Search NASA⌕ Search

SEARCH · Search NASA

Results for “Planning and Scheduling”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 37 records · Page 2

Agent-Based Coordination Scheme for PV Integration (ABC4PV)

Renewables and especially photovoltaics (PV) have benefitted significantly from a host of incentives and policies targeted toward enhanced integration and adoption of specific energy technologies. However, with the push to move forward into a subsidy-free market framework, behind-the-meter residential PV applications have generally struggled to retain their value (unlike utility scale and commercial projects) [1]. This project focused on developing control-theoretic solutions aimed at improving the integration and interaction of behind-the-meter residential PV with other distribution system assets (controllable and non-controllable) to enhance the integrated value of residential PV. To this end, a suite of decentralized control methodologies have been developed to enable effective coordination and control of behind-the-meter residential load customers’ PV, battery storage systems (BSS), controllable loads and other similar assets within a distribution feeder. This interaction aims at procuring energy savings and, thus, energy bill savings. The main source of savings is drawn from reducing the effect of demand charge pricing and is realized at the feeder level, assuming community level interaction and management among the aforementioned assets. Optimal control of the assets is implemented with a distributed optimization methodology, leveraging consensus-based algorithms. The results gathered from the optimal control simulations demonstrates that the savings can be duly achieved and the algorithm decision times (to dynamically control asset set points, for example) are fast. As for the overall efficiency of PV+BSS systems, to procure energy savings from curtailment of the demand charge pricing effects, the optimal control is set up so as to minimize the variance of the load for all customers, throughout a feeder and throughout time in a rolling horizon scheduling with model predictive control. The control takes into account inter-temporal electrochemical storage (battery) degradation costs: specifically, we have developed a long-term lifetime model for the BSS that weighs in the effect of the degradation factor in the dispatch formulations, thus, a considerable operating cost that affects energy decision making. The levelized cost of energy (LCOE – redefined for the purpose of quantifying asset integration effectiveness through the customers’ energy cost) is shown to be below the threshold set for the combined PV+BSS topology of $ 0.14/kWh for multiple cases of PV penetration all the way up to 50%, provided that a policy of shared ownership of and savings is in place. Further, the LCOE calculated for the case before the deployment PV+BSS systems is also achievable, i.e. the deployment of PV+BSS, if planned and scheduled optimally. will have no effect on customers’ energy costs. From the control methodology viewpoint, the developed consensus-based algorithms are shown to converge for a wide range of problem cases (spanning normal operating scenarios and contingencies), guaranteeing dispatch solutions under forecasting errors, communication break-downs and cyber-security attacks. The proposed control solutions are scalable and real-time implementable, with dispatch computations and device set-point updates converging in less than 2s in most practical instances of the above events.

14 SOLAR ENERGY↗

A simulation‐based integrated virtual testbed for dynamic optimization in smart manufacturing systems

Abstract In a manufacturing system, production control‐related decision‐making activities occur at different levels. At the process level, one of the main control activities is to tune the parameters of individual manufacturing equipment. At the system level, the main activity is to coordinate production resources and to route parts to appropriate workstations based on their processing requirement, priority indices, and control policy. At the factory level, the goal is to plan and schedule the processing of parts at different operations for the entire system in order to optimize certain objectives. Note that the results of such activities at different levels are closely coupled and affect the overall performance of the manufacturing system as a whole. Therefore, it is important to systematically integrate these control and optimization activities into one unified platform to ensure the goal of each individual activity is aligned with the overall performance of the system. In this paper, we develop a simulation‐based virtual testbed that implements dynamic optimization, automatic information exchange, and decision‐making from the process‐level, system‐level, and factory‐level of a manufacturing system into an integrated computation environment. This is demonstrated by connecting a Python‐based numerical computation program, discrete‐event simulation software (Simul8), and an optimization solver (CPLEX) via a third‐party master program. The application of this simulation‐based virtual testbed is illustrated by a case study in a machining shop.

