Assessing the viability of K-Mo2C for reverse water-gas shift scale-up: molecular to laboratory to pilot scale
Explore the source record for details and available documents.
SEARCH · Search NASA
Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.
Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.
Explore the source record for details and available documents.
The primary objective of this project was to develop and demonstrate an integrated pilot-scale circuitry for recovering high-value rare earth elements (REEs) from coal and coal byproducts. The target performance was to produce a mixed REE product with content of at least two percent by weight on a dry mass basis in a cost-effective and environmentally benign manner. During the first nine months of the project period (Phase 2 Budget Period 2), pilot plant construction was completed including all field site startup activities such as permitting, engineering design, procurement/bidding, unit fabrication, site construction, equipment installation, module assembly, safety training, and circuit shakedown. During the remaining 21 months of project period (Phase 2 Budget Period 3), detailed field-testing activities were performed including feedstock sample collection and preparation, exploratory testing, circuit modification, detailed parametric study, and performance optimization. A detailed techno-economic analysis was performed based on the pilot plant testing findings which provided various scenarios for REE production. The project successfully accomplished the proposed target performance by producing mixed rare earth oxide (REO) with greater than 90% purity by weight in a continuous pilot scale operation from two distinctly different coarse refuse materials (i.e., West Kentucky No. 13 and Fire Clay coal seams), and at least three secondary sources (i.e., heap leach process and naturally formed acid mine drainage system). Project partners included the University of Kentucky, Virginia Tech, West Virginia University, Alliance Coal, Blackhawk Mining, Mineral Refining Company, and Mineral Separation Technologies. The pilot scale test facility was constructed at a former mining complex owned by Alliance Natural Resource Partners (Alliance Coal). The site was rehabilitated to accommodate the equipment installation, construction and fabrication, electrical power requirement, water line management and containment. The process units constructed and installed included X-ray sorting unit, crushing and grinding unit, physical separation unit, acid leaching unit, solvent extraction unit, and wastewater management unit. A rare earth mineral concentration unit was constructed as a standalone unit for flexible operation. A detailed environmental assessment and control plan was carried out to identify and quantify any potential impacts of the pilot-scale processing circuitry on the human and eco-system health and well-being. Corresponding mitigation strategies and control measures were provided. A conceptual flowsheet was developed to effectively remove thorium and uranium from high purity rare earth oxide mix or any potential radionuclide enriched stream. The two distinct feedstock materials were secured from the Blackhawk Mining Complex in eastern Kentucky where the Fire Clay (Hazard No. 4) seam is processed. The West Kentucky No. 13 (Baker) coarse refuse material was collected from an active process stream at an Alliance coal preparation plant located in western Kentucky. Characterization analysis indicated that both of feed materials generated from the two sources contained >300 ppm of TREEs on a dry whole mass basis which met the requirements for a qualified feed stock. The two feedstocks were further upgraded using a dual x-ray sorter to prepare the feed material for hydrometallurgical circuit. Thermal treatment on feed material prior to leaching was found to: 1) improve the leaching recovery of REEs, 2) increase the leaching kinetics, and 3) allow the leaching reaction to occur at lower acidity. Roasting at 600°C was selected as the pre-treatment condition for both West Kentucky No. 13 and Fire Clay coarse refuse material. Over 40% of leaching recovery was achieved by roasting West Kentucky No. 13 material having a top particle size of 3 mm in the pilot scale operation using 1.2M sulfuric acid leaching at 75OC. Initial pilot scale testing involved continuous operation of the pilot plant for 94 hours. The leaching unit was operated at solid-to-liquid ratio of 1 to 10 (w/v) using 0.5M sulfuric acid solution at a temperature of 75°C. The continuous solvent extraction circuit utilized rougher and cleaner units with DEHPA and TBP as the extractants. An innovative stripping circuit was developed to accumulate the REE concentration in the stripping solution to a level above 600 ppm. A bleed stream from the recycled strip solution was treated using oxalic acid precipitation which produced a high grade rare earth oxalate. The oxalate product was roasted to remove the oxalate which produced a rare earth oxide product having a purity greater 90%. Due to high concentrations of contaminant ions in the pregnant leach solution (PLS), a modified flowsheet was developed that involved pre-concentration of the REEs using multiple stages of precipitation and redissolution. The advantage of this process was improved removal of contamination before the downstream purification process and a significant cost reduction relative to the circuit that utilized the solvent extraction process. The modified circuitry included processes involving leaching, multistage precipitation, redissolution, and oxalate precipitation followed by roasting of the oxalate product. The circuit produced a mixed REO that was 92.96% pure from the initial test. A detailed parametric test plan was carried out which involved varying key parameters including solids feed rate, acid flowrate, acid concentration, multistage precipitation pH, redissolution pH, oxalate precipitation dosage and pH. The response variables included REE recovery, contaminant recovery, REO product grade and overall chemical consumption. Test results indicated that the acid-to-solid ratio is the key parameter to leaching efficiency as performance deteriorated with an increase in solids concentration. The optimal pH determined for REE precipitation and redissolution was 6.5 and 2.5, respectively. Additional tests were conducted to further improve the flowsheet. Recirculating a portion of the PLS to the feed of the leach tanks improved the leaching