Search NASA⌕ Search

SEARCH · Search NASA

Results for “PRA”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 37 records · Page 2

Constellation Probabilistic Risk Assessment (PRA): Design Consideration for the Crew Exploration Vehicle

Managed by NASA's Office of Safety and Mission Assurance, a pilot probabilistic risk analysis (PRA) of the NASA Crew Exploration Vehicle (CEV) was performed in early 2006. The PRA methods used follow the general guidance provided in the NASA PRA Procedures Guide for NASA Managers and Practitioners'. Phased-mission based event trees and fault trees are used to model a lunar sortie mission of the CEV - involving the following phases: launch of a cargo vessel and a crew vessel; rendezvous of these two vessels in low Earth orbit; transit to th$: moon; lunar surface activities; ascension &om the lunar surface; and return to Earth. The analysis is based upon assumptions, preliminary system diagrams, and failure data that may involve large uncertainties or may lack formal validation. Furthermore, some of the data used were based upon expert judgment or extrapolated from similar components~systemsT. his paper includes a discussion of the system-level models and provides an overview of the analysis results used to identify insights into CEV risk drivers, and trade and sensitivity studies. Lastly, the PRA model was used to determine changes in risk as the system configurations or key parameters are modified.

Prassinos, Peter G.↗

Probabilistic Risk Analysis (PRA) of a Mobile Offshore Drilling Unit (MODU) Dynamic Positioning System (DPS)

Probabilistic Risk Assessment (PRA) has been utilized by NASA in a variety of space oriented projects. It has served as one of the primary risk identification and ranking tools. Recent developments in the oil and gas industry have presented opportunities for NASA to lend their PRA expertise to both ongoing and developmental projects within the industry. As a result, NASA has entered into an agreement with Anadarko Petroleum Company (APC) to collaboratively develop PRAs for different aspects of the subsea drilling and completion process of well development. This paper documents how PRA was applied to estimate the probability that a Mobile Offshore Drilling Unit (MODU) equipped with a generically configured Dynamic Positioning System (DPS) loses location and needs to initiate an emergency disconnect. Since this project was in essence a pilot project, the PRA described in this paper is intended to be generic such that the vessel meets the general requirements of an International Maritime Organization (IMO) Maritime Safety Committee (MSC)/Circ. 645 Class 3 dynamically positioned vessel. The results of this analysis are not intended to be applied to any specific drilling vessel, although provisions were made to allow the analysis to be configured to a specific vessel if required.

Thigpen, Eric B.↗

CHP-PRA Proof-of-Concept [Simulation] Sensitivity Assessment

An effort is underway to establish a Crew Health and Performance system (CHP) tradespace tool using a Probabilistic Risk Assessment (PRA) modeling and simulation system. The goal of the CHP-PRA effort is to provide a means of quantifying the integrated influence of CHP functions and capabilities on risk outcome metrics associated with health, performance, and long-term health. These metrics can then be used to establish potential risk-based trades on CHP system designed functionality and capabilities. Previously, our team demonstrated a proof-of-concept PRA approach that estimated the integrated influence of exercise countermeasures on 8 human system risks (Figure 1a) with outcomes associated with health and medical risk metrics. We reported that the change in the integrated relative health risk was small (Figure 1b) and that the small change in overall risk resulted from compounding and competing contribution levels of the individual risks. This interesting observation illustrates the emergent complexity of even straightforward representations of the human health and performance risk space and the ability of PRA models to capture this balance of global risk concerns. A key question that is not addressed in the initial analysis is “even though the global risk is relatively nominal, do any of the local risks become unacceptable?” In essence, we seek to determine what relative change in the human system risks are contributing to the relatively muted sensitivity of the proof-of-concept model combined risk assessments. Evaluations at the component risk level should elucidate if any individual risk reaches a high level that is subsequentially balanced by reductions in other areas. To further understand the relative changes in the component risks in the proof-of-concept model, and to elucidate how future refinements can be targeted, a means of establishing the contributions of the robustness of the proof-of-concept approach will be demonstrated.