Sun, Yuting↗

Advanced silicon tracking detector developments for the future Electron-Ion Collider

The proposed Electron-Ion Collider (EIC) will operate high-luminosity high-energy electron+proton and electron+nucleus collisions at the collision energies from 20 GeV to 141 GeV to solve several fundamental questions in the high energy and nuclear physics fields. Its instantaneous luminosity can reach 10 33-34 cm -2 s -1 and the bunching crossing rate is around 10 ns. The EIC project has received CD1 approval from the US DOE in 2021 and moves toward the machine design and preparation for construction. To realize various particle measurements with high precision at the future EIC, a low material-budget and high-granularity silicon vertex and tracking detector with fine spatial and momentum resolutions and nearly 4π solid angle coverage is desired. The Monolithic Active Pixel Sensor (MAPS) and AC Coupled Low Gain Avalanche Diode (AC-LGAD) technologies stand out of several advanced technology options for the EIC silicon vertex and tracking detector subsystems. The MAPS technology has advanced features of low material budget, low power consumption, good radiation resistance and fine spatial resolution. The AC-LGAD technology can achieve fast timing resolution. Latest studies and progress of the EIC silicon vertex and tracking detector conceptual design, performance validations in simulation and ongoing MAPS and AC-LGAD R&D will be shown. Furthermore, schedule and plan of the EIC project detector development will be discussed as well.

46 INSTRUMENTATION RELATED TO NUCLEAR SCIENCE AND ↗

MRT 7365: Power flow physics and key physics phenomena

The Z accelerator at Sandia National Laboratories conducts z-pinch experiments at 26 MA in support of DOE missions in stockpile stewardship, dynamic materials, fusion, and other basic sciences. Increasing the current delivered to the z-pinch would extend our reach in each of these disciplines. To achieve increases in current and accelerator efficiency, a fraction of Z’s shots are set aside for research into transmission-line power flow. These shots, with supporting simulations and theory, are incorporated into this Advanced Diagnostics milestone report. The efficiency of Z is reduced as some portion of the total current is shunted across the transmission-line gaps prior to the load. This is referred to as “current loss”. Electrode plasmas have long been implicated in this process, so the bulk of dedicated power-flow experiments are designed to measure the plasma environment. The experimental analyses are enhanced by simulations conducted using realistic hardware and Z voltage pulses. In the same way that diagnostics are continually being improved for sensitivity and resolution, the modeling capability is continually being improved to provide faster and more realistic simulations. The specifics of the experimental hardware, diagnostics, simulations, and algorithm developments are provided in this report. The combined analysis of simulation and data confirms that electrode plasmas have the most detrimental impact on current delivery. Experiments over the last three years have tested the theoretical current-loss mechanisms of enhanced ion current, plasma gap closure, and Hall-related current. These mechanisms are not mutually exclusive and may be coincident in the final feed as well as in upstream transmission lines. The final-feed geometries tested here, however, observe lower-density plasmas without dominant ion currents which is consistent with a Hall-related current. The picture of plasma formation and transport formed from experiment and simulation is informing hardware designs being fielded on Z now and being proposed for the Next-Generation Pulsed Power (NGPP) facility. In this picture, the strong magnetic fields that heat the electrodes above particle emission thresholds also confine the charged particles near the surface. Some portion of the plasmas thus formed is transported into the transmission-line gap under the force of the electric field, with aid from plasma instabilities. The gap plasmas are then transported towards the load by a cross-field drift, where they accumulate and contribute to a likely Hall-related cross-gap current. The achievements in experimental execution, model validation, and physical analysis presented in this report set the stage for continued progress in power flow and load diagnostics on Z. The planned shot schedule for Z and Mykonos will provide data for extrapolation to higher current to ensure the predicted performance and efficiency of a NGPP facility.

43 PARTICLE ACCELERATORS↗

Radiation Hardened Engineered Substrates for Time and Space Resolution

Low Gain Avalanche Diodes (LGADs) have become sensors of choice for fast timing of minimum ionizing particles. The current generation of these devices suffer from only moderate radiation hardness, low fill factor, and limited design options. Cactus Materials Inc. proposes to develop sensors with gain layer implants buried beneath the surface which will, with AC coupling developed by Brookhaven National Laboratory (BNL) and University of California Santa Cruz (UC Santa Cruz) solve these problems. Fermilab has a major role in the CMS timing upgrade using the current generation of LGADs and development of AC-coupled, buried layer LGADs will solve some of the central problems inherent in this technology. Annex B included a two-year work plan, deliverables, schedule and funding for the project’s SBIR Phase II award to develop and test prototype LGADs utilizing wafer bonding technology and epitaxial growth, that will allow for fabrication of radiation hard AC coupled devices with 100% fill factor and adjustable operating point.