performance by lowering the pH of the leaching system and reducing the contamination recovery by shortening the residence time. Moreover, the removal of Al prior to REE precipitation significantly reduced the oxalic acid consumption in the oxalate precipitation circuit. The modified circuit produced over 90% grade REO by weight from both West Kentucky No. 13 and Fire Clay coarse refuse material in pilot scale continuous test programs. A case analysis model was developed to project the REE and major contaminants concentration in each PLS stream based on the leaching condition, pH cut point, and oxalic acid dosage. A correlation was established using empirical and semi-empirical models. Using the models, chemical consumption required for each stage was predicted based on the projected performance of the hydrometallurgy circuit. After identifying the optimum conditions, validation tests were carried out for the treatment of both West Kentucky No. 13 and Fire Clay coarse refuse materials in the pilot plant. The actual circuit performance and chemical consumptions were very close to the model predictions. Other than the two coarse refuse sources, several secondary feedstocks were also tested in the pilot plant facility. A “heap leach” system was constructed using the coarse refuse material generated from cleaning the West Kentucky No. 13 seam coal. Using the two stage SX rougher and cleaner circuit, a concentrate with a grade >90% REO was produced while recovering >97% of the REEs from the heap leach PLS. Naturally generated acid mine drainage (AMD) from West Kentucky No.13 mine was processed using the multistage precipitation circuit in the pilot plant in a test conducted for a period of 32 hours. The final grade of the mix RE oxide produced from the AMD was 90.84% with an overall circuit recovery of 64%. The primary source of REE was the selective precipitation steps involving iron and aluminum rejection. The hydrophobic-hydrophilic separation (HHS) process was proven to effectively recover coal from fine waste materials. For REM recovery, the HHS process was able to produce concentrates at grades of approximately 1.8% REE on an ash basis; however, recovery values were typically low, <10%, under the optimal conditions determined in the laboratory-scale testing. Staged testing of the pilot-scale HHS process for coal recovery and semi-continuous laboratory testing for REM testing showed that a total concentration ratio of more than 15x was observed for the REM recovery process. A circuit simulation package was developed for REE extraction and purification using a spreadsheet-based platform (Microsoft Excel). The REESim circuit simulation package is configured to track the mass and volume flows of components passing through a series of unit operations specified and configured by the user. The mass rates can then be utilized by the user to determine important performance indicators such as product mass yields, concentrate purity levels, element-by-element recoveries, and so forth. The techno-economic analysis showed that the roasting and leaching operations were the most expensive capital items, each contributing approximately 30% to the total capital cost. One notable contributor to the high production costs was the low REE recovery observed in the pilot scale trials. The product basket price was shown to have a strong influence on the economic viability of the scenarios, with the scandium price being the most significant influencer. Operating cost was shown to be extremely sensitive to REE recovery, REE feed grade, and leaching acid consumption. An analysis of ten different scenarios for a 500 t/h commercial operation revealed that three were economically favorable, producing internal rates of return varying from 27.7% to 33.1% and payback periods of 4 to 5 years. The project successfully developed and demonstrated a process to recover REEs from coal and coal byproducts in a pilot-plant operation which consistently produced over 90% grade REO mix from varies types of feedstocks. Commercialization analysis showed that the technology readiness level successfully achieved TRL 6 at the end of the project and demonstrated the need and the potential for scaling the process to further advance the technologies toward the goal of providing a domestic supply of REEs at a commercial scale.
The diesel-piloted dual-fuel compression ignition combustion strategy is well-suited to accelerate the decarbonization of transportation by adopting hydrogen as a renewable energy carrier into the existing internal combustion engine with minimal engine modifications. Despite the simplicity of engine modification, many questions remain unanswered regarding the optimal pilot injection strategy for reliable ignition with minimum pilot fuel consumption. The present study uses a single-cylinder heavy-duty optical engine to explore the phenomenology and underlying mechanisms governing the pilot fuel ignition and the subsequent combustion of a premixed hydrogen-air charge. The engine is operated in a dual-fuel mode with hydrogen premixed into the engine intake charge with a direct pilot injection of n-heptane as a diesel pilot fuel surrogate. Optical diagnostics used to visualize in-cylinder combustion phenomena include high-speed IR imaging of the pilot fuel spray evolution as well as high-speed HCHO* and OH* chemiluminescence as indicators of low-temperature and high-temperature heat release, respectively. Three pilot injection strategies are compared to explore the effects of pilot fuel mass, injection pressure, and injection duration on the probability and repeatability of successful ignition. The thermodynamic and imaging data analysis supported by zero-dimensional chemical kinetics simulations revealed a complex interplay between the physical and chemical processes governing the pilot fuel ignition process in a hydrogen containing charge. Hydrogen strongly inhibits the ignition of pilot fuel mixtures and therefore requires longer injection duration to create zones with sufficiently high pilot fuel concentration for successful ignition. Results show that ignition typically tends to rely on stochastic pockets with high pilot fuel concentration, which results in poor repeatability of combustion and frequent misfiring. In conclusion, this work has improved the understanding on how the unique chemical properties of hydrogen pose a challenge for maximization of hydrogen’s energy share in hydrogen dual-fuel engines and highlights a potential mitigation pathway.
