Search NASA⌕ Search

SEARCH · Search NASA

Results for “RADIOACTIVE WASTE STORAGE”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 37 records · Page 2

Assessment of Cold Spraying Mild-Steel Powder onto Mild-Steel Substrate for Development of Waste Tank Repair System - 20515

Infrastructure for nuclear waste storage and processing (e.g., waste tanks, transfer pipelines, evaporators) at the U.S. Department of Energy (DOE) Hanford Site has been in service well beyond its original design life. Past corrosion control methods at Hanford for waste tanks have not been fully successful, as evidenced by leaks forming in tank AY-102, the first double-shell tank (DST) constructed, and significant degradation detected in the primary tanks of AP-102 and AY-101. Failure of infrastructure components can pose a significant risk to the environment, worker safety, and project schedules. Therefore, remotely deployable methods for repairing and extending the service life of the existing tank waste infrastructure are needed. Cold spray has been identified as a potential technique for performing in situ repairs and material buildup for life extension of waste storage and processing infrastructure. Cold-spray repair methods and technology are well-established and are used extensively by industry and the military for making repairs using dissimilar materials. Pacific Northwest National Laboratory is evaluating the process of making repairs using mild-steel powder applied to a mild-steel substrate to minimize the galvanic corrosion potential. This paper presents the initial results for a feasibility ('go/no-go') assessment as to whether low-density deposits with sound metallurgic bonds, to build-back steel plate material, can be achieved using existing commercial cold-spray equipment. An assessment of steel-on-steel deposit is necessary to determine if cold spray is a viable candidate for DST carbon steel plate restoration/repair and thus DST service life extension. Powder properties and preparation requirements have been investigated and operating conditions and parameters for depositing a cold-spray buildup of mild steel on a mild-steel substrate have been determined. Soundness of metallurgic bonding as a function of the operating parameters exercised and results from applying cold spray to lay a deposit over simulated small-diameter flaws in 1/2-inch mild-steel plate are presented. Application of in situ cold-spray repair to the DOE complex has the potential to reduce cost and schedule impacts associated with component failures and the need to procure and construct replacement infrastructure. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Testing of Crystalline Silicotitanate to Support Tank-Side Cesium Removal System Operations - 20458

The direct feed of waste from the Hanford tank farms to the Low-Activity Waste Facility at the Hanford Waste Treatment and Immobilization Plant requires an intermediate treatment step that prepares the waste for vitrification. Washington River Protection Solutions (WRPS) selected a near-tank treatment system known as the Tank-Side Cesium Removal (TSCR) system to perform the required intermediate treatment functions. The approach in the TSCR system is to filter waste supernatant with a sintered metal dead-end filter and then use a series of ion exchange columns to remove cesium; this system has several similarities to the Tank Closure Cesium Removal system that has been deployed on the Savannah River Site. The ion exchange media proposed for use is crystalline silicotitanate (CST), which is a non-elutable media with a high affinity for cesium. Because the media is non-elutable, loaded columns will be blown down with compressed air, moved into interim storage, and replaced with new columns when cesium capacity is reached. The assumed extent and rate of drying that could be achieved in the TSCR column geometry lacked confirmation by experimental data. In addition, once the columns are loaded with cesium, they generate flammable gases (primarily hydrogen) via radiolysis acting on any resident liquids, i.e., moisture, remaining in the media bed. An assessment of available information on CST concluded that gas generation data that bounds expected operational conditions were needed to support the TSCR system safety basis and planned operations. Working with WRPS, Pacific Northwest National Laboratory (PNNL) designed and conducted testing with CST media to address the need for (a) representative in-column drying data, and (b) bounding flammable gas generation data. Drying testing was performed using a full-height column with a diameter of approximately 2 inches with injected air at temperatures of 18 deg. C and 30 deg. C. Gas generation testing was conducted in an engineered bunker that allowed simultaneous irradiation of up to eight samples at a time. These two experimental approaches used at PNNL for the CST testing are summarized and the major outcomes are presented. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

