Search NASASearch

SEARCH · Search NASA

Results for “Project 8”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 37 records · Page 2

HD ADOPT: Heavy-Duty Vehicle Choice Model Documentation

HD ADOPT is a logit consumer vehicle choice and stock model that analyzes the Class 8 tractor market. The model projects future technology shares, fuel consumption, and greenhouse gas (GHG) emissions under input assumptions of technology progress, energy prices, and policies. ADOPT is distinguished from other vehicle choice models through inclusion of non-linear and heterogenous consumer preferences and characterization of the full range of market options rather than use of composite vehicles. In addition, ADOPT has integrated vehicle simulation capabilities that enable performance assessment and optimization of endogenous technology evolution. Optionally, the model is able to adjust this evolution to enforce compliance with fuel economy and GHG emissions regulations. Primary results include projection of technology shares and future in-use fleet energy demand, petroleum consumption, and GHG emissions. This enables analysis and comparison of future scenarios of technology improvements, economic conditions, and national policies. Recent new features for the HD modeling also enable examination of different on-board hydrogen fuel storage technologies from the lens of consumer preferences for vehicle cost and range. This report documents current ADOPT capabilities and methodologies.

33 ADVANCED PROPULSION SYSTEMS

Automated Generation of Graph-based Cyber Threat Intel

With the advancement of AI technology and tools, specifically in the cybersecurity domain, both cyber defenders and threat actors are continuously adapting the use of these capabilities to expedite their operations. With this phenomenon, threat intelligence that is up to date, refreshable, and has relevant context to a specific threat becomes more and more important as it enables cybersecurity professionals to gain insight into relevant data and relationships to guide their operations. This project enables users to frequently aggregate threat intelligence from various sources, such as vendor vulnerability advisories affecting critical infrastructure, malware reports, and adversary writeups into a centralized, standardized database. The project utilizes the Structured Threat Intelligence eXpression (STIX) for a standardized, shareable threat intelligence data format and Neo4j as a graph database solution to store STIX nodes and relationships. Initial results of the project include datasets of over 8,000 nodes and 20,000 relationships extracted from over 500 data sources that have been released within the past month.

Threat Intelligence

Alaska Liquid Natural Gas Pipeline Front-End Engineering & Design (Final Technical Report)

The Alaska Gasline Development Corporation (AGDC) is Alaska’s natural gas infrastructure development corporation established in 2013. AGDC’s mission is to maximize the benefit of Alaska’s vast North Slope natural gas resources for Alaskans through the development of infrastructure necessary to move the gas into local and international markets. AGDC was identified for a Congressionally Directed Spending (CDS) project for funding in the Energy and Water Development and Related Agencies Appropriations Act, 2023 under the heading: “Congressionally Directed Energy Efficiency and Renewable Energy Projects.” The CDS included $\$$4,000,000 of direct funding, with required match funds, to move the project forward. Alaska’s North Slope holds America’s largest proven and conventional natural gas supply. The integrated Alaska LNG Project will deliver 3.5 billion cubic feet of natural gas per day from Alaska’s North Slope gas fields to Alaskans as well as to a marine terminal located at tidewater in Cook Inlet. Alaska LNG is an integrated gas infrastructure project with three major components: a gas treatment plant (GTP) located at Prudhoe Bay, an 807-mile (1,287 km) gas pipeline (Mainline Pipeline) to Southcentral Alaska with interconnections for in-state gas use, and a natural gas liquefaction facility (LNG Facility) in Nikiski, Alaska. The integrated Alaska LNG Project has several strategic advantages including proven gas resources, existing upstream infrastructure, an advantageous arctic climate for LNG production, proximity to LNG markets, a track record of reliability from a state that first began exporting LNG to Japan in 1969, and broad support from Alaskans. North Slope natural gas is a conventional resource and can be produced with minimal drilling at a fraction of the carbon dioxide emissions of shale gas from the Lower 48 states. Through the development of the Alaska LNG Project, Alaska can provide energy security to Alaskans and a stable source of LNG to the Asia-Pacific region for generations. The Alaska LNG Project has been progressed through Pre-Front-End Engineering Design (Pre-FEED) and has obtained all major federal and State of Alaska permits and authorizations to construct the project, including the Federal Energy Regulatory Commission (FERC) Order Granting Authorization Under Section 3 of the Natural Gas Act. On September 5, 2024, the U.S. Department of Energy (DOE), National Energy Technology Laboratory (NETL) awarded Project No. DE-FE0032307 to AGDC with the objective to progress the project to Front-End Engineering Design (FEED) entry for the Alaska LNG Project Phase 1 Pipeline. The award Start Date was made effective July 1, 2023, with a Period of Performance through June 30, 2025. On March 27, 2025, AGDC announced the execution of definitive commercial agreements with Glenfarne Alaska LNG, LLC, an affiliate of Glenfarne Group, LLC, (together as “Glenfarne”), to lead the development of the Alaska LNG Project and enter FEED for the Phase 1 Pipeline. Project activities are now funded and directed by this private sector partner who holds a 75% interest in 8 Star Alaska, LLC (8 Star). 8 Star holds the assets of the Alaska LNG Project. As planned, AGDC continues to hold 25% minority interest in 8 Star and will play a governance role moving forward with Alaska LNG. This definitive commercial agreement milestone led to the successful completion of AGDC’s Statement of Project Objectives (SOPO) for FEED entry and led to the completion of DOE Project No. DE-FE0032307. At conclusion of the SOPO, AGDC also reached the award’s maximum federal cost share of $\$$4,000,000. AGDC is, therefore, providing Final Technical Report to close out DOE Project No. DE-FE0032307.