Dual-fuel (DF) engines, in which premixed natural gas and air in an open-type combustion chamber is ignited by diesel-fuel pilot sprays, have been more popular for marine use than pre-chamber spark ignition (PCSI) engines because of their superior durability. However, control of ignition and combustion in DF engines is more difficult than in PCSI engines. In this context, here we focus on the ignition stability of n-heptane pilot-fuel jets injected into a compressed premixed charge of natural gas and air at low-load conditions. To aid understanding of the experimental data, chemical-kinetics simulations were carried out in a simplified engine-environment that provided insight into the chemical effects of methane (CH4) on pilot-fuel ignition. The simulations reveal that CH4 has an effect on both stages of n-heptane autoignition: the small, first-stage, cool-flame-type, low-temperature ignition (LTI) and the larger, second-stage, high-temperature ignition (HTI). As the ratio of pilot-fuel to CH4 entrained into the spray decreases, the initial oxidization of CH4 consumes the OH radicals produced by pilot-fuel decomposition during LTI, thereby inhibiting its progression to HTI. Using imaging diagnostics, the spatial and temporal progression of LTI and HTI in DF combustion are measured in a heavy-duty optical engine, and the imaging data are analyzed to understand the cause of severe fluctuations in ignition timing and combustion completeness at low-load conditions. Images of cool-flame and hydroxyl radical (OH*) chemiluminescence serve as indicators of LTI and HTI, respectively. The cycle-to-cycle and spatial variation in ignition extracted from the imaging data are used as key metrics of comparison. The imaging data indicate that the local concentration of the pilot-fuel and the richness of the surrounding natural-gas air mixture are important for LTI and HTI, but in different ways. In particular, higher injection pressures and shorter injection durations increase the mixing rate, leading to lower concentrations of pilot-fuel more quickly, which can inhibit HTI even as LTI remains relatively robust. Decreasing the injection pressure from 80 MPa to 40 MPa and increasing the injection duration from 500 µs to 760 µs maintained constant pilot-fuel mass, while promoting robust transition from LTI to HTI by effectively slowing the mixing rate. This allows enough residence time for the OH radicals, produced by the two-stage ignition chemistry of the pilot-fuel, to accelerate the transition from LTI to HTI before being consumed by CH4 oxidation. Thus from a practical perspective, for a premixed natural gas fuel–air equivalence-ratio, it is possible to improve the “stability” of the combustion process by solely manipulating the pilot-fuel injection parameters while maintaining constant mass of injected pilot-fuel. This allows for tailoring mixing trajectories to offset changes in fuel ignition chemistry, so as to promote a robust transition from LTI to HTI by changing the balance between the local concentration of the pilot-fuel and richness of the premixed natural gas and air. This could prove to be a valuable tool for combustion design to improve fuel efficiency or reduce noise or perhaps even reduce heat-transfer losses by locating early combustion away from in-cylinder walls.
Since at least the late 1970s, electric utilities and their regulators have recognized the value of experimentation to motivate innovation. The industry has a long history of using pilots to help inform future decision making about electric utility rates, customer technology adoption and integration, and even changes to the utility’s regulatory or business model. Although utility pilots have become almost ubiquitous proving grounds for new rates, technologies, and alterations to the traditional utility regulatory and business model, some regulators are beginning to raise questions about what constitutes a “good” pilot. Much has been written about utility pilots over the years; however, what is missing from the literature is the identification of a comprehensive process for not only designing and evaluating a pilot, but also implementing, successful utility pilots that provide actionable outcomes upon which more informed decisions can be made. This report provides a step-by-step process that regulators, policymakers, and utilities can follow to help promote a more successful pilot, even if whatever is being tested fails to produce the intended or expected result(s). It is worth noting that this report is not intended to serve as a technical resource for those designing, implementing, and evaluating pilots. However, there are myriad references provided for those wishing to delve deeper into the technical details.