The TRANSCEND University Consortium: Theme 4: Nuclear Materials - 20431

The safe and secure management of Pu is a matter of international concern, with ∼250 t of separated Pu currently stockpiled worldwide. The UK's civil inventory of nuclear materials contains significant stocks of separated Pu from the reprocessing of Magnox and AGR spent fuels. The preferred option for the 138.5 tonnes of Pu is re-use as mixed oxide (MOx) fuel, although 5% is not suitable for re-use and is recommended for direct disposal. However, it will take more than 15 years to implement re-use, requiring that the Pu be kept in interim storage in its current state for that period, i.e. as PuO{sub 2} powder within inert steel storage cans at Sellafield. The focus of the work presented here is thus plutonium storage and the direct disposal of plutonium. The Research and Development needs of both are now pressing: in the case of storage due to it being the current default; in the case of immobilization and disposal because of a comparative lack of Research and Development on Pu conditioning and packaging due to policy uncertainty as to whether it would be disposed of in a Geologic Disposal Facility (GDF). Addressing these needs is complicated by Pu's high radioactivity, decay heat and radiotoxicity, criticality, nuclear safeguard requirements and, for some UK Pu contaminated materials targeted for disposal, poor inventory. Thus, there is also a critical requirement for underpinning research on Pu bearing materials in these two contexts. In response to these needs, the TRANSCEND Consortium (Transformative Science and Engineering for Nuclear Decommissioning, a multi-disciplinary collaboration of 11 universities and 8 key industry partners from across the UK's civil nuclear sector) is seeking to provide technical underpinning to ongoing option development for the UK's civil Pu stockpile. Whilst understanding the behaviour of plutonium during its re-use as MOx is beyond the scope of the TRANSCEND Consortium work plan, the main objectives of the work are: (1) For interim storage: to understand how the surface structure and properties of pristine and radiation damaged PuO{sub 2} change with time in the absence and presence of water; and (2) For immobilization and disposal: to understand the mechanisms of incorporation of Pu into ceramic and glass-ceramic waste-forms, as well as the effect on these of self-induced radiation damage. Each objective is being addressed through separate work packages, the details of which are discussed in this paper. (authors)

11 NUCLEAR FUEL CYCLE AND FUEL MATERIALS↗

Hydrogen Recombiner Catalyst Evaluations for Waste Storage

Radiolysis of water in nuclear waste storage generates hydrogen gas that can accumulate within sludge style waste and be rapidly released during agitation events, creating a significant flammability hazard. Engineering controls are therefore required to limit hydrogen concentrations during both quiescent storage and transient disturbances. Catalytic recombination of hydrogen in waste storage offgas is a proven mitigation strategy, maintaining hydrogen levels below flammability limits and managing sudden concentration spikes. Conventional recombiners rely on platinum and/or palladium catalysts, with development efforts focused on extending service life, increasing active surface area, and ensuring safe deployment in radioactive environments. Savannah River National Laboratory (SRNL) is evaluating a newly developed hydrogen recombiner catalyst from Canadian Nuclear Laboratories as a cost-effective and durable alternative for nuclear waste applications. Testing was conducted in SRNL’s Shielded Cells facility, which enables reduced-scale experimental modeling under radiation fields and near-use-case conditions relevant to radioactive waste storage. Catalyst performance was evaluated using a custom offgas characterization system designed for near-zero flow conditions. The experimental apparatus consisted of a gas-tight 2.7 L PTFE vessel equipped with temperature monitoring, gas flow controls, and a variable-speed mixer to simulate sludge agitation. Offgas composition was monitored using a dedicated gas chromatograph with argon carrier gas and a krypton internal standard. Measurements were obtained for an empty vessel, the vessel containing a well characterized radioactive tank waste sample, and the same configuration with the candidate catalyst installed. Results demonstrate that the new catalyst effectively reduced hydrogen concentrations in the offgas within the constraints of the experimental design. In addition to confirming catalytic activity, the testing provided valuable insights into experimental optimization and considerations for future performance evaluations. These findings support the potential scalability of the technology and highlight its applicability to broader nuclear waste management operations, offering improved safety and reduced operational costs through enhanced catalyst durability and lower replacement frequency.

