Develop and test fuel cell powered on-site integrated total energy system. Phase 3: Full-scale power plant development

An integrated 5 kW power system based upon methanol fuel and a phosphoric acid fuel cell operating at about 473 K is described. Description includes test results of advanced fuel cell catalysts, a semiautomatic acid replenishment system and a completed 5 kW methanol/system reformer. The results of a preliminary system test on a reformer/stack/inverter combination are reported. An initial design for a 25 kW stack is presented. Experimental plans are outlined for data acquisition necessary for design of a 50 kW methanol/steam reformer. Activities related to complete mathematical modelling of the integrated power system, including wasteheat utilization, are described.

Kaufman, A.↗

An integrated and modular digital modeling approach for the space station electrical power system development

An electrical power system for the Space Station was designed, developed and built. This system provides for electrical power generation, conditioning, storage, and distribution. The initial configuration uses photovoltaic power generation. The power system control is based on a hierarchical architecture to support the requirements of automation. In the preliminary design and technology development phase of the program, various modeling techniques and software tools were evaluated for the purpose of meeting the Space Station power system modeling requirements. Rocketdyne and LeRC jointly selected the EASY5 simulation software, developed by Boeing Computer Services, as a system level modeling tool. The application of the selected analytical modeling approach to represent the entire power system is described. Typical results of model predictions are also summarized. The equipment modeled includes solar arrays, dc to ac converters, resonant inverters, battery storage system, alternator, transmission line, switch gear, and system level microprocessor controls. During the advanced development phase of this program, several models were developed using this approach.

Gombos, Frank J.↗

An integrated and modular digital modeling approach for the Space Station electrical power system development

An electrical power system for the Space Station was designed, developed and built. This system provides for electrical power generation, conditioning, storage, and distribution. The initial configuration uses photovoltaic power generation. The power system control is based on a hierarchical architecture to support the requirements of automation. In the preliminary design and technology development phase of the program, various modeling techniques and software tools were evaluated for the purpose of meeting the Space Station power system modeling requirements. Rocketdyne and LeRC jointly selected the EASY5 simulation software, developed by Boeing Computer Services, as a system level modeling tool. The application of the selected analytical modeling approach to represent the entire power system is described. Typical results of model predictions are also summarized. The equipment modeled includes solar arrays, dc to ac converters, resonant inverters, battery storage system, alternator, transmission line, switch gear, and system level microprocessor controls. During the advanced development phase of this program, several models were developed using this approach.

Gombos, Frank J.↗

New developments in power semiconductors

This paper represents an overview of some recent power semiconductor developments and spotlights new technologies that may have significant impact for aircraft electric secondary power. Primary emphasis will be on NASA-Lewis-supported developments in transistors, diodes, a new family of semiconductors, and solid-state remote power controllers. Several semiconductor companies that are moving into the power arena with devices rated at 400 V and 50 A and above are listed, with a brief look at a few devices.

Sundberg, G. R.↗

Space shuttle orbiter auxiliary power unit development challenges

When the flying spacecraft was approved for development, a power unit for the hydraulic system had to be developed. Unlike other systems on the orbiter, there was no precedent in earlier spacecraft for a hydraulic system nor for the power unit to drive the hydraulic pumps. The only prototypes available were airplane auxiliary power units (APU), which were not required to operate in the severe environments of a spacecraft nor to have the longevity of an orbiter hydraulic power unit. The challenge was to build a hydraulic power unit which could operate in 0g or 3g, in a vacuum or at sea level pressure, and at -65 F or 225 F, which would be capable of restarting while hot, and which would be capable of sustaining the hydraulic loads for the life of the orbiter. The basic approach to providing hydraulic power for the orbiter was to use a small, high speed, monopropellant fueled turbine power unit to drive a conventional aircraft type hydraulic pump. The stringent requirements imposed on the orbiter APU quickly made this machine different from existing aircraft APUs.

Lance, R.↗

Develop and test fuel cell powered on-site integrated total energy systems: Phase 3: Full-scale power plant development

The development of a commercially viable and cost-effective phospheric acid fuel cell powered on-site integrated energy system (OS/IES) is described. The fuel cell offers energy efficients in the range of 35-40% of the higher heating value of available fuels in the form of electrical energy. In addition, by utilizing the thermal energy generated for heating, ventilating and air-conditioning (HVAC), a fuel cell OS/IES could provide total energy efficiencies in the neighborhood of 80%. Also, the Engelhard fuel cell OS/IES offers the important incentive of replacing imported oil with domestically produced methanol, including coal-derived methanol.