Coal Direct Chemical Looping (CDCL) is an advanced oxy-combustion technology that has the potential to substantially reduce the energy penalty and the cost of electricity (COE) for coal-fired power generation with CO₂ capture. The Babcock & Wilcox Company (B&W) and The Ohio State University (OSU) have been collaborating on the development of an iron oxide oxygen-carrier based chemical looping technology for clean power generation with inherent carbon capture. In this process, coal is dried and pulverized prior to being transported into a moving-bed reducer. In the reducer, coal reacts with the oxygen-carrier particles, forming combustion byproducts, predominantly CO₂ and H₂O, while reducing the iron oxide oxidation state from Fe₂O₃ to a mixture of FeO and Fe. The reduced state particles are then transported to a combustor reactor and re-oxidized with air. Following the oxidation, the oxygen-carrier particles are regenerated, and a large amount of heat is released for steam production. The produced steam is sent to a turbine for electricity generation. Meanwhile, the CO₂–rich stream leaving the reducer is cooled, cleaned, and compressed for subsequent pipeline transportation and sequestration. By combining air separation and fuel conversion into a single system, the CDCL technology enables the intensification of oxy-combustion processes by eliminating the energy and cost intensive cryogenic air separation unit and thereby results in higher overall plant efficiencies and lower COE’s. The use of a moving-bed reducer results in high conversions of volatile hydrocarbons and high CO₂ purity, which reduces the cost of downstream CO₂ purification for sequestration or utilization. The Babcock & Wilcox Company in collaboration with The Ohio State University, Johnson & Matthey, The Electric Power Research Institute, and Dover Light & Power completed a Preliminary Front-End Engineering and Design (Pre-FEED) study of a 10 MWe coal-direct chemical looping (CDCL) pilot plant. The planned system is a modular 10 MWe CDCL large pilot facility consisting in 4 modules of 2.5 MWe each, working in parallel and to be hosted within the current structure at the City of Dover’s Municipal Power Plant. The CDCL system can achieve auto-thermal operation and includes a sub-critical steam cycle for power generation. The pilot system was designed to demonstrate full commercial operation at a reduced scale. The coal distribution per plan area is a representative slice of larger commercial arrangements. The system includes a CO₂ recycle system, but it does not include a compression system. The large pilot includes all the environmental control equipment and oxygen carrier and ash handling systems. As part of the project, the Team performed laboratory testing and carried out multiple pilot test campaigns to obtain design and performance information at the 250 kWth CDCL pilot facility at the Babcock & Wilcox Company’s Research Center. The Team demonstrated sustained operations at designed coal inputs, high coal conversion, high CO₂ purity, heat generation on the combustor, low carbon carryover between reactors and low particle attrition. Emissions generated in the reducer reactor were identified as SO₂ and NO x . The commercial manufacturing cost of oxygen carrier particle was evaluated by JM. A particle manufacturing report was generated and submitted to the DOE. Based on the results from the pilot tests and the pre-FEED design efforts, a techno-economic analysis was performed. The study shows that the CDCL process is a promising carbon-friendly technology capable of producing electricity with high efficiency. The estimated COE of the supercritical CDCL plant is $83.3 / MWh, which meets DOE’s target of less than 30% increase in COE when compared to a supercritical PC plant without CO₂ capture. This is the lowest among the existing carbon capture technologies (post-combustion and oxy-combustion) for fossil fuel power plant. CDCL is evaluated to be the most promising technology for carbon capture from the economic aspect.
The Flameless Pressurized Oxy-Combustion (FPO) cycle, a novel flexible fuel technology, is being developed into a large pilot. This effort seeks to complete the preliminary engineering and planning of a 25 MWth Pilot Plant that will demonstrate the technology for scale-up to a commercial unit. The technology, pioneered by ITEA at the 5 MWth scale, must be brought to a higher technology readiness level (TRL) to be viable at the commercial scale. The 25 MWth pilot cycle was optimized for cost and technology development and demonstration. Preliminary drawings, layouts, and plans were defined. Process flow diagrams were used to describe the pilot configuration in greater detail. A heat and mass balance with stream data was created. A master equipment list specified the operating conditions for major pieces of equipment within the pilot using this heat and mass balance. The 25 MWth FPO pilot is assessed for environmental performance. A test campaign is developed to assess the type of test and number of hours required for pilot demonstration. The environmental performance is compared against projected performance at the commercial scale. This project builds upon extensive evaluation of the techno-economic performance of the FPO technology already performed by ITEA. This includes system improvements, such as the addition of a turbo-expander to the flue gas stream. Some of the performance-enhancing components are not as well defined as others. The primary goal of this effort was to bring all of the core cycle components to the same level of design maturity. A techno-economic assessment (TEA) evaluated the FPO technology at the commercial scale in comparison to the NETL baseline cases. The reference plants were used in combination with proprietary equipment estimates to build a plant capital cost and cost of electricity evaluation. FPO performed better than the sub-bituminous post-combustion capture cases. Further preliminary estimates of improvements to the FPO cycle show even further gains when compared to conventional carbon capture methods.