46 INSTRUMENTATION RELATED TO NUCLEAR SCIENCE AND ↗

Versatile Link+ Transceiver Production Readiness

The Versatile Link + project is about to enter its production phase, ready for the Phase 2 HL-LHC detector upgrades. We present the status of the front-end part of the Versatile Link$^+$ project: the Versatile Link$^+$ Transceiver, which provides a low-mass, radiation tolerant, optical transmit- and receive module for tight integration in the upgrading HL-LHC detectors. We describe the development and thorough testing carried out with the transceiver prototypes and their sub-components and the design decisions that have led to the final production-ready prototype. The planned production schedule is also presented.

46 INSTRUMENTATION RELATED TO NUCLEAR SCIENCE AND ↗

Technical Language Processing of Nuclear Power Plants Equipment Reliability Data

Operating nuclear power plants (NPPs) generate and collect large amounts of equipment reliability (ER) element data that contain information about the status of components, assets, and systems. Some of this information is in textual form where the occurrence of abnormal events or maintenance activities are described. Analyses of NPP textual data via natural language processing (NLP) methods have expanded in the last decade, and only recently the true potential of such analyses has emerged. So far, applications of NLP methods have been mostly limited to classification and prediction in order to identify the nature of the given textual element (e.g., safety or non-safety relevant). In this paper, we target a more complex problem: the automatic generation of knowledge based on a textual element in order to assist system engineers in assessing an asset’s historical health performance. The goal is to assist system engineers in the identification of anomalous behaviors, cause–effect relations between events, and their potential consequences, and to support decision-making such as the planning and scheduling of maintenance activities. “Knowledge extraction” is a very broad concept whose definition may vary depending on the application context. In our particular context, it refers to the process of examining an ER textual element to identify the systems or assets it mentions and the type of event it describes (e.g., component failure or maintenance activity). In addition, we wish to identify details such as measured quantities and temporal or cause–effect relations between events. This paper describes how ER textual data elements are first preprocessed to handle typos, acronyms, and abbreviations, then machine learning (ML) and rule-based algorithms are employed to identify physical entities (e.g., systems, assets, and components) and specific phenomena (e.g., failure or degradation). A few applications relevant from an NPP ER point of view are presented as well.

97 MATHEMATICS AND COMPUTING↗

Test Plan to Investigate the Optimal Cure Schedule of an Epoxy Resin for Its Application as an Adhesive in Optocouplers

Epoxy resins are polymeric materials that are known for their versatility, low cost, and strong thermal and mechanical properties. They can be used as coatings, adhesives, automotive primers, and have become staples in electronics, aerospace composites and semiconductor encapsulates. Recently, LANL has experienced a decline in the quality of a specialized electronic device, called an optocoupler, which is normally acquired from commercial suppliers. Because of this, a group at LANL is exploring the feasibility of in-house manufacturing of an optocoupler that is better suited for their application. The current prototype has resulted in adhesive failure after being exposed to several thermal cycles. There is a need to investigate the possible reasons for this failure, particularly how the cure schedule of the epoxy might affect its adhesive strength over time and in cycled temperatures. To assist in this investigation, a test plan has been developed involving multiple experiments using thermomechanical analysis (TMA), dynamic mechanical analysis (DMA) and differential scanning calorimetry (DSC).

36 MATERIALS SCIENCE↗

The Myth of Fungible FTE: A Quantitative Assessment of Matrixed Resource Allocation