Tener, Zachary P. [Savannah River National Laborat↗

Plutonium Solubility and Supernate Concentration for Neutralized Fast Critical Assembly Discards to Savannah River Site Tank Waste

The Savannah River Site (SRS) plans to dissolve non-irradiated stainless steel (SS)-clad bundles of Fast Critical Assembly (FCA) materials in eighteen batches.1 FCA dissolution is currently underway in the 6.3D dissolver by simultaneous chemical and electrolytic dissolution, which is required to generate the harsh conditions necessary for dissolution of metal-oxide (MOX) and non-aluminum spent nuclear fuels (NASNFs).2 Nitric acid and potassium fluoride are used to promote chemical dissolution.2 Gadolinium will be added during processing as a thermal neutron poison for criticality control. There are no plans for recovering plutonium from this waste stream. After FCA dissolution, the acidic (HNO3/KF) “discards” containing the dissolved metals will be neutralized by addition of 50 wt% sodium hydroxide to a final free hydroxide concentration of 1.2 M.1 Neutralization will precipitate a slurry of insoluble solids, predominantly metal oxides/hydroxides of plutonium, uranium, and SS components. Small fractions of the SS components, Pu, U, and Gd will remain dissolved in the supernate. The neutralized slurry will be composited to existing radioactive waste storage tanks within the SRS Concentration, Storage, and Transfer Facilities (CSTF) containing other similar sludge batch (SB) materials.1 The fate of soluble plutonium and freshly-precipitated, colloidal plutonium from this process are of concern since the total Pu can challenge the waste acceptance criteria (WAC) at the downstream SRS Liquid Waste (LW) facility. Supernate decants including the neutralized FCA discards (nFCAd) within the CSTF will be composited with salt batch (StB) materials and transferred to the SRS Salt Waste Processing Facility (SWPF), where total plutonium is also of concern.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Cell G 7606A Mockup Measurement Analysis Methods and Results

The production of research isotopes at the Radiochemical Engineering Development Center (REDC) invariably leads to the accumulation of radioactive waste. Storage of this waste onsite at ORNL serves as an interim solution prior to shipment to long term storage facilities, however onsite capacity is limited. Proper characterization of the activity of waste products is essential for determining the appropriate waste stream and, ultimately, mitigating the cost of disposal. This is typically done via gamma spectrometry and use of the In-Situ Object Counting System (ISOCS), a software package from Mirion that serves as an accepted community standard. However, variability in the contents, density, and activity distribution in waste containers can introduce large errors in ISOCS quantification. A measurement campaign using a mockup of the proposed setup in Cell G seeks to quantify the magnitude and source of these systematic errors. Analysis of this data will guide the creation of ISOCS geometry templates and measurement methods designed to minimize overall uncertainty in reported activities.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Opportunities to Implement Solutions to Achieve Remedial Action Objectives in Consideration of Stakeholder Interests - 20365

