X-43A Final Flight Observations

The presentation will provide an overview of the final flight of the NASA X-43A project. The project consisted of three flights, two planned for Mach 7 and one for Mach 10. The first flight, conducted on June 2, 2001, was unsuccessful and resulted in a nine-month mishap investigation. A two-year return to flight effort ensued and concluded when the second Mach 7 flight was successfully conducted on March 27, 2004. The third and final flight, which occurred on November 16, 2004, was the first Mach 10 flight demonstration of an airframe-integrated, scramjet-powered, hypersonic vehicle. As such, the final flight presented first time technical challenges in addition to final flight project closeout concerns. The goals and objectives for the third flight as well as those for the project will be presented. The configuration of the Hyper-X stack including the X-43A, Hyper-X launch vehicle, and Hyper-X research vehicle adapter wil also be presented. Mission differences, vehicle modifications and lessons learned from the first and second flights as they applied to the third flight will also be discussed. Although X-43A flight 3 was always planned to be the final flight of the X-43A project, the X-43 program had two other vehicles and corresponding flight phases in X-43C and X-43B. Those other projects never manifested under the X-43 banner and X-43A flight 3 also became the final flight of X-43 program.

Grindle, Laurie↗

ALICE-USA Barrel Tracking Upgrade (Project Final Report)

The ALICE-USA Barrel Tracking Upgrade (BTU) project began in 2015 to participate in a major upgrade of the Time Projection Chamber (TPC) and the Inner Tracking System (ITS) of the ALICE Experiment at CERN in Geneva, Switzerland. This upgrade increased the maximum readout rate of the ALICE detector to accommodate the increased heavy ion interaction rates following Long Shutdown 2 of the Large Hadron Collider, and greatly improved the vertexing performance of the detector. The original scope was completed and reviewed in November 2019. The BTU project document BTU.19.v1 "ALICE Barrel Tracking Upgrade Project Closeout / Transition to Operations (2019)" from November 2019 describes the status in detail and is attached as Appendix 1 below. At that point, all delivery milestones had been met on time, all Key Performance Parameters (KPPs) of the project had been satisfied, and the project was under budget. Several subsequent No Cost Extensions (NCEs) supported integration and pre-commissioning of the BTU project deliverables at CERN, as well as study and assessment of performance with Pb-Pb collisions at 50 kHz. The BTU project was successfully completed on 30 September 2024.

46 INSTRUMENTATION RELATED TO NUCLEAR SCIENCE AND ↗

USACE FUSRAP Records Management Challenges in the Digital Age - 20242

In late 2016, the U.S. Army Corps of Engineers (USACE) implemented a Headquarters-supported nationwide records management initiative managed by the USACE-New England District to address the digitization and organization of Formerly Utilized Sites Remedial Action Program (FUSRAP) project files. This initiative will prepare USACE FUSRAP for moving toward a fully electronic system of records management. Additionally, the records management initiative streamlines the process and prepares the Administrative Record (AR) and Permanent Record (PR) file for transfer from USACE to the U.S. Department of Energy (DOE)-Office of Legacy Management (LM) following project closeout. Over the past couple of years, USACE and DOE-LM have been working to finalize a joint guidance document to assist in the FUSRAP records transition process. However, there remain key records management topics that require further discussion and development. Specifically, these topics include the implementation, process, and procedure for the capture of social media records and compliance with Section 508 of the Rehabilitation Act of 1973 (29 USC 794d), as amended. Due to advances in technology and the ease of communication it provides, USACE is using social media more often to interface with the public than 5, 10 or 15 years ago. The identification and capture of these records are challenging because it requires each USACE district or producer of a record to track what has been released through social media so that it can be captured as part of the AR or PR. USACE is currently evaluating processes and procedures for social media records capture. This paper explores how social media is being used by USACE across FUSRAP projects and best practices for the capture of social media records. Public accessibility to the project AR is required under the Comprehensive Environmental Response, Compensation, and Liability Act, which USACE FUSRAP must follow. As USACE FUSRAP ARs are converted to a digital format, greater accessibility to the files can be provided through web sites or other electronic media. However, Section 508 of the Rehabilitation Act must be considered when releasing electronic files to the public. Under Section 508, government agencies must ensure that information is made available to the public in a format that provides equal access to persons with disabilities. This paper discusses the electronic records requirements under Section 508 and addresses broad implementation of compliance across large digital records sets. Records management challenges are presented in the context of the FUSRAP records management program; however, these records management considerations and best practices are applicable across all Federal agency records management programs. Examples presented will further aid in understanding electronic records requirements that may be included on new USACE FUSRAP contracts as well as upcoming National Archives Records Administration requirements that will move us toward an electronic government. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Building America Industrialized Housing Partnership (BAIHP II)

This report summarizes the work conducted by the Building America Industrialized Housing Partnership (BAIHP - www.baihp.org) during the final budget period (BP5) of our contract, January 1, 2010 to November 30, 2010. Highlights from the four previous budget periods are included for context. BAIHP is led by the Florida Solar Energy Center (FSEC) of the University of Central Florida. With over 50 Industry Partners including factory and site builders, work in BP5 was performed in six tasks areas: Building America System Research Management, Documentation and Technical Support; System Performance Evaluations; Prototype House Evaluations; Initial Community Scale Evaluations; Project Closeout, Final Review of BA Communities; and Other Research Activities.

