of lifetime over orbit was evaluated. The following equipment performance specifications were examined during a typical orbit: battery current and discharges, voltage limitations, battery temperature variations, and current sensor performance. Tabulated battery performance data is also included.

Broderick, R.

Coding Performance of the Probe-Orbiter-Earth Communication Link

The coding performance of the Probe-Orbiter-Earth communication link is analyzed and compared for several cases. It is assumed that the coding system consists of a convolutional code at the Probe, a quantizer and another convolutional code at the Orbiter, and two cascaded Viterbi decoders or a combined decoder on the ground.

D Divsalar

Ni-cd Battery Life Expectancy in Geosynchronous Orbit

The feasibility of using nickel cadmium batteries as an alternate if flight qualified NiH2 batteries are not available is explored. Battery life expectancy data being a key element of power system design, an attempt is made to review the literature, life test data and in orbit performance data to develop an up to date estimate of life expectancy for NiCd batteries in a geosynchronous orbit.

Broderick, R. J.

Horseshoe Asteroids and Quasi-satellites in Earth-like Orbits

Newly found asteroid 2003 YN107 is the first and only known current quasi-satellite (QS) of the Earth. Asteroid 2002 AA29 is in a horseshoe orbit (HS) but has periods of QS behavior. Both asteroids closely follow Earth s orbit. 2002 AA29 has inclination i is approximately 11 degrees while for 2003 YN107 i<5 degrees, making the most Earth-like orbit known. 2003 YN107, 2002 AA29, and other Earth-resonant objects in less Earthlike orbits, form an important new class of co-orbital bodies with interesting dynamics and are the best targets for sample return missions to asteroids.

M Connors

Spacecraft Disposal Rosetta Stone: Parametric Tool for Orbital Lifetime, Disposal, and Cost Assessment

This Technical Memorandum documents a simplified, parametric method for evaluating spacecraft orbital lifetime, disposal compliance, and disposal-related cost impacts during early mission formulation and preliminary design. The method captures the dominant drivers of orbital decay—effective ballistic coefficient, operating altitude, and solar-cycle variability—using conservative bounding assumptions. Solar maximum conditions are used to bound achievable mission lifetime, while solar minimum conditions are used to bound disposal timelines and compliance with orbital debris requirements. A single tabulated dataset provides orbital lifetime under both solar-cycle extremes together with representative disposal ΔV required to ensure compliant disposal, enabling rapid assessment of disposal feasibility, cost sensitivity, and system-level impacts prior to committing to higher-fidelity analyses.

Orbital debris mitigation

Orbiting Solar Observatory Battery and Power Design

The OSO-1 represents a recent vintage satellite, or more recent design satellite. A summary of the battery design used on OSO-1 is presented. The temperature effects on voltage and charging-discharging of the battery system are discussed.

F E Ford

In Flight Performance of a Six Ampere-hour Nickel-cadmium Battery in Low Earth Orbit

Flight data for 17,000 orbital cycles are reviewed and summarized. The nickel cadmium battery system operated without failure or abnormality. Battery trend analysis used in determining the feasibility of extending mission life is discussed. The life test data for 20% depth of discharge indicates design life requirements would be reached even at a deeper depth of discharge.

Mcdermott, J. K.

In-Orbit Earth Radiation Budget Satellite (ERBS) Battery Switch

A viewgraph presentation outlines the Earth Radiation Budget Satellite (ERBS) power system and battery history. ERBS spacecraft and battery cell failures are listed with the reasons for failure. The battery management decision and stabilization of the batteries is discussed. Present battery operations are shown to be successful.

Ahmad, Anisa

RCA SATCOM Battery in Orbit Performance Update and Accelerated Life Test Results

No significant degradation of nickel cadmium battery performance in SATCOM F1 and F2 after almost 8 and 7-3/4 years in orbit was shown. Battery minimum discharge voltage data are presented for these spacecraft. In addition, 2 groups of nickel cadmium cells which are representative of those in orbit are undergoing real time eclipse-reduced suntime cycling in the laboratory. These groups of cells, which are being cycled at a maximum of 53% and 62% depth of discharge (based on actual capacity), have completed 14 and 15 eclipse seasons, respectively. Data for these groups of cells are presented and are compared with the in-orbit battery data.

Gaston, S. J.