A case study in the implementation of a soils excavation and removal project conducted at a Formerly Utilized Sites Remedial Action Program (FUSRAP) Maywood Superfund Site (FMSS) vicinity property; an active commercial business, in a densely populated area, with significant operational, technical and, logistical constraints that were expected to limit areas that could be remediated. The United States Army Corps of Engineers-led (USACE) team successfully navigated complex overlapping stakeholder interests to achieve a more efficient and complete removal of contaminated soils and debris while minimizing unnecessary excess costs to the Government. This paper centers on FUSRAP activities at the FMSS vicinity property located at 149-151 Maywood Avenue, Maywood, Bergen County, New Jersey. For most of its FUSRAP history, this ∼109,000 square meter (27-acre) property housed a now-demolished ∼26,000 square meter (6.5-acre) warehouse operated by Sears Logistics Services, a unit of the Sears Roebuck Company (Figure 2). Sears ended its property lease and vacated the warehouse in December 2016. Given that long history and for the purposes of this paper, the property will be referred to as the 'Sears property' or simply 'the property.' The Sears property is approximately 109,000 square meters (27-acres) and is currently zoned for commercial use. The property is bound to the north and northwest by 100 West Hunter Avenue (the Stepan Company), to the northeast by 205 Maywood Avenue, to the east by Maywood Avenue, to the south by 23 West Howcroft Road, and to the west by businesses on NJ Route 17 and the NJ Route 17 roadway. Until December 2016, the property housed a warehouse and distribution center operated by Sears Logistical Services. On-site structures were demolished by the property owner in 2017. The warehouse covered the north section of the property along the Stepan Company property line. A railroad spur from the adjacent property now known as the Maywood Interim Storage Site (MISS) ended at the northeast corner of the warehouse. Wetlands were located east of the warehouse; the rest of the property was covered with paved parking lots and grassed areas. During remediation at the property, opportunities frequently arose where the project team was able to coordinate effectively with stakeholders to sequence remediation activities to facilitate removal of otherwise inaccessible soils and identify opportunities for materials reuse when supported by residual radiological and chemical levels. Some specific opportunities include: - remediating individual truck loading dock bays to maintain tenant operations; - working along a busy highway and in a utility corridor containing a 30-inch high pressure gas main; - remediating Lodi Brook and associated wetlands requiring bypass pumping and other diversionary structures to maintain local community stormwater drainage; - protecting during remediation and supporting access to facilitate tenant/owner maintenance of critical fire protection and water supply system service lines buried in contaminated soils and necessary for safe warehouse operations; and - coordinating with stakeholders to ensure non-radiological contaminants of concern for the site (unaffiliated with FUSRAP) were addressed by the responsible party in a manner that maximized benefit to all parties while supporting an efficient overall site remediation program. Once the property was vacant and the warehouse structure and radiologically non-impacted above-grade structures were demolished, the project identified an opportunity to significantly reduce the volume of waste associated with the foundation of the former warehouse, a foundation suspected of being partially constructed in radiologically contaminated soils. The project developed and implemented supplemental radiological verification survey and sampling strategies based on radiological cross-contamination risk potential with process flow-charts and screening-level based decision points; a program that classified saw-cut sections of concrete based on observed residual surface radioactivity conditions using a combination of gamma sensitive sodium-iodide scans and beta sensitive Geiger-Muller direct measurements. The proposed approach was reviewed with stakeholders with feedback, including consideration of applicable State of New Jersey Site Remediation Program criteria and guidance before implementation. Once classified, additional sampling was performed at frequencies driven by screening. The sampling methods, stockpile sampling frequencies, criteria and, approach to data evaluation were developed in consideration of existing site cleanup standards, regional background ranges, State of New Jersey radiological remediation program guidance, and specific stakeholder input With the property remediation and survey efforts nearly completed, it is relevant to examine retrospectively the objectives, assumptions and limitations in the remedial design (i.e., what was planned) versus what was able to be accomplished through effective teaming. Benefits to other environmental remediation site programs include better understanding of how to work effectively with stakeholders to achieve win-win outcomes, and approaches to site remediation, waste minimization and materials reuse that were successful in their overall outcomes. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Seismic detection switch

A seismic switch (SS) that is able to detect and signal when internal faults have occurred within the SS is described. The SS provides safety class functionality to the detection of seismic activity. For example, the SS may detect earthquakes above a specified level, resulting in the disconnection of electrical power to a radioactive waste storage facility, which could result in the ignition of waste materials should the storage facility and/or storage container fail during a seismic event. By reducing the risk of fire under these circumstances, the possibility of offsite releases is significantly reduced.

Hayward, Allen D.↗

Panel Session 14: US NRC - Current and Emerging US NRC Regulatory Topics

This panel focused on several current and emerging US Nuclear Regulatory Commission (NRC) regulatory issues impacting the commercial radioactive waste arena in the US. The panelists provided different perspectives on key issues such as the revision of 10 Code of Federal Regulations Part 61 'Licensing Requirements For Land Disposal Of Radioactive Waste', the scoping study on very low-level waste, the consolidated interim storage of spent nuclear fuel and other timely regulatory topics. Panelists with presentations: Overview of NRC Low-Level Radioactive Waste Activities and Initiatives (Patricia Holahan); US Nuclear Power Plant Waste Management - US LLW Disposal Issues (Joe Weismann); Decommissioning Rule (Vern C. Rogers); What is TRU? Definition, Legislation, and Rulemaking (David Carlson); LLRW Regulatory Topics of Interest in Texas (Bobby Janecka); International Low Level Waste Management Practices (Richard McGrath)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Radioactive nuclear waste stabilization - Aspects of solid-state molecular engineering and applied geochemistry

