Search NASA⌕ Search

SEARCH · Search NASA

Results for “Phase III”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 37 records · Page 2

Acoustic Detection of Faults and Degradation in a High-Bypass Turbofan Engine during VIPR Phase III Testing

The Vehicle Integrated Propulsion Research (VIPR) Phase III project was executed at Edwards Air Force Base, California, by the National Aeronautics and Space Administration and several industry, academic, and government partners in the summer of 2015. One of the research objectives was to use external radial acoustic microphone arrays to detect changes in the noise characteristics produced by the research engine during volcanic ash ingestion and seeded fault insertion scenarios involving bleed air valves. Preliminary results indicate the successful acoustic detection of suspected degradation as a result of cumulative exposure to volcanic ash. This detection is shown through progressive changes, particularly in the high-frequency content, as a function of exposure to greater cumulative quantities of ash. Additionally, detection of the simulated failure of the 14th stage stability bleed valve and, to a lesser extent, the station 2.5 stability bleed valve, to their fully-open fail-safe positions was achieved by means of spectral comparisons between nominal (normal valve operation) and seeded fault scenarios.

noise spectra↗

Establishing an Early CO 2 Storage Complex in Kemper County, Mississippi: Project ECO 2 S (Phase III) (Final Progress Report)

“Establishing an Early CO 2 Storage Complex in Kemper County, Mississippi (Project ECO 2 S)” is an early mover project within the U.S. Department of Energy (DOE) and National Energy Technology Laboratory’s Carbon Storage Assurance Facility Enterprise, or CarbonSAFE, initiative. Phase III of Project ECO2S advanced the foundational work of Phase II, which confirmed the potential for safely, permanently, and economically storing commercial volumes of carbon dioxide (CO 2 ) in the regionally significant saline reservoir system near Mississippi Power Company’s (MPC) Kemper County Energy Facility. The primary objective of Phase III was to complete detailed site characterization necessary to obtain an Underground Injection Control (UIC) Class VI Permit to Construct from the U.S. Environmental Protection Agency. This involved transitioning from regional geologic assessments to high-resolution site-specific analyses.

03 NATURAL GAS↗

Wyoming CarbonSAFE Phase III: Site Characterization and Permitting Commercial-Scale Carbon Storage Complex Feasibility Study at Dry Fork Station, Wyoming

This report presents the findings of the technical and non-technical site characterization and permitting activities (“Phase III”) conducted under the Wyoming CarbonSAFE: Accelerating CCUS Commercialization and Deployment at Dry Fork Power Station (DFS) and the Wyoming Integrated Test Center project (“Wyoming CarbonSAFE”). Wyoming CarbonSAFE is part of the U.S. Department of Energy’s (DOE) National Energy Technology Laboratory (NETL) Carbon Storage Assurance Facility Enterprise (“CarbonSAFE”) Initiative. The results of Phase III demonstrate that the Wyoming CarbonSAFE project - referred to as the Northern Powder River Basin Carbon Sequestration Hub (NPRB-CSH) - meets the technical, regulatory, and commercial feasibility requirements necessary to advance toward commercial development and construction. The activities completed under this project Phase make the NPRB-CSH one of the region’s most commercially ready carbon storage sites. Completion of this Phase included the finalization of all site surface and subsurface characterization activities, completion and testing of two Class VI standard wells, 10 draft Class VI permits-to construct to address the future needs of a storage complex, finalized NEPA assessments, transportation and capture FEED studies, and a full commercialization strategy with economic modeling, operation and site closure strategies. The NPRB-CSH meets all requirements to progress to a CarbonSAFE Phase IV program or advance to full commercial operations under the development of a business partner.