32 ENERGY CONSERVATION, CONSUMPTION, AND UTILIZATI↗

Final Technical Report

The project, Capital Investment to Fund Equipment Purchases and Facility Modifications to Create a Sustainable Future for EnergyXchange served to replace landfill gas energy with alternative energy resources, primarily solar and wood waste. This is the final project closeout report.

09 BIOMASS FUELS↗

FIELD IMPLEMENTATION PLAN FOR A WILLISTON BASIN BRINE EXTRACTION AND STORAGE TEST

The Energy & Environmental Research Center (EERC) successfully completed all technical work of Phase I, including development of a field implementation plan (FIP) for a brine extraction and storage test (BEST) in the North Dakota portion of the Williston Basin. This implementation plan was commissioned by the U.S. Department of Energy (DOE) National Energy Technology Laboratory (NETL) as a proxy for managing formation pressure plumes and measuring/monitoring the movement of differential pressure and CO2 plumes in the subsurface for future saline CO2 storage projects. BEST comprises the demonstration and validation of active reservoir management (ARM) strategies and extracted brine treatment technologies. Two prospective commercial brine injection sites were evaluated for BEST to satisfy DOE’s goals. Ultimately, an active saltwater disposal (SWD) site, Johnsons Corner, was selected because it possesses an ideal combination of key factors making it uniquely suited to host BEST. This site is located in western North Dakota and operated by Nuverra Environmental Solutions (Nuverra), a national leader in brine handling, treatment, and injection. An integrated management approach was used to incorporate local and regional geologic characterization activities with geologic and simulation models, inform a monitoring, verification, and accounting (MVA) plan, and to conduct a risk assessment. This approach was used to design a FIP for an ARM schema and an extracted brine treatment technology test bed facility. The FIP leverages an existing pressure plume generated by two commercial SWD wells. These wells, in conjunction with a new brine extraction well, will be used to conduct the ARM schema. Results of these tests will be quantified based on their impact on the performance of the existing SWD wells and the surrounding reservoir system. Extracted brine will be injected into an underlying deep saline formation through a new injection well. The locations of proposed extraction and injection wells were selected during the Phase I efforts. These wells will be permitted as North Dakota Administrative Code Underground Injection Control Class II wells and will yield additional characterization data which will further refine the FIP in Phase II. An array of surface and downhole monitoring techniques will validate ARM performance against predictive simulation results. Infrastructure will be constructed to manage extracted fluids at the surface and provide brine to a treatment test bed facility. Treatment of extracted brine can provide a means of reducing extracted brine disposal volumes, an alternate source of water, and/or salable products for beneficial use. A test bed facility will be constructed to provide a means of demonstrating these technologies on a wide range of brine concentrations. Screening criteria based on a techno-economic and life cycle assessment were developed to select high-salinity brine treatment technologies for extended duration treatment (30–60 days) in Phase II. A detailed cost assessment determined total implementation costs for BEST of $19,901,065 million (DOE share $15,680,505). These costs are inclusive of all necessary equipment, infrastructure construction, operations and project closeout costs required to implement BEST. An ideal combination of key factors makes the Johnsons Corner site uniquely suited to be the BEST demonstration.

10 SYNTHETIC FUELS↗

Environmental Cost Analysis System (ECAS) Status and Compliance Requirements for EM Consolidated Business Center Contracts - 13204

The Department of Energy (DOE) Office of Environmental Management (EM) has developed a web-accessible database to collect actual cost data from completed EM projects to support cost estimating and analysis. This Environmental Cost Analysis System (ECAS) database was initially deployed in early 2009 containing the cost and parametric data from 77 decommissioning, restoration, and waste management projects completed under the Rocky Flats Closure Project. In subsequent years we have added many more projects to ECAS and now have a total of 280 projects from 8 major DOE sites. This data is now accessible to DOE users through a web-based reporting tool that allows users to tailor report outputs to meet their specific needs. We are using it as a principal resource supporting the EM Consolidated Business Center (EMCBC) and the EM Applied Cost Engineering (ACE) team cost estimating and analysis efforts across the country. The database has received Government Accountability Office review as supporting its recommended improvements in DOE's cost estimating process, as well as review from the DOE Office of Acquisition and Project Management (APM). Moving forward, the EMCBC has developed a Special Contract Requirement clause or 'H-Clause' to be included in all current and future EMCBC procurements identifying the process that contractors will follow to provide DOE their historical project data in a format compatible with ECAS. Changes to DOE O 413.3B implementation are also in progress to capture historical costs as part of the Critical Decision project closeout process. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

High-Burnup Spent Fuel Data Project Sibling Pin Test Campaign Closeout Summary

The Used Fuel Disposition Campaign (UFDC) was established within the United States (U.S.) Department of Energy (DOE) Office of Nuclear Energy (NE) to conduct research and development (R&D) activities associated with storage, transportation, and disposal of used or spent nuclear fuel (UNF or SNF) and high-level radioactive waste.