02 PETROLEUM

HPC-Enabled Optimization of High Temperature Heat Exchangers (CRADA Final Report)

This project was a collaborative effort between Lawrence Livermore National Security, LLC (LLNS) as manager and operator of Lawrence Livermore National Laboratory (LLNL) and Materials Sciences, LLC, to develop a technology for design and optimization of heat exchangers using powerful desktop and laptop computers. The project was originally designated as a 12-month project, and consisted of 3# major tasks and the following 8# major deliverables: 1) CFD models of 3D heat exchangers based on existing and new geometry. 2) Validation against experimental data provided by MSC and published in the literature. 3) CFD models of 3D unit cells based on TPMS. 4) Surrogate models capable of delivering the gradients of the homogenized properties with respect to the parametrization. 5) 3D design methodology using TO algorithms. 6) Conventional reference and topology optimized designs. 7) 3D optimized designs stored in a 3D printer build format. 8) Verification of the improved performance. All of the deliverables for this project were successfully completed with two no-cost time extensions.

13 HYDRO ENERGY

Techno-Economic Evaluation of a 600MW Pumped Storage Hydropower Plant using the Pumped Storage Hydropower Valuation Tool

This paper presents a techno-economic evaluation of the proposed 600 MW, 8-hour Craig – Hayden pumped storage hydropower project using the U.S. Department of Energy’s Pumped Storage Hydropower Valuation Tool. The analysis integrates plant technical characteristics, regional grid conditions, and market-based operating assumptions to quantify stacked value streams from energy arbitrage, capacity, ancillary services, transmission congestion relief, and reliability. Both price taker and price influencer frameworks are applied to examine the impact of market participation and system interactions on lifecycle economic performance using Benefit - Cost Analysis and Multi - Criteria Decision Analysis. The results show that the price taker approach provides higher revenue estimates based on exogenous price signals, while the price influencer approach captures production cost savings, renewable curtailment reduction, and market price formation, yielding more conservative but system-representative outcomes. The study demonstrates the strategic value of long-duration PSH for enhancing operational flexibility, resource adequacy, and grid reliability in a high-renewable Western Interconnection.