Source record↗

Develop and test fuel cell powered on-site integrated total energy systems. Phase 3: Full-scale power plant development

A schematic and physical layout is given for the 5kW integrated system and the development status of individual components is described. The results of using a one dimensional mathematical model of the 5kW reformer are presented. Plans for a single-tube reformer test unit for the acquisition of temperature profile data are described. Tentative specifications for a 50kW dc-to-ac inverter are listed. Performance data are given on two 3-cell stacks incorporating semiautomatic acid replenishment systems and improved electrocatalysts. A qualification test on methanol/steam reforming catalyst T2107RS is reported, including a portion in which the catalyst was deliberately poisoned with 800 ppm ethanol in the feed.

Source record↗

Development and test fuel cell powered on-site integrated total energy systems. Phase 3: Full-scale power plant development

The on-site system application analysis is summarized. Preparations were completed for the first test of a full-sized single cell. Emphasis of the methanol fuel processor development program shifted toward the use of commercial shell-and-tube heat exchangers. An improved method for predicting the carbon-monoxide tolerance of anode catalysts is described. Other stack support areas reported include improved ABA bipolar plate bonding technology, improved electrical measurement techniques for specification-testing of stack components, and anodic corrosion behavior of carbon materials.

Kaufman, A.↗

Develop and test fuel cell powered on-site integrated total energy systems. Phase 3: Full-scale power plant development

Satisfactory performance is reported for the first three 12-cell sub-stacks of the 5 kW stack rebuild. Early general conclusions are presented from an economic study. Results are reported on a successful 700-hour test of a 3-cell stack in the full-sized configuration (0.33m x 0.56m). Construction of a 5 kW equivalent methanol/steam reformer based on a commercial shell-and-tube heat exchanger was completed. Several test runs are summarized. Preliminary conclusions are presented on the technical and economic aspects of fuel cell/HVAC interaction. Physical data are presented on several dense graphite materials which are candidates for gas-distribution plates. Performance of a new cathode catalyst is reported.

Source record↗

Develop and test fuel cell powered on-site integrated total energy systems. Phase 3: Full-scale power plant development

Two 25-cell, 13 inch x 23 inch (4kW) stacks were started up to evaluate the reliability of component and stack technology developed through the end of 1983. Both stacks started up well and are running satisfactorily on hydrogen-air after 1900 hours and 800 hours, respectively. A synthetic-reformat mixing station is nearing completion, and both stacks will be operated on reformate fuel. A stack-protection control system was placed in operation for Stack No. 2, and a similar set-up is in preparation for Stack No. 1. This system serves to change operating conditions or shut the stack down to avoid deleterious effects from nonstack-related upsets. The capability will greatly improve changes of obtaining meaningful long-term test data.

Kaufman, A.↗

Develop and test fuel cell powered on-site integrated total energy systems: Phase 3, full-scale power plant development

Two 25 cell stacks of the 13 inch x 23 inch cell size (about 4kW) remain on test after 4000 hours and 2900 hours, respectively, using simulated reformate fuel. These tests are focusing on the durability of fuel cell stack components developed through the end of 1983. Also, these stacks are serving as forerunners of a 25kW stack that will contain 175 cells of the same size and will employ the same technology base. The stack technology development program has focused on a new, low cost bipolar plate edge seal technique and evaluation of advanced cathode catalysts, an electrolyte replenishment system, and nonmetallic cooling plates in small stacks.

Kaufman, A.↗

Develop and test fuel cell powered on-site integrated total energy systems: Phase 3, full-scale power plant development

A 25 cell stack of the 13 inch x 23 inch cell size (about 4kW) remains on test after 6000 hours, using simulated reformate fuel. A similar stack was previously shut down after 7000 hours on load. These tests were carried out for the purpose of assessing the durability of fuel cell stack components developed through the end of 1983. In light of the favorable results obtained, a 25kW stack that will contain 175 cells of the same size is being constructed using the same technology base. The components for the 25kW stack have been completed. A methanol steam reformer with a design output equivalent to 50kW has been constructed to serve as a hydrogen generator for the 25kW stack. This reformer and the balance of the fuel processing sub system are currently being tested and debugged. The stack technology development program focused on cost reduction in bipolar plates, nonmetallic cooling plates, and current collecting plates; more stable cathode catalyst support materials; more corrosion resistant metal hardware; and shutdown/start up tolerance.