01 COAL, LIGNITE, AND PEAT↗

Criticality Control Overpack Fire Testing (Phase III)

This report will describe the one test conducted during phase III of the Pipe Overpack Container (POC) test campaign, present preliminary results from these tests, and discuss implications for the Criticality Control Overpack (CCO). The goal of this test was to see if aerosol surrogate material inside the Criticality Control Container (CCC) gets released when the drum lid of the CCO comes off during a thirty-minute long, fully-engulfing, fire test. As expected from POC tests conducted in Phase I and II of this test campaign, the CCO drum lid is ejected about one minute after the drum is exposed to fully-engulfing flames. The remaining pressure inside the drum is high enough to eject the top plywood dunnage a considerable distance from the drum. Subsequently, most of the bottom plywood dunnage supporting the CCC burns off during and after the fire. High pressure buildup inside the CCC and inside two primary containers holding the surrogate powder also results in damage to the filter media of the CCC and the filter-house, thread attachment of the primary canisters. No discernable release of surrogate powder material was detected from the two primary containers when pre- and post-test average mass were compared. However, when the average masses are corrected to account for possible uncertainties in mass measurements, error overlap does not preclude the possibility that some surrogate powder mass may have been lost from these primary canisters. Still, post-test conditions of the secondary canisters enclosing these two primary canisters suggest it is very unlikely this mass loss would have escaped into the CCC.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Validation of Numerical Models of the Offshore Wind Turbine From the Alpha Ventus Wind Farm Against Full-Scale Measurements Within OC5 Phase III

The main objective of the Offshore Code Comparison Collaboration Continuation, with Correlation (OC5) project is validation of aero-hydro-servo-elastic simulation tools for offshore wind turbines (OWTs) through comparison of simulated results to the response data of physical systems. Phase III of the OC5 project validates OWT models against the measurements recorded on a Senvion 5M wind turbine supported by the OWEC Quattropod from the alpha ventus offshore wind farm. The following operating conditions of the wind turbine were chosen for the validation: (1) idling below the cut-in wind speed, (2) rotor-nacelle assembly (RNA) rotation maneuver below the cut-in wind speed, (3) power production below and above the rated wind speed, and (4) shutdown. A number of validation load cases were defined based on these operating conditions. The following measurements were used for validation: (1) strains and accelerations recorded on the support structure and (2) pitch, yaw, and azimuth angles, generator speed, and electrical power recorded from the RNA. Strains were not directly available from the majority of the OWT simulation tools; therefore, strains were calculated based on out-of-plane bending moments, axial forces, and cross-sectional properties of the structural members. The simulation results and measurements were compared in terms of time series, discrete Fourier transforms, power spectral densities, and probability density functions of strains and accelerometers. A good match was achieved between the measurements and models setup by OC5 Phase III participants.

17 WIND ENERGY↗

Validation of Numerical Models of the Offshore Wind Turbine From the Alpha Ventus Wind Farm Against Full-Scale Measurements Within OC5 Phase III

The main objective of the Offshore Code Comparison Collaboration Continuation, with Correlation (OC5) project is validation of aero-hydro-servo-elastic simulation tools for offshore wind turbines (OWTs) through comparison of simulated results to the response data of physical systems. Phase III of the OC5 project validates OWT models against the measurements recorded on a Senvion 5M wind turbine supported by the OWEC Quattropod from the alpha ventus offshore wind farm. The following operating conditions of the wind turbine were chosen for the validation: (1) Idling below the cut-in wind speed; (2) Rotor-nacelle assembly (RNA) rotation maneuver below the cut-in wind speed; (3) Power production below and above the rated wind speed; and (4) Shutdown. A number of validation load cases were defined based on these operating conditions. The following measurements were used for validation: (1) Strains and accelerations recorded on the support structure; (2) Pitch, yaw, and azimuth angles, generator speed, and electrical power recorded from the RNA. Strains were not directly available from the majority of the OWT simulation tools. Therefore, strains were calculated based on out-of-plane bending moments, axial forces, and cross-sectional properties of the structural members. Also, a number of issues arose during the validation: (1) The need for a thorough quality check of sensor measurements; (2) The sensitivity of the turbine loads to the controller and airfoil properties, which were only approximated in the modeling approach; (3) The importance of estimating and applying an appropriate damping value for the structure; and (4) The importance of wind characteristics beyond turbulence on the loads. The simulation results and measurements were compared in terms of time series, discrete Fourier transforms, power spectral densities, probability density functions of strains and accelerometers. A good match was achieved between the measurements and models set up by OC5 Phase III participants.