Bhattacharyya, Arjun [ORNL] (ORCID:000900060976046

Numerical Investigation of Fluid Flow and Space Charge in Liquid Argon Time Projection Chamber (LArTPC) Detectors

Overview This project focused on developing a high-fidelity numerical framework to simulate the multiphysics environment within Liquid Argon Time Projection Chamber (LArTPC) detectors. The primary objective was to characterize the complex interplay between ion transport, background fluid dynamics, and electric field distortions—a critical factor for the calibration and sensitivity of next-generation High Energy Physics experiments, such as DUNE. Technical Achievements The research successfully yielded a hybrid numerical space-charge solver utilizing a Cell-Centered Finite Volume Method (FVM) for ion transport coupled with a Finite Element Method (FEM) for electric potential. Key accomplishments include: • Verification & Validation: The 3-D solver was rigorously verified against 1-D analytical solutions, demonstrating high numerical accuracy in predicting space-charge-induced field deviations. • Field Distortion Analysis: 3D simulations revealed that space charge effects introduce significant non-uniformities in the electric field. Critically, the research identified that background LAr flow velocities, when comparable to ion drift velocities, markedly exacerbate these distortions. • Technology Transfer: The resulting source code and comprehensive user manuals were successfully transferred to collaborators at Fermilab, providing a portable computational tool for the broader scientific community. Challenges and Future Directions While the space-charge solver achieved all performance metrics, the integrated fluid dynamics modeling encountered convergence challenges stemming from the extreme 200-fold disparity in length scales between the detector's 37 mm inlet pipes and the 8-meter global domain. To address this, the project has identified a clear technical pivot toward Hierarchical Geometric Adaptive Mesh Refinement (HG-AMR). By implementing an h-type refinement strategy with hanging nodes, future iterations of this solver will be capable of resolving localized high-gradient inlet flows without the prohibitive computational costs of regular grids. This advancement, combined with data-driven uncertainty quantification based on MicroBooNE-style calibration, will enable the precise modeling of detector responses in large-scale cryogenic environments where direct measurement remains difficult. Impact The computational tools developed under this award provide a foundation for enhancing the energy resolution and spatial reconstruction of noble liquid detectors. By bridging the gap between theoretical fluid dynamics and experimental field calibration, this work supports the DOE’s mission to advance the frontiers of neutrino physics and dark matter detection.

42 ENGINEERING

Underwater Target Detection Software Demonstration on the RivGen Turbine

This repository contains data and processing scripts necessary to train the object detection models utilized in the underwater target detection software demonstration on the RivGen turbine project and to produce performance metrics (precision, recall, mAP50, mAP50-95). - Contents - Data consist of "images" and "labels". Each image has an associated label, both share the same time string in its file name (e.g., 2024_05_25_09_01_57.98.jpg and 2024_05_25_09_01_57.98.txt). Time strings have the format %yyyy_%mm_%dd_%HH_%MM_%SS.%3f. Images and labels were curated from 2021 and 2024 smolt outmigration periods at the project site in Igiugig, AK. Images are monochrome 8-bit images of objects (smolt, debris, and other) passing through the field of view of the deployed cameras during various operational stages of the RivGen turbine. Labels are text files indicating the class and bounding polygon of each object in an image. The provided labels use the "YOLO" label format. - Requirements - Python3.8+ is required to install and run the train and validation script. The README.md provides instruction for installing the requirements from the requirements.py file. - Instructions - The "example_train.py" file ingests the provided data, trains a model, and produces model performance metrics at completion. NOTE: model performance metrics will vary from run to run as a consequence of the random selection of training and validation data.

16 TIDAL AND WAVE POWER

Initial Development of Fusion Magnet Simulation Capabilities for Performance and Safety Evaluation Using the MOOSE Framework