In June 2018 the team embarked on an ambitious project to address the slow development pace of Alaska’s 20+ billion barrels heavy oil resource via the first ever polymer flood pilot. Following the successful commencement of the pilot in August 2018, the field demonstration, supporting laboratory experiments and numerical simulation have steadily progressed. A significant amount of valuable data and lessons learned have been collected, and are reported in this paper. The ongoing pilot and the research activities is making headway toward the primary objective of validating the use of polymer flooding for extracting heavy oil in Alaska’s challenging environment. The pilot is conducted in two pre-existing pairs of horizontal injectors and producers in an isolated fault block of the Schrader Bluff heavy oil reservoir at the Milne Point Field. A customized polymer blending and pumping unit injects HPAM polymer at a concentration of 1,750 ppm to achieve a target viscosity of 45 cP. Supporting coreflood laboratory experiments have focused on quantification of polymer retention in the rock, and effect of injection water salinity, polymer, and their combinations on oil recovery. The injection and production response of the pilot flood pattern is utilized to develop a history matched reservoir simulation model for forecasting oil recovery beyond the pilot. Finally, specially designed laboratory experiments address anticipated operating concerns regarding post-polymer breakthrough such as oil-water separation efficiency and polymer induced fouling of heater tubes. Polymer has been injected continuously since startup except for two short equipment modification shutdowns, and more recently a prolonged disruption due to polymer hydration issues at the J-pad field site. Cumulatively, over 600,000 lbs. of polymer has been injected, corresponding to ~7%PV. The two producers show significant decrease in the water cut, gradually increasing oil rate, and no polymer breakthrough. Two main observations from the coreflood are a significant uncertainty in polymer retention values, and positive oil recovery response to low salinity water (2,600 mg/liter TDS). The heterogeneity in the flood pattern presents some challenges in obtaining a robust history matched simulation model. Experimental results on produced fluids treatment indicate the formation of a dense polymer deposit, at certain conditions, on heating tubes that can negatively impact the heat transfer efficiency. The scientific knowledge, including the lessons learned during unanticipated shutdowns, quality control, logistics and field data that is being acquired from this effort has referential value for other planned EOR projects. Finally, by all indications, the polymer field pilot is steadily progressing toward achieving the ultimate goal of unlocking the massive heavy oil resources on Alaska North Slope (ANS).
The work described in this report is responsive to the Office of Fossil Energy program ‘Energy Storage for Fossil Power Generation.’ This Phase I report has been prepared by Pintail Power LLC, with support from Nexant ECA, Electric Power Research Institute (EPRI) and Southern Company Services as a deliverable for the U.S. Department of Energy for NETL Award DE-FE-00320016. The Liquid Salt Combined Cycle™ (LSCC™) technology provides large-scale energy storage integrated with Fossil Electric Generating Units (FEGUs) to meet critical needs in the energy transition by providing: • the lowest cost large-scale storage for time-shifting of renewable energy, • superior fuel efficiency to reduce GHGs from dispatchable resources, • flexible capacity and ramping to balance variability of wind and solar resources, • essential grid stability services to assure reliability of a low-carbon grid. The LSCC approach: • employs equipment that has already been proven in utility service, • uses safe, non-toxic, non-degrading, perpetual-life storage medium, • leverages and repurposes existing FEGU assets, • expands the value stack of energy storage to reduce market, financing, and commodity risks. Pintail Power has developed the LSCC technology to meet the need for reliable, efficient, and cost-effective integration of Variable Renewable Energy (VRE) into a low-carbon electric grid by coupling proven thermal energy storage with proven gas turbines, steam turbines, and heat transfer equipment. This novel approach is intended to address the key issues facing the grid and operators of renewable and fossil generating units including: • Overgeneration and curtailment of renewables, • Need for fast ramping dispatchable resources, • Improved efficiency and flexibility of fossil units, • Additional peaking capacity to support electrification of transportation and heating, • Provision of reliability services to support high penetration of VRE, especially synchronous inertia and fast frequency response. A Technology Readiness assessment by EPRI confirmed that LSCC technology consists of commercially proven hardware used in industrial and utility applications. Although the novel LSCC approach has not yet been demonstrated as a complete system, interfaces between major components have been conservatively specified. A Phase III pilot is planned to demonstrate equipment integration and operation. The patented innovation is removal of the evaporator section from the exhaust heat recovery system, with the evaporation performed by stored energy in a separate steam generator. This arrangement couples renewable and fossil power generation via long-duration energy storage to deliver cost, performance, and operational synergies, including superior charging and discharging flexibility, reduced fuel consumption and lower CO 2 emissions compared to conventional Combined Cycle Power Plants, and low-cost, large-scale energy storage. The LSCC technology is composed of proven equipment integrated with gas turbine exhaust heat in a novel system. During charging, electric heaters raise the salt temperature as it flows from the Cold Salt Tank to the Hot Salt Tank. During discharging, hot salt produces steam from feedwater that is heated with