17 WIND ENERGY↗

Validation of Numerical Models of the Offshore Wind Turbine from the Alpha Ventus Wind Farm Against Full-Scale Measurements Within OC5 Phase III: Preprint

The main objective of the Offshore Code Comparison Collaboration Continuation, with Correlation (OC5) project, is validation of aero-hydro-servo-elastic simulation tools for offshore wind turbines (OWTs) through comparison of simulated results to the response data of physical systems. Phase III of the OC5 project validates OWT models against the measurements recorded on Senvion 5M wind turbine supported by the OWEC Quattropod from the alpha ventus offshore wind farm. The following operating conditions of the wind turbine were chosen for the validation: (1) Idling below the cut-in wind speed; (2) Rotornacelle assembly (RNA) rotation maneuver below the cut-in wind speed; (3) Power production below and above the rated wind speed; and (4) Shut-down. A number of validation load cases were defined based on these operating conditions. The following measurements were used for validation: (1) Strains and accelerations recorded on the support structure; (2) Pitch, yaw, and azimuth angles, generator speed, and electrical power recorded from the RNA. Strains were not directly available from the majority of the OWT simulation tools. Therefore, strains were calculated based on out-of-plane bending moments, axial forces, and geometrical properties of the structural members. Also, a number of issues arose during the validation: (1) The need for a thorough quality check of sensor measurements; (2) The sensitivity of the turbine loads to the controller and airfoil properties, which were only approximated in the modeling approach; (3) The importance of estimating and applying an appropriate damping value for the structure; and (4) The importance of wind characteristics beyond turbulence on the loads. The simulation results and measurements were compared in terms of time series, discrete Fourier transforms (DFTs), power spectral densities (PSDs), probability density functions (PDFs) of strains and accelerometers. A good match was achieved between the measurements and models set up by OC5 Phase III participants.

17 WIND ENERGY↗

Southwest Regional Partnership on Carbon Sequestration: Phase III (Final Scientific/Technical Report)

The Southwest Regional Partnership on Carbon Sequestration (SWP) is one of 7 regional partnerships formed in 2003 under the U.S. Department of Energy’s (DOE) Regional Carbon Sequestration Partnerships (RCSPs) initiative. The overall purpose of the initiative was to help determine and implement the technology, infrastructure, and regulations most appropriate to promote carbon storage in different regions of the country. Covering Arizona, Colorado, New Mexico, Oklahoma, Utah, and parts of Texas, Wyoming, and Kansas, the SWP evaluated regional carbon storage and utilization potential and focused on technologies and sites that could complement the region’s strong position in energy production. The project progressed through three phases: • Phase I (2003–2005): Characterized regional geologic formations and CO 2 sources, assessed sequestration potential, and identified pilot test sites. • Phase II (2005–2013): Conducted small-scale field tests to validate sequestration methods, including geologic and terrestrial projects. • Phase III (2008–2022): Demonstrated large-scale CO 2 injection at a commercial oil field to test monitoring, verification, and long-term storage strategies. This report covers Phase III. The final project site, the Farnsworth Unit (FWU) in Texas, provided real-world testing of reservoir characterization, monitoring, and risk evaluation tools and processes that could be used in any commercial scale carbon capture, utilization, and storage (CCUS) project. Extensive data collection and analysis helped refine best practices for reservoir characterization, injection monitoring, and storage verification. The SWP contributed to national databases, DOE best practice manuals, and regional geological assessments to support future sequestration efforts. Key lessons learned include the importance of robust data management, strategic site selection, regulatory navigation, and effective industry collaboration. The project’s findings will inform ongoing and future carbon storage initiatives. Task 1 (Regional Characterization) • The SWP continued to participate in national outreach efforts and NATCARB. • The SWP evaluated multiple potential sites before selecting the FWU as the primary field test location. Task 2 (Public Outreach and Education) • The SWP contributed to national databases, DOE best practice manuals, and regional geological assessments to support future sequestration efforts. Task 3 (Permitting and Regulatory Compliance) • The SWP ensured compliance with federal and state regulations, including National Environmental Policy Act (NEPA) requirements. • The SWP obtained all necessary permits for drilling, injection, and monitoring activities. Task 4 (Site Characterization and Planning) • The SWP developed work plans for four key activities: characterization, simulation, monitoring and verification, and risk evaluation. • The SWP collected and synthesized legacy data from multiple sources to build initial static geological models and dynamic reservoir models demonstrating project feasibility. • The SWP conducted an initial risk evaluation and developed mitigation plans. Task 5 (Field Operations and Data Collection) • The SWP drilled, logged, and cored three characterization wells to gather critical subsurface data. • The SWP conducted multiple geophysical surveys, including 3D seismic, crosswell seismic, and vertical seismic profiling, to improve reservoir characterization. Task 6 (Monitoring and Verification) • The SWP performed extensive geological characterization using data from characterization wells and seismic surveys. • The SWP established a surface monitoring network to track CO 2 flux in soil gas, groundwater chemistry, and near-surface atmospheric CO 2 levels. • The SWP built and refined reservoir models to study the effects of relative permeability on simulation behavior and improve calibration with experimental data. Task 7 (Risk Assessment and Model Refinement) • The SWP conducted multiple studies to evaluate reservoir integrity, predict CO 2 plume behavior and improve predictive modeling capabilities. • The SWP refined geological models and used them to enhance the accuracy of simulation models. • The SWP continued quantitative risk assessment of top-ranked risks and strengthened the link between qualitative and quantitative risk methodologies.