Fusion energy holds the promise of being a transformative technology as a carbon-neutral, sustainable source of energy. Whole device modeling and the development of fusion digital twins will be increasingly important for emerging fusion device concepts at both national laboratories and within the commercial fusion industry. However, meeting the challenge of whole device modeling of fusion energy devices requires robust, multiphysics, multiscale modeling and simulation technologies capable of running on large-scale supercomputers. Detailed analysis of individual systems at-scale is also required to ensure safe and efficient operation as well as provide the safety basis for future device designs and licensing activities. In a tokamak, toroidal and poloidal magnets confine and shape the fusion plasma to promote the fusion reaction. High plasma temperatures and high magnetic field requirements in modern design concepts (leading to high amounts of energy stored within each magnet) impose electrical, thermal, and mechanical loads on the magnet components, which in turn impacts the safety considerations of the magnet and their supporting systems. Idaho National Laboratory (INL) has a history of working in this space, including development and benchmarking of the Magnetic System Circuitry Analysis Program (MSCAP) and Magnet Arcing (MAGARC) codes to study magnet quench events; notably, MAGARC was used to study quenching during the ITER Engineering Design Activity. However, these legacy codes and capabilities are not parallel and scalable, and new tools are required for future advances in this area, which leads to the INL-developed Multiphysics Object-Oriented Simulation Environment (MOOSE) framework. Developed originally for fission reactor systems under United States Department of Energy, Office of Nuclear Energy modeling and simulation programs, the MOOSE framework has been well-suited to multiscale, multiphysics modeling and simulation needs for nuclear systems. The framework is open-source, well-tested, under continuous development and deployment, and developed to a Nuclear Quality Assurance, Level 1 software quality standard. MOOSE has also been used in the fusion space previously in several projects: INL’s Tritium Migration Analysis Program, Version 8 (TMAP8) for tritium migration, UK Atomic Energy Authority’s A Unified Resource for OpenMC (fusion) Reactor Applications (AURORA) code for fusion thermo-mechanical and neutronics analysis, and Argonne National Laboratory’s Cardinal for high-fidelity computational fluid dynamics and neutronics. However, to model superconducting magnets, several MOOSE enhancements are required: additions to the current MOOSE electromagnetic capabilities, new material libraries for superconductors of interest (such as YBCO), as well as fusion-specific models for thermo-mechanics. This talk will discuss initial development activities to build these capabilities in MOOSE, focusing on initial validation and benchmarking activities. Proposed coupling workflows and future work to support the simulation of fusion magnets and magnet structural assemblies for performance and safety evaluation in MOOSE will also be discussed.

70 - PLASMA PHYSICS AND FUSION TECHNOLOGY

Improving the Freight Productivity of a Heavy-Duty, Battery Electric Truck by Intelligent Energy Management

This project aimed to enhance the range and reduce the operating costs of battery electric Class 8 trucks traveling over 250 miles daily. This was achieved through the development and implementation of an intelligent-Energy Management System (i-EMS) that leverages vehicle and operations data, physics-aware machine learning algorithms, and vehicle-to-cloud (V2C) connectivity. The project hypothesized that advanced machine learning algorithms and real-time data analytics could significantly improve the energy efficiency and range of these trucks. Key objectives included developing a physics-aware machine learning algorithm, implementing an i-EMS with V2C connectivity and physics-aware spatial data analytics (PSDA), and validating the system’s effectiveness with fleet partners HEB Companies and Murphy Logistics. Extensive data collection from vehicle operations, including vehicle characteristics, road conditions, and payload, was conducted. A machine learning algorithm was developed to predict energy consumption and enable proactive decision-making. The i-EMS was implemented on two Volvo VNR BEVs, with operators receiving charging and routing recommendations. Charging stations were installed at depot locations in Texas and Minnesota, with an additional on-route charger in Minnesota. Significant findings included a 14% range improvement for Murphy Logistics on a highway-driving eco-route and a 22% range improvement for HEB Companies on a city-driving eco-route. The i-EMS utilized rule-based methods and physics-based algorithms to predict and reduce energy consumption, with real-time monitoring and analysis through V2C connectivity enabling proactive decision-making. The project demonstrated the feasibility and economic viability of battery electric Class 8 trucks for long-haul operations, showcasing the potential of physics-aware machine learning in optimizing energy management. The successful implementation of the i-EMS in real-world scenarios validates its practical application and effectiveness, paving the way for the widespread adoption of battery electric vehicles in the freight transportation industry.