astronaut health↗

Limitations of traditional tools for beyond design basis external hazard PRA

Probabilistic risk assessment (PRA) is being used increasingly by the nuclear industry for safety during normal operations as well as for the protection against external hazards. Computation of total risk in an external hazard PRA is dependent on hazard assessment, fragility assessment, and systems analysis. A systems analysis for propagation of component fragilities is conducted using event and fault trees. The event and fault trees for an actual power plant can be fairly large in size, which imposes computational challenges. Hence, certain assumptions are employed for computational efficiency. These assumptions typically represent the conditions imposed during the design basis (DB) scenario. The traditional PRA tools based on these assumptions are also widely applied to perform risk assessment in the context of beyond design basis (BDB) scenarios. However, some of these assumptions may not be valid for certain BDB scenarios. In addition, the probability of dependent failures also increases in BDB scenarios due to common cause failures (CCF) which usually results from design modifications, human errors, etc. In this manuscript, a simple and a relatively more complex illustrative examples are used to show the limitation of these assumptions in the numerical quantification of risk for the case of BDB conditions. Case studies with CCF events across multiple fault trees are also presented to illustrate the effect of these assumptions when traditional approach is used in BDB risk assessment. It is shown that the assumptions are valid for the case of DB conditions but may lead to excessively conservative risk estimates in the case of BDB conditions. Finally, a Bayesian network based top-down algorithm is proposed as an alternative tool for accurate numerical quantification of total risk in systems analysis.

73 NUCLEAR PHYSICS AND RADIATION PHYSICS↗

Integrated Fire Probabilistic Risk Assessment (PRA) Modeling in Support of Operational Efficiency (Final Report)

To improve the realism of Fire PRA associated with fire progression and damage modeling or manual suppression, previous research by the Socio-Technical Risk Analysis (SoTeRiA) Research Laboratory at the University of Illinois at Urbana-Champaign focused on the development of an Integrated PRA (I-PRA) methodological framework for fire risk analysis in NPPs.

22 GENERAL STUDIES OF NUCLEAR REACTORS↗

PRA in Design: Increasing Confidence in Pre-Operational Assessments of Risks (Results of a Joint NASA/NRC Workshop)

In late 2009, the National Aeronautics and Space Administration (NASA) and the U.S. Nuclear Regulatory Commission (NRC) jointly organized a workshop to discuss technical issues associated with application of risk assessments to early phases of system design. The workshop, which was coordinated by the Idaho National Laboratory, involved invited presentations from a number of PRA experts in the aerospace and nuclear fields and subsequent discussion to address the following questions: (a) What technical issues limit decision-makers' confidence in PRA results, especially at a pre-operational phase of the system life cycle? (b) What is being done to address these issues'? (c) What more can be done ? The workshop resulted in participant observations and suggestions on several technical issues, including the pursuit of non-traditional approaches to risk assessment and the verification and validation of risk models. The workshop participants also identified several important non-technical issues, including risk communication with decision makers, and the integration of PRA into the overall design process.

Youngblood, Robert↗

Shuttle Risk Progression: Use of the Shuttle Probabilistic Risk Assessment (PRA) to Show Reliability Growth

It is important to the Space Shuttle Program (SSP), as well as future manned spaceflight programs, to understand the early mission risk and progression of risk as the program gains insights into the integrated vehicle through flight. The risk progression is important to the SSP as part of the documentation of lessons learned. The risk progression is important to future programs to understand reliability growth and the first flight risk. This analysis uses the knowledge gained from 30 years of operational flights and the current Shuttle PRA to calculate the risk of Loss of Crew and Vehicle (LOCV) at significant milestones beginning with the first flight. Key flights were evaluated based upon historical events and significant re-designs. The results indicated that the Shuttle risk tends to follow a step function as opposed to following a traditional reliability growth pattern where risk exponentially improves with each flight. In addition, it shows that risk can increase due to trading safety margin for increased performance or due to external events. Due to the risk drivers not being addressed, the risk did not improve appreciably during the first 25 flights. It was only after significant events occurred such as Challenger and Columbia, where the risk drivers were apparent, that risk was significantly improved. In addition, this paper will show that the SSP has reduced the risk of LOCV by almost an order of magnitude. It is easy to look back afte r 30 years and point to risks that are now obvious, however; the key is to use this knowledge to benefit other programs which are in their infancy stages. One lesson learned from the SSP is understanding risk drivers are essential in order to considerably reduce risk. This will enable the new program to focus time and resources on identifying and reducing the significant risks. A comprehensive PRA, similar to that of the Shuttle PRA, is an effective tool quantifying risk drivers if support from all of the stakeholders is given.