02 PETROLEUM↗

A Microfabricated Segmented-Involute-Foil Regenerator for Enhancing Reliability and Performance of Stirling Engines. Phase III Final Report for the Radioisotope Power Conversion Technology NRA

Under Phase III of NASA Research Announcement contract NAS3-03124, a prototype nickel segmented-involute-foil regenerator was microfabricated and tested in a Sunpower Frequency-Test-Bed (FTB) Stirling convertor. The team for this effort consisted of Cleveland State University, Gedeon Associates, Sunpower Inc. and International Mezzo Technologies. Testing in the FTB convertor produced about the same efficiency as testing with the original random-fiber regenerator. But the high thermal conductivity of the prototype nickel regenerator was responsible for a significant performance degradation. An efficiency improvement (by a 1.04 factor, according to computer predictions) could have been achieved if the regenerator was made from a low-conductivity material. Also, the FTB convertor was not reoptimized to take full advantage of the microfabricated regenerator s low flow resistance; thus, the efficiency would likely have been even higher had the FTB been completely reoptimized. This report discusses the regenerator microfabrication process, testing of the regenerator in the Stirling FTB convertor, and the supporting analysis. Results of the pre-test computational fluid dynamics (CFD) modeling of the effects of the regenerator-test-configuration diffusers (located at each end of the regenerator) are included. The report also includes recommendations for further development of involute-foil regenerators from a higher-temperature material than nickel.

Ibrahim, Mounir B.↗

Big Sky Regional Carbon Sequestration Partnership (Phase III Final Scientific/Technical Report)