32 ENERGY CONSERVATION, CONSUMPTION, AND UTILIZATI

Heliostat Sizing Methodology for Solar Heat for Industrial Processes

This study presents a method to obtain a heliostat size that minimizes the levelized cost of a heliostat-based concentrating solar thermal system for industrial process heat (IPH) applications at operating temperatures from 565 to 1550 degrees Celsius. The method extends prior work by embedding a routine for system design that obtains near-optimal subsystem sizes, increasing the fidelity of drive cost functions, and adding an optical performance model. An illustrative business case is developed for Daggett, California, targeting specified annual thermal energy outputs of 50 to 400 GWhth. Optical performance is modeled using verified estimates from the literature. A surrogate heliostat cost model, derived from commercial heliostat designs and scaled for production volume, installation, and operations and maintenance costs, is used to develop cost functions. Results show that heliostat size strongly affects the levelized cost of heat (LCOH), producing a characteristic U-shaped trend with a robust near-optimal window of 8 - 12 m2; the heliostat size producing the lowest project cost in our study grows slightly as the project size increases, and is reduced as the operating temperature increases. The findings in this study are consistent with the general trend of smaller heliostats under deployment at existing projects for high-temperature industrial process heat and reflect the significant reduction in power electronics and other per-heliostat costs. The methodology we propose is general and can be tailored to revised cost curves as the technology continues to evolve.

14 SOLAR ENERGY

Statistical Downscaling of Climate Models for Solar Resource Assessment

This study presents the development of statistical models to efficiently downscale future projections of solar irradiance for solar energy applications. A climate data set simulated from a Regional Climate Model (RCM) obtained from the North American Coordinated Regional Climate Downscaling Experiment (NA-CORDEX) is selected as input to the statistical models to create high-resolution global horizontal irradiance (GHI) over the contiguous United States (CONUS). Our approach builds statistical downscaling models that (1) regrid RCM data (0.22 degree and daily spatiotemporal resolution), (2) correct bias of GHI projections, (3) downscale the future GHI project from daily-scale to hourly-scale, and (4) spatially downscale to generate GHI at 8-km resolution. To calibrate and validate the statistical models, we adapt and use the National Solar Radiation Database (NSRDB). Preliminary results show that the statistical downscaling approach downscales future projections of GHI under two climate scenarios (RCP4.5 and RCP8.5) with a nBIAS of 3%, nMAE of 34% and nRMSE of 46% estimated against NSRDB for the contiguous United State. This presentation will summarize the implemented methodology and validation results as well as future extension of this research.

climate data

Carbon Capture from ArcelorMittal Hot Briquetted Iron Plant Using Air Liquide Cryocap™ FG Technology – FEED Study