gas turbine exhaust, which also superheats steam to drive a steam turbine. LSCC technology can be added to any combustion-turbine to integrate renewable energy, provide needed grid services, and increase the value of fossil electric generating units based on the technology’s following attributes: • Long-duration storage enables time-shifting of VRE to avoid curtailment and impairment of renewable assets. • Long storage duration combined with fast-charging capability increases arbitrage opportunities by storing more energy when the price is low and discharging more hours when the price is high. • Long storage duration allows resource adequacy to be supplied across multiple days to increase reliability and reduce risk. • The stored energy reduces fuel heat rate and GHG emissions, and increases merit, so the LSCC dispatches earlier and longer to increase the plant’s capacity factor and asset value. • The stored energy enables pre-heating and startup of the steam cycle, without operating the gas turbine, to enable fast startup and ramping when dispatched for discharge. • The steam turbine can operate without the gas turbine so it can provide valuable synchronous inertia during charging without consuming fuel. • Fast frequency response and regulation services can be provided during charging using solid-state heater and pump controls to vary the charge power input in response to grid signals. • The LSCC system can be configured for resilience including black start, islanded/micro-grid operation, and even self-recharging of storage using either gas turbine power or gas turbine exhaust heat. The commercialization plan is to add LSCC technology to existing simple cycle gas turbine power plants with the 50MW GE LM6000 aero-derivative gas turbine as the reference design basis. A Techno-economic assessment of the reference design evaluated the benefits (Levelized Avoided Cost of Energy) and costs (Levelized Cost of Energy). The plant definition included all major systems and budgetary vendor quotes. Pintail Power and NexantECA developed the overall cost estimate for the LSCC plant up to the total plant cost level, following the DOE-NETL cost estimate guidelines at AACE Class 3 (-20%/+30%). This includes the equipment cost, bulk material, direct and indirect labor costs to arrive at the bare erected cost. Engineering costs are factored from the BEC and added to it to arrive at the EPC cost. Process and project contingencies were then factored from the EPC cost and rolled-up to yield the total plant cost of $\$$184 million for 1746 MWh of discharge electricity. • At $\$$105/kWh, the reference plant costs less than any of the Energy Storage Systems evaluated by PNNL in 2020 for the Energy Storage Grand Challenge. Operations and Maintenance cost estimates were scaled from combined cycle practice, assuming that the LSCC unit was co-located with and sharing some labor expense with other units, to arrive at $\$$2.2 million per year. Plant economics were evaluated using prices from the ERCOT Day-Ahead Market for calendar year 2019 (excluding the market disruptions from the COVID pandemic and the February 2020 deep freeze event). Assuming economic dispatch in the ERCOT Day-Ahead market, the reference plant capacity factor would have discharged for 2777 hours at 91.9 MW, a 31.66% capacity factor, with a marginal cost of $\$$25.59/MWh, and a LACE of $\$$82.41/MWh. Fixed charges were calculated according to EIA guidelines to arrive at an LCOE of $\$$83.48. The benefit-to-cost ratio of 0.99 suggests that the reference plant would have been cost-effective and competitive in the market. EPRI interviewed selected utilities to gauge the need for, applicability of and interest in the LSCC system. Several utilities are currently managing increased load growth along with the inclusion of increasing levels of renewable generation, putting pressure on conventional generation by requiring increased turndown requirements and ultimately lower capacity factors. All of the utilities interviewed have CO 2 reduction targets in the 2030-2050 timeframe that will severely limit the participation of fossil generation and require better utilization of carbon free generation. While there is limited opportunity for storage in the current markets, the utilities interviewed stated that there will be a substantial need for long duration energy storage in the future given the expected trends. Utilizing an energy storage system will generally be preferred over new gas capacity in some cases, with the capabilities of the LSCC system being a potential option for retrofit to existing simple cycle gas turbine units, allowing them to deliver greater participation in the market with lower carbon intensity. A technology gap assessment and technology maturation plan identified a pilot-scale demonstration as the final step before commercialization. Key gaps to be addressed during the Phase II FEED (Front-End Engineering Design) are component selection and design, commissioning procedures, and operational procedures and the control system for LSCC charging and discharging. The project team has been expanded to include Wood Group PLC as EPC. The proposed Phase II work leads to a pilot-scale engineering demonstration (TRL 6) to be conducted at Southern Company’s Plant Rowan, where the prototype system will perform “all the functions that will be required of the operational system.” The proposed pilot will facilitate commercialization (TRL-9) by scale-up to utility-scale systems integrated with peaking GTs or directly to facility scale systems using industrial GTs. The conceptual design for the pilot plant focuses on the novel integration aspects of LSCC technology. A slipstream of gas turbine exhaust will feed a waste heat recovery unit coupled to a molten salt steam generator heated by stored energy. The pilot is intended to demonstrate all key operating modes of the LSCC technology during charging, discharging and standby. The pilot equipment will be approximately one-seventh scale of the LM6000 commercial target and is expected to have commercial off-ramp potential for facility-scale applications.