Kaufman, A.↗

Develop and test fuel cell powered on site integrated total energy systems. Phase 3: Full-scale power plant development

The third in a series of 4kW stacks, consisting of 24 cells of the 13 inch x 23 inch cell size, has been on test for about 1600 hours. This stack is similar to the first two stacks, which ran 7000 and 8400 hours, respectively. The present stack incorporates technology improvements relating to the electrolyte-matrix, the current-collector assembly, and a reduction in the number of cooling plates. Performance is currently averaging about 0.64 per cell at 161 mA sq cm.

Kaufman, A.↗

Develop and test fuel cell powered on-site integrated total energy systems. Phase 3: Full-scale power plant development

The testing of two 25-cell stacks of the 13 inch x 23 inch cell size (about 4kW) was carried out for 7000 and 8400 hours, respectively. A 25kW stack containing 175 cells of the same size and based on the same technology was constructed and is on test. A third 4kW stack, which will contain 24 cells, will comprise several new technology features; these will be assesed for performance and durability in long-term testing.

Kaufman, A.↗

Develop and test fuel cell powered on site integrated total energy sysems: Phase 3: Full-scale power plant development

A 25-cell stack of the 13 inch x 23 inch cell size (about 4kW) remains on test after 8300 hours, using simulated reformate fuel. A similar stack was previously shut down after 7000 hours on load. These tests have been carried out for the purpose of assessing the durability of fuel cell stack components developed through the end of 1983. A 25kW stack containing 175 cells of the same size and utilizing a technology base representative of the 25-cell stacks has been constructed and is undergoing initial testing. A third 4kW stack is being prepared, and this stack will incorporate several new technology features.

Kaufman, A.↗

Earth-to-Geostationary Orbit Transportation for Space Solar Power System Development

Space solar power satellites have the potential to provide abundant quantities of electricity for use on Earth. One concept, the Sun Tower, can be assembled in geostationary orbit from pieces transferred from Earth. The cost of transportation is one of the major hurdles to space solar power. This study found that autonomous solar-electric transfer is a good choice for the transportation from LEO to GEO.

Martin, James A.↗

Hardware Assessment in Support of the Dynamic Power Convertor Development Effort

Stirling Radioisotope Power Systems (RPS) are being developed by NASA's RPS Program in collaboration with the U.S. Department of Energy (DOE). Efforts ranging from 2001 to 2015 enabled development of the Technology Demonstration Convertor (TDC) for use in the 110-watt Stirling Radioisotope Generator (SRG-110) and the Advanced Stirling Convertor (ASC) for use in the Advanced Stirling Radioisotope Generator (ASRG). The DOE selected Lockheed Martin Space Systems Company (LMSSC) as the system integration contractor for both flight development efforts. The SRG-110 housed two TDCs fabricated by Infinia and resulted in the production of 16x demonstration units and 2x engineering units. The project was redirected in 2006 to make use of a more efficient and lower mass ASCs under development by Sunpower Inc. The DOE managed the flight contract with LMSSC and subcontractor Sunpower Inc. from 2007 to 2013 to build the ASRG, with support from NASA Glenn Research Center (GRC). Sunpower Inc. held two parallel contracts to produce ASCs, one with Lockheed Martin to produce ASC-F flight units and one with GRC for the production of ASC-E3 engineering unit pathfinders that were used to refine the flight design and production processes. The DOE initiated termination of the ASRG contract in late 2013. After ASRG had ended, GRC completed characterization testing of the ASRG Engineering Unit #2 (EU2) and the GRC contract with Sunpower was also completed. The NASA RPS Program Office has recently initiated a new Dynamic Power Conversion development effort which includes the potential maturation of Stirling, Brayton, and Rankine power convertors for the next generation of RPS. The effort started with the request for proposal and review of submits. Contracts are anticipated for release in 2017 and will initially focus on a design phase prior to fabrication and testing. This new effort will focus on robustness in addition to high efficiency, specific power, and reliability. Also, some requirements introduced during the ASRG contract have also been included in the new effort, such as constant lateral loading. Due to the focus on robustness and new requirements relative to the older TDC design, the Stirling Cycle Development Project has initiated an assessment of government owned hardware to help inform requirements evolution and evaluation of future designs. While lessons learned from the ASRG flight development project have been taken into consideration, the evaluation of the TDC design had not been completed for some existing environments or relatively new requirements. To further assess the TDC design, a series of tasks were initiated to evaluate degradation for units that have operated unattended for over 105,000 hours, demonstrate robustness to a random vibration environment, characterize and evaluate performance for varying lateral load profiles. The status for each task are described.

Wilson, Scott D.↗