The process of steel production is energy and carbon intensive with global average energy consumption of 5.5 MWh/tonne of steel and CO2 emission intensity of 1.83 tonne CO2/tonne of steel. The steel making process has inherent CO2 emissions from mineral conversion and is considered major contributors to the global carbon emissions. The steel industry is responsible for 8% of global carbon emissions. The main objective of this research project is to execute and complete a front-end engineering and design (FEED) study for a commercial-scale, carbon capture project that separates 95% of the total CO2 emissions at the ArcelorMittal’s Hot Briquetted Iron (HBI) plant in Portland, TX (Figure 1). The HBI is an ore-based metallic that is used as high-grade feedstock for high-quality steel via an Electric Arc Furnace (EAF) route. The HBI plant produces 2.0 million metric tonnes of high-quality HBI and emits approximately 1 million tonnes CO2/yr. The capture system is a Pressure Swing Adsorption (PSA) system assisted Cryocap™ FG technology (Figure 2). The captured CO2 will be pipeline grade and will be geologically stored in a facility within 10 miles of the CO2 source. The Host Site location in Corpus Christi, TX, is near hydrocarbon processing facilities and near Environmental Justice (EJ) and Qualified Opportunity Zone (QOZ) communities. Due to the location of the Host Site, the retrofit project offers the ability to demonstrate how a workforce focused on the fossil energy sector can be redirected to the clean- energy sector. The Air Liquide Cryocap™ capture technology is a proven technology and has been extensively examined for large industrial applications. It has been shown to be applicable to a variety of industrial applications including the steel industry. Cryocap™ FG (specific setup for Flue Gas application) consists of a Pressure Swing Adsorption (PSA) unit coupled with a Cryogenic System. The PSA pre-concentrates the CO2 from the flue gas, while the cryogenic unit enables the CO2 purity to be increased to the desired level. The scope of this study incorporates completing FEED study of the CO2 capture system which includes point-source CO2 capture and balance-of-plant; Business Case Analysis (BCA) outlining the current and projected volumes of the steel plant’s point sources of CO2 and the potential utilization of tax credits, including its projected revenue and duration; Life Cycle Analysis (LCA); Environmental Justice Analysis; Economic Revitalization and Job Creation Outcomes Analysis; and Workforce Readiness Plan. The plant design work was divided into two components: Inside Battery Limits (ISBL) and Outside Battery Limits (OSBL). The ISBL focuses on the capture system, while the OSBL focuses on the utility feeds and ducting from the plant to the capture system. Various design and engineering deliverables will be developed to define commodity quantities, equipment specifications, and labour effort required to execute the project. These FEED study deliverables will be prepared with the intent to develop an overall project capital cost estimate consistent with an AACE Class 3 estimate. The modular approach for the Cryocap™ FG that is being designed for this study integrates compression, PSA, and cryogenic “bricks” to achieve the desired CO2 capture rates. This carbon capture system integrates easily with the existing plant, thus reducing project costs and risks. It is also capable of managing impurities such as nitrogen oxides (NOx), sulfur oxides (SOx), mercury, hydrocarbons, and particulate matter. The capture system has a smaller footprint than amine-based systems. The two-step process uses PSA to preconcentrate the CO2 in the feedstream and then uses the cryogenic portion to purify and compress the resulting high purity CO2 product. This combination of purification and compression (i.e., process intensification) significantly reduces the CAPEX associated with use of a separate compressor commonly utilized for amine solvent-based systems. Successful completion of the FEED study will provide DOE with a detailed understanding of the costs for scaling up this proven capture technology for commercial applications at industrial facilities.

42 ENGINEERING

Techno-Economic Evaluation of Electrified Vehicle Options in Drayage Fleets

The electrification of drayage fleets offers potential economic and operational benefits, but the financial viability of electrified vehicles remains sensitive to battery cost, energy price, and fleet usage patterns. While total cost of ownership (TCO) is a useful benchmark, fleet operators and investors are equally concerned with investment performance metrics such as payback period (PB) and Internal Rate of Return (IRR), which better reflect financial risks and investment return timelines. This study develops a unified techno-economic framework that jointly evaluates TCO, PB, and IRR to determine when electrified trucks become cost-effective alternatives to diesel trucks. Building on a previously developed cost modeling tool and using real-world telematics data from a Class 8 drayage fleet at the Port of Savannah, the analysis incorporates projected battery cost trajectories, electricity and diesel price trends, vehicle efficiency improvements, and multiple battery capacities. Parameter ranges reflect widely cited projections and observed drayage-duty-cycle variability. A surrogate-modeling method approximates economic performance across thousands of battery cost–electricity price combinations, enabling high-resolution identification of conditions that achieve TCO parity, acceptable PB thresholds, and target IRR levels. Additionally, the study estimates the evolving share of the fleet that can feasibly electrify over time under multiple economic metrics. This integrated framework offers a novel, data-driven approach to inform risk-aware decision-making for fleet electrification and supports investment planning under evolving cost and operational conditions.