In a thermal fluid system, a control valve includes a flow valve and a solenoid pilot valve. The flow valve has an inlet and an outlet; a control chamber for receiving a pilot pressure; and a valve member operable by the pilot pressure to selectively open and close a fluid path from the inlet to the outlet. The pilot pressure acts in a closing direction of the flow valve. The pilot valve provides the pilot pressure to the control chamber and is a 3/2 way valve with a first port in fluid communication with the control chamber, a second port to be connected to a pressure source, and a third port. The pilot valve has a first position connecting the first port with the second port and a second position connecting the first port with the third port.
Test runs in the pilot plants consume significant resources, and therefore, the learning from test runs should be maximized. Test runs conducted in the pilot plants are often steady state. It takes several hours for reaching steady-state in the pilot plants, and thus, the duration of the test runs needs to be long even for collecting few steady-state data points. On the other hand, a large number of measurements can be collected through dynamic test runs in a short span of time. This paper presents a systematic design of dynamic experiments (DoDEs) for identifiability of model parameters, which is achieved by persistently exciting the inputs signals. A pseudorandom binary sequence (PRBS) is designed as the input signal for DoDE due to its efficiency in obtaining sufficient spectral content. However, due to the long sequence size of the PRBS signal, a Schroeder-phase input signal, which is a multisine signal, is also designed. Tests for both types of signals are run in the Pilot Solvent Test Unit (PSTU) at the National Carbon Capture Center in Wilsonville, Alabama. The transient data are used to solve dynamic data reconciliation and parameter estimation problem. The estimated parameters are found to be not only superior to those estimated from using data collected from hundreds of steady-state test runs in a nonreactive (air–water) system, but the parameters could be estimated by using the dynamic data collected for about 24 h from the pilot plant for the MEA-H 2 O–CO 2 system.
While operating at light loads, diesel pilot-ignited natural gas engines with lean premixed natural gas suffer from poor combustion efficiency and high methane emissions. This work investigates the limits of low-load operation for a micro-pilot diesel natural gas engine that uses a stoichiometric mixture to enable methane and nitrogen oxide emission control. By optimizing engine hardware, operating conditions, and injection strategies, this study focused on defining the lowest achievable load while maintaining a stoichiometric equivalence ratio and with acceptable combustion stability. A multi-cylinder diesel 6.7 L engine was converted to run natural gas premix with a maximum diesel micro-pilot contribution of 10%. With a base diesel compression ratio of 17.3:1, the intake manifold pressure limit was 80 kPa(absolute). At a reduced compression ratio of 15:1, this limit increased to 85 kPa, raising the minimum stable load. Retarding the combustion phasing, typically used in spark-ignition engines to achieve lower loads, was also tested but found to be limited by degraded diesel ignition at later timings. Reducing the pilot injection pressure improved combustion stability, as did increasing pilot quantity at the cost of lower substitution ratios. The lean operation further reduced load but increased NOx and hydrocarbon emissions. At loads below the practical dual-fuel limit, a transition to lean diesel operation will likely be required with corresponding implications for the aftertreatment system.
This manuscript discusses developing a model-based scale-up methodology for a successful technology transfer of gas-phase catalytic reactors from a lab-scale to a pilot-scale operation. The manuscript demonstrates the methodology for gas-phase dehydration of tetrahydrofurfuryl alcohol (THFA) to dihydropyran (DHP) process over commercial Al 2 O 3 catalysts. A two-dimensional reactor model was developed using COMSOL Multiphysics 6.1 software. The model solves heat and mass transport equations in bed-scale and particle scales simultaneously. This powerful feature enables accurate prediction of the heat and mass transfer limitations in pilot-scale reactors, if any exists. Further, the model uses isothermal lab-scale experimental data to derive and validate the reaction chemistry, flow fields and boundary conditions. The model was then scaled-up to project conversion, selectivity, yield and formation rate of DHP in a pilot-scale reactor. The results highlight the complex nature of chemistry, heat, and mass transfer effects in lab-scale and pilot-scale reactors. The model results inform the possible operational limitations of the pilot-scale reactor and design strategies to improve process efficiency. Although the scale-up approach is explained through the THFA dehydration process, the methodology is applicable to any catalytic packed-bed reactor models for a successful process scale-up.