The Big Sky Carbon Sequestration Partnership (BSCSP) pursued a Phase III demonstration project at Kevin Dome in north central Montana. Kevin Dome covers approximately 700 square miles and is a naturally occurring CO 2 reservoir that is flanked by oil and gas fields. The carbon dioxide (CO 2 ) is in the upper Devonian Duperow (carbonate) formation and does not reach the spill point of the dome; therefore, the dome has potential as a CO 2 sequestration reservoir, a CO 2 supply, or as both if anthropogenic sources and enhanced oil recovery (EOR) operations are associated with the dome. Kevin Dome could potentially act as a buffer to continue accepting anthropogenic CO 2 when EOR flooding operations are interrupted or completed. The project objective was to produce one million tonnes of CO 2 from the gas cap of Kevin Dome, pipe it laterally, inject, and re-store it in the brine leg of the same formation to test the hub / buffer storage concept. This was to be accomplished by drilling up to five production wells, building a short pipeline and compression facilities, and drilling an injection well and several monitoring wells. BSCSP commenced outreach and site characterization activities including acquiring baseline data for near-surface insurance monitoring, acquiring 3-dimensional, 9-component surface seismic over the project area, drilling two test wells (one in the production area and one in the injection area), coring key intervals, and performing comprehensive logging. Well tests of those wells revealed two barriers to the project. The production (Danielson 33-17) well was perforated in multiple zones but failed to produce any significant CO 2 . This was despite being drilled in the near vicinity of a historic well that had produced 3700 MCF per day in a drill stem test. Modeling indicated that this was likely due to a phase change during production causing a temperature drop resulting in hydrate and/or water ice formation that clogged the formation. Tests of the injection zone (Wallewein 22-1) well indicated total dissolved solids (TDS) slightly below the EPA required 10,000 parts per million (ppm) for a Class VI underground injection control permit. While the project was initiated before Class VI rules were promulgated, and this was an experimental project (seemingly qualified for a Class V permit), the Environmental Protection Agency (EPA) indicated that injection would require a Class VI permit. The low salinity result was unexpected as contours plotted based on regional formation water quality data indicated an expected TDS above 20,000 ppm, and wells between the recharge zone and the Wallewein well tested above 10,000 ppm. Faced with the inability to obtain an injection permit, the demonstration project could not proceed. However, the project had generated valuable samples and data on a large natural analog including 32 sq. mi. of 3-D, 9-C seismic, 430 ft. of carbonate core covering seven different depositional environments taken from areas with, and without the presence of CO 2 , 30 ft. of core of two caprocks, a tight carbonate and an anhydrite, a full set of modern logs on both wells, and well tests. DOE decided to re-scope the project around completing studies utilizing this data. This report covers both the initial scope and the re-scope (Task / Section numbers preceded with an R). While the report covers a wide range of project activities, highlights of this work include: Development of a geostatic model using neural nets to match well logs to facies and using multi-waveform seismic to inform reservoir heterogeneity; Unique mechanical testing of permeability – stress relationship in two caprock materials; Development of full waveform inversion to generate a high resolution velocity model; Model development for dual permeability (fracture and matrix) systems to better account for matrix-matrix interactions; Joint seismic wave inversion (including the first quadr-joint inversion) exhibiting better imaging of a challenging reservoir zone in stiff rock; Core flow and core flood results on a reactive carbonate; and Innovative laboratory measurements of seismic response of fractured core as a function of fluid fill.

54 ENVIRONMENTAL SCIENCES↗

Objective Lightning Probability Forecasting for Kennedy Space Center and Cape Canaveral Air Force Station, Phase III

The AMU created new logistic regression equations in an effort to increase the skill of the Objective Lightning Forecast Tool developed in Phase II (Lambert 2007). One equation was created for each of five sub-seasons based on the daily lightning climatology instead of by month as was done in Phase II. The assumption was that these equations would capture the physical attributes that contribute to thunderstorm formation more so than monthly equations. However, the SS values in Section 5.3.2 showed that the Phase III equations had worse skill than the Phase II equations and, therefore, will not be transitioned into operations. The current Objective Lightning Forecast Tool developed in Phase II will continue to be used operationally in MIDDS. Three warm seasons were added to the Phase II dataset to increase the POR from 17 to 20 years (1989-2008), and data for October were included since the daily climatology showed lightning occurrence extending into that month. None of the three methods tested to determine the start of the subseason in each individual year were able to discern the start dates with consistent accuracy. Therefore, the start dates were determined by the daily climatology shown in Figure 10 and were the same in every year. The procedures used to create the predictors and develop the equations were identical to those in Phase II. The equations were made up of one to three predictors. TI and the flow regime probabilities were the top predictors followed by 1-day persistence, then VT and Ll. Each equation outperformed four other forecast methods by 7-57% using the verification dataset, but the new equations were outperformed by the Phase II equations in every sub-season. The reason for the degradation may be due to the fact that the same sub-season start dates were used in every year. It is likely there was overlap of sub-season days at the beginning and end of each defined sub-season in each individual year, which could very well affect equation performance.