Matrix organizations allow scientific facilities to share specialized personnel across projects, operations, maintenance, and strategic initiatives. Nominal staffing allocations, however, may not capture the schedule consequences of fragmented individual commitments, limited access to specialist groups, and intermittent availability of key decision makers. We developed a stochas- tic, daily-time-step simulation of a hypothetical medium-sized accelerator-facility project com- prising sequential phases and parallel tasks. Each task requires role-specific work measured in FTE-days. Ordinary personnel may be unavailable because they contribute concurrently to other institutional activities, while designated key roles have independently specified daily un- availability probabilities. An organization-wide priority factor scales the number of people from each functional group who can effectively contribute to the project. It is interpreted as a composite proxy for project access and workforce fragmentation across competing commit- ments. We examined project completion time as a function of this factor and Project Lead unavailability using 100 Monte Carlo runs per condition. Increasing priority factor from 0.1 to 1.0 reduced median completion time from 1708.5 days (interquartile range 1681.5–1735.25) to 390 days (interquartile range 379–399). At priority factor = 0.1, increasing Project Lead unavailability from 0.5 to 0.9 increased median completion time from 1713.5 days (interquartile range 1691–1733.25) to 4,417 days (interquartile range 4271.75–4550.5). The model quantifies the commonly expected sensitivity of project schedules to fragmented resource commitments and limited coordination availability. Within this model, the results also indicate a possible threshold regime in which small increases in workforce availability yield only modest sched- ule improvements until sufficient capacity becomes accessible, after which project performance improves sharply. With further validation and calibration, this quantitative framework could support resource-allocation decisions during initial project planning and subsequent schedule rebaselining.

Bai, Mei [SLAC National Accelerator Laboratory (SL↗

DOE Hanford Tank Side Cesium Removal System (TSCR) Update: Fabrication and Factory Acceptance Testing - 20300

The Tank Side Cesium Removal (TSCR) System is a modular, quickly-deployable, and passively safe system for efficiently removing solids and cesium from alkaline liquid waste raffinate created by fuel processing on the Hanford site. This paper provides an overview of the project with particular emphasis on completion of fabrication and factory acceptance testing (FAT). All TSCR System components are inside three enclosures known as the Process Enclosure, Ancillary Enclosure, and Control Enclosure. The Process Enclosure is seismic design category II (SDC-II) and built to withstand the rigors of transportation and lifting, high winds, volcanic ash fall, and heavy precipitation (snow) over a temperature range of -25 to 115 deg. F. The Process Enclosure and Control Enclosure were fabricated in AVANTech's Columbia, SC facility, while the Ancillary Enclosure was fabricated in AVANTech's Richland, WA facility. The design and preliminary documented safety analysis were completed in December 2019, with all work being performed in accordance with ASME NQA-1 quality assurance requirements. The Process Enclosure, Ion Exchange Columns (IXCs), and several other TSCR components have a nuclear safety function and are designated as safety significant structures, systems, and components (SS-SSCs). The NQA-1 Commercial Grade Dedication (CGD) process was used to identify critical characteristics in order to accept materials and items used for fabrication of several safety significant TSCR components. This paper also addresses unique aspects and challenges of implementing CGD in DOE facilities and systems. After fabrication and preliminary testing, the Process and Control Enclosures were shipped to AVANTech's Richland facility where the complete TSCR System was setup and connected in a represented layout and configuration that will be used on the Hanford site. Test tanks and pumps were put in place and connected to the TSCR Process Enclosure in a manner that mimicked interfacing Double Shell Tanks in the 241-AP Tank Farm. The TSCR System was then tested/operated under conditions equivalent to those planned for onsite operation. Testing was separated into five separate phases as defined below: - Phase 1: Confirmation of TSCR System readiness for the FAT; - Phase 2: Verification of TSCR System operation under standard conditions; - Phase 3: Demonstration of TSCR System operation under non-standard conditions; - Phase 4: Demonstration of ion exchange media removal from an IXC; and - Phase 5: Completion of TSCR System lift plans and site mobilization. The Hanford Tank Operations Contractor, Washington River Protection Solutions (WRPS), participated in all phases of testing. Testing at AVANTech's Richland Facility allowed WRPS personnel to familiarize themselves with TSCR operations in a radiologically clean facility prior to onsite mobilization. Engineering and operations personnel gained valuable experience that allowed them to better refine onsite operational protocols and procedures - including handling and movement of IXCs with a forklift. This paper describes the technologies used by the TSCR System as well as how these technologies are deployed and operated to advance the Hanford mission of safely, efficiently, and effectively treating tank waste. It also provides detailed information on fabrication and FAT, including operational data from simulated tank waste runs. A project schedule for WRPS' planned construction acceptance testing, operational acceptance testing, and actual tank waste treatment is provided. This presentation should be of great interest to parties responsible for the design, testing, and mobilization of modular NQA-1 technologies for the treatment of raffinate and similar liquid wastes containing high concentrations of radioactive cesium. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