Hamlin, Teri L.↗

An Overview of PRA with Applications to Aerospace Systems

Probabilistic Risk Assessment (PRA) is a systematic process for evaluating the probabilities and consequences of undesirable events that can occur in a process or system along with providing a measure of the uncertainty associated with these probability estimates. In the past it was looked at with suspicion by many at NASA, perhaps because of bad experiences with unsuccessful quantitative methods during the Apollo era, but since the Challenger accident NASA has mandated that it be used, and it has been very successful. With NASA's new "faster, better, cheaper" philosophy, it is vital that a tool be in place that can help to achieve these goals in the reliability area. This paper describes the history of PRA, gives examples of its aerospace applications to date, and gives suggestions for how it can be used in the future, both for space shuttle upgrades and for totally new technologies such as the Second Generation Reusable Launch Vehicle.

Sharon E. Navard↗

PSRP Approach to PRA

There have been two scenarios in which the Payload Safety Review Panel (PSRP) has considered a Probabilistic Risk Assessment (PRA) a viable tool. For use in considering trade-offs during the initial design. When in a waiver condition to explain rationale for acceptance. The PSRP would consider the use of PRA in other applications where credible.

Stewart, Christine↗

PRA and Conceptual Design

Once a project obtains approval, decision makers have to consider a variety of alternative paths for completing the project and meeting the project objectives. How decisions are made involves a variety of elements including: cost, experience, current technology, ideologies, politics, future needs and desires, capabilities, manpower, timing, available information, and for many ventures management needs to assess the elements of risk versus reward. The use of high level Probabilistic Risk Assessment (PRA) Models during conceptual design phases provides management with additional information during the decision making process regarding the risk potential for proposed operations and design prototypes. The methodology can be used as a tool to: 1) allow trade studies to compare alternatives based on risk, 2) determine which elements (equipment, process or operational parameters) drives the risk, and 3) provide information to mitigate or eliminate risks early in the conceptual design to lower costs. Creating system models using conceptual design proposals and generic key systems based on what is known today can provide an understanding of the magnitudes of proposed systems and operational risks and facilitates trade study comparisons early in the decision making process. Identifying the "best" way to achieve the desired results is difficult, and generally occurs based on limited information. PRA provides a tool for decision makers to explore how some decisions will affect risk before the project is committed to that path, which can ultimately save time and money.

DeMott, Diana↗

CHP-PRA: Sensorimotor Countermeasures Proof of Concept

The capabilities included in Crew Health and Performance (CHP) systems are designed to keep the crew healthy, happy, and productive. In doing so, the CHP system allows reductions in human related risks to be realized. All human missions, though particularly future Artemis and Mars missions, have constraints on the mass and volume allocated to the CHP system. Thus, trades must be made on how to best buy down risk while still meeting other requirements. Understanding how different CHP capabilities influence medical, performance, and long-term health risks is key to making informed choices among these trades. To address this, an integrated CHP Probabilistic Risk Assessment (PRA) model is being developed. Much like how IMPACT is designed to allow medical resource trades informed by medical risks, CHP PRA will enable analogous trades in human system risks across all CHP functions and capabilities. There are 29 Human System Risk Board (HSRB) risk areas to consider for model implementation. This effort focused solely on the implementation of countermeasures associated with sensorimotor risk. The framework and lessons learned from this proof of concept will benefit the implementation of other risks and countermeasures. Astronauts experience sensorimotor changes when entering or exiting a microgravity environment. While most sensorimotor issues are resolved within a few days, they pose a serious risk to crew health and performance during the adaptation period. This adaptation period aligns with gravity transitions and key mission phases where the crew members may be required to complete challenging tasks ideally with an undisturbed sensorimotor system. Countermeasures such as training or pharmaceuticals can be used to mitigate risk. This effort began by identifying physiological changes to the sensorimotor system that could lead to functional performance decrements or medical conditions and potential countermeasures, so that the overall effect of sensorimotor disturbance on human risk could be captured. We then selected example countermeasures, mapped relationships between countermeasures and outcomes, and used results from existing sensorimotor investigations to define the relationship between a sensorimotor countermeasure and subsequent performance of a sensorimotor-affected task. Specifically, using shuttle landing performance data, we compared the use or absence of inflight training capabilities to yield a relative performance change that can be applied to the prediction of the risk associated with manual control performance in future missions, as depicted in the figure. This sensorimotor proof of concept demonstrates how HRP research information can be transformed into quantifiable relationships to describe changes in HSRB medical and performance risks.