Crawford, Winifred C.↗

DARPA NOM4D Phase III Kickoff

A review of laser forming efforts performed by NASA Marshall Space Flight Center in preparation of the DARPA NOM4D Phase III kickoff.

TVAC↗

On the characteristics of the wake of a wind turbine undergoing large motions caused by a floating structure: an insight based on experiments and multi-fidelity simulations from the OC6 project Phase III

This study reports the results of the second round of analyses of the Offshore Code Comparison, Collaboration, Continued, with Correlation and unCertainty (OC6) project Phase III. While the first round investigated rotor aerodynamic loading, here, focus is given to the wake behavior of a floating wind turbine under large motion. Wind tunnel experimental data from the UNsteady Aerodynamics for FLOating Wind (UNAFLOW) project are compared with the results of simulations provided by participants with methods and codes of different levels of fidelity. The effect of platform motion on both the near and the far wake is investigated. More specifically, the behavior of tip vortices in the near wake is evaluated through multiple metrics, such as streamwise position, core radius, convection velocity, and circulation. Additionally, the onset of velocity oscillations in the far wake is analyzed because this can have a negative effect on stability and loading of downstream rotors. Results in the near wake for unsteady cases confirm that simulations and experiments tend to diverge from the expected linearized quasi-steady behavior when the rotor reduced frequency increases over 0.5. Additionally, differences across the simulations become significant, suggesting that further efforts are required to tune the currently available methodologies in order to correctly evaluate the aerodynamic response of a floating wind turbine in unsteady conditions. Regarding the far wake, it is seen that, in some conditions, numerical methods overpredict the impact of platform motion on the velocity fluctuations. Moreover, results suggest that the effect of platform motion on the far wake, differently from original expectations about a faster wake recovery in a floating wind turbine, seems to be limited or even oriented to the generation of a wake less prone to dissipation.

17 WIND ENERGY↗

OC6 project Phase III: validation of the aerodynamic loading on a wind turbine rotor undergoing large motion caused by a floating support structure

Abstract. This paper provides a summary of the work done within Phase III of the Offshore Code Comparison Collaboration, Continued, with Correlation and unCertainty (OC6) project, under the International Energy Agency Wind Technology Collaboration Programme Task 30. This phase focused on validating the aerodynamic loading on a wind turbine rotor undergoing large motion caused by a floating support structure. Numerical models of the Technical University of Denmark 10 MW reference wind turbine were validated using measurement data from a 1:75 scale test performed during the UNsteady Aerodynamics for FLOating Wind (UNAFLOW) project and a follow-on experimental campaign, both performed at the Politecnico di Milano wind tunnel. Validation of the models was performed by comparing the loads for steady (fixed platform) and unsteady (harmonic motion of the platform) wind conditions. For the unsteady wind conditions, the platform was forced to oscillate in the surge and pitch directions under several frequencies and amplitudes. These oscillations result in a wind variation that impacts the rotor loads (e.g., thrust and torque). For the conditions studied in these tests, the system aerodynamic response was almost steady. Only a small hysteresis in airfoil performance undergoing angle of attack variations in attached flow was observed. During the experiments, the rotor speed and blade pitch angle were held constant. However, in real wind turbine operating conditions, the surge and pitch variations would result in rotor speed variations and/or blade pitch actuations, depending on the wind turbine controller region that the system is operating. Additional simulations with these control parameters were conducted to verify the fidelity of different models. Participant results showed, in general, a good agreement with the experimental measurements and the need to account for dynamic inflow when there are changes in the flow conditions due to the rotor speed variations or blade pitch actuations in response to surge and pitch motion. Numerical models not accounting for dynamic inflow effects predicted rotor loads that were 9 % lower in amplitude during rotor speed variations and 18 % higher in amplitude during blade pitch actuations.