2020 Exascale Computing Project Annual Meeting (Executive Summary Report)

The Exascale Computing Project (ECP) delivers specific applications, software products, and outcomes on DOE computing facilities. Integration across these elements for specific hardware technologies for exascale system instantiations is fundamental to ECP success. The outcome of the ECP is the delivery of a capable exascale computing ecosystem to provide breakthrough solutions addressing our most critical challenges in scientific discovery, energy assurance, economic competitiveness, and national security. This outcome is not a matter of ensuring more powerful computing systems. The ECP is designed to create more valuable and rapid insights from a wide variety of applications (“capable”), which requires a much higher level of inherent efficacy in all methods, software tools, and ECP-enabled computing technologies to be acquired by DOE laboratories (“ecosystem”). The ECP annual meeting provides a unique opportunity for the core technical expertise in the United States focused on achieving this next plateau of computational science and computing performance to engage in direct discussions on project execution. Face-to-face gatherings in technical communities like this are common and needed for the exchange of scientific ideas and technical performance. The ECP annual meeting stands apart from other technical conferences and meetings in the computing community as it is uniquely and solely focused on the execution of the ECP and the integration of technical activities leading to the creation of the exascale computing ecosystem for the future. The direct interaction of key critical technical staff, who are leaders in their respective fields, and the resulting give-and-take between software, applications, and hardware and the technical co-design therein, is unique and essential to the effective execution of the ECP. The first annual meeting was held in Knoxville, Tennessee, January 31 – February 2, 2017 and brought together, for the first time, a diverse collection of researchers from 16 DOE national laboratories as well as university computer and computational science researchers to discuss shared problems and joint solutions for the development of a capable exascale computing ecosystem. These interactions resulted in focused technical plans and an energized community centered on advances for ECP. The second annual meeting was held in Knoxville, Tennessee, February 5–9, 2018. It included 643 individual thought leaders and performers in application development, software research and deployment, and hardware research and integrators, all of whom are part of the multifaceted, billion dollar HPC community. This meeting provided a platform to discuss and disseminate numerous examples where researchers with common goals and synergistic solutions came together for the first time to deliver tangible results. Additionally, at the 2018 meeting, ECP researchers had the opportunity to digest all US HPC vendor R&D product roadmaps pointing to exascale – not only to learn how their research can play a role, but, more importantly, to influence those roadmaps to ensure successful delivery on DOE applications that will contribute to (if not solve) problems of national interest in national security, science, energy, and health, as well as growing security threats. The third annual meeting was held in Houston, Texas, January 14–17, 2019. With a 19% increase in the number of registrations (768 people), and the change in location, the third annual meeting was considered the most impactful of the three at the time. The new website provided a better platform for the dissemination of the content, the new venue as a meeting hotel instead of a conference center facilitated interactions and discussions after event hours, and the addition of an award-winning mobile event conference app (Whova) transformed dramatically the attendee experience at the event. This fourth annual meeting was held in Houston, Texas, February 3-7, 2020. This meeting had an increase in the number of attendees for a total of 824 people registered (782 attendees) and included numerous enhancements based on feedback and lessons learned from previous meetings, some of which are listed here: Improved quality of the sessions, their material and the whole program.; Had more industry participation and addition of external collaborators from overseas.; Published the full agenda earlier to better accommodate attendance and travel plans based on schedule.; Centralized all sessions in one venue.; Provided additional hotels and room blocks for the attendees.; Improved communication with the audience (links, material, directions, notifications, etc.) to go paperless.; Enhanced side meeting scheduling, management and user experience.; Made available additional space and tables for impromptu meetings and side discussions.; Improved IT and A/V solutions for speakers. In addition, our final survey captured the following points as opportunities for improvement in future meetings: consider a different meeting location that is more pedestrian friendly, reduce talks during working meals to allow more collaboration and informal time, adapt the agenda to acknowledge attendees from different timezones, consider recording some of the tutorials and/or sessions to share broadly with the HPC community, have a larger poster room, provide additional power strips, and improve the WiFi.