Abstract Aims Cardiac anxiety, which is cardiac-related fear and avoidance behaviours, is common following myocardial infarction (MI) and has been associated with increased risk for cardiovascular events. However, there are currently no treatments specifically designed to target cardiac anxiety. The aim of the two pilot studies was to evaluate an exposure-based cognitive behavioural therapy protocol (MI-CBT) targeting cardiac anxiety following MI, assessing feasibility, acceptability, and the intervention's potential for reducing cardiac anxiety and improving health-related quality of life (QoL). Methods and results A series of two sequential, uncontrolled pilot studies were conducted. In Pilot Study 1 (n = 15), MI-CBT was delivered via face-to-face videoconference, while Pilot Study 2 (n = 23) was delivered online. Patients with a history of MI (≥6 months before assessment, type 1 ST- or non-ST-segment elevation MI, and elevated cardiac anxiety as per clinical interview) were included. The interventions lasted 8 weeks and were therapist-led, with key components including exposure to cardiac-related symptoms and reduction of avoidance behaviours. Participants completed self-rated assessments, including the Cardiac Anxiety Questionnaire (CAQ) and the 12-Item Short Form Health Survey (SF-12), at baseline, post-treatment, and 6-month follow-up. Treatment adherence and satisfaction were high. Cognitive behavioural therapy led to a large reduction in cardiac anxiety, as measured by the CAQ (P < 0.001), and significant improvements in health-related QoL, as measured by the SF-12 (P < 0.001), in both pilot studies. Conclusion These studies suggest that exposure-based CBT is a feasible, acceptable, and promising approach to reduce cardiac anxiety and improve QoL following MI. A randomized controlled trial should be conducted to evaluate the efficacy of the intervention.
Many extreme scale scientific applications have workloads comprised of a large number of individual highperformance tasks. The Pilot abstraction decouples workload specification, resource management, and task execution via job placeholders and late-binding. As such, suitable implementations of the Pilot abstraction can support the collective execution of large number of tasks on supercomputers. We introduce RADICAL-Pilot (RP) as a portable, modular and extensible Pilot enabled runtime system. We describe RP's design, architecture and implementation. We characterize its performance and show its ability to scalably execute workloads comprised of tens of thousands heterogeneous tasks on DOE and NSF leadership-class HPC platforms. Specifically, we investigate RP's weak/strong scaling with CPU/GPU, single/multi core, (non)MPI tasks and python functions when using most of ORNL Summit and TACC Frontera. RADICAL-Pilot can be used stand-alone, as well as the runtime for third-party workflow systems.
Heat duty and heat loss were measured at the pilot plant at UT Austin. Heat loss was measured with energy balances using water. Heat loss was studied using surface temperature measurements over 68 different locations at the pilot plant. Surface temperature measurements indicated that bare metal surfaces were the primary source of heat loss from the pilot plant. Heat loss from bare metal surfaces was at least 50% controlled by natural convection and in many cases was as high as 75% natural convection controlled. Measured heat loss at the pilot plant was 20100 BTU/hr and overall heat loss did not show any dependence on the heat rate of the plant. Compared to PZAS™ at the National Carbon Capture Center, heat loss relative to heat rate was higher at 38%. The relative heat loss at the pilot plants was found to decrease by 20% per MW of added capacity. Measured net heat duty was found to be dependent on measured lean loading and cold rich bypass flow rate. Measured net heat duty was between 2.2 and 2.4 GJ/tonne at an optimum lean loading of 0.2–0.21 mol/mol. Data reconciliation by Aspen Plus® Data Fit™ underpredicted CO2 flow rate by 20% due to an overprediction of lean loading by 19%, indicating a necessary change in thermodynamic parameters in the model. This resulted in an over prediction of heat duty by 33% on average.
This research report (1) describes the process followed and products developed during the SR I&C Pilot Project Initial Scoping Phase, and (2) captures lessons learned. Exelon Generation and LWRS collaborated to develop a Digital Transformation Strategy as part of a larger Advanced Concept of Operations. The proposed SR I&C Pilot Upgrade provides a foundation stone for this Digital Transformation that will improve plant safety, reliability, and operational performance while lowering plant Total Cost of Ownership (TCO). Initial Scoping Phase activities for this Pilot Project have been performed in accordance with industry processes that have been adapted to better support digital upgrades. These processes include IP-ENG-001, Standard Design Process (SDP), NISP-EN-04, Standard Digital Engineering Process (SDEP), and Electric Power Research Institute (EPRI) Report 3002011816, Digital Engineering Guide (DEG). Completing Initial Scoping Phase Engineering and Operations, Licensing, and Project Management Activities was necessary to sufficiently bound the scope, schedule, and estimated cost of the Project to enable utility management to authorize moving into the Conceptual Design Phase. A significant finding of the Business Case Analysis (BCA) methodology developed and applied as part of this effort was that the growth rate of material costs for sustaining the operation of obsolete SR I&C equipment is accelerating. This directly contributed to the Project Economic Analysis created to justify continuing the Project. Project Initial Scoping Phase lessons learned have also been captured to assist the larger industry in understanding the Digital Transformation Strategy and SR I&C Pilot Project Initial Scoping Phase efforts. This is in keeping with the public/private partnership that has been established between the Department of Energy (DOE) and Exelon for this effort with engagement from the NRC. By addressing first-of-a-kind (FOAK) risks and capturing lessons learned, the SR I&C Pilot Upgrade Project addresses technical, regulatory, and business risks to enable subsequent implementers of similar upgrade.