17 WIND ENERGY↗

Investigation of Global Particulate Nitrate from the AeroCom Phase III Experiment

An assessment of global particulate nitrate and ammonium aerosol based on simulations from nine models participating in the Aerosol Comparisons between Observations and Models (AeroCom) phase III study is presented. A budget analysis was conducted to understand the typical magnitude, distribution, and diversity of the aerosols and their precursors among the models. To gain confidence regarding model performance, the model results were evaluated with various observations globally, including ground station measurements over North America, Europe, and east Asia for tracer concentrations and dry and wet depositions, as well as with aircraft measurements in the Northern Hemisphere mid-to-high latitudes for tracer vertical distributions. Given the unique chemical and physical features of the nitrate occurrence, we further investigated the similarity and differentiation among the models by examining (1) the pH-dependent NH3 wet deposition; (2) the nitrate formation via heterogeneous chemistry on the surface of dust and sea salt particles or thermodynamic equilibrium calculation including dust and sea salt ions; and (3) the nitrate coarse-mode fraction (i.e., coarse/total). It is found that HNO3, which is simulated explicitly based on full O3-HOx-NOx-aerosol chemistry by all models, differs by up to a factor of 9 among the models in its global tropospheric burden. This partially contributes to a large difference in NO3(-), whose atmospheric burden differs by up to a factor of 13. The atmospheric burdens of NH3 and NHC 4 differ by 17 and 4, respectively. Analyses at the process level show that the large diversity in atmospheric burdens of NO3(-), NH3, and NHC4(+) is also related to deposition processes. Wet deposition seems to be the dominant process in determining the diversity in NH3 and NHC 4 lifetimes. It is critical to correctly account for contributions of heterogeneous chemical production of nitrate on dust and sea salt, because this process overwhelmingly controls atmospheric nitrate production (typically greater than 80 %) and determines the coarse- and fine-mode distribution of nitrate aerosol.

Ammonium aerosol based on simulations↗

Illinois Storage Corridor CarbonSAFE Phase III: Stakeholder Engagement and Outreach Plan

The Stakeholder Engagement and Outreach Plan provides a comprehensive framework for engaging stakeholders of the Illinois Storage Corridor (ISC) project. The ISC project is a CarbonSAFE Phase III project designed to facilitate commercial deployment of carbon capture, utilization, and storage (CCUS) in Illinois. The project aims to establish a multi-industry carbon storage corridor through development of storage sites near the One Earth Energy (OEE) ethanol production facility in north-central Illinois and the Prairie State Generating Company (PSGC) coal-fired power plant in south-central Illinois, with combined annual CO 2 capture ultimately exceeding 8.6 million tons per year. Stakeholder engagement is recognized as a critical component for successful CCUS deployment, alongside technical and economic considerations. As an emerging technology, CCUS may not be well understood by the general population, and lack of public awareness can lead to opposition that poses significant barriers to project development. This plan addresses this challenge through systematic stakeholder identification, analysis, planning, and implementation of engagement actions. The plan is structured around four main sections: Communication, Stakeholder Analysis, Stakeholder Engagement, and Environmental Justice. Activities will be conducted under Tasks 1 and 4 of the project's Statement of Project Objectives, with two key subtasks: (1) developing a stakeholder analysis and engagement plan through face-to-face meetings, facilitated discussions, and surveys; and (2) implementing stakeholder engagement and public outreach activities including meetings, open houses, and permit hearings. The Illinois State Geological Survey (ISGS) will manage engagement activities following DOE-NETL best practices, focusing on providing objective, fact-based information about CCUS and the ISC project. A comprehensive Communication Plan establishes protocols for media contacts, site visits, and crisis communications. The stakeholder analysis follows a structured workflow process divided into Pre-feasibility and Feasibility phases, incorporating contextual understanding, assessment, data collection, and analysis. Key stakeholder groups include government bodies, educational organizations, conservation and environmental groups, agricultural communities, and religious organizations. The plan addresses common stakeholder questions regarding project risks, benefits, safety, property values, liability, and environmental impacts. Recommendations emphasize developing clear messaging, creating informational materials, and preparing to address both project-specific and broader environmental concerns to ensure transparent communication and build stakeholder support throughout project implementation.

25 ENERGY STORAGE↗