97 MATHEMATICS AND COMPUTING↗

Facility Energy Saving and Securing Technology Using Multi-Source Data (FEST) (Final Report)

Facility Energy Saving and Securing Technology (FEST) project focuses on developing algorithmic tools and techniques for analyzing cyber-physical security of DoD’s military site facilities, and optimal scheduling, operation and planning of their Distributed Energy Resources (DER). The project is led by LLNL with the team including University of Michigan-Dearborn and XENDEE. The military site partner providing the energy metering data is White Sands Missile Range (WSMR). This report summarizes the work performed during the project and future directions for follow-on research.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Doppler Lidar Motion-Correction Wind Profiles (DLMCPROF-WIND) Value-Added Product Report

Wind speed and direction, together with pressure, temperature, and relative humidity, are the most fundamental atmospheric state parameters. Accurate measurement of these parameters is crucial for numerical weather prediction. Vertically resolved wind measurements in the atmospheric boundary layer are particularly important for modeling pollutant and aerosol transport. The U.S. Department of Energy (DOE) Atmospheric Radiation Measurement (ARM) user facility currently operates several scanning coherent Doppler lidar (DL) systems that provide accurate height-resolved measurements of wind speed and direction. These instruments operate in the near infrared (IR;1.5 microns) and provide range-resolved measurements of radial velocity, attenuated aerosol backscatter, and signal-to-noise ratio (SNR). The systems are operated using a fixed scan schedule consisting of plan position indicator (PPI) or Doppler Beam-Swing (DBS) scans. PPI scans are performed by scanning the beam in azimuth while maintaining a fixed elevation angle, and DBS scans are similar but typically also include a vertical beam. Radial velocity data from these scans are processed to yield profiles of wind speed direction. For stationary ground-based deployments, the Doppler Lidar Horizontal Wind Profiles (DLPROF-WIND) Value-Added-Product (VAP) provides height- and time-resolved measurements of the winds (Newsom and Krishnamurthy 2022). For operation on a moving platform, modifications to the existing DLPROF-WIND VAP are required to compensate for the effects of the platform motion. This report describes a parallel VAP, DLMCPROF-WIND, that was developed for computing motion-compensated wind profiles from ARM Doppler lidar data acquired during the Multidisciplinary drifting Observatory for the Study of Arctic Climate (MOSAiC) campaign, when the lidar was deployed on the German icebreaker Polarstern.

54 ENVIRONMENTAL SCIENCES↗

Summary of FY 2024 A709 Code Case testing at ANL, INL and ORNL

A collaborative research and development effort in support of the Alloy 709 Code Case qualification in the American Society of Mechanical Engineers (ASME) Boiler and Pressure Vessel Code, Section III, Division 5, High Temperature Reactors is being carried out at Oak Ridge National Laboratory (ORNL), Idaho National Laboratory (INL), and Argonne National Laboratory (ANL). Key testing data for the Alloy 709 100,000-hr near-term Code Case submittal to ASME is expected to be completed by the end of 2024, with design parameters anticipated to be finalized in FY 2025. This report summarizes the testing results for three commercial heats of Alloy 709 conducted across three laboratories, reviews the current testing status, and outlines the remaining data needed to support the first Alloy 709 Code Case submittal to ASME. The Alloy 709 Code Case plan remains on schedule.

22 GENERAL STUDIES OF NUCLEAR REACTORS↗

Multi-modal Energy-optimal Trip Scheduling in Real-time (METS-R) for Transportation Hubs (Final Report)