Caroline R Austin↗

Recalibration of the Viyager PRA antenna for polarization sense measurement

The Voyager Planetary Radio Astronomy (PRA) antenna and receiver system provides an indication of the sense of elliptical or circular polarization of radiation that is not correct for all directions of incidence. The true sense could be determined for all directions if accurate calibration data were available. It was not feasible to make the calibration before the Voyagers were launched. Lecacheux & Ortega-Molina (1987), however, were able to derive such calibration data from planetary radio observations made in flight. They expressed their results in terms of the tilt of a plane (the E-plane) that divides the incident ray directions for which the indicated polarization sense is correct from those directions for which the indicated sense is reversed. We demonstrate that there are certain directions for which this calibration is itself in error, and that the surface dividing the two sets of incident rays is more complex than a tilted plane. We are able to make a crude approximation to the true surface from the limited data available.

Wang, L.↗

How Can You Support RIDM/CRM/RM Through the Use of PRA

Probabilistic Risk Assessment (PRA) is one of key Risk Informed Decision Making (RIDM) tools. It is a scenario-based methodology aimed at identifying and assessing Safety and Technical Performance risks in complex technological systems.

DoVemto. Tpmu↗

Dynamic PRA-Based Estimation of PWR Coping Time Using a Surrogate Model for Accident Tolerant Fuel

In this study, we propose an interpolation-based response surface surrogate methodology to manage a large number of scenarios in dynamic probabilistic risk assessment. It adopts the shape Dynamic Time Warping algorithm to cluster the interpolation neighborhood from time series sample data. The interpolation method was adapted from Taylor Kriging to allow a reduced-order model of the Taylor series. In order to demonstrate its applicability to complex issues in risk assessment for nuclear engineering, an example risk response surface to estimate emergency core cooling system (ECCS) criteria for triplex silicon carbide (SiC) accident-tolerant fuel was constructed. The response surface was exploited to estimate the cumulative failure probability of the fuel cladding structure due to the uncertainties in operator actions and safety systems. The functional failures were assessed based on a combination of individual layer failures computed by coupling Risk Analysis Virtual Environment software with a pressurized water reactor 1000-MW(electric) RELAP5 model and the in-house fuel performance assessment module. Results showed that SiC cladding failure probability spiked less than 1 min after a large-break loss-of- coolant accident whenever the current ECCS criteria for Zircaloy-4 (Zr-4) cladding was used. However, it still provides an increased safety margin of three orders of magnitude compared to Zr-4. This positive margin could be utilized to relax active ECCS requirements by allowing deviations of up to 450 s in its actuation time. The proposed surrogate methodology generated a response surface of SiC cladding failure probability reasonably well, with a significant savings of computation time. This methodology is expected to be useful in the analysis of system response with complex uncertainty sources.

22 GENERAL STUDIES OF NUCLEAR REACTORS↗

Artemis Missions Probabilistic Risk Assessment (PRA) & Reliability Assessment Overview

To show how NASA’s Moon-to-Mars (M2M) program can use hardware reliability assessments and comprehensive Probabilistic Risk Assessments (PRAs) to estimate risk of future missions and manage risk via safety and mission success requirements from the top down, so that this risk can be balanced with other program metrics like cost and schedule. These PRAs and reliability assessments can be used during the concept, design, and operational phases of development. This presentation also provides some thoughts on how the NASA process can be utilized for a lunar surface power grid development.

PRA↗