Sun, Ruixiao [ORNL] (ORCID:0000000341768676)

Estimating Electrification Potential for Class 8 Regional-Haul Trucks

This one-page highlight details the key takeaways from a project that utilized NREL's Fleet Research, Energy Data, and Insights (FleetREDI) data analysis pipeline. As part of the North American Council for Freight Efficiency's (NACFE's) Run on Less Depot data workshop, NREL sought to understand how Tesla semi-trucks would perform in real-world regional haul applications. Analysis reveals that the modeled Tesla trucks, with an average efficiency of 1.78 kWh/mi, struggle to achieve full operational coverage using current battery and charging configurations assuming operations remain unchanged. However, in an extreme case where ubiquitous charging exists, 100% EV coverage is possible for the given drive cycles. These findings highlight the trade-off between battery size and charge rate in electrification potential and emphasize the necessity for advancements in charging infrastructure to enable electric trucks for regional haul operations.

ADVANCED PROPULSION SYSTEMS

Dual-loop Solvent-based CCS for Net Negative CO 2 Emissions with Lower Cost

This final technical report details the successful design, construction, and operational validation of an innovative dual-loop CO 2 capture technology designed to achieve deep decarbonization (>99%) from Natural Gas Combined Cycle (NGCC) power plants that results in the electricity with carbon intensity of approximate 42 kg CO 2 -eq/MWh, less than the electricity produced by solar PV. The integrated process couples a primary aqueous solvent (in this project, a water lean solvent – WLS) absorption loop for bulk CO 2 removal with a secondary potassium hydroxide (KOH) polishing loop featuring electrochemical regeneration. This architecture leverages the higher exergy efficiency of the primary loop while utilizing the fastest kinetic of the secondary loop to capture dilute residual CO 2 , achieving an overall capture rate of 99.9% and co-producing pure hydrogen after moisture being condensed and dehydrated. Technical feasibility was established through a comprehensive 2,000-hour experimental campaign on a bench-scale fully-integrated unit (using 4” absorber and 4” stripper) with the feeding flue gas flowrate in the range of 8-20 cfm, confirming the attainment of Technology Readiness Level (TRL) 4. The project executed extensive parametric testing followed by 1,000 hours of continuous steady-state testing, demonstrating exceptional process stability with the electrochemical regenerator exhibiting less than a 10% reduction in electrical conductivity over the duration of the campaign. Operational characterization gathering on the bench unit revealed distinct energy profiles for the hybrid system: the primary loop required approximately 280 kJ mol -1 for bulk removal, while the polishing loop required approximately 1,600 kJ mol -1 specifically when reducing dilute CO 2 concentrations from ~740 ppm down to <50 ppm. (Please note those energy values/numbers can only be viewed as relative relationship and should not be extrapolated as absolute values required for CO 2 capture). Furthermore, dynamic testing validated the system’s flexibility for utility applications, demonstrating a rapid process response time of <30 minutes to changes in flue gas flowrate. Emission monitoring confirmed that the dual-loop architecture effectively mitigates solvent losses, utilizing a water wash to remove entrained aerosols to <1 ppm. The Techno-Economic Analysis (TEA) indicates a cost of capture of $\$$59.3/tonne and a Levelized Cost of Electricity (LCOE) of 71.7 $\$$/MWh at the overall capture efficiency of 99.8% of total carbon in the flue gas stream, with sensitivity analysis identifying an economic optimum when the primary loop captures 97% of the total CO 2 . A Life Cycle Assessment (LCA) confirms the technology’s potential for net-negative emissions, determining a Global Warming Potential (GWP) of 52 kg CO 2 -eq/MWh—significantly lower than the baseline—which further decreases to 42 kg CO 2 -eq/MWh when crediting the displacement of conventional hydrogen production.

03 NATURAL GAS

The 8RH 2 Process for Producing Clean Hydrogen with Autothermal Reforming and Carbon Capture

The primary objective of this project is to demonstrate the commercial viability and environmental benefits of an 8 Rivers Hydrogen (8RH 2 ) process, a proprietary technology developed to optimally produce high-purity blue H 2 with up to 99% carbon capture. This 8RH 2 process is particularly notable for its integration of a low-energy cryogenic CO 2 separation system that not only maximizes hydrogen recovery but also minimizes the carbon footprint of the operation. This aligns with global environmental goals and supports the United States' push toward energy sustainability and independence.

03 NATURAL GAS