This report summarizes the work performed under the award number EE0008524. The project develops the Multi-modal Energy-optimal Trip Scheduling in Real-time (METS-R) platform as the next-generation transportation solution based on autonomous electric vehicles (AEV) serving passenger trips from and to urban transportation hubs, to substantially reduce transportation energy consumption. Extensive data collection and analyses were first conducted to understand the demand patterns and energy consumption of hub-based on-road trips. Then, a data-driven framework that consists of an analytical module and a simulation module was proposed. For the analytical module, five planning + operation tools were developed to support the planning and energy-efficient operations of urban AEV services: the charging station planning that robotically allocates charging supplies based on the stationary charging demand distribution; the transit planning and demand adaptive scheduling model that efficiently generates\ candidate transit routes from hubs to other places and dynamically adjusts the transit time table to fit the current demand; the online energy-efficient routing that learns the energy-optimal paths from observations of link-level energy consumption in real-time; the hub-based ridesharing that matches trip requests together with account for the uncertainty of future trip demand and vehicle supply; and finally, the integrated demand prediction and anomaly detection pipeline that leverages the flight/train time table and support other planning/operation tools. To demonstrate the performance of these tools, a scalable high-performance agent-based simulator was built. We divided the urban space into multiple service zones where each zone was considered as an agent for passenger generation and vehicle charging. Two types of AEV agents were coded to model two types of mobility services: AEV taxi and AEV transit. For the AEV taxi, the team implemented the functions of pickup/drop-off passengers, energy-efficient routing, ridesharing, fleet rebalancing, and recharging. For the AEV bus, the team implemented the functions of demand-adaptive route scheduling, passenger boarding, and recharging. A high-performance computing framework was introduced to receive various profiling information (such as link energy updates, vehicle speed) from the simulator instances and communicate the operational commands back to the instances. The numerical experiments show that each of the proposed operational algorithms can reduce energy consumption and improve system efficiency. Furthermore, there exists the need to collectively consider multiple planning + operational strategies as multiple strategies can influence each other in terms of performance impacts. Recommendations for future work related to AEV planning and simulation are discussed.

29 ENERGY PLANNING, POLICY, AND ECONOMY↗

Tools and Methods for Optimization of Nuclear Plant Outages

Refueling outages are one of the most challenging phases in a nuclear power plants (NPP) operating cycle. Refueling outages are extremely costly for a NPP due to the large amount of required resources and because of lost revenue due to plant being off the grid. Outage durations have steadily decreased across the industry over that last few decades primarily due to improved planning and coordination, but there are still many plants that struggle to meet the performance metrics accomplished by other utilities. Schedule resilience is one of the issues. NPP outages require scheduling thousands of activities in a duration of around 30 days on average. Outage staff begin working on the schedule more than a year ahead of the outage start and make every effort to build a robust schedule. Despite the robust and detailed planning, once the outage starts, numerous emergent issues typically appear along with schedule delays requiring continuous replanning and adjusting. When schedule disruption occurs during an outage, plant staff make urgent efforts to recover but often not able to maintain the planned outage duration. These outage delays can cost a utility several million dollars per day. Tools that could help outage schedulers create a more resilient schedule and allow them to optimally reschedule emergent work could significantly reduce outage delays. One key aspect of creating a resilient schedule is to have accurate estimates for activity duration. Another important outage scheduling capability is the ability to schedule emergent work with minimal disruption. The Optimization of Outage Activities project under the Risk-Informed Systems Analysis Pathway (RISA) sponsored by Department of Energy (DOE) Light Water Reactor Sustainability (LWRS) program focuses on developing tools and methods to support nuclear power plants with optimization of outage schedules. The goal of the outage optimization is the completion of all planned and emergent outage activities as fast as possible while maintaining highest level of safety. This report describes the initial development of tools to support outage management that leverage computational and machine learning methods developed in other RISA and LWRS projects.

22 GENERAL STUDIES OF NUCLEAR REACTORS↗

Holistic fleet optimization incorporating system design considerations

The methodology described in this article enables a type of holistic fleet optimization that simultaneously considers the composition and activity of a fleet through time as well as the design of individual systems within the fleet. Often, real-world system design optimization and fleet-level acquisition optimization are treated separately due to the prohibitive scale and complexity of each problem. Importantly, this means that fleet-level schedules are typically limited to the inclusion of predefined system configurations and are blind to a rich spectrum of system design alternatives. Similarly, system design optimization often considers a system in isolation from the fleet and is blind to numerous, complex portfolio-level considerations. In reality, these two problems are highly interconnected. To properly address this system-fleet design interdependence, we present a general method for efficiently incorporating multi-objective system design trade-off information into a mixed-integer linear programming (MILP) fleet-level optimization. This work is motivated by the authors' experience with large-scale DOD acquisition portfolios. However, the methodology is general to any application where the fleet-level problem is a MILP and there exists at least one system having a design trade space in which two or more design objectives are parameters in the fleet-level MILP.

97 MATHEMATICS AND COMPUTING↗