Stabilization techniques for the storage of radioactive wastes are surveyed, with emphasis on immobilization in a primary barrier of synthetic rock. The composition, half-life, and thermal-emission characteristics of the wastes are shown to require thermally stable immobilization enduring at least 100,000 years. Glass materials are determined to be incapable of withstanding the expected conditions, average temperatures of 100-500 C for the first 100 years. The geological-time stability of crystalline materials, ceramics or synthetic rocks, is examined in detail by comparing their components with similar naturally occurring minerals, especially those containing the same radioactive elements. The high-temperature environment over the first 100 years is seen as stabilizing, since it can recrystallize radiation-induced metamicts. The synthetic-rock stabilization technique is found to be essentially feasible, and improvements are suggested, including the substitution of nepheline with freudenbergite and priderite for alkaline-waste stabilization, the maintenance of low oxygen fugacity, and the dilution of the synthetic-rock pellets into an inert medium.

Haggerty, S. E.↗

Structural Changes in Molten Salt Fuel and/or Waste Stream Compounds Cs 2 UCl 6 and Cs 2 UO 2 Cl 4 from Room Temperature to Melting and Related Materials [Slides]

Perovskite phases have been explored in recent literature as waste forms for long term storage of radioactive waste from molten salt reactors specifically. Synthesis of new halide perovskite phases can inform these efforts as well as molten salt reactor chemistry in general. Inorganic perovskites have also shown promise as new scintillating materials for detection of X-rays and gamma rays. Modifying the structure and chemistry of these compounds, perhaps with organic components, could be used to synthesize new scintillating compounds or modify the properties of existing ones. Both U 6+ and U 4+ readily form compounds with a striking similarity to vacancy ordered perovskites (Cs 2 UO 2 Cl 4 and Cs 2 UCl 6 ). Each of these compounds is relevant to molten salt reactor chemistry and/or waste streams. These phases could from in uranium chloride salt systems or waste streams: Cs being a fission product.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Update on Full-Scale Retrieval and Transfer System Testing for Pneumatic Conveyance of High-Level Calcine Waste - 20241

The Idaho National Laboratory processed spent nuclear fuel from 1953 to 1994. The process used solvent extraction to separate uranium, resulting in a liquid waste. A calcination process was used to convert the liquid waste to a high-level radioactive solid powder, referred to as calcine. The calcine is stored in stainless steel bins contained within concrete vaults called the Calcined Solids Storage Facilities. There are a total of seven CSSFs. The Calcine Retrieval Project is tasked with retrieving the calcine from the bins of CSSF 1 and pneumatically transferring it to the bins of CSSF 6. CSSF 1 was constructed to be a final calcine repository with no forethought of retrieval. It represents the greatest technical hurdle to calcine extraction of all the CSSFs. The challenges inherent with accessing the calcine, safely extracting it, and securely transporting it are copious and complex. Once the calcine is removed from CSSF1, that facility may be closed, reducing the footprint of waste storage at the INL. The same process for removing Calcine from CSSF1 may then be utilized to remove the calcine from the remaining CSSFs for final treatment and transport to a long-term storage facility. To overcome these inherent challenges with accessing CSSF 1 and extracting the calcine in a timely manner, a full-scale integrated mockup has been constructed. The mockup includes a full-size model of a concentric group of bins from CSSF 1 and a storage vessel representing CSSF 6. All essential elements of the transport design are represented in the Mockup, including motive and makeup air supply (air compressor), a replica of the CSSF6 cyclone, pre-filter, HEPA filter, vacuum pump, and retrieval control devices. Construction on the Mockup was completed in 2018 and testing began in February 2019. It has already proven very beneficial to the CRP. Experience in running the Mockup have aided in the development of retrieval and transport methodologies and the selection of process parameter values. It has also uncovered some unforeseen technological challenges and will continue to be valuable to the testing team as these hurdles are overcome and the process is proven effective. Operations personnel have also benefitted from its use as a training tool and will continue to use the Mockup as a simulator to reproduce problems encountered during extraction and transfer of Calcine from CSSF 1. The knowledge gained during this process will also be of continued benefit as future work is done to remove various types of calcine from the remaining CSSFs. The methodology of safe and secure transfer of radioactive material may be of benefit to others throughout the U.S. Department of Energy complex. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Use of Multi-Attribute Utility Analyses to Assess Transportation Routes from ISFSIs - 20535