11 NUCLEAR FUEL CYCLE AND FUEL MATERIALS↗

TC3 Overview

This presentation gives an overview of the technology, methods and processes developed during the TC3 Technical Challenge of the System-Wide Safety (SWS) project. The presentation goes over the motivation for doing this research, gives an overview of the tool, methods and process developed under this program, and describes case studies and impact in industry.

Software assurance↗

Development of Solid Isotope Harvesting Methods in Preparation for FRIB (Closeout Report)

This project developed the techniques necessary to isolate hydrolysable radiometals from irradiated accelerator components. It was a collaborative project headed by Dr. Jennifer Shusterman at Hunter College in coordination with Dr. Nick Scielzo at Lawrence Livermore National Laboratory and Dr. Gregory Severin at Michigan State University. To develop the methods for harvesting hydrolysable radiometals, both non-radioactive and radioactive experiments were conducted. Non-radioactive tests involved dissolving common accelerator materials (tungsten, copper, aluminum, and gold), adding trace amounts of Zr 4+ and Y 3+ , and then separating the added ions out again using a variety of column-based approaches. These methods were then tested on surrogate materials that were created by irradiating tungsten, copper, aluminum and gold foils with a low-purity 88 Zr beam at the National Superconducting Cyclotron Laboratory. The implanted 88 Zr (and co-implanted and daughter-product 88 Y) were recovered, validating the developed methods. MSU’s role in the project was to develop the chemistry for recovering Zr and Y from tungsten; build the target station for irradiating the foils; conduct the irradiations with the collaborators; to validate the tungsten methodology using the irradiated foils; and to disseminate the results.

07 ISOTOPE AND RADIATION SOURCES↗

Development of Gas Analysis Capabilities

Project Description: The project objective was to develop gas analysis methodology and processes to identify and quantify contaminants specific to KSC, primarily volatile organic compounds (VOCs), utilizing the recently purchased gas chromatograph-mass spectrometer (GCMS) coupled with a sample pre-concentrator. This work established a standing, quick-turnaround quantitative GCMS methodology for KSC-specific VOCs associated with launching and landing spacecraft at trace-levels far below previous detection limits. Closeout Summary: This project established a standing methodology for rapid turnaround identification and quantification of 119 targeted VOCs considered most likely to be encountered at KSC. Of these, 111 of the calibration files are based on manufacturer-certified gas standard mixes. The other eight were generated using standards generated in-house from neat, certified reference materials using procedures for standard generation that were developed under this project. Additionally, the spectral signatures of two hydrofluorocarbon precision cleaning solvents, that are widely used in flight hardware processing, have been added to the mass spectral library for rapid qualitative identification.

Cristina Oropeza↗

New Industry Partnerships: Solar Energy Technologies Office Support for Early Projects in the Energy Systems Integration Facility: An Agreement Closeout Summary Report

The U.S. Department of Energy (DOE) Office of Energy Efficiency and Renewable Energy (EERE) Solar Energy Technologies Office (SETO)-funded New Industry Partnerships (NIPs) agreement established multiple new cooperative research projects with industry partners. Each project demonstrated the use of the National Renewable Energy Laboratory's Energy Systems Integration Facility (ESIF) as a national asset for research and development, testing, and validation of new technologies to support high penetrations of solar energy on the electric grid. The agreement was launched in 2013 and represented the SETO portion of the DOE EERE-wide Integrated Network Testbed for Energy Grid Research and Technology Experimentation (INTEGRATE) program. The focus of INTEGRATE was on multi-energy system testing and on testing the interactions of energy systems with information technology, communications, and telecommunications (ICT) systems. The NIPs agreement was a bit different from traditional research projects because it was specifically structured to enable partnerships for ESIF testing and as such required at least a 1:1 funds-in cost share from industry partners. In the end, the project engaged six different industry partnerships and resulted in testing a large number of innovative technologies. These included tiny inverters; power-to-gas technologies; and advanced simulation, analysis, and power-hardware-in-the-loop testing techniques. The agreement also provided significant impact for both research and industrial communities. This summary report provides a brief, high-level overview of these projects and their highlights along with lists of citations and other impacts. Readers are referred to the corresponding project reports for more in-depth information.

14 SOLAR ENERGY↗