With two consolidated interim storage facilities for used nuclear fuel (UNF) having applied for storage licenses, there is the potential need to transport UNF in the U.S. from shutdown reactor sites to complete the site cleanup and from operating reactor sites who may be running out of storage options (e.g., spent fuel pools are nearly full and dry storage facilities are reaching licensed capacity). At some of the shutdown reactor sites, only the independent spent fuel storage installation (ISFSI) exists and often there remains a degraded transportation infrastructure for performing shipments from these sites. At other sites (e.g., operating reactor plants), the existing transportation infrastructure on the site is unchanged and sufficient for moving UNF, but the environment around the route may have changed (e.g., what was once a rural setting has transformed into a more urban setting) and/or local stakeholders want their input taken into consideration in UNF transportation activities. So, although preliminary evaluations have been performed to identify viable modes of transport from these sites using rail, barge, and/or heavy haul truck, if multiple options exist for moving the UNF from the site (e.g., multiple truck routes or a truck and a barge route both exist) then an evaluation that takes input from multiple stakeholders should be considered to identified the preference (e.g., ranking) of routes from a site. Orano has supported the development of several studies examining the viable routes for removing UNF from some of these sites and has utilized a multi-attribute utility analysis (MUA) to establish a ranking of routes and associated modes to move the UNF from the ISFSIs to a Class I rail carrier. The ultimate result from the MUA is a list(s) of the most to the least favored/preferred routes from the site. This paper provides an overview of the MUA methodology and provides an example of its application to a site with a shutdown reactor. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Development of the 3 m{sup 3} Low Level Radioactive Waste Container in Taiwan - 20037

Chinshan Nuclear Power Plant stopped its business operation in July, 2019, and Kuosheng Nuclear Power Plant will also be permanently shut down in 2023. Nuclear Reactor Facilities Regulation Act requires a nuclear facility must be dismantled in 25 years after being permanently ceased operation. According to the approved decommissioning plan of Chinshan Nuclear Power Plant and the proposed one of Kuosheng Nuclear Power Plant, the 3 m{sup 3} low level radioactive waste container is planned to store the low level radioactive wastes with higher radiation produced during the decommissioning. However, 3 m{sup 3} low level radioactive waste containers are not used or developed in Taiwan before. To meet such need, Institute of Nuclear Energy Research develops a new type of 3 m{sup 3} low level radioactive waste container and performs the corresponding analyses and tests based on Guidelines of Applying the Usage License of Low Level Radioactive Waste Containers and Regulations for the Safe Transport of Radioactive Material. In this article, it provides the information of the low level radioactive waste containers that have been approved or is under reviewing in Taiwan, and so do the design specifications of the developed 3 m{sup 3} waste container. Besides, the numerical evaluation and test results of the developed 3 m{sup 3} waste container are also included in this article. Based on the evaluation and test results, the developed 3 m{sup 3} waste container satisfies the requirements of the storage container and industrial package type 2. Institute of Nuclear Energy Research will submit the usage license applications to the authority this year, and the usage licenses would be granted in 2021, expectedly. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Lessons Learned from Hanford's Purex Tunnel 2 Structural Stabilization Project - 20509

In 2019, U.S. Department of Energy (DOE) contractor CH2M Hill Plateau Remediation Company (CHPRC) completed structurally stabilizing the Plutonium Uranium Extraction Plant (Purex) waste storage Tunnel 2 with engineered grout. This action significantly reduced risk to Hanford workers, the surrounding community and environment by preventing future collapse of the tunnel and possible release of radioactive materials. Decades of plutonium production at the Purex facility required construction of two large underground tunnels for storage of highly contaminated plutonium processing equipment that had failed during the operation of Purex and other facilities across the Hanford Site. Following the partial collapse of Purex Tunnel 1 on May 9, 2017, DOE and CHPRC took immediate action to safely stabilize the collapsed section of the tunnel. The hole in the tunnel was filled the next day as a temporary stabilization measure, and no contamination was detected as a result of the partial collapse of the tunnel. Workers then stabilized Tunnel 1 in its entirety by filling with engineered grout, which also encapsulated the radioactive equipment and railcars within the tunnel. Grouting eliminated the risk of further collapse and stabilized the tunnel contents, all while not precluding future remedial actions or final closure decisions. While conducting an integrity analysis of Tunnel 1 by using construction drawings, photos and other historical documents, project teams also analyzed the much larger Purex Tunnel 2. The analysis found Tunnel 2 did not meet current codes for structural integrity, and it may not be able to bear the weight of the soil above the tunnel. Therefore, it was determined that Tunnel 2 was also at risk of collapse. DoE's independent panel of experts determined grouting to be the best choice for stabilizing Tunnel 2 because it provides the highest level of stability and protection, and does not preclude future remedial actions. DOE authorized CHPRC to commence work and the Purex Tunnel 2 Structural Stabilization Project was launched in December of 2017. The paper will discuss the process of recognizing the following critical aspects and risks associated with stabilizing Tunnel 2, and the actions taken by the project team to mitigate these risks, including: - Tunnel investigation and data collection to assist with future remediation; - On-site batching and mock-ups to provide the large quantity of grout required for stabilizing the tunnel; - Workforce involvement and innovative actions that mitigated the project's most significant potential hazards, including traffic control; - Project team high level of execution translated into successful project execution. Sharing lessons learned from this critical risk-reduction effort can enhance the safety and efficiency of other complex and hazardous projects across the DOE complex. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Investigating Uranium Corrosion in Magnesium-containing Sludge Using X-ray Tomography - 20042

One of the current primary concerns within the British nuclear community is the decommissioning of legacy storage ponds in Sellafield Cumbria, where nuclear fuel cladding material (a Mg-Al alloy) resides along with fuel metallic swarf. Corrosion of the immersed metallic elements, which has been occurring over the storage period, has resulted in the formation of what is commonly known as Corroded Magnox Sludge. The behaviour of uranium metal within this particular environment and, more significantly, the identity of the corrosion products that may have formed is currently unknown. The present study attempts to shed some light on these aspects by investigating simplified surrogate systems, mimicking storage ponds. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Viability of In-Drum Treatment for Transuranic Wastes Containing Nitrates and Organics - 20406

In February of 2014, a breach in a waste drum stored at the Waste Isolation Pilot Plant resulted in the release of radioactive material into the immediate surroundings and outside of the plant. The waste drum contained a mixture of an organic absorbent and nitrate salts that pressurized the drum, eventually causing the drum lid to fail, leading to the adverse event. Other waste drums with similar contents exist posing both storage and treatment risks. These drums may successfully be treated by an in-drum treatment system. This paper considers the design and operation of an in-drum treatment system and the characteristics of waste containing organics and nitrates to evaluate the viability of treatment. A description of the system, how it is operated, and a summary of previous testing performed is provided. Treatment of both liquids and absorbed liquids comprised of organics and nitrates is addressed. Viability of treatment is demonstrated by presenting operational methods and design strategies to ensure successful treatment of the waste drums. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Panel Session 134: Stakeholder Involvement in Consolidated ISF Storage, Disposal, and Transportation Initiatives

Planning of activities related to waste storage, transportation, and disposal requires involvement and engagement on the parts of both regulators and stakeholders. There have been challenges felt by both parties, which has led to discussions about how to best proceed with projects not just from a technical perspective, but how to create better relationships between the general public and scientific community. This panel was designed to highlight lessons learned, best practices, and next steps in anticipated projects. This panel focused on the current efforts undertaken by initiatives to involve stakeholders for the success of ISF Storage and Disposal facilities. For example, two license applications were submitted to the US NRC by two private entities - Interim Storage Partners (WCS, Inc, and Orano) and Holtec, Inc./ELLA - for consolidated ISF in West Texas and in NM (respectively). This panel discussed elements needed for success in engaging various stakeholders at all levels of the project life cycle, and can include lessons learned from previous projects. Panelists with presentations: Stakeholder Engagement in SNF Storage and Disposal (Miriam Juckett); Stakeholders, Siting and Nuclear Waste Disposal -Thoughts on a Path Forward (Jim Hamilton)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